WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
Suggestion Service
Technical documentation part of
WP4 Integration of SUNSHINE pilot smart urban services
Revision: 1.0
Authors:
Luca Giovannini, Oscar Benedetti (SGIS)
Umberto Di Staso, Gabrio Girardi (GRAPHITECH)
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
Dissemination level PU (public)
Contributor(s)
Reviewer(s)
Editor(s)
Partner in charge(s)
Due date
Submission Date
REVISION HISTORY AND STATEMENT OF ORIGINALITY
Revision Date Author Organisation Description
V0.1 06/11/2015 Luca Giovannini SGIS
Document
created
V1.0 21/12/2015 Luca Giovannini SGIS Final release
Statement of originality:
This deliverable contains original unpublished work except where clearly indicated otherwise.
Acknowledgement of previously published material and of the work of others has been made
through appropriate citation, quotation or both.
Moreover, this deliverable reflects only the author’s views. The European Community is not
liable for any use that might be made of the information contained herein.
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
Table of Contents
1 Use Cases - Buildings.......................................................................................................... 4
1.1 Access to daily suggestion on heating system use ........................................................ 4
1.1.1 user interface mockups .......................................................................................... 5
1.2 View/edit of building comfort profiles .......................................................................... 7
1.2.1 user interface mockups .......................................................................................... 7
2 Use Cases - Shelters ........................................................................................................... 9
2.1 Access to daily prediction on h/c system activity.......................................................... 9
2.1.1 user interface mockups .......................................................................................... 9
2.2 View/edit of h/c system thresholds............................................................................. 10
2.2.1 user interface mockups ........................................................................................ 11
3 Server-side Service Specifications.................................................................................... 13
3.1 Servizi RESTful (profili comfort e threshold buildings) ................................................ 13
3.1.1 Esempi................................................................................................................... 14
3.2 Servizi SOS (suggestion output)................................................................................... 16
3.2.1 Building ................................................................................................................. 16
3.2.2 Shelter................................................................................................................... 17
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
1 Use Cases - Buildings
The suggestion service for buildings has two use cases:
1. Access to daily suggestion on heating system use
Regular supervision activity of system suggestions, based on standard comfort profiles
ingested at the beginning of the heating season and on daily weather forecasts. Suh a
form of fruition implies the ability to access (without editing) daily profiles for:
o Requested comfort
o Estimated internal temperature profile
o Estimated system on/off profile
This use case includes also an email notification of the daily suggestion to the user in
the case of “out-of-the-average days”.
2. View/edit of building comfort profiles
Spot activity to verify/adjust/plan inputted comfort profiles. This use case has to allow
a global view of all the requested comfort profiles throughout the thermal season and
allow its adjustment.
1.1 Access to daily suggestion on heating system use
Suggestions are computed daily for each pilot building covered by the service.
 The suggestion is estimated for the day following the current and is scheduled to be
computed at 11:00 CET daily, right after the new weather prediction for the current
day are loaded from Meteogrid’s weather service.
 If the system was not able to retrieve the new 3-day weather forecasts for the day,
the forecast of the previous day are used.
 If no consumption profile has been provided for the day following the current, the
suggestion routine is not executed and no suggestion is computed.
The suggestion routine has two outputs:
 The estimated internal temperature profile for the day following the current
 The suggested on/off profile for the heating system of the building for the same day
The outputs of the suggestion profile can be accessed by the user in three ways:
 the web client
 the energy app
 email notification to building manager
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
1.1.1 user interface mockups
1.1.1.1 web client
The client shows:
 The requested comfort profile [1] for the selected day
 The estimated internal temperature profile [2] for the selected day
 The suggested on/off profile [3] for the heating system of the building for the day
By selecting a different day in the past from the calendar [4], the dashboard updates the
contents of panel [1], [2] and [3] accordingly.
With respect to panel [2] and [3], no suggestion is computed when either:
