Simple Lean Value
and Waste Training
By: Romains Bos
• Introduction – Value and Waste
• Defining Value and Waste
• Understanding and Eliminating Waste
• Value and Waste
• Types of Waste
• Examples of Waste
• Office Examples of Waste
• Benefits of Lean
• Remembering the Seven Wastes
• Foundations of Project Success
Agenda
Value and Waste
Introduction
Defining Value and Waste
Value Added Activity
• Done right the first time
• Any activity that changes the form, fit,
function or finish of a product / transaction
• Something customers are willing to pay for
• Addresses specific need(s) at a specific
time
and or a specific price
Non-Value Added Activity
• Not done right the first time
• Takes time / resources / space but does
not add value
• Customer is not willing to pay for
• All other actions and unwanted features
are by definition — WASTE
Typical process is 2-5% value-added activities… 95-98% waste!
Types of
Waste
Unnecessary Waste - adds no value and can be
eliminated immediately. "That's embarrassing.
Let's stop doing that."
Necessary Waste - adds no value, but is
required for the way things are currently done.
(e.g. Verification, approvals)
Observe that two things are ALWAYS happening. . .
Things that should be done
Things that should not be done WASTE
WORK
Time
After
Before
Value Added Work
After
Before
Non Value Added Work
Time
“It”…Either Adds Value or Does Not
Understanding and Eliminating
Waste
Value and Waste
Value
Unnecessary
waste
Necessary
waste
Rework
Missing
information
Lack of / Poor
communication
Information
that does not
(from the
viewpoint of
the customer)
add value to a
good or service
Reviewing the business
rules
Quality checks
Building the metrics
Resources consumed by
inefficient or non-essential
activities
Designing the organizational tools
Transforming the information
Assembling the part
Creating the drawing
Examples of Waste
Waiting
Excess Inventory
Transportation
Over Production
Excess Motion
Over Processing
Defects
IT examples
• Performance and Availability
Issues
• Poor technical designs
• Unused HW, SW and / or licenses
• Multiple versions of the same
reports or objects
• Required fields not really needed
• Not enough Poka-yoke
• Buggy code
• Too many screens
• Manually moving data from one
system to another
• Poor integration design
• Utilizing non-standard integration
tools
• Over-solutioning (unused
features)
• Duplicate functionality
• Table scans of complete
databases
• More than one screen / system
for the same transaction
• Input fields not organized
• Credit application awaiting
approval
• Invoices waiting to be paid
• Missed customer due dates
• Data entry errors
• Duplicate entries
• Shipping hard copies that
requiring signatures
• Running a credit check for
every customer inquiry
• Looking / Searching for data
and info
• Printing material for personal
use
Transaction examples Product examples
• Expensive machine running at
30% capacity
• Material between operations and
process steps
• Buffer & safety stock inventory
• Poor quality or fit of materials
• Handwork…polishing, deburring
• Conveyance of any materials
and tooling
• Conveyance systems
• Sub-assemblies and components
between feeder and main line
• Operators bending, twisting,
turning and reaching
• Machines “cutting air”
• Robotic motion getting home
Office Examples of Waste
Defects
• Data entry errors
• Other order entry or invoice errors
• Any error that gets passed downstream - only to
be returned for correction or clarification
• Changes (Not requested by the customer)
• Design flaws
• Employee turnover
• Absenteeism
Office Examples of Waste - Cont’d
Over Production
• Printing paperwork (That might change) before it
is needed
• Processing an order (That might change) before it
is needed
• Any processing that is done on a routine schedule
- regardless of current demand
Office Examples of Waste - Cont’d
