NOTICE
Ecology will “RED TAG” any UST system that
does not have required spill prevention,
overfill prevention, leak detection, or corrosion
protection equipment
Release Detection
Methods/Equipment
Tank Release Detection





Automatic Tank Gauging (ATG)
Interstitial Monitoring
Inventory Control
Manual Tank Gauging

Piping Release Detection

 Automatic Line Leak Detector
 Annual Line Tightness Testing
 Interstitial Monitoring or Sump Sensors
One form of release detection must be performed.
Example: If ATG is not operating you must use another from of detection such as
SIR to stay operational
Cathodic Protection System
•
•
•
•

•

•

Performance standard requirement for a
steel UST
Coated with a dielectric
External corrosion protection
Must be designed by a field corrosion
expert
Current then flows through the soil to the
UST system and returns to the rectifier
through an insulated wire attached to the
UST. The UST system is protected because
the current going to the UST system
overcomes the corrosion-causing current
normally flowing away from it.
Must be tested when installed every 3
years thereafter.
Release Detection Equipment
Dispenser

This is a typical gasoline-product dispenser. A containment basin is located
underneath to collect any product that is released due to a malfunction in or
below the dispenser . Any liquid in the catch basin must be removed and
disposed of properly. Tanks must be monitored every 30 days for leak
detection (frequent testing is encouraged for early leak detection).
Spill Bucket

This photos shows a typical fill sump. Surrounding the fill is a spill
bucket that collects small releases of fuel during delivery and
rainwater. Fill sumps should be kept free of debris and dry.
Release Detection
 UST owners/operators must be able to detect a release from tanks or
connected piping. Systems must be monitored every 30 days for releases
 You must keep 5 years of release detection records
 Equipment must have 95% confidence of detecting a leak from any portion
of the system routinely containing product
 Equipment must be installed, calibrated, operated, and maintained per
manufacturer’s specifications , including routine maintenance
 It must meet certain performance claims
 You must use approved equipment, and it may only be installed and
serviced by certified technicians
Release Detection
 Tanks of 1,000 gallons or less may use weekly tank gauging
 Emergency generator tanks of less than 2,000 gallons may use monthly
tank gauging in conjunction with annual tightness test, over 2,000 gallons
must use weekly testing in conjunction with annual tightness test
 tightness testing every five years, daily inventory control, automatic tank
gauging, vapor monitoring, ground water monitoring, can be used as a
form of tank leak detection in performance requirements of section
WAC 173-360-345
 An automatic line leak detector or line tightness testing conducted by a
citified UST supervisor can be used as a form of pipe leak detection for
pressurized or suction piping in performance requirements of section
WAC 173-360-350
Release Detection
Keep all records and paperwork onsite or readily
available on release detection methods, including:





Performance Claims
Third-Party Evaluations
Testing Results
Calibration, Maintenance, and Repair
Release Detection
 Both a suspected or confirmed release from tanks/piping must be reported to the
EcologyWITHIN24 HOURS (see regional contact numbers for your area on map below)
 Suspected releases must be investigated within 7 days of discovery
 If you have a tank with a confirmed release, product cannot be delivered to that tank.
 It is highly recommended that the leaking tank be emptied
 You must lock the fill pipe
 Emergency spills to waterways like catch basins contact number is 1-800-258-5990
(Emergency Operations Center of the Dept of Management)
Reference: https://fortress.wa.gov/ecy/publications/91br11.pdf
Checking Product Level