 No comfort profile is provided for the day (the building is not in use)
 No forecast data is available
2
4
3
1
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
1.1.1.2 energy app
The client shows:
 The requested comfort profile [1] for the day following the current
 The estimated internal temperature profile [2] for the day following the current
 The suggested on/off profile [3] for the heating system of the building for the same
day
By selecting a different day in the past from the calendar [4], the dashboard updates the
contents of panel [1], [2] and [3] accordingly.
With respect to panel [2] and [3], no suggestion is computed when either:
 No comfort profile is provided for the day (the building is not in use)
 No forecast data is available
1.1.1.3 email notification to building manager
Daily heating schedule suggestion for:
Elementare Poledrelli - Via Poledrelli 1 - CT03-77
Heating suggestion for day:
2015-11-03
Requested comfort temperature:
20 °C
Requested comfort periods:
32
1
4
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
from 7:30 to 18:00
Temperature difference with respect to previous days:
DeltaT_min = 3.0 °C (normal)
Suggested turn on/off times:
Turn on 4:32
Turn off 18:00
1.2 View/edit of building comfort profiles
1.2.1 user interface mockups
1.2.1.1 web client
The client shows:
 The requested comfort profiles [5] for all the days of the year. Comfort profiles are
shown in blocks of 7 consecutive days and changing the day in the calendar on top
allows to scroll the blocks backwards and forwards. Days with no comfort profiles are
shown with blank lines.
 The form to modify/delete [6] the comfort profiles for all the days of the year. The
fields from/to allow to edit more than one day at the same time (all with the same
comfort values). In order to edit just a single day it is sufficient to fill the field “from”
with the corresponding date.
6
5
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
1.2.1.2 energy app
The client shows:
 The requested comfort profiles for all the days of the year. Comfort profiles are shown
in a calendar panel [5] with buttons allowing to scroll between the months.
 The form to modify/delete [6] the comfort profiles for all the days of the year.
6
5
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
2 Use Cases - Shelters
The suggestion service for shelter has two use cases:
 Access to daily prediction on h/c system activity (shelters)
 View/edit of h/c system thresholds (shelters)
2.1 Access to daily prediction on h/c system activity
2.1.1 user interface mockups
2.1.1.1 web client
The client shows:
 The requested system use thresholds [1] for the selected month
 The estimated internal temperature profile [2] for the selected day
 The suggested heating/cooling system use [3] for the same day
By selecting a different day in the past from the calendar [4], the dashboard updates the
contents of panel [2] and [3] accordingly.
With respect to panel [2] and [3], no suggestion is computed when no forecast data is
available.
2
1
3
4
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
2.1.1.2 energy app
The client shows:
 The requested system use thresholds [1] for the selected month
 The estimated internal temperature profile [2] for the selected day
 The suggested heating/cooling system use [3] for the same day
By selecting a different day in the past from the calendar [4], the dashboard updates the
contents of panel [2] and [3] accordingly.
With respect to panel [2] and [3], no suggestion is computed when no forecast data is
available.
2.2 View/edit of h/c system thresholds
There are two types of thresholds:
 The number of times the heating system of the shelter is turned on during the day
 The number of times the cooling system of the shelter is turned on during the day
These two types of threshold can be specified independently
 For each shelter
 For each month of the year
When editing threshold values, the clients only allow the user to specify the year and month
of the corresponding timestamp. Then the client will send a PUT command to the server (see
4
1
2 3
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
section 3.1.1.2) by adding a fictitious day to the specified date (ie. 2015-12-01). New PUT
values referring to the same year/month will overwrite the previous values.
Since threshold values are inserted with a bulk ingestion procedure, no INSERT command is
available for the client, but just a MODIFY one.
2.2.1 user interface mockups
2.2.1.1 web client
The client shows:
 The requested system use thresholds [5] for all the months of the year. Changing the
day in the calendar on top allows to scroll the thresholds of the different months.
 The form to modify/delete [6] the thresholds for all the months of the year.
5 6
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
2.2.1.2 energy app
The client shows:
 The requested system use thresholds [5] for all the months of the year.
 The form to modify/delete [6] the thresholds for all the months of the year.
5
6
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
3 Server-side Service Specifications
3.1 Servizi RESTful (profili comfort e threshold buildings)
 Le risorse gestibili con i servizi REST sono profiles (profili comfort di temperatura attesa).
 Nella sintassi dei servizi REST il nome della risorsa è sempre al plurale.
 La chiamata a un servizio REST è costituita da una richiesta HTTP che utilizza un cosiddetto
verbo (GET, POST, PUT, DELETE …), a un URI di una risorsa a cui si riferisce l’azione del
servizio, corredata da eventuali parametri in stile “query string” (?par1=val1&par2=val2) e
