CEB Quality Leadership Council
Drive Superior Supplier
Quality Outcomes
19 May 2015
A Framework for Member Conversations
The mission of The Corporate Executive Board Company (CEB) and its affiliates is to unlock the potential of organizations and leaders by advancing the science and practice of management.
When we bring leaders together, it is crucial that our discussions neither restrict competition nor improperly share inside information. All other conversations are welcomed and encouraged.
Confidentiality and Intellectual Property
These materials have been prepared by CEB for the exclusive and individual use of our member companies. These materials contain valuable confidential and proprietary information
belonging to CEB, and they may not be shared with any third party (including independent contractors and consultants) without the prior approval of CEB. CEB retains any and all
intellectual property rights in these materials and requires retention of the copyright mark on all pages reproduced.
Legal Caveat
CEB is not able to guarantee the accuracy of the information or analysis contained in these materials. Furthermore, CEB is not engaged in rendering legal, accounting, or any other
professional services. CEB specifically disclaims liability for any damages, claims, or losses that may arise from a) any errors or omissions in these materials, whether caused by CEB or its
sources, or b) reliance upon any recommendation made by CEB.
 3
© 2015 CEB. All rights reserved. QUAL2565215SYN
ROADMAP FOR THE PRESENTATION
Measure Supplier
Performance
Introduction Improve Suppliers Next Steps and Q&A
 4
© 2015 CEB. All rights reserved. QUAL2565215SYN
Revenue Expectations Cost Pressure
0%
50%
100%
2%6%
10%
15%
41%
19%
7%
1%
4%
8%
20%
43%
18%
6%
INTENSE PRESSURES DESPITE SUPPLY RISKS
Business Executive Expectations of Revenue Growth and Cost Pressure in Next 12 Months
Q4 2014 Business Barometer Survey
Business Executive Expectations of Supply Chain Disruptions in Next 12 Months
Q4 2014 Business Barometer Survey
Much Higher
Higher
Somewhat Higher
No Change
Somewhat Lower
Lower
Much Lower
Decreased
Same
Increased
Supply Chain Disruption
0%
50%
100%
35%
56%
9%
n = 332.
Source:	CEB 2014 Business Barometer Survey.
n = 1,938.
Source:	CEB 2014 Business Barometer Survey.
Companies expect to fuel
growth through increased
efficiencies as cost
pressures remain.
■■ However, few expect supply
chain risks to change over the
next 12 months.
■■ This pressure to perform, while
containing costs, can lead to an
unintentional oversight of key
risk assessment and reduction
strategies.
 5
© 2015 CEB. All rights reserved. QUAL2565215SYN
INSUFFICIENT SUPPLIER OVERSIGHT INCREASES COSTS
Estimated Costs Incurred by Accelerator Pedal and Floor Mat Recalls
Toyota Motor Corporation, in Billions of US Dollars
Product recall and
repair costs
Estimated lost sales.
The recall is estimated
to have dented demand
by 10,000 vehicles.
National Highway Traffic
Safety Administration
fines for not notifying
the agency in a timely
manner of problems.
Settlement costs
related to complaints of
unintended acceleration.
$1.1 $0.8 $0.08 $1.10
Source:	Tomoko A. Hosaka, “Toyota Recalls May Cost Automaker $5.5 Billion.” NBCNews.com, 10 March 2013, www.nbcnews.com/id/35893905/ns/business-
autos/t/toyota-recalls-may-cost-automaker-billion; Mike Ramsey, “Toyota in $5.5 Billion Gas Pedal Settlement,” The Wallstreet Journal, 27 December
2013, https://online.wsj.com/article/SB10001424127887324669104578203440990704994.html.
Insufficient supplier
oversight has overt costs
that impact profitability.
■■ Toyota’s 2009 recalls for
accelerator pedals and floor
mats cost the company an
estimated $3 billion.
 6
© 2015 CEB. All rights reserved. QUAL2565215SYN
BUILD SUPPLIER QUALITY MANAGEMENT CAPABILITIES
Supplier Quality Management Maturity Curve
■■ Led by
Procurement
■■ Ad hoc program
■■ Led by Quality
■■ Introduces
supplier self-
assessments
■■ Uses on-
site audits
occasionally
■■ Limits supplier
development
■■ Uses standard
qualification and
auditing process
■■ Establishes
standard
criteria to
identify supplier
performance
issues
■■ Prioritizes
supplier
development
activities
■■ Measures
supplier
performance
■■ Uses supplier risk
profiles
■■ Audits for
strategic
management
criteria
■■ Develops
suppliers
on strategic
activities
■■ Establishes
a shared risk
prioritization
framework with
procurement
■■ Integrates
activities into
corporate
risk and audit
programs
■■ Assesses and
audits for culture
and corporate
management
practices
■■ Uses supplier
performance to
inform business
continuity
planning and
customer
experience risk
assessments
Basic Emerging Intermediate Advanced World-Class
Source:	CEB analysis.
Quality organizations
move through five levels of
maturity as they strive for
world-class supplier quality
management.
■■ Supplier quality management
often begins as a procurement-
led activity, but at world-
class companies it eventually
integrates with other
assurance activities related
to corporate risk.
 7
© 2015 CEB. All rights reserved. QUAL2565215SYN
Measure Supplier
Performance
Introduction Improve Suppliers Next Steps and Q&A
ROADMAP FOR THE PRESENTATION
 8
© 2015 CEB. All rights reserved. QUAL2565215SYN
THE CURRENT STATE OF SUPPLIER PERFORMANCE
MEASUREMENT
“Measure Supplier Performance” Importance Versus Maturity Score
Average Score
Quality executives recognize
the importance of measuring
supplier performance, but
maturity lags.
■■ Measure Supplier Performance:
Approaches used to measure
the performance of existing
suppliers.
Level 1 Level 2 Level 3 Level 4 Level 5
Quality measures
supplier performance
locally according to
incoming inspections
and quality issues.
Quality measures
supplier
performance locally
according to their
ability to consistently
deliver products
that meet product
specifications.
Quality uses a
single consistent
framework for
measuring supplier
performance to
assess a supplier’s
ability to meet
several operational
expectations.
Quality provides
supplier
performance inputs
to an integrated
supplier scorecard
that is used globally
to track and
compare supplier
performance across
all elements of the
relationship.
Supplier performance
reports are integrated
into corporate risk
reports and inform
business continuity
planning and
customer loyalty risk
assessments.
n = 24.
Source:	CEB Quality 2014 Functional Maturity Diagnostic.
Importance Maturity
3.38
2.55
Very Important
5.0
4.0
3.0
2.0
1.0
0.0
 9
© 2015 CEB. All rights reserved. QUAL2565215SYN
INTEGRATED SCORECARD DEVELOPMENT BEST
PRACTICES
Principles Benefits
Involve internal business partners before
developing scorecard.
Demonstrates how scorecard focuses on elements
business partners care about (i.e., metrics beyond
quality).
Create category-based scorecards.
Enables analysis of similar suppliers in an apples-
to-apples fashion.
Focus on the “critical few” KPIs (approximately
three to five per metric).
Maintains focus on the most important drivers
of supplier performance.
Select KPIs that are within the organization’s
control.
Measures outcomes that can be influenced by
the organization and the supplier.
Use a mix of both quantitative and qualitative KPIs.
Contributes to a fact-based scorecard while
allowing for day-to-day user perception.
Incorporate existing KPIs and/or SLAs where
appropriate.
Encourages adherence to existing contract terms
and conditions.
Automate data collection, aggregation, and
reporting.
Creates a scalable performance management
process.
Source:	CEB analysis.
Use a standardized supplier
scorecard effectively
manage suppliers.
 10
© 2015 CEB. All rights reserved. QUAL2565215SYN
DEVELOP SCORECARD WITH BUSINESS PARTNER INPUT
Participants
■■ Share opinions
■■ Help determine criteria for
supplier key performance
indicators
Administrator
Organizes the meetings
Takes notes and distributes
to all participants
Facilitator
Creates meeting agenda
Keeps participants focused on
meeting goals
Drives decision making process
Sponsor
Ensures proper people
attend the workshop
Ensures performance
criteria meet overarching
business objectives
Source:	CEB analysis.
Source:	CEB analysis.
Ask probing questions to surface business partners’ performance expectations for a category of suppliers, such as:
■■ What equates to satisfactory performance for suppliers in this category?
■■ If we hired a new supplier today, how could they make an immediate positive impact? What defines a negative
impact?
■■ Are there any existing measurements you are tracking that define supplier success in this category (i.e., SLAs, other
pre-defined expectations)?
■■ What causes you heartache with suppliers in this category?
■■ What aspects of your supplier interactions should be measured in a scorecard?
■■ What do high performing suppliers in this category do that lower performing suppliers don’t?
■■ When you come across situations where a supplier can improve, what typically causes you to think that?
Use a workshop to get
business partner input to
scorecard development.
■■ Include both Quality staff
and business partners with
knowledge of the supplier
relationships.
 11
© 2015 CEB. All rights reserved. QUAL2565215SYN
SCORECARD STRUCTURE: METRICSQuality provides inputs
to a standard, integrated
supplier scorecard.
■■ The sample scorecard uses six
standard metrics designed to
answer the following questions.
■■ Cost: Is the expected value
being received?
■■ Delivery and Support: How
reliable is the supplier? Do they
meet established time frames?
■■ Flexibility and Ease of Doing
Business: How “well run” is the
supplier? Is billing accurate?
■■ Quality: Does product and
service meet expectations?
■■ Partnership: Is the supplier
proactive? Do they provide
strategic guidance?
■■ Risk and Compliance: Does
the supplier mitigate risk? Do
they comply with company
standards?
Metric
Metric Weight
Percentage
KPI KPI Measurement
Cost 30%
Price Competitiveness Ranking compared to competitors
Discounts and Value-Add
Supplier proactively identifies volume discounts and other
price-reducing options
Transparency in Negotiations Provides transparency into its cost breakdowns
Delivery
and
Support
25%
Problem Resolution
Supplier is willing to take ownership of day-to-day issues
and problems
On-Time Delivery Degree to which hardware orders are delivered on time
Service Dependability Degree to which hardware service calls are completed on time
Order Accuracy Degree to which supplier fills orders accurately
