SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Richie Felix
7668 Camino Real #104-90, Carlsbad, Ca.• 661-900-0842
Email: Rgfelix72@gmail.com
https://www.linkedin.com/in/richie-felix-6582a788
Sr. Construction Estimator/ Project Manager/Business Development
Sr. Construction Estimator/Project Manager/Supervisor with more than 12 years of Construction experience.
Expertly oversee operations from “Cradle to the Grave” encompassing multiple Customer Projects
concurrently in many field locations throughout California.
• Business Development
• Project Planning/Scheduling
• Professional Client/Vendor/Contractor Relationship
• Budget Planning, Management & Cost Control
• Project Management
• Material/Equipment Procurement
• Safety Awareness
• Training & Development
• Extreme attention to detail
• Excellent Planning and Organizational Skills
• Estimated Concrete, Earthwork, Coating/Paintings
• Demolition and Abatement
• Steel Building Erection
• Agriculture Facility Construction
• Process Improvements
EXPERIENCE
Robert Heely Construction Lead Estimator, Bakersfield, Ca. (2016-2016)
• Attended job walks for Lump Sum, Not to Exceed or Time and Materials.
• Review Scope of work for proposed project. Methodically broke down entire project, in categories
such as in house capabilities, 3rd
party, sub-contractors. What material our company is to provide,
against what client material is provided.
• Review P&ID, ISO drawings, Blueprints and other documents pertaining to proposed project.
• Prepare Estimates based upon information provided by Client and gathered from job walks and
RFI’s for projects. To include equipment, labor, materials, third party, testing, etc.…
• Submitted scope requirements to 3rd
party vendors for pricing.
• Convey positive, Professional Impression of Company to current and future clients.
• Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and
made recommendations to project team.
Resume
• Reviewed and prepared contractual requirements relating to bids, planning, scheduling, RFI’s,
progress payments & billing.
• Excellent Relationship/Communication Skills with Customers, Manager’s & Engineers.
Matrix Service Company(Fortune 500), Estimator, Bakersfield, Ca. (2014-2015)
• Attended job walks for Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials.
• Analyzed Scope of work requirements such as 3rd
party requirements, in house resources, permitting
etc.…
• Review P&ID, Blueprints and other documents to give an estimate of time, cost, equipment, required
to complete the project. Including but not limited to labor costs, subcontracted work, purchased or
leased equipment, owned equipment, materials, etc.…
• Attended job walks for Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials.
• Analyzed Scope of work requirements such as 3rd
party requirements, in house resources, permitting
etc.…
• Prepare Estimates based upon information provided by Client and gathered from job walks and
RFI’s for projects. To include equipment, labor, materials, third party, testing, etc.…
• Submitted Scope requirements to 3rd
party vendors for pricing.
• Convey positive, Professional Impression of Company to current and Future clients.
• Review detailed drawings from customer to provide shop with accurate material take off for
construction. And labor loading projections.
• Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and
made recommendations to project team.
• Prepared contractual requirements relating to awarded bids, planning, scheduling, RFI’s, progress
payments & billing.
• Excellent Relationship/Communication Skills with Customers, Manager’s & Engineers to ensure
proper resource and cost loaded estimate to comply with construction schedules and budget.
GWC a Division of Total Western, Sr. Estimator/Project Manager Bakersfield, CA
(2009 to 2014)
• Solicited existing and Future clients to obtain the opportunity to submit a bid, or be able to have the
opportunity to be place on bid list.
• Prepare, develop and coordinate the integrated master plan and integrated master estimate schedule
to meet all program objectives
• Attended job walks for Lump Sum, Not to Exceed or Time and Materials.
• Reviewed Scope of work requirements from client. And methodically compiled estimate in multiple
categories as “Self-perform”, ”Sub-Contractor’s”, “or “fabrication shope’s”.
• Review P&ID, ISO’s, Blueprints and other documents to give an estimate.
• Prepare Estimates based upon information provided by Client and gathered from job walks and
RFI’s for projects. To include equipment, labor, materials, third party, testing, and any site work etc.
…
• Instrumental in moving GWC from a negative service rating to a positive service rating impacting
future prospective bids.
Resume
• Communicated with management to evaluate contract performance
• Directly involved in Estimating, Forecasting, Planning, Managing, and budgeting for Current and
Future Projects.
• Convey positive, Professional Impression of Company to current and Future clients.
• Review detailed drawings from customer to provide shop with accurate material take off for
construction. And labor loading projections.
• Direct and lead others in a TEAM spirited environment, to maintain Profitability and Completion of
Project on Time.
• Assessed Construction with Company QA/QC standard, generated, tracked and compiled all
necessary documents, and analyzing components along with verifying compliance for codes and/or
permitting.
• Prepared forecast reports utilizing Microsoft Projects.
• Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and
made recommendations to project team
• Prepared contractual requirements relating to awarded bids, planning/ scheduling, progress