con un eventuale “body” codificato in JSON o XML. Anche gli header vengono utilizzati per
qualificare meglio richiesta: Content-Type specifica ad esempio il formato richiesto. I
parametri della query string possono influenzare il comportamento del servizio (parametri
per effettuare ricerche, per paginare il risultato …). Nella risposta è essenziale il codice di
stato HTTP. Ad es.: 200  ok, 404  not found, 401  not authorized
 chiamata tipo:
HTTP VERB https://<baseURL>/<resourceURI>?<query_string> BODY
 I profiles stabiliscono la temperatura che si vuole avere in un determinato edificio in
determinati periodi della giornata. Per ogni edificio, sarà possibile stabilire un profilo di
comfort per ogni giorno dell’anno. Ogni profilo di comfort è quindi caratterizzato da:
edificio, giornata di attuazione. Ogni edificio è identificato dal suo id (buildingid) e dal
pilot (pilot) di appartenenza.
Ogni profiles si presenta in tal modo:
{"T":20,"INT":[{"from_hh":0, "from_mm":0, "to_hh":0, "to_mm": 0}]}
dove :
a. T : temperature attesa ( richiesta )
b. INT : array di 4 parametri che determinano il periodo di
interesse.
i. from_hh : identifica l’ora in cui il periodo inizia
ii. from_mm : identifica i minuti in cui il periodo inizia
iii. to_hh : identifica l’ora in cui il periodo ha termine
iv. to_mm : identifica i minuti in cui il periodo ha
termine
 Il modello dati di input/output è sempre in formato JSON
base URL: https://sunshine.sinergis.it/services/suggestion
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
RISORSA: profiles (dispositivi)
verb resource description
GET
<base_url>/css/<CODESPACE>/profiles?buildingid=
<BUILDINGID>&pilot=<PILOT>
Lista dei profili di comfort legati
all’edificio determinato dal
BUILDINGID di un determinate pilot
GET <base_url>/css/<CODESPACE>/profiles/<ID>
Dettaglio del profilo con id = <ID>
PUT <base_url>/css/<CODESPACE>/profiles/<ID>
Permette di modificare il profilo
indicato in uri. Ritorna il dettaglio del
profilo modificato. Il payload della
richiesta deve contenere il nuovo
profilo visto appena sopra
POST
<base_url>/css/<CODESPACE>/profiles?
buildingid=<BUILDINGID>&pilot=<PILOT>&daybelow=
<DAYBELOW>&dayupper=<DAYUPPER>
Permette di settare un periodo non
ancora presente in banca dati.
(I.E dayupper=2015-09-
05&daybelow=2015-09-03)
Gli estremi sono compresi nel periodo.
RISORSA: thresholds
verb resource description
GET
<base_url>/css/<CODESPACE>/thresholds?foiuri=<F
OIIDENTIFIER>
Dettaglio delle thresholds per lo shelter
con FOIIDENTIFIER specificata
GET <base_url>/css/<CODESPACE>/thresholds/<ID>
Dettaglio delle thresholds con id = <ID>
PUT
<base_url>/css/<CODESPACE>/thresholds?foiuri=<F
OIIDENTIFIER>&day=<yyyy-MM-
dd>&warmthreshold=<INT_VALUE>&coldthreshold=<IN
T_VALUE>
Permette di editare i valori delle
thresholds per uno specifico shelter e
una determinata data.
3.1.1 Esempi
3.1.1.1 Profili comfort per buildings
Dettaglio del profilo 461:
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
GET https://sunshine.sinergis.it/services/suggestion/css/FER/profiles/461
{
id: "461"
buildingid: "49146"
day: "2015-09-05"
comfortProfile: "{"T":20,"INT":[{"from_hh":0, "from_mm":0, "to_hh":0,
"to_mm": 0}]} "
pilot: "ferrara"
}
Modifica del profilo di comfort:
PUT https://sunshine.sinergis.it/services/suggestion/css/FER/profiles/461
Payload:
{"T":20,"INT":[{"from_hh":8, "from_mm":0, "to_hh":18, "to_mm": 0}]}
{
id: "461"
buildingid: "49146"
day: "2015-09-05"
comfortProfile: "{"T":20,"INT":[{"from_hh":8, "from_mm":0,
"to_hh":18, "to_mm": 0}]} "
pilot: "ferrara"
}
3.1.1.2 Thresholds sulle accensioni per shelters
GET
https://sunshine.sinergis.it/services/suggestion/css/TRN/thresholds?foiuri=http://www.sunsh
ineproject.eu/swe/featureOfInterest/TRN/shelter/SMI
{
thresholds:
{
id: "1"
day: "2015-12-26"
warmthreshold: "2"
coldthreshold: "5"
}
}
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
PUT
https://sunshine.sinergis.it/services/suggestion/css/TRN/threshold?foiuri=http://www.sunshi
neproject.eu/swe/featureOfInterest/TRN/shelter/SMI&day=2015-12-
26&warmthreshold=2&coldthreshold=3
{
thresholds:
{
id: "1"
day: "2015-12-01"
warmthreshold: "2"
coldthreshold: "3"
}
}
3.2 Servizi SOS (suggestion output)
Ad ora è stato attivato il suggestion per un edificio e per uno shelter. Sono state aggiunte due
tipologie di offering per permettere la catalogazione dell’output del suggestion :
CWRM_NUL_1d, CCLD_NUL_1d.
Rispettivamente, la prima rappresenta un contatore giornaliero adimensionale dei picchi di
riscaldamento e il secondo un contatore giornaliero adimensionale dei picchi di
rinfrescamento.
3.2.1 Building
Procedure : http://www.sunshineproject.eu/swe/procedure/FER-S12
Featureofinterest :
http://www.sunshineproject.eu/swe/featureOfInterest/FER/building/ScuolaElemPoledrelli
Offering :
 http://www.sunshineproject.eu/swe/offering/FER-S12_TEMP_CEL_1h
 http://www.sunshineproject.eu/swe/offering/FER-S12_ONOF_BOO_1h
WP8 – Project coordination
D8.1 Project Handbook
CIP-ICT-PSP-2012-6 – 325161
"This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the
Competitiveness and Innovation Framework Programme by the European Community"
(http://ec.europa.eu/ict_psp).
3.2.2 Shelter
Procedure : http://www.sunshineproject.eu/swe/procedure/TRN-S47
Featureofinterest : http://www.sunshineproject.eu/swe/featureOfInterest/TRN/shelter/SMI
Offering :
 http://www.sunshineproject.eu/swe/offering/TRN-S47_TEMP_CEL_15
 http://www.sunshineproject.eu/swe/offering/TRN-S47_CWRM_NUL_1d
 http://www.sunshineproject.eu/swe/offering/TRN-S47_CCLD_NUL_1d

