SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Fiber Losses:
Fiber Losses and different Wavelengths
FiberType Wavelength FiberAttenuation ConnectorLoss Splice Loss
Single Mode 1310 nm 0.35 0.5 db 0.05 db
Single Mode 1550 nm 0.22 0.5 db 0.05 db
Attenuation:
The steady decrease or loss of signal power in an optical fiber, primarily due to absorption and scattering.
Attenuation is a wavelength dependent, measured in DB and can be converted to db/km.
Attenuation Formula:
Attenuation(db) = 10 * log2 (P1/P2)
In fiber optics attenuation can be measured as 10 times the log of ratio of input power (P1) to output
power (P2) in watts. Input power is always grater the output power, therefore the ratio will be greater
than 1 and attenuation will be a positive number.
Attenuation (db) = 10 * log2 (P1/P2)
Attenuation (db) = 10 * log2 (1000 uw/ 500 uw)
Attenuation (db) = 10 * log2 (2)
Attenuation (db) = 10 * 0.3
Attenuation (db) = 3 db
Attenuation per km = 3db/15km = 0.2 db/km
Link Loss
The total measured power loss of a fiber optic point to point span or link. The loss is a intrinsic
attenuation and extrinsic discontinuities in a fiber optic cable. Link Loss is wavelength dependent and
measured in decibels per kilometer or db/km.
Link loss is the total loss of power over one link when all factors including fiber attenuation and splices,
connectors, cable bends and other mechanical factors are measured.
Loss Budget :
Total calculated power loss in an optical link or span. Calculation is derived from the sum of all losses
including fiber attenuation splices, connectors and margin of error. Loss budget will be measured in in
db.
Calculate Loss by loss budget formula
Attenuation Test/Insertion loss (Measured by PM/LS)
Calculate Margin(= total loss budget – total measured insertion loss)
Attenuation Test Procedure
Fiber loss & link loss calculating
Fiber loss & link loss calculating
Fiber loss & link loss calculating

Weitere ähnliche Inhalte

Was ist angesagt?

DWDM Presentation
DWDM PresentationDWDM Presentation
DWDM Presentation
ayodejieasy
 
Optical fiber cable production industry
Optical fiber cable production industryOptical fiber cable production industry
Optical fiber cable production industry
Ajjay Kumar Gupta
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf
mehdiberenji
 
ftth mnc vision march 2019.pptx
ftth mnc vision  march 2019.pptxftth mnc vision  march 2019.pptx
ftth mnc vision march 2019.pptx
DandiErlangga2
 

Was ist angesagt? (20)

DWDM Presentation
DWDM PresentationDWDM Presentation
DWDM Presentation
 
Common Layer 2 Threats, Attacks & Mitigation
Common Layer 2 Threats, Attacks & MitigationCommon Layer 2 Threats, Attacks & Mitigation
Common Layer 2 Threats, Attacks & Mitigation
 
loss budget calculation in fiber optic link
 loss budget calculation in fiber optic link loss budget calculation in fiber optic link
loss budget calculation in fiber optic link
 
1 asr9 k platform architecture
1   asr9 k platform architecture1   asr9 k platform architecture
1 asr9 k platform architecture
 
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 CablesHeat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
Huawei GPON Fundamentals
Huawei GPON FundamentalsHuawei GPON Fundamentals
Huawei GPON Fundamentals
 
ALU 7360 5520_gpon_basic_configuration
ALU  7360 5520_gpon_basic_configurationALU  7360 5520_gpon_basic_configuration
ALU 7360 5520_gpon_basic_configuration
 
SDH BASICS
SDH BASICSSDH BASICS
SDH BASICS
 
Optical fiber cable production industry
Optical fiber cable production industryOptical fiber cable production industry
Optical fiber cable production industry
 
Handling Common Faults and Alarms for Huawei RTN Microwaves
Handling Common Faults and Alarms for Huawei RTN MicrowavesHandling Common Faults and Alarms for Huawei RTN Microwaves
Handling Common Faults and Alarms for Huawei RTN Microwaves
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf
 
