SlideShare ist ein Scribd-Unternehmen logo
1 von 25
Downloaden Sie, um offline zu lesen
Project SLOPE
1
WP 6 – System integration
Kick-off Meeting
2-4/Jul/2014
Agenda
• Work Package Goals
• Tasks Overview
• Timeline
• Deliverables
• Task Details
• Risks and Mitigation Actions
• Open Discussion
Kick-off Meeting
2-4/Jul/2014
Work Package Goals
“Achieve a complete integration of the different components that are part of
the SLOPE platform”
WP 2 Components
Forest information
collection and analysis
COA,FLY,GT,ITE,TRE
WP 3 Components
Integration of novel
intelligent harvesting systems
CNR,GRE,KES,ITE,MHG
WP 5 Components
Forest information
system development
CNR,TRE,BO
WP6 Integration (All Partners)
SLOPE PLATFORM
Kick-off Meeting
2-4/Jul/2014
Work Package Goals
• Build a WORKING System
• Ready for pilots and on the field testing
• 3 integration steps
• 3 main tasks (T.6.2,T.6.3,T.6.4)
• Technical and Economical Analysis
• Overall solution costs
• Social impacts
• Environmental impacts
T.6.2
T.6.3
T.6.4
Kick-off Meeting
2-4/Jul/2014
Tasks and Roles
• T.6.1 Definition of integration Steps
• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE
• T.6.2 First Integration - Forest inventory & harvesting systems
• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE
• T.6.3 Second integration – Forest management
• Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE
• T.6.4 – Third integration - System validation
• Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE
• T.6.5 – Scientific Coordination
• Task leader: GRAPHITECH;
Kick-off Meeting
2-4/Jul/2014
Timeline
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
• WP 2,3,4,5 still running when T.6.1 starts
• WP 2,3,4,5 closed before the end of T.6.4
Kick-off Meeting
2-4/Jul/2014
Timeline & Deliverables
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.03 SLOPE System Field Trials Readiness Assessment Report
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
Kick-off Meeting
2-4/Jul/2014
Timeline & Deliverable & Milestone
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing ending
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting
2-4/Jul/2014
Timeline & Deliverable & Milestone & Project Meetings
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing ending
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting
2-4/Jul/2014
Deliverables
• D. 6.01 System Integration and Validation Plan
• Integration and validation procedures and timeline to validate the SLOPE system
• Based on the use cases in WP1
• D.6.03 SLOPE System Field Trials Readiness Assessment Report
• Assessment of the initial user experience and recommendations for the field trials
operations.
• Guidance and system operation manual for the Field Trials operators
Kick-off Meeting
2-4/Jul/2014
Deliverables
• D. 6.021 System Integration Report I:
• Integration test and validation concept procedures results
• Assessment of the initial user experience
• Recommendations for field trials operations
• D 6.022 System Integration Report II:
• Integration test and validation concept procedures results (rev. 2)
• Assessment of the initial user experience (rev. 2)
• Recommendations for field trials operations (rev. 2)
• D 6.023 System Integration Report III:
• Integration test and validation concept procedures results (rev. 3)
• Assessment of the initial user experience (rev. 3)
• Recommendations for field trials operations (rev. 3)
Kick-off Meeting
2-4/Jul/2014
Deliverables
• D6.041 SLOPE System Techno-Economic Evaluation Report I:
• Analysis of technical and economical aspects of SLOPE system
• Current practices and the potential known alternatives comparison
• Estimation phase