Excess Inventory
• Purchasing or making things before they are
needed (Think office supplies, literature...)
• Things waiting in an (Electronic or physical) In Box
• Unread email
• Any form of batch processing (e.g. Transactions,
reports...)
Office Examples of Waste - Cont’d
Over Processing
• Relying on inspections / auditors or quality
checks, rather than designing the process to
eliminate errors
• Re-entering data into multiple information systems
• Making extra copies
• Generating unused reports
• Expediting
• Unnecessarily cumbersome processes (Think
financial statement period end close, expense
reporting, the budget process...)
Office Examples of Waste - Cont’d
Excess Motion
• Walking to copier, printer, fax...
• Walking between offices
• Central filing
• Going on a "safari" to find missing information
• Backtracking back and forth between computer
screens
Office Examples of Waste - Cont’d
Transportation
• Movement of paperwork
• Multiple hand-offs of electronic data
• Approvals
• Excessive email attachments
• Distributing unnecessary Cc copies to people who
don't really need to know
Office Examples of Waste - Cont’d
Waiting
• Slow computer speed
• Downtime (Computer, fax, phone...)
• Waiting for approvals
• Waiting for information from customer
• Waiting for clarification or correction of work
received from upstream process
Office Examples of Waste - Cont’d
Confusion
• Any missing or misinformation
• Any goals or metrics that cause uncertainty about
the right thing to do
Unsafe or Un-ergonomic
• Office work conditions that cause carpel tunnel,
eye fatigue, chronic back pain, or that
compromise the health and productivity of workers
in any way
Office Examples of Waste - Cont’d
Under Utilized Human Potential
(Performance / Talent)
• Restricting employee's authority and responsibility to make
routine decisions
• Having highly paid staff do routine tasks that don't require
their unique expertise
• Not providing the business tools needed to perform and
continuously improve each employee's assigned work
• Not trusting your people to stop production in order to stop
and fix a problem
• Not trusting people with a flat organization structure of
largely self-directed teams
• Not expecting (and measuring) every person to contribute to
continuous improvement
Excess Inventory Full inboxes, lengthy To-Do lists, long work queues
Defects
Memos / emails / documentation containing spelling and
grammar errors
Waiting Delaying a meeting until a coworker returns from vacation
Over Production Excessive e-mail Cc’ing
Over Processing Routing documents for approval
Excess Motion Walking to the copier, printer, and fax machine
Transportation Interoffice mail / information
Business Process Analogues
Benefits of Lean
• Reduced Cycles
• Better Delivery
• More Capacity
• Better Quality
• Productivity
Improved Customer
Satisfaction
. . . Any Process or Value Stream
After
Before
Wait / Waste . . .
Non Value Add Time
Wait / Waste . . .
Non Value Add Time
Lean Attacks Waste Here
Work . . .
Value Add Time
Work . . .
Value Add Time
Lead Time / Cycle Time
Remembering the Seven Wastes
An easy way to
remember the seven
wastes is TIMWOOD
• T: Transportation
• I: Inventory
• M: Motion
• W: Wait
• O: Over Processing
• O: Over Production
• D: Defect
Another easy way is
NOW TIME: It's now
time to eliminate Mudas
• N: Non Quality
• O: Over Production
• W: Wait
• T: Transportation
• I: Inventory
• M: Motion
• E: Excess
Processing
An even better way is
DOWNTIME which
includes the all important
8th waste of Non Utilized
Talent
• D = Defects
• O = Over Production
• W = Waiting
• N = Non Utilized
Talent
• T = Transportation
• I = Inventory
• M = Motion
• E = Excess
Processing
Foundations of Project Success
Scope and Requirements
Schedule
Project Success
Quality
Cost
Integrity and Safety
The
End
Questions
?
Comments
?