Flexibility
and Ease
of Doing
Business
10%
Invoice Accuracy Degree to which supplier provides error-free invoices
Invoice Timeliness Invoices are provided in a timely manner
Account Management
Responsiveness
Supplier’s account management team quickly responds to requests
Usefulness of Reporting
Reports contain clear, concise, and actionable information including
performance, financial performance data, or trend information as
appropriate
Order Modifications
Supplier is able to accommodate order changes without significant
impact from delays
Quality 20%
Quality of Product Quality of product against requirements
Mean Time to Repair (MTTR) MTTR statistics against requirements
Reliability Mean time between failures against expectations
Warranty/Maintenance Number of warranty claims and defects
Resource Quality
Ability of resources to install and/or repair hardware based
on contractual obligations
Partnership 10%
Provision of Innovative Solutions Proactive provision of valuable and innovative solutions
Business Alignment
Supplier’s recommendations reflect their understanding of our
business objectives
Technology Supplier uses leading-edge technology in its products
Risk and
Compliance
5%
Product Safety Products function in accordance with industry safety standards
Business Alignment Supplier supports our diversity goals
Source:	CEB analysis.
 12
© 2015 CEB. All rights reserved. QUAL2565215SYN
Metric
Metric Weight
Percentage
KPI KPI Measurement
Quality 20%
Quality of Product Quality of product against requirements
Mean Time to Repair (MTTR) MTTR statistics against requirements
Reliability
Mean time between failures against
expectations
Warranty/Maintenance Number of warranty claims/defects
Resource Quality
Ability of resources to install and/or repair
hardware based on contractual obligations
SCORECARD STRUCTURE: KEY PERFORMANCE
INDICATORS (KPIs)
KPI Evaluation Criteria
If a KPI is effective, you should be able to answer “yes”
to many of the following questions:
■■ Does it align with business objectives?
■■ Is it actionable?
■■ Is it quantitative and objective?
■■ Is it contractual?
■■ Is it well defined, including rating system?
■■ Is it controllable?
■■ Will it drive desired behavior?
■■ Is reliable data reasonably efficient to obtain?
Source:	CEB analysis.
Identify three to five critical
few KPIs per metric.
 13
© 2015 CEB. All rights reserved. QUAL2565215SYN
Metric
Metric Weight
Percentage
KPI KPI Measurement
Quality 20%
Quality of Product Quality of product against requirements
Mean Time to Repair (MTTR) MTTR statistics against requirements
Reliability
Mean time between failures against
expectations
Warranty/Maintenance Number of warranty claims/defects
Resource Quality
Ability of resources to install and/or repair
hardware based on contractual obligations
SCORECARD STRUCTURE: KPI MEASUREMENTS
KPI Measurement Considerations
Consider the following questions when selecting
KPI measurements:
■■ What am I trying to measure?
■■ Who can provide this data?
■■ How often does the data change?
■■ Who or what is the data source?
Source:	CEB analysis.
Define standard KPI
measurement criteria
for clarity across the
organization.
 14
© 2015 CEB. All rights reserved. QUAL2565215SYN
PANELIST
Simone Silva
Director of Quality North America
Whirlpool Corporation
Simone Silva is currently the Director of Quality for Whirlpool in North
America. Simone is responsible for the definition of the strategy for
supplier development in North America and its execution, leading a team
of approximately 60 people working with 1400 suppliers and supporting
the 12 plants of Whirlpool in the US and in Mexico.
Simone has over 18 years of experience in Quality and Service, 11 years in
Automotive and 7 years at Whirlpool Corporation, having had important
international assignments in China, Germany and Mexico.
 15
© 2015 CEB. All rights reserved. QUAL2565215SYN
SUPPLIER QUALITY RISK RATING DEFINITION AND APPLICATION
Before
■■ No standardized quality metric across different regions
■■ All available metrics were single focused, PPM, A-Defect, field,
warranty cost
■■ Multiple KPIs used by different stakeholders to assess supplier
quality
■■ No assessment of supplier competencies to support quality
■■ As a result quality not consistently considered as a factor in business
decisions
After
■■ Balanced criteria for supplier quality assessment composed by
performance and competence metrics
■■ Stakeholder alignment on single criteria
■■ Standardized criteria used to assess global suppliers in different
marketing regions
■■ Supplier risk rating used to prioritize training and supplier
development initiatives
■■ Supplier risk rating used as the single source of quality input for
supplier selection
February March April May June July August
Supplier Risk Rating—Definition/Alignment
Execution—Use of Risk Rating (New Launches and Existing Products)
SDE PDPs SDE On-Boarding Supplier Training
Whirlpool Quality Vision
Undisputed Quality Leader: Recognizably the Best, and Differentiated
Versus Competition
Global Strategic Sourcing Mission
Quality Parts and Services, Sourced and Delivered on Time, from the
Right Supplier, at the Right Cost
Source:	Whirlpool Corporation.
 16
© 2015 CEB. All rights reserved. QUAL2565215SYN
THE TOOL—SUPPLIER QUALITY RISK RATING
■■ Assessment performed by the SDE responsible for the Commodity on the corresponding market region
■■ Criteria for scoring defined for each individual metric
■■ Hard metrics from the corporate data systems, SAP, ONTRAC
■■ Cross-functional collaboration encouraged for the competence assessment
■■ Risk rating available to all functions interacting with suppliers on a web-based system
Source:	Whirlpool Corporation.
Scoring for Associated Risk
Risk Scoring Range
Low Risk
Total score between 80 to 100
points is considered Low Risk
Medium Risk
Total score between 60 to 79 points
is considered Medium Risk
High Risk
Total score below 60 points is
considered High Risk
70 points of scoring for
associated Risk
30 points of scoring for
associated Risk
SUPPLIER PERFORMANCE SUPPLIER CAPABILITY
QUALITY RISK
ASSESSMENT
Contribution to
Total Regional
PPM
Total
Regional CAL
Occurrence
Sir/Field
Failures Last 12
Months
PPM Trend CAL Trend 8D
W-PPAP
FPY
Process
FMEA
FSA
Risk
Value
Risk
9 0.03% 7 3 12 N 0 11,299 6 5 9 3 4 2 52
High
Risk
 17
© 2015 CEB. All rights reserved. QUAL2565215SYN
QUALITY RISK SCORING
Supplier Performance
Risk
Contribution to TOT
Regional PPM
TOT Regional CAL
Occurrences
SIR/Field Failures
Last 12 Months
PPM Trend CAL Trend
Contribution to PPM <.1%
and PPM <150:
PPM 0 = 10 pts
PPM <.05% = 9 pts
PPM .05–.1% = 8 pts
CAL<1 Occurrences
CAL 0 = 10 pts
CAL 1 = 8 pts
No (FF) Field Failures in the last 12 month:
0 Field Failures and 0 CAL = 14 pts
0 Field Failures and CAL>0 = 12 pts
Supplier PPM <150
Trends down on 6 and 3 months
rolling PPM with >40% imp = 18 pts
Trends down on 6 and 3 months
rolling PPM with >30% imp = 16 pts
Trends down on 6 and 3 months
rolling PPM with >20% imp = 14 pts
Suppliers under 50 PPM
automatically get full 18 points
Trends down on 6 and 3 months
rolling with >40% imp = 18 pts
Trends down on 6 and 3 months
rolling with >30% imp = 16 pts
Trends down on 6 and 3 months
rolling with >20% imp = 14 pts
Suppliers with 1 or less CAL
automatically get full 18 points
Contribution to PPM <..4%
and PPM <500:
PPM .11–.2% = 7 pts
PPM .21–.4% = 6 pts
CAL <6 Occurrences
CAL 2–3 = 7 pts
CAL 4–6 = 6 pts
Field failures (FF) in last 12 month with minimal effect to
customer due to timely and robust countermeasures
(10 pts)
Supplier PPM <500
Trends down on 6 and 3 months
rolling PPM with >10% imp = 12 pts
Trends down on 6 and 3 months
rolling PPM with <10% imp = 11 pts
PPM with 0 imp = 10 pts
Suppliers 150–200 PPM
Automatically get full 12 Points
Trends down on 6 and 3 months
rolling CAL with >10% imp =
12 pts
Trends down on 6 and 3 months
rolling CAL with <10% imp =
11 pts
CAL with 0 imp = 10 pts
Suppliers with 2–3 CAL
automatically get full 12 Points
Contribution to PPM >.4%
and PPM >500:
PPM .41–.5 = 5 pts
PPM .51–.6% = 4 pts
PPM .61–.8% = 3 pts
PPM .81–1% = 2 pts
PPM 1.01–1.5% = 1 pts
PPM>1.5% = 0 pts
Contribution to CAL >6
Occurrences
CAL 7 = 5 pts
CAL 8–10 = 4 pts
CAL 11–12 = 3 pts
CAL 13 = 2 pts
CAL 14–15 = 1 pts
CAL> 15 = 0 pts
Field Failures (FF) in the last 12 month with significant
customer impact:
Field Failures with medium customer impact and support
cooperation = 8 pts
Field Failures with high customer impact and support
cooperation = 6 pts
Multiple part families with Field Failures from supplier = 4 pts
Fail Failures with medium customer impact and poor support
cooperation = 2 pts
Field Failures with high impact on customer and poor
support cooperation = 0 pts
Supplier PPM >500
PPM Increasing <5% = 8 pts
PPM Increasing <10% = 6 pts
PPM Increasing <15% = 4 pts
PPM Increasing <20% = 2 pts
PPM Increasing >20% = 0 pts
PPM >1000 is automatically 0 pts
Supplier CAL >6 CAL
CAL Increasing <5% = 8 pts
CAL Increasing <10% = 6 pts
CAL Increasing <15% = 4 pts
CAL Increasing <20% = 2 pts
CAL Increasing >20% = 0 pts
CAL>15 is automatically 0 pts
Contrib 10 pts 10 pts 14 pts 18 pts 18 pts
70 points of scoring for associated
risk based on performance.
Source:	Whirlpool Corporation.
Note:	These are guidelines—SDEs still need to use critical thought.
 18
© 2015 CEB. All rights reserved. QUAL2565215SYN
QUALITY RISK SCORING
Supplier Capabilities
Risk
Problem Solving
(8D)
Perfect Launch
(PPAP/FPY)
Process Control
(Process FMEA)
Continuous Improvement
(Focus Supplier)
Use of proper tools with all issue closure less
than 30 days and no repeat issues
(9–12 Points)
Above 90% FPY on PPAP submissions and no
issues in first 90 days
(5–6 Points)
Process FMEA present with active RPN
reduction activities and robust control plans
(5–6 Points)
Not on focus supplier with good quality
performance
(5–6 Points)
Use of proper tools with average closure less
than 30 days with minimal repeat issues
(7–8 Points)
70–89% FPY on PPAP submissions with minor
issues in first 90 days and prompt reaction
(4 Points)
Process FMEA present with active RPN
reduction activities and robust control plans
(5–6 Points)
Quality trends indicate lack of continuous
improvement
(3–4 Points)
Lack of use of proper tools with average
closure greater than 30 days and numerous
repeats
(0–6 Points)
Below 70% FPY on PPAP submissions with
poor reaction
(0–3 Points)