payments, Insurance requirements, & and/or progress billing.
• Create all Construction Estimates Fixed Price, Hard Dollar, Price not to Exceed or Time and
Materials. Utilizing, MS Projects ’07,’13, and Excel program.
• Excellent Relationship/Communication with Customers Manager’s & Engineers to ensure proper
resource and cost loaded estimate schedules. Ensures major projects schedules and plans are
horizontally and vertically integrated across company functional groups including engineering,
material, and quality.
Monroe Construction Inc.- Bakersfield Branch (2009-2007)
• Solicited existing and Future clients to obtain the opportunity to submit a bid, or be able to have the
opportunity to be placed on bid list.
• Prepare, develop and coordinate the integrated master plan and integrated master estimate, schedule,
to meet all project objectives.
• Attended job walks for Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials.
• Analyzed Scope of work requirements such as 3rd
party requirements, in house resources, permitting
etc.…
• Review P&ID, Blueprints and other documents to give an estimate of time, cost, equipment, required
to complete the project. Including but not limited to labor costs, subcontracted work, purchased or
leased equipment, owned equipment, materials, etc.…
• Create all Construction Estimates Fixed Price, Hard Dollar, Price not to Exceed or Time and
Materials. Utilizing, MS Projects ’07,’13, and Excel program.
• Create all Construction Estimates utilizing, MS Projects ’07, or Microsoft Excel program. Directly
managed all crews in the field(Superintendent), updated MS Projects schedules with client,
managed man power, equipment, and/or any resources for completion of projects.
• Instrumental in moving Monroe Construction from a negative service rating to a positive service
rating, through Effective hands on daily Construction Meetings, Schedule updates, RFI’s, and
Communication with Construction rep’s. and/or Engineer’s.
• Communicated with Owners/Upper Management to evaluate progress and contract performance.
• Directly involved in forecasting, planning and budgeting.
• Convey positive, Professional Impression of Company to current and Future clients.
Resume
• Review detailed drawings from customer to provide shop/Field with accurate material take off for
construction. and labor loading projections.
• Assessed Construction with Company QA/QC standard, generated, tracked and compiled all
necessary documents, analyzing production rates, Change Orders, along with verifying compliance
with the Scope of work.
• Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and
made recommendations to field project team.
• Prepared contractual requirements relating to awarded bids, planning/ scheduling, progress
payments, insurance, permitting requirements, and billing schedule.
• Prepare, develop and coordinate the integrated master plan and integrated master estimate schedule
to meet all program objectives
• Excellent Relationship/Communication with Customers Manager’s & Engineers to ensure proper
resource and cost loaded estimate schedules. Ensures major projects schedules and plans are
horizontally and vertically integrated across company functional groups including engineering,
material, and quality.
•
Custom Deluxe Construction(owner) Bakersfield, CA (2006-2007)
• Owner/Operator/Performer
• Residential Remodeling Contractor
• Direct interface with home Owner/Architect/Engineer to discuss and evaluate what the homeowner
wanted within a Scope and Budget of Homeowner.
• Turnkey Remolding from “Cradle to the Grave”
• Managed all Scope Changes as Homeowner requested and provide cost estimate in a timely manner
as to what the new Renovation would cost with Engineering, Architect, and Permitting.
• Planning, Designing, Engineering, City Approval, Permitting.
• Utilized the LEED/Green Construction methods to comply with the best allowable State rebates
afforded for the Renovation Construction.
Grijalva Builders Bakersfield, CA (2004-2006)
• New Construction Residential Superintendent.
• Scheduled all Sub-Contractors accordingly to construction schedule.
• Completed all Finish Carpenter work. “Pick up” work to complete construction.
• Submitted Plans for City Approval, discussed necessary changes to be made to comply with code
and plan restraints.
• Coordinated all Sub-Contractor’s and the schedule’s for the completion of Construction.
• Final walk through with homeowner to complete satisfaction with plans, and scope of work.
EDUCATION
East Bakersfield High School
Bakersfield, CA
Resume
California State University Fresno
Fresno, Ca,
Inspection Training Associates
Oceanside, Ca.
Contractor State License School
Bakersfield, Ca.
Associations
American Petroleum Institute
Hispanic Chamber of Commerce
Proficiencies
Microsoft Projects 2007, 2013
Microsoft Excel
Microsoft Word
Bid 2 Win
ADDITIONAL TRAINING CERTIFICATES
Passport Certified
PLW Training
Certified Property Inspector
General “B” Contractor
Objective
To seek a position as:
Business Development Manager, Area Manager, Project Manager, Estimator, Procurement
Manager.
Resume
California State University Fresno
Fresno, Ca,
Inspection Training Associates
Oceanside, Ca.
Contractor State License School
Bakersfield, Ca.
Associations
American Petroleum Institute
Hispanic Chamber of Commerce
Proficiencies
Microsoft Projects 2007, 2013
Microsoft Excel
Microsoft Word
Bid 2 Win
ADDITIONAL TRAINING CERTIFICATES
Passport Certified
PLW Training
Certified Property Inspector
General “B” Contractor
Objective
To seek a position as:
Business Development Manager, Area Manager, Project Manager, Estimator, Procurement
Manager.
Resume