Weitere ähnliche Inhalte

Was ist angesagt?

ISA Energy - VPS - Corporate Presentation
ISA Energy - VPS - Corporate PresentationISA Energy - VPS - Corporate Presentation
ISA Energy - VPS - Corporate Presentation
Nuno Torrado Francisco
 

Was ist angesagt? (20)

SUNSHINE Project: Francesco Pignatelli, Maria Teresa Borzacchiello
SUNSHINE Project: Francesco Pignatelli, Maria Teresa BorzacchielloSUNSHINE Project: Francesco Pignatelli, Maria Teresa Borzacchiello
SUNSHINE Project: Francesco Pignatelli, Maria Teresa Borzacchiello
 
S.1.c Building Energy Performance Estimation
S.1.c Building Energy Performance EstimationS.1.c Building Energy Performance Estimation
S.1.c Building Energy Performance Estimation
 
S 2.1 Introduction to Scenario 2
S 2.1 Introduction to Scenario 2S 2.1 Introduction to Scenario 2
S 2.1 Introduction to Scenario 2
 
S.1.2 Data Model for Energy Maps
S.1.2 Data Model for Energy MapsS.1.2 Data Model for Energy Maps
S.1.2 Data Model for Energy Maps
 
Servizio Gestione Flussi Dati Energetici Edifici
Servizio Gestione Flussi Dati Energetici EdificiServizio Gestione Flussi Dati Energetici Edifici
Servizio Gestione Flussi Dati Energetici Edifici
 
S.1.b Building Energy Pre Certification Service
S.1.b Building Energy Pre Certification ServiceS.1.b Building Energy Pre Certification Service
S.1.b Building Energy Pre Certification Service
 
S.1.1 Introduction to Scenario 1
S.1.1 Introduction to Scenario 1S.1.1 Introduction to Scenario 1
S.1.1 Introduction to Scenario 1
 
SUNSHINE Project: Romain Nouvel, Jean Marie Bahu
SUNSHINE Project: Romain Nouvel, Jean Marie BahuSUNSHINE Project: Romain Nouvel, Jean Marie Bahu
SUNSHINE Project: Romain Nouvel, Jean Marie Bahu
 
S.1.3 INSPIRE Directive
S.1.3 INSPIRE DirectiveS.1.3 INSPIRE Directive
S.1.3 INSPIRE Directive
 
S.1.4 Model for Energy Map Calculation
S.1.4 Model for Energy Map CalculationS.1.4 Model for Energy Map Calculation
S.1.4 Model for Energy Map Calculation
 
S.1.5 Map4Data App
S.1.5 Map4Data AppS.1.5 Map4Data App
S.1.5 Map4Data App
 
SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives
 
ISA Energy - VPS - Corporate Presentation
ISA Energy - VPS - Corporate PresentationISA Energy - VPS - Corporate Presentation
ISA Energy - VPS - Corporate Presentation
 
Standard geodata models for Energy Performance of Buildings: experiences from...
Standard geodata models for Energy Performance of Buildings: experiences from...Standard geodata models for Energy Performance of Buildings: experiences from...
Standard geodata models for Energy Performance of Buildings: experiences from...
 
Jure Čižman, Jožef Stefan Institute, Ljubljana, Slovenia.
Jure Čižman, Jožef Stefan Institute, Ljubljana, Slovenia.Jure Čižman, Jožef Stefan Institute, Ljubljana, Slovenia.
Jure Čižman, Jožef Stefan Institute, Ljubljana, Slovenia.
 
About 50000&1 SEAPs - the EnMS+SEAPs´ approach
About 50000&1 SEAPs - the EnMS+SEAPs´ approachAbout 50000&1 SEAPs - the EnMS+SEAPs´ approach
About 50000&1 SEAPs - the EnMS+SEAPs´ approach
 
SUNSHINE Project Presentation
SUNSHINE Project PresentationSUNSHINE Project Presentation
SUNSHINE Project Presentation
 
Aitor Elorriaga, Institut für Angewandte Systemtechnik Bremen, Germany.
Aitor Elorriaga, Institut für Angewandte Systemtechnik Bremen, Germany.Aitor Elorriaga, Institut für Angewandte Systemtechnik Bremen, Germany.
Aitor Elorriaga, Institut für Angewandte Systemtechnik Bremen, Germany.
 
System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...
System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...
System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...
 
Matija Vajdic, Joint Secretariat, Interreg Central Europe Programme, Vienna, ...
Matija Vajdic, Joint Secretariat, Interreg Central Europe Programme, Vienna, ...Matija Vajdic, Joint Secretariat, Interreg Central Europe Programme, Vienna, ...
Matija Vajdic, Joint Secretariat, Interreg Central Europe Programme, Vienna, ...
 