A tank-gauging stick is one method for daily inventory control to determining
level of product in the UST. Use the stick daily to cross-reference with sales
and delivery volume as one method of UST leak detection. (measure to 1/8 of
an inch)
At least two forms of leak detection is recommended such as tightness
testing and automatic tank gauging if tank is larger than 1000 gallons
Statistical Inventory Reconciliation (SIR)
An outside vendor that analyzes inventory, delivery, and
dispensing data collected over a period of time to determine
whether or not a tank system is leaking
Information must be sent in monthly and Report kept on
site
The vendor uses sophisticated computer software to
conduct a statistical analysis of the data and provides you
with a test report
Equivalent to tank tightness testing, a SIR method must be
able to detect a leak at least as small 0.1 gallons per hour and
meet the federal regulatory requirements
SIR meets federal leak detection requirements for new and
existing USTs as follows with a:
0.2 gallon per hour leak detection capability meets
the federal requirements for monthly monitoring
for the life of the tank and piping
0.1 gallon per hour leak detection capability meets
the federal requirements as an equivalent to tank
tightness testing
Automatic Tank Gauging

A method of leak detection is automatic tank gauging. An ATG machine like
the one pictured here has sensors that provide information like UST
product levels and also detects leaks and water in the system. Sensors are
located throughout the UST system. Most ATGs have a loud, audible alarm
to notify facility personnel when a release is detected.
Automatic Tank Gauge Alarm
Automatic Tank Gauge Reports
Automatic Tank Gauge Reporting
 Daily
ATG performs a leak test and will alarm if not in compliance with federal
requirement leak rate of 0.2 gph from any portion of the tank
 Monthly
Recommended - keep one passing leak test printout per month for each
tank
 Annually
ATG equipment inspected and calibrated
Must be placed in test mode and report kept on file at site
Automatic Tank Gauge Reporting
Keep the following records for 5
years
 Monthly ATG leak-test results printouts
 All calibration, maintenance and repair records for the ATG
Record Keeping
 ALL PERFORMANCE CLAIMS, TESTING RESULTS, CALIBRATIONS, AND
MAINTENANCE, ETC., MUST BE KEPT FOR 5 YEARS
 Report suspected and confirmed releases within 24 hours
 Keep records of the following:
 Released substances
 Product found in soil
 Unexplained water in tanks, pipes, and spill buckets
 Alarm logs and response
 Erratic behavior in equipment unless found to be defective, not
leaking
Record Keeping
 You must keep records of all written performance claims pertaining to
any release-detection system used and the 3rd party evaluation and
approval
 Keep results of any sampling, equipment testing, or monitoring for 5
years
 Keep written documentation of all calibration, maintenance, and repair
of release detection equipment permanently located onsite or readily
available
 Any leak test results or other observations or results indicating a
release must be reported within 24 hours as a suspected release

Weitere ähnliche Inhalte

Was ist angesagt?

Krishnan basics of calibrations and pv non analytical instruments
Krishnan basics of calibrations and pv non analytical instrumentsKrishnan basics of calibrations and pv non analytical instruments
Krishnan basics of calibrations and pv non analytical instruments
eslamgouda
 
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
Franklin Del Rosario, P.Eng.
 
Calibration of Instruments
Calibration of InstrumentsCalibration of Instruments
Calibration of Instruments
karoline Enoch
 
Thariq_Ahamed.M(Nov 15)
Thariq_Ahamed.M(Nov 15)Thariq_Ahamed.M(Nov 15)
Thariq_Ahamed.M(Nov 15)
Thariq Ahamed
 

Was ist angesagt? (20)

Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
 
Water Quality Monitor - Sensor Check Procedures
Water Quality Monitor - Sensor Check ProceduresWater Quality Monitor - Sensor Check Procedures
Water Quality Monitor - Sensor Check Procedures
 
Bridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBridging the Gap in Flow Measurement
Bridging the Gap in Flow Measurement
 
Workshop On Risk Assesment by Palash Ch Das
Workshop On Risk Assesment by Palash Ch DasWorkshop On Risk Assesment by Palash Ch Das
Workshop On Risk Assesment by Palash Ch Das
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
 
PCAPP Laboratory February 26, 2014
PCAPP Laboratory February 26, 2014PCAPP Laboratory February 26, 2014
PCAPP Laboratory February 26, 2014
 