Weitere ähnliche Inhalte

Was ist angesagt?

Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...SN Panigrahi, PMP
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overviewbroper
 
mistake proofing
mistake proofingmistake proofing
mistake proofingJaya Teja
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
 
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...Antonius Pompi Bramono
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 

Was ist angesagt? (20)

Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Lean Managment
Lean ManagmentLean Managment
Lean Managment
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Poka Yoka
Poka Yoka Poka Yoka
Poka Yoka
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overview
 
Qcc
QccQcc
Qcc
 
Dwm ppt
Dwm pptDwm ppt
Dwm ppt
 
mistake proofing
mistake proofingmistake proofing
mistake proofing
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
QCC Presentation
QCC PresentationQCC Presentation
QCC Presentation
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Visual Management
Visual Management Visual Management
Visual Management
 

Andere mochten auch

House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...
House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...
House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...Rod King, Ph.D.
 
The Secret of Lean
The Secret of LeanThe Secret of Lean
The Secret of LeanLean Israel
 
Introducing The Lean Startup
Introducing The Lean StartupIntroducing The Lean Startup
Introducing The Lean StartupThijs Suijten
 
Profile raising: the power of your brand
Profile raising: the power of your brandProfile raising: the power of your brand
Profile raising: the power of your brandCommunityWaikato
 
TAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap StyleTAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap StyleMeg Weber
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
Frame Before You Build, Measure, Learn by Zach Nies
Frame Before You Build, Measure, Learn by Zach NiesFrame Before You Build, Measure, Learn by Zach Nies
Frame Before You Build, Measure, Learn by Zach NiesLean Startup Co.
 
Chapter 9 Creating Brand Equity
Chapter 9 Creating Brand EquityChapter 9 Creating Brand Equity
Chapter 9 Creating Brand EquityDiarta
 
Lean for Small Business
Lean for Small BusinessLean for Small Business
Lean for Small BusinessLean Teams USA
 
All Customers are Not Alike: Gaining a 360 Degree View
All Customers are Not Alike: Gaining a 360 Degree ViewAll Customers are Not Alike: Gaining a 360 Degree View
All Customers are Not Alike: Gaining a 360 Degree ViewG3 Communications
 
Visual Factory Planning and Scheduling
Visual Factory Planning and SchedulingVisual Factory Planning and Scheduling
Visual Factory Planning and SchedulingFulvio Lana
 
Work Place Safety
Work Place SafetyWork Place Safety
Work Place Safetyadullock
 
ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...
ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...
ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...Dillard University Library
 

Andere mochten auch (20)

House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...
House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...
House of Lean Canvas & Business Model Canvas: A PEOPLE-BEFORE-PROFIT (PBP) MA...
 
TPS house of lean
TPS house of leanTPS house of lean
TPS house of lean
 
The Secret of Lean
The Secret of LeanThe Secret of Lean
The Secret of Lean
 
Introducing The Lean Startup
Introducing The Lean StartupIntroducing The Lean Startup
Introducing The Lean Startup
 
Lean for Business
Lean for BusinessLean for Business
Lean for Business
 
Profile raising: the power of your brand
Profile raising: the power of your brandProfile raising: the power of your brand
Profile raising: the power of your brand
 
TAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap StyleTAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap Style
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Simple Lean Training
Simple  Lean TrainingSimple  Lean Training
Simple Lean Training
 
Lean Business Plan:
Lean Business Plan:Lean Business Plan:
Lean Business Plan:
 
Frame Before You Build, Measure, Learn by Zach Nies
Frame Before You Build, Measure, Learn by Zach NiesFrame Before You Build, Measure, Learn by Zach Nies
Frame Before You Build, Measure, Learn by Zach Nies
 
Chapter 9 Creating Brand Equity
Chapter 9 Creating Brand EquityChapter 9 Creating Brand Equity
Chapter 9 Creating Brand Equity
 
Lean for Small Business
Lean for Small BusinessLean for Small Business
Lean for Small Business
 
All Customers are Not Alike: Gaining a 360 Degree View
All Customers are Not Alike: Gaining a 360 Degree ViewAll Customers are Not Alike: Gaining a 360 Degree View
All Customers are Not Alike: Gaining a 360 Degree View
 
8 verspillingen
8 verspillingen8 verspillingen
8 verspillingen
 
Visual Factory Planning and Scheduling
Visual Factory Planning and SchedulingVisual Factory Planning and Scheduling
Visual Factory Planning and Scheduling
 
Waste Mapping: Lean Techniques Applied in a Healthcare Setting
Waste Mapping: Lean Techniques Applied in a Healthcare SettingWaste Mapping: Lean Techniques Applied in a Healthcare Setting
Waste Mapping: Lean Techniques Applied in a Healthcare Setting
 
Visual Board
Visual BoardVisual Board
Visual Board
 
Work Place Safety
Work Place SafetyWork Place Safety
Work Place Safety
 
ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...
ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...
ORLEANS PARISH SCHOOL BOARD PERFORMING & VISUAL ARTS SHOWCASE 2012 @ DILLARD ...
 