Andere mochten auch (7)

Sunshine lamia greek native language
Sunshine lamia greek native languageSunshine lamia greek native language
Sunshine lamia greek native language
 
S.3.l Lamp Control Service
S.3.l Lamp Control ServiceS.3.l Lamp Control Service
S.3.l Lamp Control Service
 
S.2.4 Validation Activities for Scenario 2 (case Ferrara)
S.2.4 Validation Activities for Scenario 2 (case Ferrara)S.2.4 Validation Activities for Scenario 2 (case Ferrara)
S.2.4 Validation Activities for Scenario 2 (case Ferrara)
 
Sunshine Project: Energy Maps Trenta
Sunshine Project: Energy Maps TrentaSunshine Project: Energy Maps Trenta
Sunshine Project: Energy Maps Trenta
 
SUNSHINE Project: Paolo Conci
SUNSHINE Project: Paolo ConciSUNSHINE Project: Paolo Conci
SUNSHINE Project: Paolo Conci
 
SUNSHINE Project: Bart delathouwer
SUNSHINE Project: Bart delathouwerSUNSHINE Project: Bart delathouwer
SUNSHINE Project: Bart delathouwer
 
SUNSHINE Project - Scenario 2 (HR)
SUNSHINE Project - Scenario 2 (HR)SUNSHINE Project - Scenario 2 (HR)
SUNSHINE Project - Scenario 2 (HR)
 

Ähnlich wie S.2.i Suggestion Service

IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014   MEGSUS14 - GQM on energy for SaaS - CETICIWSM2014   MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
Nesma
 

Ähnlich wie S.2.i Suggestion Service (20)

D3.4.1 Data fusion tools
D3.4.1 Data fusion toolsD3.4.1 Data fusion tools
D3.4.1 Data fusion tools
 
Smart Traffic Monitoring System Report
Smart Traffic Monitoring System ReportSmart Traffic Monitoring System Report
Smart Traffic Monitoring System Report
 
LunchBox:- A Web And Mobile Application
LunchBox:- A Web And Mobile ApplicationLunchBox:- A Web And Mobile Application
LunchBox:- A Web And Mobile Application
 
SOFTWARE BASED CALCULATION OF CAPACITY OUTAGE OF GENERATING UNITS
SOFTWARE BASED CALCULATION OF CAPACITY OUTAGE OF GENERATING UNITSSOFTWARE BASED CALCULATION OF CAPACITY OUTAGE OF GENERATING UNITS
SOFTWARE BASED CALCULATION OF CAPACITY OUTAGE OF GENERATING UNITS
 
InteGrid Scalability & Replicability results and Replication Roadmap
InteGrid Scalability & Replicability results and Replication RoadmapInteGrid Scalability & Replicability results and Replication Roadmap
InteGrid Scalability & Replicability results and Replication Roadmap
 
IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)
IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)
IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)
 
IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)
IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)
IRJET- Adroit Speculum for Institutional Updates (Smart Mirror)
 
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014   MEGSUS14 - GQM on energy for SaaS - CETICIWSM2014   MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
 
3D-ICONS- D3 1: Interim Report on Data Acquisition
3D-ICONS- D3 1: Interim Report  on Data Acquisition3D-ICONS- D3 1: Interim Report  on Data Acquisition
3D-ICONS- D3 1: Interim Report on Data Acquisition
 
InteGrid SRA & Replication Roadmap (02/06/2020)
InteGrid SRA & Replication Roadmap (02/06/2020)InteGrid SRA & Replication Roadmap (02/06/2020)
InteGrid SRA & Replication Roadmap (02/06/2020)
 
ONLINE NOTICE AND REPORT GENERATOR PLATFORM
ONLINE NOTICE AND REPORT GENERATOR PLATFORMONLINE NOTICE AND REPORT GENERATOR PLATFORM
ONLINE NOTICE AND REPORT GENERATOR PLATFORM
 
Review of Development done in Computerization of Electrical Specifications fo...
Review of Development done in Computerization of Electrical Specifications fo...Review of Development done in Computerization of Electrical Specifications fo...
Review of Development done in Computerization of Electrical Specifications fo...
 
A Collaborative Environment to Boost Co-Production of Sustainable Public Serv...
A Collaborative Environment to Boost Co-Production of Sustainable Public Serv...A Collaborative Environment to Boost Co-Production of Sustainable Public Serv...
A Collaborative Environment to Boost Co-Production of Sustainable Public Serv...
 
Strategic Technical Presenation
Strategic Technical PresenationStrategic Technical Presenation
Strategic Technical Presenation
 
33138 gf a ip v1-en
33138 gf a ip v1-en33138 gf a ip v1-en
33138 gf a ip v1-en
 
Gaurav Paranjape Resume
Gaurav Paranjape ResumeGaurav Paranjape Resume
Gaurav Paranjape Resume
 
IRJET- Google Clock Linked Solar Tractor using IoT
IRJET-  	  Google Clock Linked Solar Tractor using IoTIRJET-  	  Google Clock Linked Solar Tractor using IoT
IRJET- Google Clock Linked Solar Tractor using IoT
 
opteemal-flyer
opteemal-flyeropteemal-flyer
opteemal-flyer
 
Digital Thermoximeter Using IOT
Digital Thermoximeter Using IOTDigital Thermoximeter Using IOT
Digital Thermoximeter Using IOT
 
