LOT SIZING:
LEAST UNIT COST
BY:
RISHABH JAIN
311
UMANG AGARWAL 352
LOT-SIZING


Deterministic model, where in reality the demand is uncertain and
subject to change.



Optimal solution to the deterministic model may actually yield higher
cost because of the changes in the demand.



Some heuristic methods (example : Least Unit Cost) give lower cost
in the long run.



If the demand and/or costs change, the optimal solution may change
significantly causing some managerial problems.
 The heuristic methods may not require such changes in the
production plan.


Firms Objective : “Making Money:






Reduce Inventory – Lowers Cost – Enhances Profit

LUC is used to take the advantage of
economic purchase order discounts and also
to meet the variations in the product demand.
To find out lowest cost order quantity.
LEAST UNIT COST


A dynamic lot sizing technique that:


Includes ordering cost and inventory carrying cost
for each trial lot size.



Divides by the number of units in lot size.



Then picking the lot size with lowest unit cost.
LOT SIZING CALCULATION
 As

it is discussed before, least unit cost heuristic
chooses a lot size that equals the demand of some K
periods in future, where K>0.

 The

average holding and ordering cost per unit is
computed for each K=1, 2, 3, etc. starting from K=1
and increasing K by 1 until the average cost per unit
starts increasing. The best K is the last one up to which
the average cost per unit decreases.

 The

only difference is that Silver-Meal heuristic chooses
K on the basis of average cost per period and least unit
cost on average cost per unit.

Unit cost = [(Ordering cost + Carrying cost + purchase
price) /
Order quantity ]
LOT-SIZING
Example: The MRP gross requirements for Item A are shown here for the next 10
weeks. Lead time for A is three weeks and setup cost is $10. There is a
carrying cost of $0.01 per unit per week. Beginning inventory is 90 units.
Week
1
2
3
4
5

Gross requirements Week
30
6
50
7
10
8
20
9
70
10

Determine the lot sizes.

Gross requirements
80
20
60
200
50
Lot-Sizing: Least Unit Cost
j
rj
Order for weeks
1 week, week 4
2 weeks, weeks 4 to 5
3 weeks, weeks 4 to 6
4 weeks, weeks 4 to 7
5 weeks, weeks 4 to 8
6 weeks, weeks 4 to 9
7 weeks, weeks 4 to 10

1
2
3
4
5
6
7
20 70 80 20
60 200 50
Units in the inventory at the end of Week
Q
4
5
6
7
8
9 10

H. Ord. Unit
Cost Cost Cost

The order is placed for K periods, for some K>0. Using the above table to find K.
Lot-Sizing: Least Unit Cost
Period
Gross
Requirements
Beginning
Inventory
Net
Requirements
Time-phased Net
Requirements
Planned order
Release
Planned
Deliveries
Ending
Inventory

1
2
3
4 5 6 7 8
9 10
30 50 10 20 70 80 20 60 200 50
90 60 10
0

0

0

0
20

20

60 10

0

Week 4 net requirement = 20 > 0. So, an order is required.
Lot-Sizing: Least Unit Cost
j
rj
Order for weeks
1 week, week 4
2 weeks, weeks 4 to 5
3 weeks, weeks 4 to 6
4 weeks, weeks 4 to 7
5 weeks, weeks 4 to 8
6 weeks, weeks 4 to 9
7 weeks, weeks 4 to 10

1
2
3
4
5
6
7
20 70 80 20
60 200 50
Units in the inventory at the end of Week
Q
4
5
6
7
8
9 10

20

If K=1, order is placed for 1 week and the order size = 20.
Then, the ending inventory = inventory holding cost =0.
The order cost = $10.
Average cost per unit = (0+10)/20=$0.50

H. Ord. Unit
Cost Cost Cost

0.00

10

.500
Lot-Sizing: Least Unit Cost
j
rj
Order for weeks
1 week, week 4
2 weeks, weeks 4 to 5
3 weeks, weeks 4 to 6
4 weeks, weeks 4 to 7
5 weeks, weeks 4 to 8
6 weeks, weeks 4 to 9
7 weeks, weeks 4 to 10