Ähnlich wie Simple Lean Value and Waste Training

20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_FinalGuillermo (Bill/Gil) Echeverria
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time ManagementAbhishek Raj
 
Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?Integrify
 
Simply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisSimply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisStephanieOrgan1
 
SharePoint Workflow Best Practices
SharePoint Workflow Best PracticesSharePoint Workflow Best Practices
SharePoint Workflow Best PracticesJoAnna Cheshire
 
8 Deadly Muda_(Shut Your Mouth!)
8 Deadly Muda_(Shut Your Mouth!)8 Deadly Muda_(Shut Your Mouth!)
8 Deadly Muda_(Shut Your Mouth!)Lin Fisher
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationshivithakur110
 
Toyota Production System & 7 Muda
Toyota Production System & 7 MudaToyota Production System & 7 Muda
Toyota Production System & 7 MudaNED UET KHI
 
Reducing Costs Through Document Automation for a More Efficient Workplace
Reducing Costs Through Document Automation for a More Efficient WorkplaceReducing Costs Through Document Automation for a More Efficient Workplace
Reducing Costs Through Document Automation for a More Efficient Workplacedclsocialmedia
 
introduction_module1.pptx
introduction_module1.pptxintroduction_module1.pptx
introduction_module1.pptxSandipanMaji3
 
Pmg tag bpm_presentation
Pmg tag bpm_presentationPmg tag bpm_presentation
Pmg tag bpm_presentationMelanie Brandt
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mappingTunAnhTrnh9
 
Workflow solutions best practices and mistakes to avoid
Workflow solutions best practices and mistakes to avoidWorkflow solutions best practices and mistakes to avoid
Workflow solutions best practices and mistakes to avoidInnoTech
 

Ähnlich wie Simple Lean Value and Waste Training (20)

20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
 
Waste management
Waste managementWaste management
Waste management
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?
 
Simply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisSimply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisis
 
Process+analysis
Process+analysisProcess+analysis
Process+analysis
 
SharePoint Workflow Best Practices
SharePoint Workflow Best PracticesSharePoint Workflow Best Practices
SharePoint Workflow Best Practices
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
8 Deadly Muda_(Shut Your Mouth!)
8 Deadly Muda_(Shut Your Mouth!)8 Deadly Muda_(Shut Your Mouth!)
8 Deadly Muda_(Shut Your Mouth!)
 
Simple Lean and VSM Training
Simple Lean and VSM TrainingSimple Lean and VSM Training
Simple Lean and VSM Training
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste elimination
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
Toyota Production System & 7 Muda
Toyota Production System & 7 MudaToyota Production System & 7 Muda
Toyota Production System & 7 Muda
 
Reducing Costs Through Document Automation for a More Efficient Workplace
Reducing Costs Through Document Automation for a More Efficient WorkplaceReducing Costs Through Document Automation for a More Efficient Workplace
Reducing Costs Through Document Automation for a More Efficient Workplace
 
Lean Manufacturing 101
Lean Manufacturing 101Lean Manufacturing 101
Lean Manufacturing 101
 
introduction_module1.pptx
introduction_module1.pptxintroduction_module1.pptx
introduction_module1.pptx
 
Pmg tag bpm_presentation
Pmg tag bpm_presentationPmg tag bpm_presentation
Pmg tag bpm_presentation
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mapping
 
Workflow solutions best practices and mistakes to avoid
Workflow solutions best practices and mistakes to avoidWorkflow solutions best practices and mistakes to avoid
Workflow solutions best practices and mistakes to avoid
 

Mehr von Romains Bos, PMP, MBA

Mehr von Romains Bos, PMP, MBA (12)

Least Waste Way Project Planning
Least Waste Way Project PlanningLeast Waste Way Project Planning
Least Waste Way Project Planning
 