D-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUpD-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUp
 

Kürzlich hochgeladen

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Kürzlich hochgeladen (20)

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 

S.2.i Suggestion Service

  • 1. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). Suggestion Service Technical documentation part of WP4 Integration of SUNSHINE pilot smart urban services Revision: 1.0 Authors: Luca Giovannini, Oscar Benedetti (SGIS) Umberto Di Staso, Gabrio Girardi (GRAPHITECH)
  • 2. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). Dissemination level PU (public) Contributor(s) Reviewer(s) Editor(s) Partner in charge(s) Due date Submission Date REVISION HISTORY AND STATEMENT OF ORIGINALITY Revision Date Author Organisation Description V0.1 06/11/2015 Luca Giovannini SGIS Document created V1.0 21/12/2015 Luca Giovannini SGIS Final release Statement of originality: This deliverable contains original unpublished work except where clearly indicated otherwise. Acknowledgement of previously published material and of the work of others has been made through appropriate citation, quotation or both. Moreover, this deliverable reflects only the author’s views. The European Community is not liable for any use that might be made of the information contained herein.
  • 3. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). Table of Contents 1 Use Cases - Buildings.......................................................................................................... 4 1.1 Access to daily suggestion on heating system use ........................................................ 4 1.1.1 user interface mockups .......................................................................................... 5 1.2 View/edit of building comfort profiles .......................................................................... 7 1.2.1 user interface mockups .......................................................................................... 7 2 Use Cases - Shelters ........................................................................................................... 9 2.1 Access to daily prediction on h/c system activity.......................................................... 9 2.1.1 user interface mockups .......................................................................................... 9 2.2 View/edit of h/c system thresholds............................................................................. 10 2.2.1 user interface mockups ........................................................................................ 11 3 Server-side Service Specifications.................................................................................... 13 3.1 Servizi RESTful (profili comfort e threshold buildings) ................................................ 13 3.1.1 Esempi................................................................................................................... 14 3.2 Servizi SOS (suggestion output)................................................................................... 16 3.2.1 Building ................................................................................................................. 16 3.2.2 Shelter................................................................................................................... 17
  • 4. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 1 Use Cases - Buildings The suggestion service for buildings has two use cases: 1. Access to daily suggestion on heating system use Regular supervision activity of system suggestions, based on standard comfort profiles ingested at the beginning of the heating season and on daily weather forecasts. Suh a form of fruition implies the ability to access (without editing) daily profiles for: o Requested comfort o Estimated internal temperature profile o Estimated system on/off profile This use case includes also an email notification of the daily suggestion to the user in the case of “out-of-the-average days”. 2. View/edit of building comfort profiles Spot activity to verify/adjust/plan inputted comfort profiles. This use case has to allow a global view of all the requested comfort profiles throughout the thermal season and allow its adjustment. 1.1 Access to daily suggestion on heating system use Suggestions are computed daily for each pilot building covered by the service.  The suggestion is estimated for the day following the current and is scheduled to be computed at 11:00 CET daily, right after the new weather prediction for the current day are loaded from Meteogrid’s weather service.  If the system was not able to retrieve the new 3-day weather forecasts for the day, the forecast of the previous day are used.  If no consumption profile has been provided for the day following the current, the suggestion routine is not executed and no suggestion is computed. The suggestion routine has two outputs:  The estimated internal temperature profile for the day following the current  The suggested on/off profile for the heating system of the building for the same day The outputs of the suggestion profile can be accessed by the user in three ways:  the web client  the energy app  email notification to building manager
  • 5. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 1.1.1 user interface mockups 1.1.1.1 web client The client shows:  The requested comfort profile [1] for the selected day  The estimated internal temperature profile [2] for the selected day  The suggested on/off profile [3] for the heating system of the building for the day By selecting a different day in the past from the calendar [4], the dashboard updates the contents of panel [1], [2] and [3] accordingly. With respect to panel [2] and [3], no suggestion is computed when either:  No comfort profile is provided for the day (the building is not in use)  No forecast data is available 2 4 3 1