No FMEA or failure mitigation methods and/or
poor process control
(0–3 Points)
On the focus supplier program due to
performance or deteriorating quality levels
(0–2 Points)
Contrib 12 pts 6 pts 6 pts 6 pts
30 points of scoring for associated
risk based on capability.
Source:	Whirlpool Corporation.
 19
© 2015 CEB. All rights reserved. QUAL2565215SYN
PROCESS GOVERNANCE
Process Update
■■ All Supplier Risk Rating to be updated every six months
(Mid-Year [June–July]–End Year [December–January])
■■ If it is deemed appropriate, a supplier review board
should be scheduled for a rating review out of the
scheduled update windows:
–– Commodity manager should attend
–– Quality representative for the supplier and requesting
region should attend and present data justifying the
change
–– Regional Quality leader can attend as optional
■■ SDEs should always practice judgment while applying
the criteria
■■ SDEs should collaborate with process partners to assess
supplier competence
■■ SDEs are responsible to define quality roadmaps by
commodity based on the Risk Rating
■■ Before asking for an unplanned update, the regional SDE
should evaluate the following:
–– Are we reacting to a special cause event (single data
point)?
–– Is the change in risk based sustainable improvement
or confirmed performance degradation (3+ months)?
SDEs Responsibility
Source:	Whirlpool Corporation.
 20
© 2015 CEB. All rights reserved. QUAL2565215SYN
Measure Supplier
Performance
Introduction Improve Suppliers Next Steps and Q&A
ROADMAP FOR THE PRESENTATION
 21
© 2015 CEB. All rights reserved. QUAL2565215SYN
THE CURRENT STATE OF SUPPLIER PERFORMANCE
IMPROVEMENT
“Improve Suppliers” Importance Versus Maturity Score
Average Score
Quality executives
recognize the importance of
supplier improvement, but
maturity lags.
■■ Improve Suppliers: Practices
used to ensure the suppliers
improve their capabilities and
performance over time.
Level 1 Level 2 Level 3 Level 4 Level 5
Quality reacts to
supplier issues that
disrupt operational
processes with
limited and targeted
support to fix the
immediate issue.
Quality offers
unmetered support
to critical suppliers
with chronic poor
performance.
Quality uses
established
relationship and
performance
criteria to identify
suppliers who
need improvement
and helps them
improve systems and
processes.
Quality uses
an established
risk framework
to prioritize
suppliers requiring
improvement on
both operational and
strategic activities.
Quality identifies
select Tier 1 suppliers
to collaboratively
improve culture
of quality and the
quality of corporate
management
practices.
n = 24.
Source:	CEB Quality 2014 Functional Maturity Diagnostic.
Importance Maturity
5.0
4.0
3.0
2.0
1.0
0.0
3.35
2.31
Very Important
© 2015 CEB. All rights reserved. QUAL2565215SYN
 22
OVERVIEW
Rolls-Royce plc operates in four global markets: civil aerospace, defense aerospace, marine, and energy. It is investing
in technology and capability that can be exploited in each of these sectors to create a competitive range of products.
The success of these products is demonstrated by the company’s rapid and substantial gains in market share during
recent years. As a result, engine deliveries have grown and the company now has a total of 54,000 gas turbines in
service worldwide. The investments in product, capability, and infrastructure to gain this market position create high
barriers to entry.
GUIDING PRINCIPLES
■■ To ensure supplier performance and improvement, the company must establish structure for performance measures,
reporting, analysis, and issue resolution.
■■ Standardizing language, information, processes, and roles is as important among internal parties as with suppliers.
COMPANY SNAPSHOT
Rolls-Royce plc
Industry: Aerospace, Power
Systems, and Defense
Rolls-Royce has a broad customer base comprising more than 500 airlines,
4,000 corporate and utility aircraft and helicopter operators, 160 armed
forces, and more than 2,000 marine customers, including 50 navies. The
company has energy customers in nearly 120 countries. Rolls-Royce employs
40,000 people in more than 50 countries.
2011 Sales: ÂŁ11 Billion
Employees: 40,000
Headquarters: London
SYSTEMATIC SUPPLIER PERFORMANCE MANAGEMENT
 23
© 2015 CEB. All rights reserved. QUAL2565215SYN
SYSTEMATIC SUPPLIER PERFORMANCE
MANAGEMENT
Practice Components
Rolls-Royce creates global
standards for consistent
assessment, management,
and communication of
supplier performance.
Potential
Continuous
Improvement
Roadblocks
Practice
Components
Inconsistent/
Unreliable Data
Standards
Performance
Issues Not
Addressed
Adequately
Uncoordinated
or Inefficient
Measurement
Activity
Suppliers Lack
Awareness of
Performance
Standards
Component 1:
Comprehensive
Metric Dictionary
Easy-to-use
metrics dictionary
standardizes
all aspects of
performance
assessment.
Component 3:
“Three-in-One”
Escalation Process
Systematic
underperformance
resolution
process with
escalation triggers
involves/assigns
appropriate skills
and activities.
Component 2:
Supplier
Measurement
Road Map
Process map sets
out discrete tasks,
owners, and data
requirements.
Component 4:
Supplier Training
and Tools
Training sessions
and online tools
for suppliers
foster awareness
of performance
requirements.
“We have developed
cross-checks and
methods to ensure that
our data is world class, enabling
us to use this information to make
important business decisions.”
Rick Wells
Supplier Support Leader
Rolls-Royce
Source:	Rolls-Royce Holdings; CEB analysis.
 24
© 2015 CEB. All rights reserved. QUAL2565215SYN
RIGOROUS PERFORMANCE IMPROVEMENTA systematic process
formalizes issue resolution
actions and triggers for
escalating to higher levels
as new capabilities are
required.
Level 3:
Fundamental Redesign
Level 2:
Improve Overall
Performance
Level 1:
Make Immediate
Improvements
Level 0:
Restore the
Status Quo
■■ Purpose: Verify adherence
to established process and
product specifications.
■■ Owner: Local Area
Manager
■■ Duration: Two weeks
■■ Purpose: Analyze process,
product, or system to
identify root cause.
■■ Owner: Specialist
■■ Duration: Three weeks
■■ Purpose: Deploy cross-
functional team to address
complex/broad problem.
■■ Owner: Local Area
Manager Plus Specialist
■■ Duration: Five weeks
■■ Purpose: Involve
senior management
to determine redesign
or supplier change.
■■ Owner: BU Director,
Specialist, and Local
Area Manager
■■ Duration: Indefinite
Trigger: Fundamental
redesign may be required
to resolve issue.
Trigger: Cross-functional
team is needed to
resolve root cause.
Trigger: Problem is still
evident after status quo
restored.
3
2
1
Source:	Rolls-Royce Holdings; CEB analysis.
 25
© 2015 CEB. All rights reserved. QUAL2565215SYN
ACTIONABLE CONTINUOUS IMPROVEMENT PLAN
Escalation Gantt Chart
Illustrative
“Time-boxed” process steps
promote thoroughness
while maintaining progress.
Tasks and Milestones Owner Mandatory Support Status February March April May
3 10 17 24 3 10 17 24 1 7 14 21 28 3
Level 0: Restore the Status Quo
Verify adherence to established process and product specifications.
Problem Definition Rolls-Royce Supplier Completed
Containment Action Supplier Completed
Customer Protection Supplier Local Area Manager Completed
Process Adherence Review Supplier Local Area Manager Completed
Specification Conformity
Review
Supplier Completed
Adherence/Conformity
Results Analysis
Supplier Completed
Resolution Plan Definition/
Development
Supplier Completed
Level 1: Make Immediate Improvements
Analyze process, product, or system to identify root cause.
Root-Cause Analysis Supplier Specialist Completed
Customer Protection
Review
Supplier Rolls-Royce Completed
Improvement Plan
Implementation
Supplier Local Area Manager Completed
Progress Monitoring Supplier Completed
Level 2: Improve Overall Performance
Deploy cross-functional team to address complex/broad problem.
Integrated Team
Resources Identification
and Formation
Supplier Specialist, Local Area
Manager
Completed
Additional Root-Cause
Analysis
Supplier Specialist Completed
Customer Protection
Review
Supplier Specialist Completed
Process Improvement
Plan Definition and
Implementation
Supplier Specialist, Local Area
Manager
Completed
Progress Monitoring Supplier Local Area Manager Completed
Level 3: Fundamental Redesign
Involve senior management to determine redesign or supplier change.
Level 2 Business Care
Consideration
Supplier Three-in-One
Receiver, Specialist,
Local Area Manager,
BU Director
In Progress
Redesign Decision-Making
Process
Supplier,
Specialist, Local
Area Manager,
BU Director,
three-in-one
Receiver
Not
Started
Hard timescales
maintain process
discipline and
discourage
premature closure.
Source:	Rolls-Royce Holdings; CEB analysis.
 26
© 2015 CEB. All rights reserved. QUAL2565215SYN
CONTINUOUS IMPROVEMENT PLAN SAMPLE TEMPLATE GUIDE
Supplier: __________________
Date: __________________
Purpose: __________________
Priority Metric KPIs
Targeted
Current
Score
Target
Score
Improvement
Initiatives
Action
Step(s)
Owner Target
Date
Date
Completed
Status/Notes
1
2
3
4
5
Source:	CEB analysis.
 27
© 2015 CEB. All rights reserved. QUAL2565215SYN
Measure Supplier
Performance
Introduction Improve Suppliers Next Steps and Q&A
ROADMAP FOR THE PRESENTATION
 28
© 2015 CEB. All rights reserved. QUAL2565215SYN
SESSION TAKEAWAYS
CEB Resources and Recommended Next Steps
Assess Your Supplier Quality Management Maturity
■■ Option 1: Functional Maturity Diagnostic (Full-Functional Assessment)
■■ Option 2: Supplier Quality Management Maturity Model (Quick Self-Check)
Build a Standard Supplier Scorecard
Scorecard Builder (Library of Best-in-Class KPIs)
Create a Consistent Continuous Improvement Plan
Continuous Improvement Plan Template
Participate in the Supplier Quality Management Benchmarking Effort in the Early Fall
1.	Align scorecard metrics with elements business partners care about
(i.e., metrics beyond quality).
2.	Create standard global scorecards to assess supplier performance across all
elements of the relationship.
3.	Use scorecard results to construct actionable continuous improvement plans
that establish joint accountability.
 29
© 2015 CEB. All rights reserved. QUAL2565215SYN
QUESTION AND ANSWER SESSION
Logistics
■■ Press “*1” on your phone to ask a question.
■■ Written questions can be submitted directly into the web platform.
For more information and to access additional resources please visit
www.ceb.quality.executiveboard.com or contact lzheng@executiveboard.com.