Krishnan basics of calibrations and pv non analytical instruments
Krishnan basics of calibrations and pv non analytical instrumentsKrishnan basics of calibrations and pv non analytical instruments
Krishnan basics of calibrations and pv non analytical instruments
 
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
 
Equipment calibration PPT by Shravan Kumar
Equipment calibration PPT by Shravan KumarEquipment calibration PPT by Shravan Kumar
Equipment calibration PPT by Shravan Kumar
 
Product Line
Product LineProduct Line
Product Line
 
12-Page List of Toxic Chemicals and Heavy Metals
12-Page List of Toxic Chemicals and Heavy Metals12-Page List of Toxic Chemicals and Heavy Metals
12-Page List of Toxic Chemicals and Heavy Metals
 
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
 
Calibration of Instruments
Calibration of InstrumentsCalibration of Instruments
Calibration of Instruments
 
540 Term Paper
540 Term Paper540 Term Paper
540 Term Paper
 
Calibration
CalibrationCalibration
Calibration
 
Qualification of analytical instrument of FTIR
Qualification of analytical instrument of FTIR Qualification of analytical instrument of FTIR
Qualification of analytical instrument of FTIR
 
Thariq_Ahamed.M(Nov 15)
Thariq_Ahamed.M(Nov 15)Thariq_Ahamed.M(Nov 15)
Thariq_Ahamed.M(Nov 15)
 
Classic Controls Florida Linecard
Classic Controls Florida LinecardClassic Controls Florida Linecard
Classic Controls Florida Linecard
 
Safety Relief Valve sizing, selection & quotation software
Safety Relief Valve sizing, selection & quotation software Safety Relief Valve sizing, selection & quotation software
Safety Relief Valve sizing, selection & quotation software
 

Andere mochten auch (11)

Presentation3
Presentation3Presentation3
Presentation3
 
Presentation9
Presentation9Presentation9
Presentation9
 
Presentation4
Presentation4Presentation4
Presentation4
 
โครงงาน_29
โครงงาน_29โครงงาน_29
โครงงาน_29
 
Presentation2
Presentation2Presentation2
Presentation2
 
Hanging solutions for your bathroom
Hanging solutions for your bathroomHanging solutions for your bathroom
Hanging solutions for your bathroom
 
M2 01
M2 01M2 01
M2 01
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation8
Presentation8Presentation8
Presentation8
 
Presentation5
Presentation5Presentation5
Presentation5
 
M1 20-완성
M1 20-완성M1 20-완성
M1 20-완성
 

Ähnlich wie Presentation6

BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline Hydrostatic
Scott Nunn
 
Wetstock Live brochure
Wetstock Live brochureWetstock Live brochure
Wetstock Live brochure
Alex Yan
 
Control and dosing instruments catalog
Control and dosing instruments catalogControl and dosing instruments catalog
Control and dosing instruments catalog
Depuratori Acqua Osmosi Inversa Addolcitori Sinergroup
 
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
Schneider Electric
 

Ähnlich wie Presentation6 (20)

Rams 2007 paper pdf
Rams 2007 paper pdfRams 2007 paper pdf
Rams 2007 paper pdf
 
Underground Storage Tanks
Underground Storage TanksUnderground Storage Tanks
Underground Storage Tanks
 
An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...
 
F500 series floco positive displacement meters
F500 series floco positive displacement metersF500 series floco positive displacement meters
F500 series floco positive displacement meters
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 
All you Need to Know About Sampling and Analysis - OGSI
All you Need to Know About Sampling and Analysis - OGSIAll you Need to Know About Sampling and Analysis - OGSI
All you Need to Know About Sampling and Analysis - OGSI
 
Minimal Requirements for Relief Systems Documentation
Minimal Requirements for Relief Systems DocumentationMinimal Requirements for Relief Systems Documentation
Minimal Requirements for Relief Systems Documentation
 
Combustible Storage at Pump Stations – The Forgotten Danger – Understanding S...
Combustible Storage at Pump Stations – The Forgotten Danger – Understanding S...Combustible Storage at Pump Stations – The Forgotten Danger – Understanding S...
Combustible Storage at Pump Stations – The Forgotten Danger – Understanding S...
 
BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline Hydrostatic
 
Wetstock Live brochure
Wetstock Live brochureWetstock Live brochure
Wetstock Live brochure
 
07 wtp design 2
07 wtp design 207 wtp design 2
07 wtp design 2
 
ABHISHEK S2 PV GC pharmaceutical validation
ABHISHEK S2 PV GC pharmaceutical validationABHISHEK S2 PV GC pharmaceutical validation
ABHISHEK S2 PV GC pharmaceutical validation
 
Improving arizonas inspection program to meet modern challenges klfp
Improving arizonas inspection program to meet modern challenges klfpImproving arizonas inspection program to meet modern challenges klfp
Improving arizonas inspection program to meet modern challenges klfp
 
Flocal & flow lab oct 2017 - final
Flocal & flow lab   oct 2017 - finalFlocal & flow lab   oct 2017 - final
Flocal & flow lab oct 2017 - final
 
Control Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous ControlControl Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous Control
 
Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility System
 
Microbiology lab QC
Microbiology lab QCMicrobiology lab QC
Microbiology lab QC
 
Flow Instruments for Test and Measurement Selection Guide by Badger Meter
Flow Instruments for Test and Measurement Selection Guide by Badger MeterFlow Instruments for Test and Measurement Selection Guide by Badger Meter
Flow Instruments for Test and Measurement Selection Guide by Badger Meter
 
Control and dosing instruments catalog
Control and dosing instruments catalogControl and dosing instruments catalog
Control and dosing instruments catalog
 
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
 

Kürzlich hochgeladen

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Kürzlich hochgeladen (20)