  • 6. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 1.1.1.2 energy app The client shows:  The requested comfort profile [1] for the day following the current  The estimated internal temperature profile [2] for the day following the current  The suggested on/off profile [3] for the heating system of the building for the same day By selecting a different day in the past from the calendar [4], the dashboard updates the contents of panel [1], [2] and [3] accordingly. With respect to panel [2] and [3], no suggestion is computed when either:  No comfort profile is provided for the day (the building is not in use)  No forecast data is available 1.1.1.3 email notification to building manager Daily heating schedule suggestion for: Elementare Poledrelli - Via Poledrelli 1 - CT03-77 Heating suggestion for day: 2015-11-03 Requested comfort temperature: 20 °C Requested comfort periods: 32 1 4
  • 7. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). from 7:30 to 18:00 Temperature difference with respect to previous days: DeltaT_min = 3.0 °C (normal) Suggested turn on/off times: Turn on 4:32 Turn off 18:00 1.2 View/edit of building comfort profiles 1.2.1 user interface mockups 1.2.1.1 web client The client shows:  The requested comfort profiles [5] for all the days of the year. Comfort profiles are shown in blocks of 7 consecutive days and changing the day in the calendar on top allows to scroll the blocks backwards and forwards. Days with no comfort profiles are shown with blank lines.  The form to modify/delete [6] the comfort profiles for all the days of the year. The fields from/to allow to edit more than one day at the same time (all with the same comfort values). In order to edit just a single day it is sufficient to fill the field “from” with the corresponding date. 6 5
  • 8. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 1.2.1.2 energy app The client shows:  The requested comfort profiles for all the days of the year. Comfort profiles are shown in a calendar panel [5] with buttons allowing to scroll between the months.  The form to modify/delete [6] the comfort profiles for all the days of the year. 6 5
  • 9. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 2 Use Cases - Shelters The suggestion service for shelter has two use cases:  Access to daily prediction on h/c system activity (shelters)  View/edit of h/c system thresholds (shelters) 2.1 Access to daily prediction on h/c system activity 2.1.1 user interface mockups 2.1.1.1 web client The client shows:  The requested system use thresholds [1] for the selected month  The estimated internal temperature profile [2] for the selected day  The suggested heating/cooling system use [3] for the same day By selecting a different day in the past from the calendar [4], the dashboard updates the contents of panel [2] and [3] accordingly. With respect to panel [2] and [3], no suggestion is computed when no forecast data is available. 2 1 3 4
  • 10. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 2.1.1.2 energy app The client shows:  The requested system use thresholds [1] for the selected month  The estimated internal temperature profile [2] for the selected day  The suggested heating/cooling system use [3] for the same day By selecting a different day in the past from the calendar [4], the dashboard updates the contents of panel [2] and [3] accordingly. With respect to panel [2] and [3], no suggestion is computed when no forecast data is available. 2.2 View/edit of h/c system thresholds There are two types of thresholds:  The number of times the heating system of the shelter is turned on during the day  The number of times the cooling system of the shelter is turned on during the day These two types of threshold can be specified independently  For each shelter  For each month of the year When editing threshold values, the clients only allow the user to specify the year and month of the corresponding timestamp. Then the client will send a PUT command to the server (see 4 1 2 3
  • 11. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). section 3.1.1.2) by adding a fictitious day to the specified date (ie. 2015-12-01). New PUT values referring to the same year/month will overwrite the previous values. Since threshold values are inserted with a bulk ingestion procedure, no INSERT command is available for the client, but just a MODIFY one. 2.2.1 user interface mockups 2.2.1.1 web client The client shows:  The requested system use thresholds [5] for all the months of the year. Changing the day in the calendar on top allows to scroll the thresholds of the different months.  The form to modify/delete [6] the thresholds for all the months of the year. 5 6
  • 12. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 2.2.1.2 energy app The client shows:  The requested system use thresholds [5] for all the months of the year.  The form to modify/delete [6] the thresholds for all the months of the year. 5 6