Weitere Àhnliche Inhalte

Was ist angesagt?

Slide share The Ultimate Call Centre Diagnostic Assessment Survey based upo...
Slide share   The Ultimate Call Centre Diagnostic Assessment Survey based upo...Slide share   The Ultimate Call Centre Diagnostic Assessment Survey based upo...
Slide share The Ultimate Call Centre Diagnostic Assessment Survey based upo...Dr. Ted Marra
 
Keynote UQAM 26 november 2013 Program Management
Keynote UQAM 26 november 2013 Program ManagementKeynote UQAM 26 november 2013 Program Management
Keynote UQAM 26 november 2013 Program ManagementMichel Thiry
 
Accelerating Grassroots Adoption of IT Quality Transformation
Accelerating Grassroots Adoption of IT Quality TransformationAccelerating Grassroots Adoption of IT Quality Transformation
Accelerating Grassroots Adoption of IT Quality TransformationCognizant
 
Strategic PMO - Align Projects to Corporate Strategy
Strategic PMO - Align Projects to Corporate StrategyStrategic PMO - Align Projects to Corporate Strategy
Strategic PMO - Align Projects to Corporate StrategyAndries Jacobs PhD,MCom, CMCÂź
 
Michel Thiry - CSVA 2013 Keynote - Strategic Value Management
Michel Thiry - CSVA 2013 Keynote - Strategic Value ManagementMichel Thiry - CSVA 2013 Keynote - Strategic Value Management
Michel Thiry - CSVA 2013 Keynote - Strategic Value ManagementMichel Thiry
 
The Changing Role of Quality Professional
The Changing Role of Quality ProfessionalThe Changing Role of Quality Professional
The Changing Role of Quality ProfessionalDr. Firdaus Basbeth
 
New developments in program management
New developments in program managementNew developments in program management
New developments in program managementMichel Thiry
 
Requirements Maturity Model Overview
Requirements Maturity Model OverviewRequirements Maturity Model Overview
Requirements Maturity Model OverviewIAG Consulting
 
Strategic quality management
Strategic quality managementStrategic quality management
Strategic quality managementselinasimpson0401
 
Web Maturity Models
Web Maturity ModelsWeb Maturity Models
Web Maturity ModelsVera Rhoads
 
T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?PwC Italy
 
Six Sigma Black Belt Course outline and main components
Six Sigma Black Belt Course outline and main components Six Sigma Black Belt Course outline and main components
Six Sigma Black Belt Course outline and main components MohamedElSantty1
 
Lean-Six-Sigma-Green-Belt-Certification
Lean-Six-Sigma-Green-Belt-CertificationLean-Six-Sigma-Green-Belt-Certification
Lean-Six-Sigma-Green-Belt-CertificationStephen Lenahan
 
Lean Six Signa for Higher Education
Lean Six Signa for Higher Education Lean Six Signa for Higher Education
Lean Six Signa for Higher Education Norma Simons
 
Benchmarking Workshop by Tetrahedron
Benchmarking Workshop by TetrahedronBenchmarking Workshop by Tetrahedron
Benchmarking Workshop by TetrahedronSagar Sangam Sahu
 

Was ist angesagt? (20)

Slide share The Ultimate Call Centre Diagnostic Assessment Survey based upo...
Slide share   The Ultimate Call Centre Diagnostic Assessment Survey based upo...Slide share   The Ultimate Call Centre Diagnostic Assessment Survey based upo...
Slide share The Ultimate Call Centre Diagnostic Assessment Survey based upo...
 
Keynote UQAM 26 november 2013 Program Management
Keynote UQAM 26 november 2013 Program ManagementKeynote UQAM 26 november 2013 Program Management
Keynote UQAM 26 november 2013 Program Management
 
Accelerating Grassroots Adoption of IT Quality Transformation
Accelerating Grassroots Adoption of IT Quality TransformationAccelerating Grassroots Adoption of IT Quality Transformation
Accelerating Grassroots Adoption of IT Quality Transformation
 
FUNDAMENTALS OF TOTAL QUALITY ...
FUNDAMENTALS              OF                                   TOTAL QUALITY ...FUNDAMENTALS              OF                                   TOTAL QUALITY ...
FUNDAMENTALS OF TOTAL QUALITY ...
 
Strategic PMO - Align Projects to Corporate Strategy
Strategic PMO - Align Projects to Corporate StrategyStrategic PMO - Align Projects to Corporate Strategy
Strategic PMO - Align Projects to Corporate Strategy
 
EjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOqEjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOq
 
Michel Thiry - CSVA 2013 Keynote - Strategic Value Management
Michel Thiry - CSVA 2013 Keynote - Strategic Value ManagementMichel Thiry - CSVA 2013 Keynote - Strategic Value Management
Michel Thiry - CSVA 2013 Keynote - Strategic Value Management
 
The Changing Role of Quality Professional
The Changing Role of Quality ProfessionalThe Changing Role of Quality Professional
The Changing Role of Quality Professional
 
New developments in program management
New developments in program managementNew developments in program management
New developments in program management
 
Frank new resume 2015
Frank new resume 2015Frank new resume 2015
Frank new resume 2015
 
Effective performance management in the public sector
Effective performance management in the public sectorEffective performance management in the public sector
Effective performance management in the public sector
 
Requirements Maturity Model Overview
Requirements Maturity Model OverviewRequirements Maturity Model Overview
Requirements Maturity Model Overview
 
Strategic quality management
Strategic quality managementStrategic quality management
Strategic quality management
 
Web Maturity Models
Web Maturity ModelsWeb Maturity Models
Web Maturity Models
 
Gazelles_Mfg_casestudies
Gazelles_Mfg_casestudiesGazelles_Mfg_casestudies
Gazelles_Mfg_casestudies
 
T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?
 
Six Sigma Black Belt Course outline and main components
Six Sigma Black Belt Course outline and main components Six Sigma Black Belt Course outline and main components
Six Sigma Black Belt Course outline and main components
 
Lean-Six-Sigma-Green-Belt-Certification
Lean-Six-Sigma-Green-Belt-CertificationLean-Six-Sigma-Green-Belt-Certification
Lean-Six-Sigma-Green-Belt-Certification
 
Lean Six Signa for Higher Education
Lean Six Signa for Higher Education Lean Six Signa for Higher Education
Lean Six Signa for Higher Education
 
Benchmarking Workshop by Tetrahedron
Benchmarking Workshop by TetrahedronBenchmarking Workshop by Tetrahedron
Benchmarking Workshop by Tetrahedron
 

Andere mochten auch

Developing and Implementing Scorecards and Dashboards
Developing and Implementing Scorecards and DashboardsDeveloping and Implementing Scorecards and Dashboards
Developing and Implementing Scorecards and DashboardsVictor Holman
 
Visualization: Running a Business with Dashboards and Scorecards
Visualization:  Running a Business with Dashboards and ScorecardsVisualization:  Running a Business with Dashboards and Scorecards
Visualization: Running a Business with Dashboards and ScorecardsJodie Heflin
 
Taking Control of Supplier Quality
Taking Control of Supplier QualityTaking Control of Supplier Quality
Taking Control of Supplier QualityGerard Pearce
 
141118 Project Progress Update (Matthieu van der Heijden)
141118 Project Progress Update (Matthieu van der Heijden)141118 Project Progress Update (Matthieu van der Heijden)
141118 Project Progress Update (Matthieu van der Heijden)SINTAS
 
ODT Conference - Global Supply Chain Rev B Publish
ODT Conference - Global Supply Chain Rev B PublishODT Conference - Global Supply Chain Rev B Publish
ODT Conference - Global Supply Chain Rev B PublishGerard Pearce
 
iNTRODUCTION TO LEAN
iNTRODUCTION TO LEANiNTRODUCTION TO LEAN
iNTRODUCTION TO LEANKiril Nikolov
 
Responsible Vendor Qualifications Checklist
Responsible Vendor Qualifications ChecklistResponsible Vendor Qualifications Checklist
Responsible Vendor Qualifications Checklistachildree
 
Fundamentos de inteligencia de negocios
Fundamentos de inteligencia de negociosFundamentos de inteligencia de negocios
Fundamentos de inteligencia de negociosMel Maldonado
 
AuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sica
AuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sicaAuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sica
AuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sicaCarlos Escobar
 
Supplier quality management system
Supplier quality management systemSupplier quality management system
Supplier quality management systemselinasimpson1901
 
Inteligencia de Negocios
Inteligencia de NegociosInteligencia de Negocios
Inteligencia de NegociosCIMA IT
 
Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...
Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...
Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...Thomas LaPointe
 