Deliverables Mapping
Deliverables MappingDeliverables Mapping
Deliverables Mapping
 
Creating a Quality Circle
Creating a Quality CircleCreating a Quality Circle
Creating a Quality Circle
 
Qualities of a Great Program Manager
Qualities of a Great Program ManagerQualities of a Great Program Manager
Qualities of a Great Program Manager
 
The Basics of Good Metric Generation
The Basics of Good Metric GenerationThe Basics of Good Metric Generation
The Basics of Good Metric Generation
 
Vision of Project Success
Vision of Project SuccessVision of Project Success
Vision of Project Success
 
How to Lead High Performance Teams
How to Lead High Performance TeamsHow to Lead High Performance Teams
How to Lead High Performance Teams
 
Organizational Culture That Supports Projects
Organizational Culture That Supports ProjectsOrganizational Culture That Supports Projects
Organizational Culture That Supports Projects
 
Enterprise PMO
Enterprise PMOEnterprise PMO
Enterprise PMO
 
STRIDE Standard Process for RISK
STRIDE Standard Process for RISKSTRIDE Standard Process for RISK
STRIDE Standard Process for RISK
 
The Five Whys
The Five WhysThe Five Whys
The Five Whys
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)
 

Simple Lean Value and Waste Training

  • 1. Simple Lean Value and Waste Training By: Romains Bos
  • 2. • Introduction – Value and Waste • Defining Value and Waste • Understanding and Eliminating Waste • Value and Waste • Types of Waste • Examples of Waste • Office Examples of Waste • Benefits of Lean • Remembering the Seven Wastes • Foundations of Project Success Agenda
  • 4. Defining Value and Waste Value Added Activity • Done right the first time • Any activity that changes the form, fit, function or finish of a product / transaction • Something customers are willing to pay for • Addresses specific need(s) at a specific time and or a specific price Non-Value Added Activity • Not done right the first time • Takes time / resources / space but does not add value • Customer is not willing to pay for • All other actions and unwanted features are by definition — WASTE Typical process is 2-5% value-added activities… 95-98% waste!
  • 5. Types of Waste Unnecessary Waste - adds no value and can be eliminated immediately. "That's embarrassing. Let's stop doing that." Necessary Waste - adds no value, but is required for the way things are currently done. (e.g. Verification, approvals)
  • 6. Observe that two things are ALWAYS happening. . . Things that should be done Things that should not be done WASTE WORK Time After Before Value Added Work After Before Non Value Added Work Time “It”…Either Adds Value or Does Not Understanding and Eliminating Waste
  • 7. Value and Waste Value Unnecessary waste Necessary waste Rework Missing information Lack of / Poor communication Information that does not (from the viewpoint of the customer) add value to a good or service Reviewing the business rules Quality checks Building the metrics Resources consumed by inefficient or non-essential activities Designing the organizational tools Transforming the information Assembling the part Creating the drawing
  • 8. Examples of Waste Waiting Excess Inventory Transportation Over Production Excess Motion Over Processing Defects IT examples • Performance and Availability Issues • Poor technical designs • Unused HW, SW and / or licenses • Multiple versions of the same reports or objects • Required fields not really needed • Not enough Poka-yoke • Buggy code • Too many screens • Manually moving data from one system to another • Poor integration design • Utilizing non-standard integration tools • Over-solutioning (unused features) • Duplicate functionality • Table scans of complete databases • More than one screen / system for the same transaction • Input fields not organized • Credit application awaiting approval • Invoices waiting to be paid • Missed customer due dates • Data entry errors • Duplicate entries • Shipping hard copies that requiring signatures • Running a credit check for every customer inquiry • Looking / Searching for data and info • Printing material for personal use Transaction examples Product examples • Expensive machine running at 30% capacity • Material between operations and process steps • Buffer & safety stock inventory • Poor quality or fit of materials • Handwork…polishing, deburring • Conveyance of any materials and tooling • Conveyance systems • Sub-assemblies and components between feeder and main line • Operators bending, twisting, turning and reaching • Machines “cutting air” • Robotic motion getting home
