 For exchange of passengers and goods.
 For control of train movements.
 For taking fuels and water for locomotives.
 For changing engines and running staff.
 To allow trains to cross from opposite directions on a single
track.
 For attaching and removing wagons and compartments.
1. Drainage
2. Water Supply
3. Future Allowances
4. Gradient
5. Location or Horizontal Alignment
6. Vertical Alignment
7. Accessibility
8. Visibility
9. Facilities
Public Requirements
(i) Booking office
(ii) Platform
(iii) Waiting room
(iv) Arrangements for drinking water
(v) Retiring Room
(vi) Replacement Room
(vii)Sanitary arrangement
(viii)Lighting Arrangement
(ix) Enquiry office
(x) Public telephone
(xi) Name boards of station
(xii)Clock room
Traffic Requirements
(i) Machines for dating tickets
(ii) Weighing machine
(iii) Controlling and recording arrangement
for movement of trains
(iv) Sufficient number of sidings
(v) Suitable platform for loading, unloading
and storing of goods
Requirement of Locomotive
(i) Arrangement for supplying fuel,
water to engines
(ii) Arrangement for clearing and
examining the locomotives
(iii) Arrangement for inspecting vehicles
(iv) Turn table
(v) Residential accommodation
waiting room for loco staff
General Requirements
(i) Suitable approach road to the station
(ii) Provision of clocks showing correct time
(iii) Availability of coolies on the platform
Classification Based on
Operational Characteristics
Classification Based on
Functional Characteristics
(a) Block stations
(b) Non block stations
(c) Special class stations
(a) Wayside stations
(b) Junction Stations
(c) Terminal Stations
Block Stations
Class ‘A’ Station
Class ‘B’ StationClass ‘C’ Station
Non-Block Stations
Special Class Stations
Wayside Stations
Halt Station
Flag StationCrossing Station
Layout of a Wayside Station on Single LineLayout of a Wayside Station on Double Line TrackLayout of a Wayside Station on Triple Line Track
Junction Stations
At junction station, special arrangements are made to fulfill the
following requirements:
(a) To facilitate the interchange of traffic between main and
branch lines.
(b) To change the direction of engines.
(c) To reair and clean the train.
Terminal Stations
At terminal station following facilitates are provided:
(a) Turn-table or triangle for changing the direction of the engine.
(b) Fueling, watering and cleaning of engine.
(c) For dealing with good traffic.
Station yards systems of tracks laid within limits for
various purposes like receiving, storing, making up
trains etc. over which movement of trains is
controlled by prescribed rules, regulations and
signals.
Passenger Yards
Following are the main requirements of a passenger yard:
(i) Ticket booking office, enquire office, cloak room and luggage booking room.
(ii) Signals for receiving both up and down trains.
(iii) Space for parking all kinds of vehicles outside the station.
(iv) Signals for departure of trains.
(v) Facilities for passing a through-train at full speed without any interference.
(vi) Sufficient numbers of passenger platforms.
(vii) Sufficient number of siding with platforms.
(viii) Sufficient number of washing lines, sick lines and stabling lines.
(ix) Facilities for charging of train batteries.
Goods Yards
Following are the main requirements of a goods yard:
(i) Goods platforms for loading and unloading of goods.
(ii) Approach roads to each platform for movement of trucks.
(iii) Sufficient number of godowns for storing goods.
(iv) Cranes for loading and unloading of heavy goods.
(v) Weighing machine for weighing of goods.
(vi) Loading gauge to check the height and width of loaded wagon.
(vii) Booking office for booking of goods.
(viii) Gathering line taking off the main line or loop line with number of parallel
dead end sidings with buffer stops.
Marshalling Yards
The following are the drawbacks of marshaling yard:
(i) Traffic congestion at approaches to the yard due of continuous
shunting work in the yard.
(ii) Delay in transit of wagons.
(iii)Damage of wagons while shunting.
Flat YardsGravitational YardsHump Yards
Locomotive Yards
The following are the main requirement of a locomotive yard:
(i) It should be located near passenger yard and goods yard.
(ii) It should have sick siding for engines.
(iii) It should have facilities like ash pits, inspection pits, turn table, engine shed,
hydraulic jack etc.
(iv) It should have space and equipments for loading fuel in engines.
(v) It should have overhead tank for supply of water.
(vi) It should have space for future expansion.
Stations and Yards of Railway
Stations and Yards of Railway

Weitere ähnliche Inhalte

Was ist angesagt?

Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportationgayathrysatheesan1
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationMani Vel
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringLatif Hyder Wadho
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi ShahAditi Shah
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlockingsrinivas2036
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemBathla Tuition Centre
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional ElementsAkshathaBhandary
 

Was ist angesagt? (20)

Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi Shah
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 

Andere mochten auch

Railway engineering
Railway engineeringRailway engineering
Railway engineeringhiranrathva
 
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...Hossam Shafiq II
 
Geometric desing of railway track
Geometric desing of railway trackGeometric desing of railway track
Geometric desing of railway trackmohitjain123
 
Introduction to ground water hydrology
Introduction to ground water hydrologyIntroduction to ground water hydrology
Introduction to ground water hydrologyMohsin Siddique
 
2 handouts-lecture-7
2  handouts-lecture-72  handouts-lecture-7
2 handouts-lecture-7Saleem Malik
 
Precipitation and its estimation
Precipitation and its estimationPrecipitation and its estimation
Precipitation and its estimationMohsin Siddique
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurementMOHIT MAYOOR
 
Water cycle and water budget
Water cycle and water budgetWater cycle and water budget
Water cycle and water budgetMohsin Siddique
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )hiranrathva
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Topic%20 compression
Topic%20 compressionTopic%20 compression
Topic%20 compressionSaleem Malik
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesMohsin Siddique
 
steel structural basics
steel structural basicssteel structural basics
steel structural basicsAsan Ibrahim
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girdersSaleem Malik
 

Andere mochten auch (20)

Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
Geometric desing of railway track
Geometric desing of railway trackGeometric desing of railway track
Geometric desing of railway track
 
Introduction to ground water hydrology
Introduction to ground water hydrologyIntroduction to ground water hydrology
Introduction to ground water hydrology
 
Floods
FloodsFloods
Floods
 
2 handouts-lecture-7
2  handouts-lecture-72  handouts-lecture-7
2 handouts-lecture-7
 
Station yards
Station yardsStation yards
Station yards
 
Precipitation and its estimation
Precipitation and its estimationPrecipitation and its estimation
Precipitation and its estimation
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurement
 
Water cycle and water budget
Water cycle and water budgetWater cycle and water budget
Water cycle and water budget
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Topic%20 compression
Topic%20 compressionTopic%20 compression
Topic%20 compression
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examples
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
 
steel structural basics
steel structural basicssteel structural basics
steel structural basics
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
 

Ähnlich wie Stations and Yards of Railway

Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminalKapilLamba6
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...Hossam Shafiq I
 
CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering TANZEEL HABEEBULLA
 
ROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGmanashkedia098
 
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...Rohit894
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdfRaj Bakhtani
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptxBalpreetSingh47890
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptxashish502848
 
Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016Jayanta "Jay" Debnath
 
Automated Container Terminal Planning
Automated Container Terminal Planning Automated Container Terminal Planning
Automated Container Terminal Planning Larry Samson
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringAditya Mistry
 
1. railway track gauge
1. railway track gauge1. railway track gauge
1. railway track gaugeGaurav Jagad
 
chapter-4 Railway Station.pptx
chapter-4   Railway Station.pptxchapter-4   Railway Station.pptx
chapter-4 Railway Station.pptxMamushLeta
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway ConstructionHafizullah Sadat
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyAkshey Sharma
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottJumpingJaq
 

Ähnlich wie Stations and Yards of Railway (20)

Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminal
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering
 
Cv213
Cv213Cv213
Cv213
 
ROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYING
 
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016
 
Automated Container Terminal Planning
Automated Container Terminal Planning Automated Container Terminal Planning
Automated Container Terminal Planning
 
Container terminals (1)
Container terminals (1)Container terminals (1)
Container terminals (1)
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel Engineering
 
Geog 80 Topic 4.ppt
Geog 80 Topic 4.pptGeog 80 Topic 4.ppt
Geog 80 Topic 4.ppt
 
1. railway track gauge
1. railway track gauge1. railway track gauge
1. railway track gauge
 
chapter-4 Railway Station.pptx
chapter-4   Railway Station.pptxchapter-4   Railway Station.pptx
chapter-4 Railway Station.pptx
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway Construction
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
 