Capturing Business Requirements For Scorecards, Dashboards And Reports
Capturing Business Requirements For Scorecards, Dashboards And ReportsCapturing Business Requirements For Scorecards, Dashboards And Reports
Capturing Business Requirements For Scorecards, Dashboards And ReportsJulian Rains
 
HR Dashboard Metrics 2013
HR Dashboard Metrics 2013HR Dashboard Metrics 2013
HR Dashboard Metrics 2013nutmegslim
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlYogita patil
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assuranceLeola Ramirez
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & ControlAnand Subramaniam
 

Andere mochten auch (20)

Developing and Implementing Scorecards and Dashboards
Developing and Implementing Scorecards and DashboardsDeveloping and Implementing Scorecards and Dashboards
Developing and Implementing Scorecards and Dashboards
 
Visualization: Running a Business with Dashboards and Scorecards
Visualization:  Running a Business with Dashboards and ScorecardsVisualization:  Running a Business with Dashboards and Scorecards
Visualization: Running a Business with Dashboards and Scorecards
 
Taking Control of Supplier Quality
Taking Control of Supplier QualityTaking Control of Supplier Quality
Taking Control of Supplier Quality
 
141118 Project Progress Update (Matthieu van der Heijden)
141118 Project Progress Update (Matthieu van der Heijden)141118 Project Progress Update (Matthieu van der Heijden)
141118 Project Progress Update (Matthieu van der Heijden)
 
Ciclo de vida de la inteligencia de negocios
Ciclo de vida de la inteligencia de negociosCiclo de vida de la inteligencia de negocios
Ciclo de vida de la inteligencia de negocios
 
ODT Conference - Global Supply Chain Rev B Publish
ODT Conference - Global Supply Chain Rev B PublishODT Conference - Global Supply Chain Rev B Publish
ODT Conference - Global Supply Chain Rev B Publish
 
iNTRODUCTION TO LEAN
iNTRODUCTION TO LEANiNTRODUCTION TO LEAN
iNTRODUCTION TO LEAN
 
Fundamentos de BI
Fundamentos de BIFundamentos de BI
Fundamentos de BI
 
fundamentos de inteligencia de negocios
fundamentos de inteligencia de negociosfundamentos de inteligencia de negocios
fundamentos de inteligencia de negocios
 
Responsible Vendor Qualifications Checklist
Responsible Vendor Qualifications ChecklistResponsible Vendor Qualifications Checklist
Responsible Vendor Qualifications Checklist
 
Fundamentos de inteligencia de negocios
Fundamentos de inteligencia de negociosFundamentos de inteligencia de negocios
Fundamentos de inteligencia de negocios
 
AuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sica
AuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sicaAuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sica
AuditorĂ­a de sistemas. Controles a nivel de entidad y seguridad fĂ­sica
 
Supplier quality management system
Supplier quality management systemSupplier quality management system
Supplier quality management system
 
Inteligencia de Negocios
Inteligencia de NegociosInteligencia de Negocios
Inteligencia de Negocios
 
Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...
Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...
Supplier Quality Management: Best Practices and Practical Insights in 2015 LI...
 
Capturing Business Requirements For Scorecards, Dashboards And Reports
Capturing Business Requirements For Scorecards, Dashboards And ReportsCapturing Business Requirements For Scorecards, Dashboards And Reports
Capturing Business Requirements For Scorecards, Dashboards And Reports
 
HR Dashboard Metrics 2013
HR Dashboard Metrics 2013HR Dashboard Metrics 2013
HR Dashboard Metrics 2013
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & Control
 

Ähnlich wie Drive Superior Supplier Quality Outcomes

Is Your Audit Department Highly Effective?
Is Your Audit Department Highly Effective?Is Your Audit Department Highly Effective?
Is Your Audit Department Highly Effective?Jim Kaplan CIA CFE
 
FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters FCBPartners
 
Seller Evaluation PowerPoint Presentation Slides
Seller Evaluation PowerPoint Presentation SlidesSeller Evaluation PowerPoint Presentation Slides
Seller Evaluation PowerPoint Presentation SlidesSlideTeam
 
Below is class assignment I need this assignment to be complet.docx
Below is class assignment I need this assignment to be complet.docxBelow is class assignment I need this assignment to be complet.docx
Below is class assignment I need this assignment to be complet.docxikirkton
 
CEB Finance Service Brochure
CEB Finance Service BrochureCEB Finance Service Brochure
CEB Finance Service BrochureConnor Demarais
 
How to successfully implement ISO 9001:2015 with a minimal documents approach
How to successfully implement ISO 9001:2015 with a minimal documents approachHow to successfully implement ISO 9001:2015 with a minimal documents approach
How to successfully implement ISO 9001:2015 with a minimal documents approachPECB
 
What's the Difference between GRC and Combined Assurance?
What's the Difference between GRC and Combined Assurance?What's the Difference between GRC and Combined Assurance?
What's the Difference between GRC and Combined Assurance?Jim Kaplan CIA CFE
 
Creating and Managing Supplier Relationships
Creating and Managing Supplier RelationshipsCreating and Managing Supplier Relationships
Creating and Managing Supplier RelationshipsFaHaD .H. NooR
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
How to Build a Business Case for Formalization of Learning Analytics
How to Build a Business Case for Formalization of Learning AnalyticsHow to Build a Business Case for Formalization of Learning Analytics
How to Build a Business Case for Formalization of Learning AnalyticsHuman Capital Media
 
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...Jim Kaplan CIA CFE
 
Why Your Customer HealthScore is Useless and How to Overcome It
Why Your Customer HealthScore is Useless and How to Overcome ItWhy Your Customer HealthScore is Useless and How to Overcome It
Why Your Customer HealthScore is Useless and How to Overcome ItBoaz S. Maor
 
Bahan Ajar SCM 03.pptx
Bahan Ajar SCM 03.pptxBahan Ajar SCM 03.pptx
Bahan Ajar SCM 03.pptxBudyAriyanto1
 
Vendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation Slides Vendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation Slides SlideTeam
 
Power Point Presentation.pptx
Power Point Presentation.pptxPower Point Presentation.pptx
Power Point Presentation.pptxswaponkumarshill
 
JARO Thermal ISO9001 2015 internal auditor training 20170118
JARO Thermal ISO9001 2015 internal auditor training  20170118JARO Thermal ISO9001 2015 internal auditor training  20170118
JARO Thermal ISO9001 2015 internal auditor training 20170118Ryan Chen
 
Vendor Evaluation Powerpoint Presentation Slides
Vendor Evaluation Powerpoint Presentation SlidesVendor Evaluation Powerpoint Presentation Slides
Vendor Evaluation Powerpoint Presentation SlidesSlideTeam
 
Procurement Training- Getting ready with Contract Management
Procurement Training- Getting ready with Contract ManagementProcurement Training- Getting ready with Contract Management
Procurement Training- Getting ready with Contract ManagementSheila Elliott
 

Ähnlich wie Drive Superior Supplier Quality Outcomes (20)

Is Your Audit Department Highly Effective?
Is Your Audit Department Highly Effective?Is Your Audit Department Highly Effective?
Is Your Audit Department Highly Effective?
 
FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters
 
Seller Evaluation PowerPoint Presentation Slides
Seller Evaluation PowerPoint Presentation SlidesSeller Evaluation PowerPoint Presentation Slides
Seller Evaluation PowerPoint Presentation Slides
 
Below is class assignment I need this assignment to be complet.docx
Below is class assignment I need this assignment to be complet.docxBelow is class assignment I need this assignment to be complet.docx
Below is class assignment I need this assignment to be complet.docx
 
TotalAssure Booklet 022315
TotalAssure Booklet 022315TotalAssure Booklet 022315
TotalAssure Booklet 022315
 
CEB Finance Service Brochure
CEB Finance Service BrochureCEB Finance Service Brochure
CEB Finance Service Brochure
 
How to successfully implement ISO 9001:2015 with a minimal documents approach
How to successfully implement ISO 9001:2015 with a minimal documents approachHow to successfully implement ISO 9001:2015 with a minimal documents approach
How to successfully implement ISO 9001:2015 with a minimal documents approach
 
What's the Difference between GRC and Combined Assurance?
What's the Difference between GRC and Combined Assurance?What's the Difference between GRC and Combined Assurance?
What's the Difference between GRC and Combined Assurance?
 
Creating and Managing Supplier Relationships
Creating and Managing Supplier RelationshipsCreating and Managing Supplier Relationships
Creating and Managing Supplier Relationships
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
Getting Ready for Contract Mgmt
Getting Ready for Contract MgmtGetting Ready for Contract Mgmt
Getting Ready for Contract Mgmt
 
How to Build a Business Case for Formalization of Learning Analytics
How to Build a Business Case for Formalization of Learning AnalyticsHow to Build a Business Case for Formalization of Learning Analytics
How to Build a Business Case for Formalization of Learning Analytics
 
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
Touchstone Research for Internal Audit 2020 – A Look at the Now and Tomorrow ...
 