• D6.042 SLOPE System Techno-Economic Evaluation Report II:
• Analysis of technical and economical aspects of SLOPE system
• Current practices and the potential known alternatives comparison
• Preliminary results phase
• D6.043 SLOPE System Techno-Economic Evaluation Report III:
• Analysis of technical and economical aspects of SLOPE system
• Current practices and the potential known alternatives comparison
• Final results phase
Kick-off Meeting
2-4/Jul/2014
Tasks Details
Kick-off Meeting
2-4/Jul/2014
Task 6.1
Definition of the integration steps
• Leader: Graphitech
• Participants: KESLA, MHG, FLY, ITENE
Objectives
• Define the integration steps
• Define validation concepts
• Functionalities
• Communication
Kick-off Meeting
2-4/Jul/2014
How to achieve these objectives?
1. System Architecture Analysis (from T.1.5)
• Component Diagram
2. Use case / general process Analysis (from T.1.1 and T.1.3)
• Functional Requirements (execute A, execute B, etc.)
• Non-functional reqirements (speed, reliability, etc.)
Kick-off Meeting
2-4/Jul/2014
How to achieve these objectives?
3. Enumerate all needed software components, hardware, tools etc.
• Forest model
• Measurement systems
• 3D Model Visualisation Software
• Other Software
4. Identify and verify connection between components
5. Plan how to connect between
1. Forest Model with Harvesting
2. Forest Model & Harvesting with Forest Management
Kick-off Meeting
2-4/Jul/2014
How to achieve these objectives?
6. For each integration step between two or more subsystems
1. For each identified interaction between subsystems components:
1. Describe the interaction
2. Describe the expected result
3. Define importance level (i.e. low, medium, high)
2. Define minimum threshold to be achieved
Test
N°
Interaction
Description
Expected result Obtained Result Achieved
Anomaly
Description
... ... ... ... ... ...
8
The user use the 3D
model to…
The application shows …. The application HAS shown… YES None
... ... ... ... ... ...
Kick-off Meeting
2-4/Jul/2014
Components to be integrated
WP2
WP3WP5
WP4
SLOPE DBSLOPE DBSLOPE DB
Kick-off Meeting
2-4/Jul/2014
Deliverables
Reports:
• D.6.01 System Integration and Validation Plan (M13)
Kick-off Meeting
2-4/Jul/2014
Expectations
• Contribution from each partner for its
component
• Joint contribution for each couple of
integrated components by the
corresponding partners
• Regular Telcos on a Monthly basis
• First Telco at Task’s start
Kick-off Meeting
2-4/Jul/2014
Risks
• Data Formats
• DB Model (T.1.5 and T.5.1)
• Reduce Harmonization/adaptation
• Images and other data formats
• Unreliable Services
• Hardware interfaces with software
• RFID
• BT
• Inability to reproduce planned test
field/conditions
• Component testing takes time!
Kick-off Meeting
2-4/Jul/2014
Mitigating Actions
• Exhaustive System Architecture
• T.1.5 and Parallel Session of Tomorrow
• Exhaustive Requirement analysis
• D.1.1 and D.1.2
• Common data model
• T.1.4
• Communication
• Skype (Small Group, no desktop sharing)
• WebEx (up to 25 persons with desktop sharing)
• Monthly Basis
Kick-off Meeting
2-4/Jul/2014
Open Discussion
Kick-off Meeting
2-4/Jul/2014
Thank you for your attention
DANIELE MAGLIOCCHETTI
daniele.magliocchetti@graphitech.it
Fondazione Graphitech
Via Alla Cascata 56C
38123 Trento (ITALY)
Phone: +39 0461.283395
Fax: +39 0461.283398
Kick-off Meeting
2-4/Jul/2014
Task 6.5
Scientific Coordination
• Leader: Graphitech
Objectives
• Technical supervision of technology functionalities as planned
• Management of issues related to Software licenses and/or required hardware
• Quality Assurance and assessment/evaluation of technology results
• Regular reporting of the technical development of the project