  • 9. Office Examples of Waste Defects • Data entry errors • Other order entry or invoice errors • Any error that gets passed downstream - only to be returned for correction or clarification • Changes (Not requested by the customer) • Design flaws • Employee turnover • Absenteeism
  • 10. Office Examples of Waste - Cont’d Over Production • Printing paperwork (That might change) before it is needed • Processing an order (That might change) before it is needed • Any processing that is done on a routine schedule - regardless of current demand
  • 11. Office Examples of Waste - Cont’d Excess Inventory • Purchasing or making things before they are needed (Think office supplies, literature...) • Things waiting in an (Electronic or physical) In Box • Unread email • Any form of batch processing (e.g. Transactions, reports...)
  • 12. Office Examples of Waste - Cont’d Over Processing • Relying on inspections / auditors or quality checks, rather than designing the process to eliminate errors • Re-entering data into multiple information systems • Making extra copies • Generating unused reports • Expediting • Unnecessarily cumbersome processes (Think financial statement period end close, expense reporting, the budget process...)
  • 13. Office Examples of Waste - Cont’d Excess Motion • Walking to copier, printer, fax... • Walking between offices • Central filing • Going on a "safari" to find missing information • Backtracking back and forth between computer screens
  • 14. Office Examples of Waste - Cont’d Transportation • Movement of paperwork • Multiple hand-offs of electronic data • Approvals • Excessive email attachments • Distributing unnecessary Cc copies to people who don't really need to know
  • 15. Office Examples of Waste - Cont’d Waiting • Slow computer speed • Downtime (Computer, fax, phone...) • Waiting for approvals • Waiting for information from customer • Waiting for clarification or correction of work received from upstream process
  • 16. Office Examples of Waste - Cont’d Confusion • Any missing or misinformation • Any goals or metrics that cause uncertainty about the right thing to do Unsafe or Un-ergonomic • Office work conditions that cause carpel tunnel, eye fatigue, chronic back pain, or that compromise the health and productivity of workers in any way
  • 17. Office Examples of Waste - Cont’d Under Utilized Human Potential (Performance / Talent) • Restricting employee's authority and responsibility to make routine decisions • Having highly paid staff do routine tasks that don't require their unique expertise • Not providing the business tools needed to perform and continuously improve each employee's assigned work • Not trusting your people to stop production in order to stop and fix a problem • Not trusting people with a flat organization structure of largely self-directed teams • Not expecting (and measuring) every person to contribute to continuous improvement
  • 18. Excess Inventory Full inboxes, lengthy To-Do lists, long work queues Defects Memos / emails / documentation containing spelling and grammar errors Waiting Delaying a meeting until a coworker returns from vacation Over Production Excessive e-mail Cc’ing Over Processing Routing documents for approval Excess Motion Walking to the copier, printer, and fax machine Transportation Interoffice mail / information Business Process Analogues
  • 19. Benefits of Lean • Reduced Cycles • Better Delivery • More Capacity • Better Quality • Productivity Improved Customer Satisfaction . . . Any Process or Value Stream After Before Wait / Waste . . . Non Value Add Time Wait / Waste . . . Non Value Add Time Lean Attacks Waste Here Work . . . Value Add Time Work . . . Value Add Time Lead Time / Cycle Time
  • 20. Remembering the Seven Wastes An easy way to remember the seven wastes is TIMWOOD • T: Transportation • I: Inventory • M: Motion • W: Wait • O: Over Processing • O: Over Production • D: Defect Another easy way is NOW TIME: It's now time to eliminate Mudas • N: Non Quality • O: Over Production • W: Wait • T: Transportation • I: Inventory • M: Motion • E: Excess Processing An even better way is DOWNTIME which includes the all important 8th waste of Non Utilized Talent • D = Defects • O = Over Production • W = Waiting • N = Non Utilized Talent • T = Transportation • I = Inventory • M = Motion • E = Excess Processing
  • 21. Foundations of Project Success Scope and Requirements Schedule Project Success Quality Cost Integrity and Safety