Why Your Customer HealthScore is Useless and How to Overcome It
Why Your Customer HealthScore is Useless and How to Overcome ItWhy Your Customer HealthScore is Useless and How to Overcome It
Why Your Customer HealthScore is Useless and How to Overcome It
 
Bahan Ajar SCM 03.pptx
Bahan Ajar SCM 03.pptxBahan Ajar SCM 03.pptx
Bahan Ajar SCM 03.pptx
 
Vendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation Slides Vendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation Slides
 
Power Point Presentation.pptx
Power Point Presentation.pptxPower Point Presentation.pptx
Power Point Presentation.pptx
 
JARO Thermal ISO9001 2015 internal auditor training 20170118
JARO Thermal ISO9001 2015 internal auditor training  20170118JARO Thermal ISO9001 2015 internal auditor training  20170118
JARO Thermal ISO9001 2015 internal auditor training 20170118
 
Vendor Evaluation Powerpoint Presentation Slides
Vendor Evaluation Powerpoint Presentation SlidesVendor Evaluation Powerpoint Presentation Slides
Vendor Evaluation Powerpoint Presentation Slides
 
Procurement Training- Getting ready with Contract Management
Procurement Training- Getting ready with Contract ManagementProcurement Training- Getting ready with Contract Management
Procurement Training- Getting ready with Contract Management
 

KĂŒrzlich hochgeladen

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...noida100girls
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Catalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdfCatalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 

KĂŒrzlich hochgeladen (20)

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Catalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdfCatalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NÆŻá»šC uPVC - HDPE DE NHAT.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 