Weitere ähnliche Inhalte

Was ist angesagt?

2nd Technical Meeting - WP6
2nd Technical Meeting - WP62nd Technical Meeting - WP6
2nd Technical Meeting - WP6SLOPE Project
 
Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6SLOPE Project
 
Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction SLOPE Project
 
Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 SLOPE Project
 
Kick-Off Meeting - WP5
Kick-Off Meeting - WP5Kick-Off Meeting - WP5
Kick-Off Meeting - WP5SLOPE Project
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3SLOPE Project
 
Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3SLOPE Project
 
Kick-Off Meeting - WP3
Kick-Off Meeting - WP3Kick-Off Meeting - WP3
Kick-Off Meeting - WP3SLOPE Project
 
Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3SLOPE Project
 
Kick-Off Meeting - WP1
Kick-Off Meeting - WP1Kick-Off Meeting - WP1
Kick-Off Meeting - WP1SLOPE Project
 
3rd Technical Meeting - WP7
3rd Technical Meeting - WP73rd Technical Meeting - WP7
3rd Technical Meeting - WP7SLOPE Project
 
Kick-Off Meeting - WP7
Kick-Off Meeting - WP7Kick-Off Meeting - WP7
Kick-Off Meeting - WP7SLOPE Project
 
1st Technical Meeting - WP1
1st Technical Meeting - WP11st Technical Meeting - WP1
1st Technical Meeting - WP1SLOPE Project
 
Kick-Off Meeting - WP2
Kick-Off Meeting - WP2Kick-Off Meeting - WP2
Kick-Off Meeting - WP2SLOPE Project
 
1st Technical Meeting - WP5
1st Technical Meeting - WP51st Technical Meeting - WP5
1st Technical Meeting - WP5SLOPE Project
 
SLOPE 2nd workshop - presentation 1
SLOPE 2nd workshop - presentation 1SLOPE 2nd workshop - presentation 1
SLOPE 2nd workshop - presentation 1SLOPE Project
 
2nd Technical Meeting - WP3
2nd Technical Meeting - WP32nd Technical Meeting - WP3
2nd Technical Meeting - WP3SLOPE Project
 
3rd Technical Meeting - WP3
3rd Technical Meeting - WP33rd Technical Meeting - WP3
3rd Technical Meeting - WP3SLOPE Project
 
2nd Technical Meeting - WP2
2nd Technical Meeting - WP22nd Technical Meeting - WP2
2nd Technical Meeting - WP2SLOPE Project
 
Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1SLOPE Project
 

Was ist angesagt? (20)

2nd Technical Meeting - WP6
2nd Technical Meeting - WP62nd Technical Meeting - WP6
2nd Technical Meeting - WP6
 
Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6Mid-term Review Meeting - WP6
Mid-term Review Meeting - WP6
 
Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction Slope Final Review Meeting - Introduction
Slope Final Review Meeting - Introduction
 
Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1 Slope Final Review Meeting - WP1
Slope Final Review Meeting - WP1
 
Kick-Off Meeting - WP5
Kick-Off Meeting - WP5Kick-Off Meeting - WP5
Kick-Off Meeting - WP5
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3
 
Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3Mid-term Review Meeting - WP3
Mid-term Review Meeting - WP3
 
Kick-Off Meeting - WP3
Kick-Off Meeting - WP3Kick-Off Meeting - WP3
Kick-Off Meeting - WP3
 
Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3Slope Final Review Meeting - WP3
Slope Final Review Meeting - WP3
 
Kick-Off Meeting - WP1
Kick-Off Meeting - WP1Kick-Off Meeting - WP1
Kick-Off Meeting - WP1
 
3rd Technical Meeting - WP7
3rd Technical Meeting - WP73rd Technical Meeting - WP7
3rd Technical Meeting - WP7
 
Kick-Off Meeting - WP7
Kick-Off Meeting - WP7Kick-Off Meeting - WP7
Kick-Off Meeting - WP7
 
1st Technical Meeting - WP1
1st Technical Meeting - WP11st Technical Meeting - WP1
1st Technical Meeting - WP1
 
Kick-Off Meeting - WP2
Kick-Off Meeting - WP2Kick-Off Meeting - WP2
Kick-Off Meeting - WP2
 
1st Technical Meeting - WP5
1st Technical Meeting - WP51st Technical Meeting - WP5
1st Technical Meeting - WP5
 
