2. Technologies Developed
Semantic Multimedia Analysis
– Textual Analysis module
Click to edit Master text styles
– Visual and Audio Analysis
Second level
– Speech recognition Query Analysis Results Presentation
Semantic Query AnalysisThird level User Interface
Content Ontology
User Ontology
Content
– Sesame/Lucene engine isFourth level
exploited Mappings Management
Server
Fifth level
Google Web Toolkit (GWT) for
– Ontology Browsing and Editing Ontology Editing and
Mapping
Multimedia
Analysis
– Ontology matching and mapping
– Results presentation
Integrated view based on RESTful Web Services
3. Available Dataset
PAPYRUS Evaluation Dataset
Click to edit Master text styles
– Provided by the participating media organisations (AFP and
DW) Second level
Third level
– Consisting of text, video and images (in English, French and
German) Fourth level
Not publicly available dataset
Fifth level
– News items published in media portals
– Strict copyright rules are applied
4. Future Exploitation
Modular Approach to edit Master text styles
Click
– Web interfaces for providing
individual functionalitiesSecond level PAPYRUS Digital Library Engine
– Extensibility to future Third level Analysis
Multimedia Ontology Tools Domain Ontologies
solutions Fourth level
Audio Analysis
– Easily integrated to existing
platforms Fifth levelSemantic Video Analysis TRENDS - Ontology
editing and mapping News Ontology
Contempt Context based
Relevance Feedback
Availability Schema Concept Mapper
Ontology Browsing and History Ontology
– License based for commercial Named entities annotator Querying
Sub-topic annotator
use
Search Engine
– Some individual tools are
provided as open source
5. A few words on the PAPYRUS Project
PAPYRUS - Cultural andedit Master text styles
Click to historical digital libraries
dynamically mined from news archives (ICT-215874)
Second level
– PAPYRUS Project Web Site
• www.ict-papyrus.eu Third level
– ICT - Digital Libraries andFourth level
Content – DigiCult
• http://cordis.europa.eu/fp7/ict/telearn-
Fifth level
digicult/digicult_en.html/
Project Start Date: 1st March 2008
Project Duration: 32 months
EC contribution: €2.2m
Total cost: €3m