Drive Superior Supplier Quality Outcomes

  • 1. CEB Quality Leadership Council Drive Superior Supplier Quality Outcomes 19 May 2015
  • 2. A Framework for Member Conversations The mission of The Corporate Executive Board Company (CEB) and its affiliates is to unlock the potential of organizations and leaders by advancing the science and practice of management. When we bring leaders together, it is crucial that our discussions neither restrict competition nor improperly share inside information. All other conversations are welcomed and encouraged. Confidentiality and Intellectual Property These materials have been prepared by CEB for the exclusive and individual use of our member companies. These materials contain valuable confidential and proprietary information belonging to CEB, and they may not be shared with any third party (including independent contractors and consultants) without the prior approval of CEB. CEB retains any and all intellectual property rights in these materials and requires retention of the copyright mark on all pages reproduced. Legal Caveat CEB is not able to guarantee the accuracy of the information or analysis contained in these materials. Furthermore, CEB is not engaged in rendering legal, accounting, or any other professional services. CEB specifically disclaims liability for any damages, claims, or losses that may arise from a) any errors or omissions in these materials, whether caused by CEB or its sources, or b) reliance upon any recommendation made by CEB.
  • 3.  3 © 2015 CEB. All rights reserved. QUAL2565215SYN ROADMAP FOR THE PRESENTATION Measure Supplier Performance Introduction Improve Suppliers Next Steps and Q&A
  • 4.  4 © 2015 CEB. All rights reserved. QUAL2565215SYN Revenue Expectations Cost Pressure 0% 50% 100% 2%6% 10% 15% 41% 19% 7% 1% 4% 8% 20% 43% 18% 6% INTENSE PRESSURES DESPITE SUPPLY RISKS Business Executive Expectations of Revenue Growth and Cost Pressure in Next 12 Months Q4 2014 Business Barometer Survey Business Executive Expectations of Supply Chain Disruptions in Next 12 Months Q4 2014 Business Barometer Survey Much Higher Higher Somewhat Higher No Change Somewhat Lower Lower Much Lower Decreased Same Increased Supply Chain Disruption 0% 50% 100% 35% 56% 9% n = 332. Source: CEB 2014 Business Barometer Survey. n = 1,938. Source: CEB 2014 Business Barometer Survey. Companies expect to fuel growth through increased efficiencies as cost pressures remain. ■■ However, few expect supply chain risks to change over the next 12 months. ■■ This pressure to perform, while containing costs, can lead to an unintentional oversight of key risk assessment and reduction strategies.
  • 5.  5 © 2015 CEB. All rights reserved. QUAL2565215SYN INSUFFICIENT SUPPLIER OVERSIGHT INCREASES COSTS Estimated Costs Incurred by Accelerator Pedal and Floor Mat Recalls Toyota Motor Corporation, in Billions of US Dollars Product recall and repair costs Estimated lost sales. The recall is estimated to have dented demand by 10,000 vehicles. National Highway Traffic Safety Administration fines for not notifying the agency in a timely manner of problems. Settlement costs related to complaints of unintended acceleration. $1.1 $0.8 $0.08 $1.10 Source: Tomoko A. Hosaka, “Toyota Recalls May Cost Automaker $5.5 Billion.” NBCNews.com, 10 March 2013, www.nbcnews.com/id/35893905/ns/business- autos/t/toyota-recalls-may-cost-automaker-billion; Mike Ramsey, “Toyota in $5.5 Billion Gas Pedal Settlement,” The Wallstreet Journal, 27 December 2013, https://online.wsj.com/article/SB10001424127887324669104578203440990704994.html. Insufficient supplier oversight has overt costs that impact profitability. ■■ Toyota’s 2009 recalls for accelerator pedals and floor mats cost the company an estimated $3 billion.
  • 6.  6 © 2015 CEB. All rights reserved. QUAL2565215SYN BUILD SUPPLIER QUALITY MANAGEMENT CAPABILITIES Supplier Quality Management Maturity Curve ■■ Led by Procurement ■■ Ad hoc program ■■ Led by Quality ■■ Introduces supplier self- assessments ■■ Uses on- site audits occasionally ■■ Limits supplier development ■■ Uses standard qualification and auditing process ■■ Establishes standard criteria to identify supplier performance issues ■■ Prioritizes supplier development activities ■■ Measures supplier performance ■■ Uses supplier risk profiles ■■ Audits for strategic management criteria ■■ Develops suppliers on strategic activities ■■ Establishes a shared risk prioritization framework with procurement ■■ Integrates activities into corporate risk and audit programs ■■ Assesses and audits for culture and corporate management practices ■■ Uses supplier performance to inform business continuity planning and customer experience risk assessments Basic Emerging Intermediate Advanced World-Class Source: CEB analysis. Quality organizations move through five levels of maturity as they strive for world-class supplier quality management. ■■ Supplier quality management often begins as a procurement- led activity, but at world- class companies it eventually integrates with other assurance activities related to corporate risk.
  • 7.  7 © 2015 CEB. All rights reserved. QUAL2565215SYN Measure Supplier Performance Introduction Improve Suppliers Next Steps and Q&A ROADMAP FOR THE PRESENTATION
  • 8.  8 © 2015 CEB. All rights reserved. QUAL2565215SYN THE CURRENT STATE OF SUPPLIER PERFORMANCE MEASUREMENT “Measure Supplier Performance” Importance Versus Maturity Score Average Score Quality executives recognize the importance of measuring supplier performance, but maturity lags. ■■ Measure Supplier Performance: Approaches used to measure the performance of existing suppliers. Level 1 Level 2 Level 3 Level 4 Level 5 Quality measures supplier performance locally according to incoming inspections and quality issues. Quality measures supplier performance locally according to their ability to consistently deliver products that meet product specifications. Quality uses a single consistent framework for measuring supplier performance to assess a supplier’s ability to meet several operational expectations. Quality provides supplier performance inputs to an integrated supplier scorecard that is used globally to track and compare supplier performance across all elements of the relationship. Supplier performance reports are integrated into corporate risk reports and inform business continuity planning and customer loyalty risk assessments. n = 24. Source: CEB Quality 2014 Functional Maturity Diagnostic. Importance Maturity 3.38 2.55 Very Important 5.0 4.0 3.0 2.0 1.0 0.0
  • 9.  9 © 2015 CEB. All rights reserved. QUAL2565215SYN INTEGRATED SCORECARD DEVELOPMENT BEST PRACTICES Principles Benefits Involve internal business partners before developing scorecard. Demonstrates how scorecard focuses on elements business partners care about (i.e., metrics beyond quality). Create category-based scorecards. Enables analysis of similar suppliers in an apples- to-apples fashion. Focus on the “critical few” KPIs (approximately three to five per metric). Maintains focus on the most important drivers of supplier performance. Select KPIs that are within the organization’s control. Measures outcomes that can be influenced by the organization and the supplier. Use a mix of both quantitative and qualitative KPIs. Contributes to a fact-based scorecard while allowing for day-to-day user perception. Incorporate existing KPIs and/or SLAs where appropriate. Encourages adherence to existing contract terms and conditions. Automate data collection, aggregation, and reporting. Creates a scalable performance management process. Source: CEB analysis. Use a standardized supplier scorecard effectively manage suppliers.
  • 10.  10 © 2015 CEB. All rights reserved. QUAL2565215SYN DEVELOP SCORECARD WITH BUSINESS PARTNER INPUT Participants ■■ Share opinions ■■ Help determine criteria for supplier key performance indicators Administrator Organizes the meetings Takes notes and distributes to all participants Facilitator Creates meeting agenda Keeps participants focused on meeting goals Drives decision making process Sponsor Ensures proper people attend the workshop Ensures performance criteria meet overarching business objectives Source: CEB analysis. Source: CEB analysis. Ask probing questions to surface business partners’ performance expectations for a category of suppliers, such as: ■■ What equates to satisfactory performance for suppliers in this category? ■■ If we hired a new supplier today, how could they make an immediate positive impact? What defines a negative impact? ■■ Are there any existing measurements you are tracking that define supplier success in this category (i.e., SLAs, other pre-defined expectations)? ■■ What causes you heartache with suppliers in this category? ■■ What aspects of your supplier interactions should be measured in a scorecard? ■■ What do high performing suppliers in this category do that lower performing suppliers don’t? ■■ When you come across situations where a supplier can improve, what typically causes you to think that? Use a workshop to get business partner input to scorecard development. ■■ Include both Quality staff and business partners with knowledge of the supplier relationships.
  • 11.  11 © 2015 CEB. All rights reserved. QUAL2565215SYN SCORECARD STRUCTURE: METRICSQuality provides inputs to a standard, integrated supplier scorecard. ■■ The sample scorecard uses six standard metrics designed to answer the following questions. ■■ Cost: Is the expected value being received? ■■ Delivery and Support: How reliable is the supplier? Do they meet established time frames? ■■ Flexibility and Ease of Doing Business: How “well run” is the supplier? Is billing accurate? ■■ Quality: Does product and service meet expectations? ■■ Partnership: Is the supplier proactive? Do they provide strategic guidance? ■■ Risk and Compliance: Does the supplier mitigate risk? Do they comply with company standards? Metric Metric Weight Percentage KPI KPI Measurement Cost 30% Price Competitiveness Ranking compared to competitors Discounts and Value-Add Supplier proactively identifies volume discounts and other price-reducing options Transparency in Negotiations Provides transparency into its cost breakdowns Delivery and Support 25% Problem Resolution Supplier is willing to take ownership of day-to-day issues and problems On-Time Delivery Degree to which hardware orders are delivered on time Service Dependability Degree to which hardware service calls are completed on time Order Accuracy Degree to which supplier fills orders accurately Flexibility and Ease of Doing Business 10% Invoice Accuracy Degree to which supplier provides error-free invoices Invoice Timeliness Invoices are provided in a timely manner Account Management Responsiveness Supplier’s account management team quickly responds to requests Usefulness of Reporting Reports contain clear, concise, and actionable information including performance, financial performance data, or trend information as appropriate Order Modifications Supplier is able to accommodate order changes without significant impact from delays Quality 20% Quality of Product Quality of product against requirements Mean Time to Repair (MTTR) MTTR statistics against requirements Reliability Mean time between failures against expectations Warranty/Maintenance Number of warranty claims and defects Resource Quality Ability of resources to install and/or repair hardware based on contractual obligations Partnership 10% Provision of Innovative Solutions Proactive provision of valuable and innovative solutions Business Alignment Supplier’s recommendations reflect their understanding of our business objectives Technology Supplier uses leading-edge technology in its products Risk and Compliance 5% Product Safety Products function in accordance with industry safety standards Business Alignment Supplier supports our diversity goals Source: CEB analysis.
  • 12.  12 © 2015 CEB. All rights reserved. QUAL2565215SYN Metric Metric Weight Percentage KPI KPI Measurement Quality 20% Quality of Product Quality of product against requirements Mean Time to Repair (MTTR) MTTR statistics against requirements Reliability Mean time between failures against expectations Warranty/Maintenance Number of warranty claims/defects Resource Quality Ability of resources to install and/or repair hardware based on contractual obligations SCORECARD STRUCTURE: KEY PERFORMANCE INDICATORS (KPIs) KPI Evaluation Criteria If a KPI is effective, you should be able to answer “yes” to many of the following questions: ■■ Does it align with business objectives? ■■ Is it actionable? ■■ Is it quantitative and objective? ■■ Is it contractual? ■■ Is it well defined, including rating system? ■■ Is it controllable? ■■ Will it drive desired behavior? ■■ Is reliable data reasonably efficient to obtain? Source: CEB analysis. Identify three to five critical few KPIs per metric.
  • 13.  13 © 2015 CEB. All rights reserved. QUAL2565215SYN Metric Metric Weight Percentage KPI KPI Measurement Quality 20% Quality of Product Quality of product against requirements Mean Time to Repair (MTTR) MTTR statistics against requirements Reliability Mean time between failures against expectations Warranty/Maintenance Number of warranty claims/defects Resource Quality Ability of resources to install and/or repair hardware based on contractual obligations SCORECARD STRUCTURE: KPI MEASUREMENTS KPI Measurement Considerations Consider the following questions when selecting KPI measurements: ■■ What am I trying to measure? ■■ Who can provide this data? ■■ How often does the data change? ■■ Who or what is the data source? Source: CEB analysis. Define standard KPI measurement criteria for clarity across the organization.
  • 14.  14 © 2015 CEB. All rights reserved. QUAL2565215SYN PANELIST Simone Silva Director of Quality North America Whirlpool Corporation Simone Silva is currently the Director of Quality for Whirlpool in North America. Simone is responsible for the definition of the strategy for supplier development in North America and its execution, leading a team of approximately 60 people working with 1400 suppliers and supporting the 12 plants of Whirlpool in the US and in Mexico. Simone has over 18 years of experience in Quality and Service, 11 years in Automotive and 7 years at Whirlpool Corporation, having had important international assignments in China, Germany and Mexico.
  • 15.  15 © 2015 CEB. All rights reserved. QUAL2565215SYN SUPPLIER QUALITY RISK RATING DEFINITION AND APPLICATION Before ■■ No standardized quality metric across different regions ■■ All available metrics were single focused, PPM, A-Defect, field, warranty cost ■■ Multiple KPIs used by different stakeholders to assess supplier quality ■■ No assessment of supplier competencies to support quality ■■ As a result quality not consistently considered as a factor in business decisions After ■■ Balanced criteria for supplier quality assessment composed by performance and competence metrics ■■ Stakeholder alignment on single criteria ■■ Standardized criteria used to assess global suppliers in different marketing regions ■■ Supplier risk rating used to prioritize training and supplier development initiatives ■■ Supplier risk rating used as the single source of quality input for supplier selection February March April May June July August Supplier Risk Rating—Definition/Alignment Execution—Use of Risk Rating (New Launches and Existing Products) SDE PDPs SDE On-Boarding Supplier Training Whirlpool Quality Vision Undisputed Quality Leader: Recognizably the Best, and Differentiated Versus Competition Global Strategic Sourcing Mission Quality Parts and Services, Sourced and Delivered on Time, from the Right Supplier, at the Right Cost Source: Whirlpool Corporation.