SLOPE 2nd workshop - presentation 1
SLOPE 2nd workshop - presentation 1SLOPE 2nd workshop - presentation 1
SLOPE 2nd workshop - presentation 1
 
2nd Technical Meeting - WP3
2nd Technical Meeting - WP32nd Technical Meeting - WP3
2nd Technical Meeting - WP3
 
3rd Technical Meeting - WP3
3rd Technical Meeting - WP33rd Technical Meeting - WP3
3rd Technical Meeting - WP3
 
2nd Technical Meeting - WP2
2nd Technical Meeting - WP22nd Technical Meeting - WP2
2nd Technical Meeting - WP2
 
Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1Mid-term Review Meeting - WP1
Mid-term Review Meeting - WP1
 

Andere mochten auch

SLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Project
 
Kick-Off Meeting - WP8
Kick-Off Meeting - WP8Kick-Off Meeting - WP8
Kick-Off Meeting - WP8SLOPE Project
 
Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2SLOPE Project
 
2nd Technical Meeting - WP7
2nd Technical Meeting - WP72nd Technical Meeting - WP7
2nd Technical Meeting - WP7SLOPE Project
 
Mid-term Review Meeting - WP7
Mid-term Review Meeting - WP7Mid-term Review Meeting - WP7
Mid-term Review Meeting - WP7SLOPE Project
 
3rd Technical Meeting - WP8
3rd Technical Meeting - WP83rd Technical Meeting - WP8
3rd Technical Meeting - WP8SLOPE Project
 
Mid-term Review Meeting - WP8
Mid-term Review Meeting - WP8Mid-term Review Meeting - WP8
Mid-term Review Meeting - WP8SLOPE Project
 
Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2SLOPE Project
 
Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7SLOPE Project
 
Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4SLOPE Project
 
3rd Technical Meeting - WP2
3rd Technical Meeting - WP23rd Technical Meeting - WP2
3rd Technical Meeting - WP2SLOPE Project
 
4th Technical Meeting - WP7
4th Technical Meeting - WP74th Technical Meeting - WP7
4th Technical Meeting - WP7SLOPE Project
 
Kick-Off Meeting - WP4
Kick-Off Meeting - WP4Kick-Off Meeting - WP4
Kick-Off Meeting - WP4SLOPE Project
 
SLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Project
 
SLOPE Final Conference - electronic marking of trees
SLOPE Final Conference - electronic marking of treesSLOPE Final Conference - electronic marking of trees
SLOPE Final Conference - electronic marking of treesSLOPE Project
 
4th Technical Meeting - WP4
4th Technical Meeting - WP44th Technical Meeting - WP4
4th Technical Meeting - WP4SLOPE Project
 
2nd Technical Meeting - WP5
2nd Technical Meeting - WP52nd Technical Meeting - WP5
2nd Technical Meeting - WP5SLOPE Project
 
4th Technical Meeting - WP5
4th Technical Meeting - WP54th Technical Meeting - WP5
4th Technical Meeting - WP5SLOPE Project
 

Andere mochten auch (18)

SLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarderSLOPE Final Conference - innovative cable yarder
SLOPE Final Conference - innovative cable yarder
 
Kick-Off Meeting - WP8
Kick-Off Meeting - WP8Kick-Off Meeting - WP8
Kick-Off Meeting - WP8
 
Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2Slope Final Review Meeting - WP2
Slope Final Review Meeting - WP2
 
2nd Technical Meeting - WP7
2nd Technical Meeting - WP72nd Technical Meeting - WP7
2nd Technical Meeting - WP7
 
Mid-term Review Meeting - WP7
Mid-term Review Meeting - WP7Mid-term Review Meeting - WP7
Mid-term Review Meeting - WP7
 
3rd Technical Meeting - WP8
3rd Technical Meeting - WP83rd Technical Meeting - WP8
3rd Technical Meeting - WP8
 