Kürzlich hochgeladen

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Kürzlich hochgeladen (20)

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Stations and Yards of Railway

  • 1. SOUVIK M ON DAL D.C.E. :-62
  • 2.  For exchange of passengers and goods.  For control of train movements.  For taking fuels and water for locomotives.  For changing engines and running staff.  To allow trains to cross from opposite directions on a single track.  For attaching and removing wagons and compartments.
  • 3. 1. Drainage 2. Water Supply 3. Future Allowances 4. Gradient 5. Location or Horizontal Alignment 6. Vertical Alignment 7. Accessibility 8. Visibility 9. Facilities
  • 4. Public Requirements (i) Booking office (ii) Platform (iii) Waiting room (iv) Arrangements for drinking water (v) Retiring Room (vi) Replacement Room (vii)Sanitary arrangement (viii)Lighting Arrangement (ix) Enquiry office (x) Public telephone (xi) Name boards of station (xii)Clock room Traffic Requirements (i) Machines for dating tickets (ii) Weighing machine (iii) Controlling and recording arrangement for movement of trains (iv) Sufficient number of sidings (v) Suitable platform for loading, unloading and storing of goods Requirement of Locomotive (i) Arrangement for supplying fuel, water to engines (ii) Arrangement for clearing and examining the locomotives (iii) Arrangement for inspecting vehicles (iv) Turn table (v) Residential accommodation waiting room for loco staff General Requirements (i) Suitable approach road to the station (ii) Provision of clocks showing correct time (iii) Availability of coolies on the platform
  • 5. Classification Based on Operational Characteristics Classification Based on Functional Characteristics (a) Block stations (b) Non block stations (c) Special class stations (a) Wayside stations (b) Junction Stations (c) Terminal Stations
  • 6. Block Stations Class ‘A’ Station Class ‘B’ StationClass ‘C’ Station
  • 9. Wayside Stations Halt Station Flag StationCrossing Station
  • 10. Layout of a Wayside Station on Single LineLayout of a Wayside Station on Double Line TrackLayout of a Wayside Station on Triple Line Track
  • 11. Junction Stations At junction station, special arrangements are made to fulfill the following requirements: (a) To facilitate the interchange of traffic between main and branch lines. (b) To change the direction of engines. (c) To reair and clean the train.
  • 12. Terminal Stations At terminal station following facilitates are provided: (a) Turn-table or triangle for changing the direction of the engine. (b) Fueling, watering and cleaning of engine. (c) For dealing with good traffic.
  • 13. Station yards systems of tracks laid within limits for various purposes like receiving, storing, making up trains etc. over which movement of trains is controlled by prescribed rules, regulations and signals.
  • 14. Passenger Yards Following are the main requirements of a passenger yard: (i) Ticket booking office, enquire office, cloak room and luggage booking room. (ii) Signals for receiving both up and down trains. (iii) Space for parking all kinds of vehicles outside the station. (iv) Signals for departure of trains. (v) Facilities for passing a through-train at full speed without any interference. (vi) Sufficient numbers of passenger platforms. (vii) Sufficient number of siding with platforms. (viii) Sufficient number of washing lines, sick lines and stabling lines. (ix) Facilities for charging of train batteries.
  • 15. Goods Yards Following are the main requirements of a goods yard: (i) Goods platforms for loading and unloading of goods. (ii) Approach roads to each platform for movement of trucks. (iii) Sufficient number of godowns for storing goods. (iv) Cranes for loading and unloading of heavy goods. (v) Weighing machine for weighing of goods. (vi) Loading gauge to check the height and width of loaded wagon. (vii) Booking office for booking of goods. (viii) Gathering line taking off the main line or loop line with number of parallel dead end sidings with buffer stops.
  • 16. Marshalling Yards The following are the drawbacks of marshaling yard: (i) Traffic congestion at approaches to the yard due of continuous shunting work in the yard. (ii) Delay in transit of wagons. (iii)Damage of wagons while shunting.
  • 18. Locomotive Yards The following are the main requirement of a locomotive yard: (i) It should be located near passenger yard and goods yard. (ii) It should have sick siding for engines. (iii) It should have facilities like ash pits, inspection pits, turn table, engine shed, hydraulic jack etc. (iv) It should have space and equipments for loading fuel in engines. (v) It should have overhead tank for supply of water. (vi) It should have space for future expansion.