  • 16.  16 © 2015 CEB. All rights reserved. QUAL2565215SYN THE TOOL—SUPPLIER QUALITY RISK RATING ■■ Assessment performed by the SDE responsible for the Commodity on the corresponding market region ■■ Criteria for scoring defined for each individual metric ■■ Hard metrics from the corporate data systems, SAP, ONTRAC ■■ Cross-functional collaboration encouraged for the competence assessment ■■ Risk rating available to all functions interacting with suppliers on a web-based system Source: Whirlpool Corporation. Scoring for Associated Risk Risk Scoring Range Low Risk Total score between 80 to 100 points is considered Low Risk Medium Risk Total score between 60 to 79 points is considered Medium Risk High Risk Total score below 60 points is considered High Risk 70 points of scoring for associated Risk 30 points of scoring for associated Risk SUPPLIER PERFORMANCE SUPPLIER CAPABILITY QUALITY RISK ASSESSMENT Contribution to Total Regional PPM Total Regional CAL Occurrence Sir/Field Failures Last 12 Months PPM Trend CAL Trend 8D W-PPAP FPY Process FMEA FSA Risk Value Risk 9 0.03% 7 3 12 N 0 11,299 6 5 9 3 4 2 52 High Risk
  • 17.  17 © 2015 CEB. All rights reserved. QUAL2565215SYN QUALITY RISK SCORING Supplier Performance Risk Contribution to TOT Regional PPM TOT Regional CAL Occurrences SIR/Field Failures Last 12 Months PPM Trend CAL Trend Contribution to PPM <.1% and PPM <150: PPM 0 = 10 pts PPM <.05% = 9 pts PPM .05–.1% = 8 pts CAL<1 Occurrences CAL 0 = 10 pts CAL 1 = 8 pts No (FF) Field Failures in the last 12 month: 0 Field Failures and 0 CAL = 14 pts 0 Field Failures and CAL>0 = 12 pts Supplier PPM <150 Trends down on 6 and 3 months rolling PPM with >40% imp = 18 pts Trends down on 6 and 3 months rolling PPM with >30% imp = 16 pts Trends down on 6 and 3 months rolling PPM with >20% imp = 14 pts Suppliers under 50 PPM automatically get full 18 points Trends down on 6 and 3 months rolling with >40% imp = 18 pts Trends down on 6 and 3 months rolling with >30% imp = 16 pts Trends down on 6 and 3 months rolling with >20% imp = 14 pts Suppliers with 1 or less CAL automatically get full 18 points Contribution to PPM <..4% and PPM <500: PPM .11–.2% = 7 pts PPM .21–.4% = 6 pts CAL <6 Occurrences CAL 2–3 = 7 pts CAL 4–6 = 6 pts Field failures (FF) in last 12 month with minimal effect to customer due to timely and robust countermeasures (10 pts) Supplier PPM <500 Trends down on 6 and 3 months rolling PPM with >10% imp = 12 pts Trends down on 6 and 3 months rolling PPM with <10% imp = 11 pts PPM with 0 imp = 10 pts Suppliers 150–200 PPM Automatically get full 12 Points Trends down on 6 and 3 months rolling CAL with >10% imp = 12 pts Trends down on 6 and 3 months rolling CAL with <10% imp = 11 pts CAL with 0 imp = 10 pts Suppliers with 2–3 CAL automatically get full 12 Points Contribution to PPM >.4% and PPM >500: PPM .41–.5 = 5 pts PPM .51–.6% = 4 pts PPM .61–.8% = 3 pts PPM .81–1% = 2 pts PPM 1.01–1.5% = 1 pts PPM>1.5% = 0 pts Contribution to CAL >6 Occurrences CAL 7 = 5 pts CAL 8–10 = 4 pts CAL 11–12 = 3 pts CAL 13 = 2 pts CAL 14–15 = 1 pts CAL> 15 = 0 pts Field Failures (FF) in the last 12 month with significant customer impact: Field Failures with medium customer impact and support cooperation = 8 pts Field Failures with high customer impact and support cooperation = 6 pts Multiple part families with Field Failures from supplier = 4 pts Fail Failures with medium customer impact and poor support cooperation = 2 pts Field Failures with high impact on customer and poor support cooperation = 0 pts Supplier PPM >500 PPM Increasing <5% = 8 pts PPM Increasing <10% = 6 pts PPM Increasing <15% = 4 pts PPM Increasing <20% = 2 pts PPM Increasing >20% = 0 pts PPM >1000 is automatically 0 pts Supplier CAL >6 CAL CAL Increasing <5% = 8 pts CAL Increasing <10% = 6 pts CAL Increasing <15% = 4 pts CAL Increasing <20% = 2 pts CAL Increasing >20% = 0 pts CAL>15 is automatically 0 pts Contrib 10 pts 10 pts 14 pts 18 pts 18 pts 70 points of scoring for associated risk based on performance. Source: Whirlpool Corporation. Note: These are guidelines—SDEs still need to use critical thought.
  • 18.  18 © 2015 CEB. All rights reserved. QUAL2565215SYN QUALITY RISK SCORING Supplier Capabilities Risk Problem Solving (8D) Perfect Launch (PPAP/FPY) Process Control (Process FMEA) Continuous Improvement (Focus Supplier) Use of proper tools with all issue closure less than 30 days and no repeat issues (9–12 Points) Above 90% FPY on PPAP submissions and no issues in first 90 days (5–6 Points) Process FMEA present with active RPN reduction activities and robust control plans (5–6 Points) Not on focus supplier with good quality performance (5–6 Points) Use of proper tools with average closure less than 30 days with minimal repeat issues (7–8 Points) 70–89% FPY on PPAP submissions with minor issues in first 90 days and prompt reaction (4 Points) Process FMEA present with active RPN reduction activities and robust control plans (5–6 Points) Quality trends indicate lack of continuous improvement (3–4 Points) Lack of use of proper tools with average closure greater than 30 days and numerous repeats (0–6 Points) Below 70% FPY on PPAP submissions with poor reaction (0–3 Points) No FMEA or failure mitigation methods and/or poor process control (0–3 Points) On the focus supplier program due to performance or deteriorating quality levels (0–2 Points) Contrib 12 pts 6 pts 6 pts 6 pts 30 points of scoring for associated risk based on capability. Source: Whirlpool Corporation.
  • 19.  19 © 2015 CEB. All rights reserved. QUAL2565215SYN PROCESS GOVERNANCE Process Update ■■ All Supplier Risk Rating to be updated every six months (Mid-Year [June–July]–End Year [December–January]) ■■ If it is deemed appropriate, a supplier review board should be scheduled for a rating review out of the scheduled update windows: –– Commodity manager should attend –– Quality representative for the supplier and requesting region should attend and present data justifying the change –– Regional Quality leader can attend as optional ■■ SDEs should always practice judgment while applying the criteria ■■ SDEs should collaborate with process partners to assess supplier competence ■■ SDEs are responsible to define quality roadmaps by commodity based on the Risk Rating ■■ Before asking for an unplanned update, the regional SDE should evaluate the following: –– Are we reacting to a special cause event (single data point)? –– Is the change in risk based sustainable improvement or confirmed performance degradation (3+ months)? SDEs Responsibility Source: Whirlpool Corporation.
  • 20.  20 © 2015 CEB. All rights reserved. QUAL2565215SYN Measure Supplier Performance Introduction Improve Suppliers Next Steps and Q&A ROADMAP FOR THE PRESENTATION
  • 21.  21 © 2015 CEB. All rights reserved. QUAL2565215SYN THE CURRENT STATE OF SUPPLIER PERFORMANCE IMPROVEMENT “Improve Suppliers” Importance Versus Maturity Score Average Score Quality executives recognize the importance of supplier improvement, but maturity lags. ■■ Improve Suppliers: Practices used to ensure the suppliers improve their capabilities and performance over time. Level 1 Level 2 Level 3 Level 4 Level 5 Quality reacts to supplier issues that disrupt operational processes with limited and targeted support to fix the immediate issue. Quality offers unmetered support to critical suppliers with chronic poor performance. Quality uses established relationship and performance criteria to identify suppliers who need improvement and helps them improve systems and processes. Quality uses an established risk framework to prioritize suppliers requiring improvement on both operational and strategic activities. Quality identifies select Tier 1 suppliers to collaboratively improve culture of quality and the quality of corporate management practices. n = 24. Source: CEB Quality 2014 Functional Maturity Diagnostic. Importance Maturity 5.0 4.0 3.0 2.0 1.0 0.0 3.35 2.31 Very Important
  • 22. © 2015 CEB. All rights reserved. QUAL2565215SYN  22 OVERVIEW Rolls-Royce plc operates in four global markets: civil aerospace, defense aerospace, marine, and energy. It is investing in technology and capability that can be exploited in each of these sectors to create a competitive range of products. The success of these products is demonstrated by the company’s rapid and substantial gains in market share during recent years. As a result, engine deliveries have grown and the company now has a total of 54,000 gas turbines in service worldwide. The investments in product, capability, and infrastructure to gain this market position create high barriers to entry. GUIDING PRINCIPLES ■■ To ensure supplier performance and improvement, the company must establish structure for performance measures, reporting, analysis, and issue resolution. ■■ Standardizing language, information, processes, and roles is as important among internal parties as with suppliers. COMPANY SNAPSHOT Rolls-Royce plc Industry: Aerospace, Power Systems, and Defense Rolls-Royce has a broad customer base comprising more than 500 airlines, 4,000 corporate and utility aircraft and helicopter operators, 160 armed forces, and more than 2,000 marine customers, including 50 navies. The company has energy customers in nearly 120 countries. Rolls-Royce employs 40,000 people in more than 50 countries. 2011 Sales: ÂŁ11 Billion Employees: 40,000 Headquarters: London SYSTEMATIC SUPPLIER PERFORMANCE MANAGEMENT
  • 23.  23 © 2015 CEB. All rights reserved. QUAL2565215SYN SYSTEMATIC SUPPLIER PERFORMANCE MANAGEMENT Practice Components Rolls-Royce creates global standards for consistent assessment, management, and communication of supplier performance. Potential Continuous Improvement Roadblocks Practice Components Inconsistent/ Unreliable Data Standards Performance Issues Not Addressed Adequately Uncoordinated or Inefficient Measurement Activity Suppliers Lack Awareness of Performance Standards Component 1: Comprehensive Metric Dictionary Easy-to-use metrics dictionary standardizes all aspects of performance assessment. Component 3: “Three-in-One” Escalation Process Systematic underperformance resolution process with escalation triggers involves/assigns appropriate skills and activities. Component 2: Supplier Measurement Road Map Process map sets out discrete tasks, owners, and data requirements. Component 4: Supplier Training and Tools Training sessions and online tools for suppliers foster awareness of performance requirements. “We have developed cross-checks and methods to ensure that our data is world class, enabling us to use this information to make important business decisions.” Rick Wells Supplier Support Leader Rolls-Royce Source: Rolls-Royce Holdings; CEB analysis.
  • 24.  24 © 2015 CEB. All rights reserved. QUAL2565215SYN RIGOROUS PERFORMANCE IMPROVEMENTA systematic process formalizes issue resolution actions and triggers for escalating to higher levels as new capabilities are required. Level 3: Fundamental Redesign Level 2: Improve Overall Performance Level 1: Make Immediate Improvements Level 0: Restore the Status Quo ■■ Purpose: Verify adherence to established process and product specifications. ■■ Owner: Local Area Manager ■■ Duration: Two weeks ■■ Purpose: Analyze process, product, or system to identify root cause. ■■ Owner: Specialist ■■ Duration: Three weeks ■■ Purpose: Deploy cross- functional team to address complex/broad problem. ■■ Owner: Local Area Manager Plus Specialist ■■ Duration: Five weeks ■■ Purpose: Involve senior management to determine redesign or supplier change. ■■ Owner: BU Director, Specialist, and Local Area Manager ■■ Duration: Indefinite Trigger: Fundamental redesign may be required to resolve issue. Trigger: Cross-functional team is needed to resolve root cause. Trigger: Problem is still evident after status quo restored. 3 2 1 Source: Rolls-Royce Holdings; CEB analysis.
  • 25.  25 © 2015 CEB. All rights reserved. QUAL2565215SYN ACTIONABLE CONTINUOUS IMPROVEMENT PLAN Escalation Gantt Chart Illustrative “Time-boxed” process steps promote thoroughness while maintaining progress. Tasks and Milestones Owner Mandatory Support Status February March April May 3 10 17 24 3 10 17 24 1 7 14 21 28 3 Level 0: Restore the Status Quo Verify adherence to established process and product specifications. Problem Definition Rolls-Royce Supplier Completed Containment Action Supplier Completed Customer Protection Supplier Local Area Manager Completed Process Adherence Review Supplier Local Area Manager Completed Specification Conformity Review Supplier Completed Adherence/Conformity Results Analysis Supplier Completed Resolution Plan Definition/ Development Supplier Completed Level 1: Make Immediate Improvements Analyze process, product, or system to identify root cause. Root-Cause Analysis Supplier Specialist Completed Customer Protection Review Supplier Rolls-Royce Completed Improvement Plan Implementation Supplier Local Area Manager Completed Progress Monitoring Supplier Completed Level 2: Improve Overall Performance Deploy cross-functional team to address complex/broad problem. Integrated Team Resources Identification and Formation Supplier Specialist, Local Area Manager Completed Additional Root-Cause Analysis Supplier Specialist Completed Customer Protection Review Supplier Specialist Completed Process Improvement Plan Definition and Implementation Supplier Specialist, Local Area Manager Completed Progress Monitoring Supplier Local Area Manager Completed Level 3: Fundamental Redesign Involve senior management to determine redesign or supplier change. Level 2 Business Care Consideration Supplier Three-in-One Receiver, Specialist, Local Area Manager, BU Director In Progress Redesign Decision-Making Process Supplier, Specialist, Local Area Manager, BU Director, three-in-one Receiver Not Started Hard timescales maintain process discipline and discourage premature closure. Source: Rolls-Royce Holdings; CEB analysis.
  • 26.  26 © 2015 CEB. All rights reserved. QUAL2565215SYN CONTINUOUS IMPROVEMENT PLAN SAMPLE TEMPLATE GUIDE Supplier: __________________ Date: __________________ Purpose: __________________ Priority Metric KPIs Targeted Current Score Target Score Improvement Initiatives Action Step(s) Owner Target Date Date Completed Status/Notes 1 2 3 4 5 Source: CEB analysis.
  • 27.  27 © 2015 CEB. All rights reserved. QUAL2565215SYN Measure Supplier Performance Introduction Improve Suppliers Next Steps and Q&A ROADMAP FOR THE PRESENTATION
  • 28.  28 © 2015 CEB. All rights reserved. QUAL2565215SYN SESSION TAKEAWAYS CEB Resources and Recommended Next Steps Assess Your Supplier Quality Management Maturity ■■ Option 1: Functional Maturity Diagnostic (Full-Functional Assessment) ■■ Option 2: Supplier Quality Management Maturity Model (Quick Self-Check) Build a Standard Supplier Scorecard Scorecard Builder (Library of Best-in-Class KPIs) Create a Consistent Continuous Improvement Plan Continuous Improvement Plan Template Participate in the Supplier Quality Management Benchmarking Effort in the Early Fall 1. Align scorecard metrics with elements business partners care about (i.e., metrics beyond quality). 2. Create standard global scorecards to assess supplier performance across all elements of the relationship. 3. Use scorecard results to construct actionable continuous improvement plans that establish joint accountability.
  • 29.  29 © 2015 CEB. All rights reserved. QUAL2565215SYN QUESTION AND ANSWER SESSION Logistics ■■ Press “*1” on your phone to ask a question. ■■ Written questions can be submitted directly into the web platform. For more information and to access additional resources please visit www.ceb.quality.executiveboard.com or contact lzheng@executiveboard.com.