Mid-term Review Meeting - WP8
Mid-term Review Meeting - WP8Mid-term Review Meeting - WP8
Mid-term Review Meeting - WP8
 
Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2Mid-term Review Meeting - WP2
Mid-term Review Meeting - WP2
 
Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP7
 
Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4Slope Final Review Meeting - WP4
Slope Final Review Meeting - WP4
 
3rd Technical Meeting - WP2
3rd Technical Meeting - WP23rd Technical Meeting - WP2
3rd Technical Meeting - WP2
 
4th Technical Meeting - WP7
4th Technical Meeting - WP74th Technical Meeting - WP7
4th Technical Meeting - WP7
 
Kick-Off Meeting - WP4
Kick-Off Meeting - WP4Kick-Off Meeting - WP4
Kick-Off Meeting - WP4
 
SLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machinesSLOPE Final Conference - intelligent machines
SLOPE Final Conference - intelligent machines
 
SLOPE Final Conference - electronic marking of trees
SLOPE Final Conference - electronic marking of treesSLOPE Final Conference - electronic marking of trees
SLOPE Final Conference - electronic marking of trees
 
4th Technical Meeting - WP4
4th Technical Meeting - WP44th Technical Meeting - WP4
4th Technical Meeting - WP4
 
2nd Technical Meeting - WP5
2nd Technical Meeting - WP52nd Technical Meeting - WP5
2nd Technical Meeting - WP5
 
4th Technical Meeting - WP5
4th Technical Meeting - WP54th Technical Meeting - WP5
4th Technical Meeting - WP5
 

Ähnlich wie 1st Technical Meeting - WP6

Wp6 presentation by graphitech
Wp6 presentation by graphitechWp6 presentation by graphitech
Wp6 presentation by graphitechSLOPE Project
 
Blog #02 - Project management report for a call tracking system - A sample as...
Blog #02 - Project management report for a call tracking system - A sample as...Blog #02 - Project management report for a call tracking system - A sample as...
Blog #02 - Project management report for a call tracking system - A sample as...hiranya mht
 
A Structured Approach to Estimating Software Intensive Projects - René Berghu...
A Structured Approach to Estimating Software Intensive Projects - René Berghu...A Structured Approach to Estimating Software Intensive Projects - René Berghu...
A Structured Approach to Estimating Software Intensive Projects - René Berghu...Nesma
 
SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives Raffaele de Amicis
 
Howe Street Basic Project Approach
Howe Street Basic Project ApproachHowe Street Basic Project Approach
Howe Street Basic Project ApproachJasonLhota1
 
IRJET- Agricultural Productivity System
IRJET- Agricultural Productivity SystemIRJET- Agricultural Productivity System
IRJET- Agricultural Productivity SystemIRJET Journal
 
Fleet monitoring in thermal power plant
Fleet monitoring in thermal power plantFleet monitoring in thermal power plant
Fleet monitoring in thermal power plantShaunak Shaunak
 
Task 6.1 by graphitech
Task 6.1 by graphitechTask 6.1 by graphitech
Task 6.1 by graphitechSLOPE Project
 
2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefingloop_wwf
 
Implementation roadmap.docx
Implementation roadmap.docxImplementation roadmap.docx
Implementation roadmap.docxssuserf1bae5
 
Changes to ISO9001/ISO14001
Changes to ISO9001/ISO14001Changes to ISO9001/ISO14001
Changes to ISO9001/ISO14001Sara Gulo
 
18 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v718 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v7Michael Cary
 
eCIO PPT Sunsetting strategy v 3 general distribution
eCIO PPT Sunsetting strategy v 3 general distributioneCIO PPT Sunsetting strategy v 3 general distribution
eCIO PPT Sunsetting strategy v 3 general distributionDavid Niles
 
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...YesserProgram
 
Unit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptxUnit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptxVrundaPatadia
 
rough-work.pptx
rough-work.pptxrough-work.pptx
rough-work.pptxsharpan
 

Ähnlich wie 1st Technical Meeting - WP6 (20)

Wp6 presentation by graphitech
Wp6 presentation by graphitechWp6 presentation by graphitech
Wp6 presentation by graphitech
 
Blog #02 - Project management report for a call tracking system - A sample as...
Blog #02 - Project management report for a call tracking system - A sample as...Blog #02 - Project management report for a call tracking system - A sample as...
Blog #02 - Project management report for a call tracking system - A sample as...
 