  • 13. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 3 Server-side Service Specifications 3.1 Servizi RESTful (profili comfort e threshold buildings)  Le risorse gestibili con i servizi REST sono profiles (profili comfort di temperatura attesa).  Nella sintassi dei servizi REST il nome della risorsa è sempre al plurale.  La chiamata a un servizio REST è costituita da una richiesta HTTP che utilizza un cosiddetto verbo (GET, POST, PUT, DELETE …), a un URI di una risorsa a cui si riferisce l’azione del servizio, corredata da eventuali parametri in stile “query string” (?par1=val1&par2=val2) e con un eventuale “body” codificato in JSON o XML. Anche gli header vengono utilizzati per qualificare meglio richiesta: Content-Type specifica ad esempio il formato richiesto. I parametri della query string possono influenzare il comportamento del servizio (parametri per effettuare ricerche, per paginare il risultato …). Nella risposta è essenziale il codice di stato HTTP. Ad es.: 200  ok, 404  not found, 401  not authorized  chiamata tipo: HTTP VERB https://<baseURL>/<resourceURI>?<query_string> BODY  I profiles stabiliscono la temperatura che si vuole avere in un determinato edificio in determinati periodi della giornata. Per ogni edificio, sarà possibile stabilire un profilo di comfort per ogni giorno dell’anno. Ogni profilo di comfort è quindi caratterizzato da: edificio, giornata di attuazione. Ogni edificio è identificato dal suo id (buildingid) e dal pilot (pilot) di appartenenza. Ogni profiles si presenta in tal modo: {"T":20,"INT":[{"from_hh":0, "from_mm":0, "to_hh":0, "to_mm": 0}]} dove : a. T : temperature attesa ( richiesta ) b. INT : array di 4 parametri che determinano il periodo di interesse. i. from_hh : identifica l’ora in cui il periodo inizia ii. from_mm : identifica i minuti in cui il periodo inizia iii. to_hh : identifica l’ora in cui il periodo ha termine iv. to_mm : identifica i minuti in cui il periodo ha termine  Il modello dati di input/output è sempre in formato JSON base URL: https://sunshine.sinergis.it/services/suggestion
  • 14. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). RISORSA: profiles (dispositivi) verb resource description GET <base_url>/css/<CODESPACE>/profiles?buildingid= <BUILDINGID>&pilot=<PILOT> Lista dei profili di comfort legati all’edificio determinato dal BUILDINGID di un determinate pilot GET <base_url>/css/<CODESPACE>/profiles/<ID> Dettaglio del profilo con id = <ID> PUT <base_url>/css/<CODESPACE>/profiles/<ID> Permette di modificare il profilo indicato in uri. Ritorna il dettaglio del profilo modificato. Il payload della richiesta deve contenere il nuovo profilo visto appena sopra POST <base_url>/css/<CODESPACE>/profiles? buildingid=<BUILDINGID>&pilot=<PILOT>&daybelow= <DAYBELOW>&dayupper=<DAYUPPER> Permette di settare un periodo non ancora presente in banca dati. (I.E dayupper=2015-09- 05&daybelow=2015-09-03) Gli estremi sono compresi nel periodo. RISORSA: thresholds verb resource description GET <base_url>/css/<CODESPACE>/thresholds?foiuri=<F OIIDENTIFIER> Dettaglio delle thresholds per lo shelter con FOIIDENTIFIER specificata GET <base_url>/css/<CODESPACE>/thresholds/<ID> Dettaglio delle thresholds con id = <ID> PUT <base_url>/css/<CODESPACE>/thresholds?foiuri=<F OIIDENTIFIER>&day=<yyyy-MM- dd>&warmthreshold=<INT_VALUE>&coldthreshold=<IN T_VALUE> Permette di editare i valori delle thresholds per uno specifico shelter e una determinata data. 3.1.1 Esempi 3.1.1.1 Profili comfort per buildings Dettaglio del profilo 461:
  • 15. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). GET https://sunshine.sinergis.it/services/suggestion/css/FER/profiles/461 { id: "461" buildingid: "49146" day: "2015-09-05" comfortProfile: "{"T":20,"INT":[{"from_hh":0, "from_mm":0, "to_hh":0, "to_mm": 0}]} " pilot: "ferrara" } Modifica del profilo di comfort: PUT https://sunshine.sinergis.it/services/suggestion/css/FER/profiles/461 Payload: {"T":20,"INT":[{"from_hh":8, "from_mm":0, "to_hh":18, "to_mm": 0}]} { id: "461" buildingid: "49146" day: "2015-09-05" comfortProfile: "{"T":20,"INT":[{"from_hh":8, "from_mm":0, "to_hh":18, "to_mm": 0}]} " pilot: "ferrara" } 3.1.1.2 Thresholds sulle accensioni per shelters GET https://sunshine.sinergis.it/services/suggestion/css/TRN/thresholds?foiuri=http://www.sunsh ineproject.eu/swe/featureOfInterest/TRN/shelter/SMI { thresholds: { id: "1" day: "2015-12-26" warmthreshold: "2" coldthreshold: "5" } }
  • 16. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). PUT https://sunshine.sinergis.it/services/suggestion/css/TRN/threshold?foiuri=http://www.sunshi neproject.eu/swe/featureOfInterest/TRN/shelter/SMI&day=2015-12- 26&warmthreshold=2&coldthreshold=3 { thresholds: { id: "1" day: "2015-12-01" warmthreshold: "2" coldthreshold: "3" } } 3.2 Servizi SOS (suggestion output) Ad ora è stato attivato il suggestion per un edificio e per uno shelter. Sono state aggiunte due tipologie di offering per permettere la catalogazione dell’output del suggestion : CWRM_NUL_1d, CCLD_NUL_1d. Rispettivamente, la prima rappresenta un contatore giornaliero adimensionale dei picchi di riscaldamento e il secondo un contatore giornaliero adimensionale dei picchi di rinfrescamento. 3.2.1 Building Procedure : http://www.sunshineproject.eu/swe/procedure/FER-S12 Featureofinterest : http://www.sunshineproject.eu/swe/featureOfInterest/FER/building/ScuolaElemPoledrelli Offering :  http://www.sunshineproject.eu/swe/offering/FER-S12_TEMP_CEL_1h  http://www.sunshineproject.eu/swe/offering/FER-S12_ONOF_BOO_1h
  • 17. WP8 – Project coordination D8.1 Project Handbook CIP-ICT-PSP-2012-6 – 325161 "This project is partially funded under the ICT Policy Support Programme (ICT PSP) as part of the Competitiveness and Innovation Framework Programme by the European Community" (http://ec.europa.eu/ict_psp). 3.2.2 Shelter Procedure : http://www.sunshineproject.eu/swe/procedure/TRN-S47 Featureofinterest : http://www.sunshineproject.eu/swe/featureOfInterest/TRN/shelter/SMI Offering :  http://www.sunshineproject.eu/swe/offering/TRN-S47_TEMP_CEL_15  http://www.sunshineproject.eu/swe/offering/TRN-S47_CWRM_NUL_1d  http://www.sunshineproject.eu/swe/offering/TRN-S47_CCLD_NUL_1d