1
2
3
4
5
6
7
20 70 80 20
60 200 50
Units in the inventory at the end of Week
Q
4
5
6
7
8
9 10

H. Ord. Unit
Cost Cost Cost

20

0.00 10

.500

90 70

0.70 10

.119

If K=2, order is placed for 2 weeks and the order size = 20+70=90.
Then, inventory at the end of week 4 = 90-20=70 and
Holding cost =70 ×0.01. = 0.70.
Average cost per unit = (0.70+10)/90=$0.119.
THANK
YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Inventory fundamental powerpoint
Inventory fundamental powerpointInventory fundamental powerpoint
Inventory fundamental powerpoint
ekramkhan
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12
Hashem Yahya Almahdi
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
jetromarquez
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
3abooodi
 
Multi item inventory - joint ordering
Multi item inventory - joint orderingMulti item inventory - joint ordering
Multi item inventory - joint ordering
Anand Ellur
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 

Was ist angesagt? (20)

JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Inventory fundamental powerpoint
Inventory fundamental powerpointInventory fundamental powerpoint
Inventory fundamental powerpoint
 
Safety stocks final
Safety stocks finalSafety stocks final
Safety stocks final
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12
 
Queueing theory
Queueing theoryQueueing theory
Queueing theory
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
Inventory models
Inventory modelsInventory models
Inventory models
 
Quantity discount
Quantity discountQuantity discount
Quantity discount
 
Economies of scale to exploit quantity discount
Economies of scale to exploit quantity discountEconomies of scale to exploit quantity discount
Economies of scale to exploit quantity discount
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Managing inventory at alko inc
Managing inventory at alko incManaging inventory at alko inc
Managing inventory at alko inc
 
Cycle inventory
Cycle inventoryCycle inventory
Cycle inventory
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
 
Multi item inventory - joint ordering
Multi item inventory - joint orderingMulti item inventory - joint ordering
Multi item inventory - joint ordering
 
Inventory management
Inventory managementInventory management
Inventory management
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
JIT Scheduling + Kanban + JIT Services
JIT Scheduling + Kanban + JIT ServicesJIT Scheduling + Kanban + JIT Services
JIT Scheduling + Kanban + JIT Services
 
Economic order quantity (eoq) model
Economic order quantity (eoq) modelEconomic order quantity (eoq) model
Economic order quantity (eoq) model
 
Ch04pp
Ch04ppCh04pp
Ch04pp
 

Andere mochten auch

Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
jhanakshah
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
Avinash Verma
 
Cost unit 2013 part 1. 17 jan
Cost unit 2013 part 1. 17  janCost unit 2013 part 1. 17  jan
Cost unit 2013 part 1. 17 jan
Skript
 
Role of operations, objectives of operations
Role of operations, objectives of operations Role of operations, objectives of operations
Role of operations, objectives of operations
marshjohn
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
ejalgfer
 
5.state diagrams
5.state diagrams5.state diagrams
5.state diagrams
APU
 

Andere mochten auch (20)

Planned order release
Planned order releasePlanned order release
Planned order release
 
Assignment on MRP Calculation
Assignment on MRP CalculationAssignment on MRP Calculation
Assignment on MRP Calculation
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot Size
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Presentation on A-Cat Corp
Presentation on A-Cat CorpPresentation on A-Cat Corp
Presentation on A-Cat Corp
 
Management of education unit
Management of  education unitManagement of  education unit
Management of education unit
 
Time management Model
Time management ModelTime management Model
Time management Model
 
Managing Time & Stress A Different Approach
Managing Time & Stress A Different ApproachManaging Time & Stress A Different Approach
Managing Time & Stress A Different Approach
 
Cost Accounting Project - Determining Unit cost
Cost Accounting Project - Determining Unit costCost Accounting Project - Determining Unit cost
Cost Accounting Project - Determining Unit cost
 