Install PRESTO KPI in 5 weeks
Install PRESTO KPI in 5 weeksInstall PRESTO KPI in 5 weeks
Install PRESTO KPI in 5 weeks
 
A Structured Approach to Estimating Software Intensive Projects - René Berghu...
A Structured Approach to Estimating Software Intensive Projects - René Berghu...A Structured Approach to Estimating Software Intensive Projects - René Berghu...
A Structured Approach to Estimating Software Intensive Projects - René Berghu...
 
SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives
 
Howe Street Basic Project Approach
Howe Street Basic Project ApproachHowe Street Basic Project Approach
Howe Street Basic Project Approach
 
IRJET- Agricultural Productivity System
IRJET- Agricultural Productivity SystemIRJET- Agricultural Productivity System
IRJET- Agricultural Productivity System
 
Fleet monitoring in thermal power plant
Fleet monitoring in thermal power plantFleet monitoring in thermal power plant
Fleet monitoring in thermal power plant
 
Task 6.1 by graphitech
Task 6.1 by graphitechTask 6.1 by graphitech
Task 6.1 by graphitech
 
2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing
 
Implementation roadmap.docx
Implementation roadmap.docxImplementation roadmap.docx
Implementation roadmap.docx
 
Chap07
Chap07Chap07
Chap07
 
Changes to ISO9001/ISO14001
Changes to ISO9001/ISO14001Changes to ISO9001/ISO14001
Changes to ISO9001/ISO14001
 
18 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v718 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v7
 
Bballard2000 dissertation
Bballard2000 dissertationBballard2000 dissertation
Bballard2000 dissertation
 
eCIO PPT Sunsetting strategy v 3 general distribution
eCIO PPT Sunsetting strategy v 3 general distributioneCIO PPT Sunsetting strategy v 3 general distribution
eCIO PPT Sunsetting strategy v 3 general distribution
 
IQA_Project
IQA_ProjectIQA_Project
IQA_Project
 
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
 
Unit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptxUnit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptx
 
rough-work.pptx
rough-work.pptxrough-work.pptx
rough-work.pptx
 

Mehr von SLOPE Project

Slope Final Review Meeting - WP8
Slope Final Review Meeting - WP8Slope Final Review Meeting - WP8
Slope Final Review Meeting - WP8SLOPE Project
 
SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE Project
 
SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE Project
 
SLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Project
 
SLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Project
 
SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE Project
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE Project
 
SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE Project
 
SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE Project
 
SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE Project
 
SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE Project
 
SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE Project
 
SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE Project
 
SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2SLOPE Project
 
SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE Project
 
SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6SLOPE Project
 
SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5SLOPE Project
 
SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE Project
 
SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE Project
 

Mehr von SLOPE Project (19)

Slope Final Review Meeting - WP8
Slope Final Review Meeting - WP8Slope Final Review Meeting - WP8
Slope Final Review Meeting - WP8
 
SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 3
 
SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4SLOPE 2nd workshop - presentation 4
SLOPE 2nd workshop - presentation 4
 
SLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forestSLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - sensors for timber grading in forest
 
SLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systemsSLOPE Final Conference - remote sensing systems
SLOPE Final Conference - remote sensing systems
 
SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 3
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4
 
SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1SLOPE 3rd workshop - presentation 1
SLOPE 3rd workshop - presentation 1
 
SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 5
 
SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 4
 
SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 2
 
SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1SLOPE 4th workshop - presentation 1
SLOPE 4th workshop - presentation 1
 
SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2SLOPE 3rd workshop - presentation 2
SLOPE 3rd workshop - presentation 2
 
SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2SLOPE 2nd workshop - presentation 2
SLOPE 2nd workshop - presentation 2
 
SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 7
 
SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 6
 
SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 5
 
SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 4
 
SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3SLOPE 1st workshop - presentation 3
SLOPE 1st workshop - presentation 3
 

Kürzlich hochgeladen

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Kürzlich hochgeladen (20)

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 

1st Technical Meeting - WP6

  • 1. Project SLOPE 1 WP 6 – System integration
  • 2. Kick-off Meeting 2-4/Jul/2014 Agenda • Work Package Goals • Tasks Overview • Timeline • Deliverables • Task Details • Risks and Mitigation Actions • Open Discussion
  • 3. Kick-off Meeting 2-4/Jul/2014 Work Package Goals “Achieve a complete integration of the different components that are part of the SLOPE platform” WP 2 Components Forest information collection and analysis COA,FLY,GT,ITE,TRE WP 3 Components Integration of novel intelligent harvesting systems CNR,GRE,KES,ITE,MHG WP 5 Components Forest information system development CNR,TRE,BO WP6 Integration (All Partners) SLOPE PLATFORM
  • 4. Kick-off Meeting 2-4/Jul/2014 Work Package Goals • Build a WORKING System • Ready for pilots and on the field testing • 3 integration steps • 3 main tasks (T.6.2,T.6.3,T.6.4) • Technical and Economical Analysis • Overall solution costs • Social impacts • Environmental impacts T.6.2 T.6.3 T.6.4
  • 5. Kick-off Meeting 2-4/Jul/2014 Tasks and Roles • T.6.1 Definition of integration Steps • Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE • T.6.2 First Integration - Forest inventory & harvesting systems • Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE • T.6.3 Second integration – Forest management • Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE • T.6.4 – Third integration - System validation • Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE • T.6.5 – Scientific Coordination • Task leader: GRAPHITECH;
  • 6. Kick-off Meeting 2-4/Jul/2014 Timeline 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination • WP 2,3,4,5 still running when T.6.1 starts • WP 2,3,4,5 closed before the end of T.6.4
  • 7. Kick-off Meeting 2-4/Jul/2014 Timeline & Deliverables 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination D.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.03 SLOPE System Field Trials Readiness Assessment Report D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III
  • 8. Kick-off Meeting 2-4/Jul/2014 Timeline & Deliverable & Milestone 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination D.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III MS04 SLOPE System Integration Planning is completed MS05 Forest Inventory and Intelligent Harvesting system integration MS07 Forest Management system integrated MS09 System testing ending D.6.03 SLOPE System Field Trials Readiness Assessment Report
  • 9. Kick-off Meeting 2-4/Jul/2014 Timeline & Deliverable & Milestone & Project Meetings 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination D.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III MS04 SLOPE System Integration Planning is completed MS05 Forest Inventory and Intelligent Harvesting system integration MS07 Forest Management system integrated MS09 System testing ending D.6.03 SLOPE System Field Trials Readiness Assessment Report
  • 10. Kick-off Meeting 2-4/Jul/2014 Deliverables • D. 6.01 System Integration and Validation Plan • Integration and validation procedures and timeline to validate the SLOPE system • Based on the use cases in WP1 • D.6.03 SLOPE System Field Trials Readiness Assessment Report • Assessment of the initial user experience and recommendations for the field trials operations. • Guidance and system operation manual for the Field Trials operators