Protection
ProtectionProtection
Protection
 
Roxtec Cable Entry Seal for Cabinets
Roxtec Cable Entry Seal for CabinetsRoxtec Cable Entry Seal for Cabinets
Roxtec Cable Entry Seal for Cabinets
 
Introduction to dwdm technology
Introduction to dwdm technologyIntroduction to dwdm technology
Introduction to dwdm technology
 
Sdh total final
Sdh total finalSdh total final
Sdh total final
 
optical fibre
optical fibreoptical fibre
optical fibre
 
Pdhsdh
PdhsdhPdhsdh
Pdhsdh
 
Volume check 100 overview
Volume check 100 overviewVolume check 100 overview
Volume check 100 overview
 
Next Generation IP Transport
Next Generation IP TransportNext Generation IP Transport
Next Generation IP Transport
 
ftth mnc vision march 2019.pptx
ftth mnc vision  march 2019.pptxftth mnc vision  march 2019.pptx
ftth mnc vision march 2019.pptx
 

Ähnlich wie Fiber loss & link loss calculating

Revision Mode Fiber Optic - E5122 - Sistem Komunikasi
Revision Mode Fiber Optic - E5122 - Sistem KomunikasiRevision Mode Fiber Optic - E5122 - Sistem Komunikasi
Revision Mode Fiber Optic - E5122 - Sistem Komunikasi
Politeknik Sultan Idris Shah
 
attenuation of optical fiber communication systems.pdf
attenuation of optical fiber communication systems.pdfattenuation of optical fiber communication systems.pdf
attenuation of optical fiber communication systems.pdf
osamayousefsaeed
 
Understanding fiber-characterization-po-fop-tm-ae
Understanding fiber-characterization-po-fop-tm-aeUnderstanding fiber-characterization-po-fop-tm-ae
Understanding fiber-characterization-po-fop-tm-ae
LucioLC
 
Investigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensatedInvestigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensated
IAEME Publication
 
Investigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensatedInvestigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensated
IAEME Publication
 
study of ttc link and parallel coupled filter design
study of ttc link and parallel coupled filter designstudy of ttc link and parallel coupled filter design
study of ttc link and parallel coupled filter design
Manoj Kumar
 
Wdm passive components
Wdm passive componentsWdm passive components
Wdm passive components
Arun K Mohan
 

Ähnlich wie Fiber loss & link loss calculating (20)

Link Engg.ppt
Link Engg.pptLink Engg.ppt
Link Engg.ppt
 
Revision Mode Fiber Optic - E5122 - Sistem Komunikasi
Revision Mode Fiber Optic - E5122 - Sistem KomunikasiRevision Mode Fiber Optic - E5122 - Sistem Komunikasi
Revision Mode Fiber Optic - E5122 - Sistem Komunikasi
 
Unit II.ppt
Unit II.pptUnit II.ppt
Unit II.ppt
 
attenuation of optical fiber communication systems.pdf
attenuation of optical fiber communication systems.pdfattenuation of optical fiber communication systems.pdf
attenuation of optical fiber communication systems.pdf
 
Transceiver design
Transceiver designTransceiver design
Transceiver design
 
4.1 intro to system planning and pwr budgets
4.1 intro to system planning and pwr budgets4.1 intro to system planning and pwr budgets
4.1 intro to system planning and pwr budgets
 
GSM Link Budget
GSM Link BudgetGSM Link Budget
GSM Link Budget
 
9 steps to calculate loss budget
9 steps to calculate loss budget9 steps to calculate loss budget
9 steps to calculate loss budget
 
Understanding fiber-characterization-po-fop-tm-ae
Understanding fiber-characterization-po-fop-tm-aeUnderstanding fiber-characterization-po-fop-tm-ae
Understanding fiber-characterization-po-fop-tm-ae
 
Wcdma planning
Wcdma planningWcdma planning
Wcdma planning
 
Investigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensatedInvestigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensated
 
Investigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensatedInvestigation of optimal duty cycle for gvd undercompensated
Investigation of optimal duty cycle for gvd undercompensated
 
study of ttc link and parallel coupled filter design
study of ttc link and parallel coupled filter designstudy of ttc link and parallel coupled filter design
study of ttc link and parallel coupled filter design
 
Extinction ratio and its effect on the nonlinearity in optical fiber networks...
Extinction ratio and its effect on the nonlinearity in optical fiber networks...Extinction ratio and its effect on the nonlinearity in optical fiber networks...
Extinction ratio and its effect on the nonlinearity in optical fiber networks...
 