Enterprise resource planning erp
Enterprise resource planning  erpEnterprise resource planning  erp
Enterprise resource planning erp
 
Cost unit 2013 part 1. 17 jan
Cost unit 2013 part 1. 17  janCost unit 2013 part 1. 17  jan
Cost unit 2013 part 1. 17 jan
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
Cost centre and cost unit
Cost centre and cost unitCost centre and cost unit
Cost centre and cost unit
 
Economies of Scale and Resource Mix
Economies of Scale and Resource MixEconomies of Scale and Resource Mix
Economies of Scale and Resource Mix
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
Role of operations, objectives of operations
Role of operations, objectives of operations Role of operations, objectives of operations
Role of operations, objectives of operations
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
Operational Objectives
Operational ObjectivesOperational Objectives
Operational Objectives
 
5.state diagrams
5.state diagrams5.state diagrams
5.state diagrams
 

Ähnlich wie Opc least unit cost

Jupiter Calculator xl13
Jupiter Calculator xl13Jupiter Calculator xl13
Jupiter Calculator xl13
Deep Jyoti
 
quantity discount final.pdf
quantity discount final.pdfquantity discount final.pdf
quantity discount final.pdf
dfgd7
 
EOQ learning and calculation
EOQ learning and calculationEOQ learning and calculation
EOQ learning and calculation
lisa516
 

Ähnlich wie Opc least unit cost (20)

Inventory Management Inventory management
Inventory Management Inventory managementInventory Management Inventory management
Inventory Management Inventory management
 
Or
OrOr
Or
 
Inventory management
Inventory managementInventory management
Inventory management
 
Jupiter Calculator xl13
Jupiter Calculator xl13Jupiter Calculator xl13
Jupiter Calculator xl13
 
quantity discount final.pdf
quantity discount final.pdfquantity discount final.pdf
quantity discount final.pdf
 
Unit 3-inventory control
Unit 3-inventory controlUnit 3-inventory control
Unit 3-inventory control
 
Inventory management
Inventory managementInventory management
Inventory management
 
Ops5
Ops5Ops5
Ops5
 
Inventory management1
Inventory management1Inventory management1
Inventory management1
 
Unit III - Inventory Problems
Unit III - Inventory ProblemsUnit III - Inventory Problems
Unit III - Inventory Problems
 
Lecture4 inv f06_604
Lecture4 inv f06_604Lecture4 inv f06_604
Lecture4 inv f06_604
 
Inventory 1.1
Inventory 1.1Inventory 1.1
Inventory 1.1
 
Standard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.pptStandard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.ppt
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt
 
sunil chopra 1
sunil chopra 1sunil chopra 1
sunil chopra 1
 
EOQ learning and calculation
EOQ learning and calculationEOQ learning and calculation
EOQ learning and calculation
 
Inventory.pptx
Inventory.pptxInventory.pptx
Inventory.pptx
 
Topic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptxTopic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptx
 
Inventory management Q&A
Inventory management Q&AInventory management Q&A
Inventory management Q&A
 
EOQ_EDITED (1).ppt
EOQ_EDITED (1).pptEOQ_EDITED (1).ppt
EOQ_EDITED (1).ppt
 

Kürzlich hochgeladen

Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Kürzlich hochgeladen (20)

Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Opc least unit cost

  • 1. LOT SIZING: LEAST UNIT COST BY: RISHABH JAIN 311 UMANG AGARWAL 352
  • 2. LOT-SIZING  Deterministic model, where in reality the demand is uncertain and subject to change.  Optimal solution to the deterministic model may actually yield higher cost because of the changes in the demand.  Some heuristic methods (example : Least Unit Cost) give lower cost in the long run.  If the demand and/or costs change, the optimal solution may change significantly causing some managerial problems.  The heuristic methods may not require such changes in the production plan.
  • 3.
  • 4.  Firms Objective : “Making Money:    Reduce Inventory – Lowers Cost – Enhances Profit LUC is used to take the advantage of economic purchase order discounts and also to meet the variations in the product demand. To find out lowest cost order quantity.
  • 5. LEAST UNIT COST  A dynamic lot sizing technique that:  Includes ordering cost and inventory carrying cost for each trial lot size.  Divides by the number of units in lot size.  Then picking the lot size with lowest unit cost.
  • 6. LOT SIZING CALCULATION  As it is discussed before, least unit cost heuristic chooses a lot size that equals the demand of some K periods in future, where K>0.  The average holding and ordering cost per unit is computed for each K=1, 2, 3, etc. starting from K=1 and increasing K by 1 until the average cost per unit starts increasing. The best K is the last one up to which the average cost per unit decreases.  The only difference is that Silver-Meal heuristic chooses K on the basis of average cost per period and least unit cost on average cost per unit. Unit cost = [(Ordering cost + Carrying cost + purchase price) / Order quantity ]
  • 7. LOT-SIZING Example: The MRP gross requirements for Item A are shown here for the next 10 weeks. Lead time for A is three weeks and setup cost is $10. There is a carrying cost of $0.01 per unit per week. Beginning inventory is 90 units. Week 1 2 3 4 5 Gross requirements Week 30 6 50 7 10 8 20 9 70 10 Determine the lot sizes. Gross requirements 80 20 60 200 50
  • 8. Lot-Sizing: Least Unit Cost j rj Order for weeks 1 week, week 4 2 weeks, weeks 4 to 5 3 weeks, weeks 4 to 6 4 weeks, weeks 4 to 7 5 weeks, weeks 4 to 8 6 weeks, weeks 4 to 9 7 weeks, weeks 4 to 10 1 2 3 4 5 6 7 20 70 80 20 60 200 50 Units in the inventory at the end of Week Q 4 5 6 7 8 9 10 H. Ord. Unit Cost Cost Cost The order is placed for K periods, for some K>0. Using the above table to find K.
  • 9. Lot-Sizing: Least Unit Cost Period Gross Requirements Beginning Inventory Net Requirements Time-phased Net Requirements Planned order Release Planned Deliveries Ending Inventory 1 2 3 4 5 6 7 8 9 10 30 50 10 20 70 80 20 60 200 50 90 60 10 0 0 0 0 20 20 60 10 0 Week 4 net requirement = 20 > 0. So, an order is required.
  • 10. Lot-Sizing: Least Unit Cost j rj Order for weeks 1 week, week 4 2 weeks, weeks 4 to 5 3 weeks, weeks 4 to 6 4 weeks, weeks 4 to 7 5 weeks, weeks 4 to 8 6 weeks, weeks 4 to 9 7 weeks, weeks 4 to 10 1 2 3 4 5 6 7 20 70 80 20 60 200 50 Units in the inventory at the end of Week Q 4 5 6 7 8 9 10 20 If K=1, order is placed for 1 week and the order size = 20. Then, the ending inventory = inventory holding cost =0. The order cost = $10. Average cost per unit = (0+10)/20=$0.50 H. Ord. Unit Cost Cost Cost 0.00 10 .500
  • 11. Lot-Sizing: Least Unit Cost j rj Order for weeks 1 week, week 4 2 weeks, weeks 4 to 5 3 weeks, weeks 4 to 6 4 weeks, weeks 4 to 7 5 weeks, weeks 4 to 8 6 weeks, weeks 4 to 9 7 weeks, weeks 4 to 10 1 2 3 4 5 6 7 20 70 80 20 60 200 50 Units in the inventory at the end of Week Q 4 5 6 7 8 9 10 H. Ord. Unit Cost Cost Cost 20 0.00 10 .500 90 70 0.70 10 .119 If K=2, order is placed for 2 weeks and the order size = 20+70=90. Then, inventory at the end of week 4 = 90-20=70 and Holding cost =70 ×0.01. = 0.70. Average cost per unit = (0.70+10)/90=$0.119.