  • 11. Kick-off Meeting 2-4/Jul/2014 Deliverables • D. 6.021 System Integration Report I: • Integration test and validation concept procedures results • Assessment of the initial user experience • Recommendations for field trials operations • D 6.022 System Integration Report II: • Integration test and validation concept procedures results (rev. 2) • Assessment of the initial user experience (rev. 2) • Recommendations for field trials operations (rev. 2) • D 6.023 System Integration Report III: • Integration test and validation concept procedures results (rev. 3) • Assessment of the initial user experience (rev. 3) • Recommendations for field trials operations (rev. 3)
  • 12. Kick-off Meeting 2-4/Jul/2014 Deliverables • D6.041 SLOPE System Techno-Economic Evaluation Report I: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison • Estimation phase • D6.042 SLOPE System Techno-Economic Evaluation Report II: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison • Preliminary results phase • D6.043 SLOPE System Techno-Economic Evaluation Report III: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison • Final results phase
  • 14. Kick-off Meeting 2-4/Jul/2014 Task 6.1 Definition of the integration steps • Leader: Graphitech • Participants: KESLA, MHG, FLY, ITENE Objectives • Define the integration steps • Define validation concepts • Functionalities • Communication
  • 15. Kick-off Meeting 2-4/Jul/2014 How to achieve these objectives? 1. System Architecture Analysis (from T.1.5) • Component Diagram 2. Use case / general process Analysis (from T.1.1 and T.1.3) • Functional Requirements (execute A, execute B, etc.) • Non-functional reqirements (speed, reliability, etc.)
  • 16. Kick-off Meeting 2-4/Jul/2014 How to achieve these objectives? 3. Enumerate all needed software components, hardware, tools etc. • Forest model • Measurement systems • 3D Model Visualisation Software • Other Software 4. Identify and verify connection between components 5. Plan how to connect between 1. Forest Model with Harvesting 2. Forest Model & Harvesting with Forest Management
  • 17. Kick-off Meeting 2-4/Jul/2014 How to achieve these objectives? 6. For each integration step between two or more subsystems 1. For each identified interaction between subsystems components: 1. Describe the interaction 2. Describe the expected result 3. Define importance level (i.e. low, medium, high) 2. Define minimum threshold to be achieved Test N° Interaction Description Expected result Obtained Result Achieved Anomaly Description ... ... ... ... ... ... 8 The user use the 3D model to… The application shows …. The application HAS shown… YES None ... ... ... ... ... ...
  • 18. Kick-off Meeting 2-4/Jul/2014 Components to be integrated WP2 WP3WP5 WP4 SLOPE DBSLOPE DBSLOPE DB
  • 19. Kick-off Meeting 2-4/Jul/2014 Deliverables Reports: • D.6.01 System Integration and Validation Plan (M13)
  • 20. Kick-off Meeting 2-4/Jul/2014 Expectations • Contribution from each partner for its component • Joint contribution for each couple of integrated components by the corresponding partners • Regular Telcos on a Monthly basis • First Telco at Task’s start
  • 21. Kick-off Meeting 2-4/Jul/2014 Risks • Data Formats • DB Model (T.1.5 and T.5.1) • Reduce Harmonization/adaptation • Images and other data formats • Unreliable Services • Hardware interfaces with software • RFID • BT • Inability to reproduce planned test field/conditions • Component testing takes time!
  • 22. Kick-off Meeting 2-4/Jul/2014 Mitigating Actions • Exhaustive System Architecture • T.1.5 and Parallel Session of Tomorrow • Exhaustive Requirement analysis • D.1.1 and D.1.2 • Common data model • T.1.4 • Communication • Skype (Small Group, no desktop sharing) • WebEx (up to 25 persons with desktop sharing) • Monthly Basis
  • 24. Kick-off Meeting 2-4/Jul/2014 Thank you for your attention DANIELE MAGLIOCCHETTI daniele.magliocchetti@graphitech.it Fondazione Graphitech Via Alla Cascata 56C 38123 Trento (ITALY) Phone: +39 0461.283395 Fax: +39 0461.283398
  • 25. Kick-off Meeting 2-4/Jul/2014 Task 6.5 Scientific Coordination • Leader: Graphitech Objectives • Technical supervision of technology functionalities as planned • Management of issues related to Software licenses and/or required hardware • Quality Assurance and assessment/evaluation of technology results • Regular reporting of the technical development of the project