Rf basics part1
Rf basics part1Rf basics part1
Rf basics part1
 
Wdm passive components
Wdm passive componentsWdm passive components
Wdm passive components
 
3 g basics
3 g basics3 g basics
3 g basics
 
All Digital Phase Lock Loop 03 12 09
All Digital Phase Lock Loop 03 12 09All Digital Phase Lock Loop 03 12 09
All Digital Phase Lock Loop 03 12 09
 
Transmission system used for optical fibers
Transmission system used for optical fibers Transmission system used for optical fibers
Transmission system used for optical fibers
 
Baud rate is the number of change in signal
Baud rate is the number of change in signalBaud rate is the number of change in signal
Baud rate is the number of change in signal
 

Mehr von Sayed Qaisar Shah (10)

Huawei OLT Ma5600 & 5608t GPON feature glance
Huawei OLT Ma5600 & 5608t GPON feature glanceHuawei OLT Ma5600 & 5608t GPON feature glance
Huawei OLT Ma5600 & 5608t GPON feature glance
 
Joining letter
Joining letterJoining letter
Joining letter
 
Ip addressing & subnetting
Ip addressing & subnettingIp addressing & subnetting
Ip addressing & subnetting
 
Wimax
WimaxWimax
Wimax
 
Jncia junos
Jncia junosJncia junos
Jncia junos
 
Alcatel lucent bts
Alcatel lucent btsAlcatel lucent bts
Alcatel lucent bts
 
Bts commissioning (alcatel lucent)
Bts commissioning (alcatel lucent)Bts commissioning (alcatel lucent)
Bts commissioning (alcatel lucent)
 
Fiber optic solution (bright wires)
Fiber optic solution (bright wires)Fiber optic solution (bright wires)
Fiber optic solution (bright wires)
 
Dcs vs scada
Dcs vs scadaDcs vs scada
Dcs vs scada
 
Bts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucentBts offline commissioning alcatel lucent
Bts offline commissioning alcatel lucent
 

Kürzlich hochgeladen

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Kürzlich hochgeladen (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Fiber loss & link loss calculating

  • 1. Fiber Losses: Fiber Losses and different Wavelengths FiberType Wavelength FiberAttenuation ConnectorLoss Splice Loss Single Mode 1310 nm 0.35 0.5 db 0.05 db Single Mode 1550 nm 0.22 0.5 db 0.05 db Attenuation: The steady decrease or loss of signal power in an optical fiber, primarily due to absorption and scattering. Attenuation is a wavelength dependent, measured in DB and can be converted to db/km. Attenuation Formula: Attenuation(db) = 10 * log2 (P1/P2) In fiber optics attenuation can be measured as 10 times the log of ratio of input power (P1) to output power (P2) in watts. Input power is always grater the output power, therefore the ratio will be greater than 1 and attenuation will be a positive number. Attenuation (db) = 10 * log2 (P1/P2) Attenuation (db) = 10 * log2 (1000 uw/ 500 uw) Attenuation (db) = 10 * log2 (2) Attenuation (db) = 10 * 0.3 Attenuation (db) = 3 db Attenuation per km = 3db/15km = 0.2 db/km
  • 2. Link Loss The total measured power loss of a fiber optic point to point span or link. The loss is a intrinsic attenuation and extrinsic discontinuities in a fiber optic cable. Link Loss is wavelength dependent and measured in decibels per kilometer or db/km. Link loss is the total loss of power over one link when all factors including fiber attenuation and splices, connectors, cable bends and other mechanical factors are measured.
  • 3. Loss Budget : Total calculated power loss in an optical link or span. Calculation is derived from the sum of all losses including fiber attenuation splices, connectors and margin of error. Loss budget will be measured in in db. Calculate Loss by loss budget formula
  • 4. Attenuation Test/Insertion loss (Measured by PM/LS) Calculate Margin(= total loss budget – total measured insertion loss)