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 

Presentation6

  • 2. NOTICE Ecology will “RED TAG” any UST system that does not have required spill prevention, overfill prevention, leak detection, or corrosion protection equipment
  • 3. Release Detection Methods/Equipment Tank Release Detection     Automatic Tank Gauging (ATG) Interstitial Monitoring Inventory Control Manual Tank Gauging Piping Release Detection  Automatic Line Leak Detector  Annual Line Tightness Testing  Interstitial Monitoring or Sump Sensors One form of release detection must be performed. Example: If ATG is not operating you must use another from of detection such as SIR to stay operational
  • 4. Cathodic Protection System • • • • • • Performance standard requirement for a steel UST Coated with a dielectric External corrosion protection Must be designed by a field corrosion expert Current then flows through the soil to the UST system and returns to the rectifier through an insulated wire attached to the UST. The UST system is protected because the current going to the UST system overcomes the corrosion-causing current normally flowing away from it. Must be tested when installed every 3 years thereafter.
  • 6. Dispenser This is a typical gasoline-product dispenser. A containment basin is located underneath to collect any product that is released due to a malfunction in or below the dispenser . Any liquid in the catch basin must be removed and disposed of properly. Tanks must be monitored every 30 days for leak detection (frequent testing is encouraged for early leak detection).
  • 7. Spill Bucket This photos shows a typical fill sump. Surrounding the fill is a spill bucket that collects small releases of fuel during delivery and rainwater. Fill sumps should be kept free of debris and dry.
  • 8. Release Detection  UST owners/operators must be able to detect a release from tanks or connected piping. Systems must be monitored every 30 days for releases  You must keep 5 years of release detection records  Equipment must have 95% confidence of detecting a leak from any portion of the system routinely containing product  Equipment must be installed, calibrated, operated, and maintained per manufacturer’s specifications , including routine maintenance  It must meet certain performance claims  You must use approved equipment, and it may only be installed and serviced by certified technicians
  • 9. Release Detection  Tanks of 1,000 gallons or less may use weekly tank gauging  Emergency generator tanks of less than 2,000 gallons may use monthly tank gauging in conjunction with annual tightness test, over 2,000 gallons must use weekly testing in conjunction with annual tightness test  tightness testing every five years, daily inventory control, automatic tank gauging, vapor monitoring, ground water monitoring, can be used as a form of tank leak detection in performance requirements of section WAC 173-360-345  An automatic line leak detector or line tightness testing conducted by a citified UST supervisor can be used as a form of pipe leak detection for pressurized or suction piping in performance requirements of section WAC 173-360-350
  • 10. Release Detection Keep all records and paperwork onsite or readily available on release detection methods, including:     Performance Claims Third-Party Evaluations Testing Results Calibration, Maintenance, and Repair
  • 11. Release Detection  Both a suspected or confirmed release from tanks/piping must be reported to the EcologyWITHIN24 HOURS (see regional contact numbers for your area on map below)  Suspected releases must be investigated within 7 days of discovery  If you have a tank with a confirmed release, product cannot be delivered to that tank.  It is highly recommended that the leaking tank be emptied  You must lock the fill pipe  Emergency spills to waterways like catch basins contact number is 1-800-258-5990 (Emergency Operations Center of the Dept of Management) Reference: https://fortress.wa.gov/ecy/publications/91br11.pdf
  • 12. Checking Product Level A tank-gauging stick is one method for daily inventory control to determining level of product in the UST. Use the stick daily to cross-reference with sales and delivery volume as one method of UST leak detection. (measure to 1/8 of an inch) At least two forms of leak detection is recommended such as tightness testing and automatic tank gauging if tank is larger than 1000 gallons
  • 13.
  • 14. Statistical Inventory Reconciliation (SIR) An outside vendor that analyzes inventory, delivery, and dispensing data collected over a period of time to determine whether or not a tank system is leaking Information must be sent in monthly and Report kept on site The vendor uses sophisticated computer software to conduct a statistical analysis of the data and provides you with a test report Equivalent to tank tightness testing, a SIR method must be able to detect a leak at least as small 0.1 gallons per hour and meet the federal regulatory requirements SIR meets federal leak detection requirements for new and existing USTs as follows with a: 0.2 gallon per hour leak detection capability meets the federal requirements for monthly monitoring for the life of the tank and piping 0.1 gallon per hour leak detection capability meets the federal requirements as an equivalent to tank tightness testing
  • 15. Automatic Tank Gauging A method of leak detection is automatic tank gauging. An ATG machine like the one pictured here has sensors that provide information like UST product levels and also detects leaks and water in the system. Sensors are located throughout the UST system. Most ATGs have a loud, audible alarm to notify facility personnel when a release is detected.
  • 18. Automatic Tank Gauge Reporting  Daily ATG performs a leak test and will alarm if not in compliance with federal requirement leak rate of 0.2 gph from any portion of the tank  Monthly Recommended - keep one passing leak test printout per month for each tank  Annually ATG equipment inspected and calibrated Must be placed in test mode and report kept on file at site
  • 19. Automatic Tank Gauge Reporting Keep the following records for 5 years  Monthly ATG leak-test results printouts  All calibration, maintenance and repair records for the ATG
  • 20. Record Keeping  ALL PERFORMANCE CLAIMS, TESTING RESULTS, CALIBRATIONS, AND MAINTENANCE, ETC., MUST BE KEPT FOR 5 YEARS  Report suspected and confirmed releases within 24 hours  Keep records of the following:  Released substances  Product found in soil  Unexplained water in tanks, pipes, and spill buckets  Alarm logs and response  Erratic behavior in equipment unless found to be defective, not leaking
  • 21. Record Keeping  You must keep records of all written performance claims pertaining to any release-detection system used and the 3rd party evaluation and approval  Keep results of any sampling, equipment testing, or monitoring for 5 years  Keep written documentation of all calibration, maintenance, and repair of release detection equipment permanently located onsite or readily available  Any leak test results or other observations or results indicating a release must be reported within 24 hours as a suspected release