Weitere ähnliche Inhalte

Was ist angesagt?

Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningJB Nartey
 
Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Jon Rocchino
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years expNaren Logi
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghuRaghu p
 

Was ist angesagt? (20)

Raghavendra Resume
Raghavendra ResumeRaghavendra Resume
Raghavendra Resume
 
CJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint PresentationCJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint Presentation
 
C .V
C .VC .V
C .V
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
Khaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 FinalKhaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 Final
 
Aju resume
Aju resumeAju resume
Aju resume
 
Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years exp
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Steve Clark CV 2015
Steve Clark CV 2015Steve Clark CV 2015
Steve Clark CV 2015
 
cv_rajesh_kachhawah
cv_rajesh_kachhawahcv_rajesh_kachhawah
cv_rajesh_kachhawah
 
Ronald Seguritan CV
Ronald Seguritan CVRonald Seguritan CV
Ronald Seguritan CV
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
my cv.doc
my cv.docmy cv.doc
my cv.doc
 

Ähnlich wie Richie Resume

Ähnlich wie Richie Resume (20)

UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Nihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal Kamal Othman Final CV
Nihal Kamal Othman Final CV
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
Construction estimator
Construction estimatorConstruction estimator
Construction estimator
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction Estimator
 
SANPPT
SANPPTSANPPT
SANPPT
 
CV_Gagan
CV_GaganCV_Gagan
CV_Gagan
 
CV_Gagan
CV_GaganCV_Gagan
CV_Gagan
 
sravankumar
sravankumarsravankumar
sravankumar
 
resume-.PDF (2)
resume-.PDF (2)resume-.PDF (2)
resume-.PDF (2)
 
CV
CVCV
CV
 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
 
Mar Dedal Portfolio
Mar Dedal PortfolioMar Dedal Portfolio
Mar Dedal Portfolio
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016Ahmed Faheem Resume 17-04-2016
Ahmed Faheem Resume 17-04-2016
 
Eddie Gamella_Resume
Eddie Gamella_ResumeEddie Gamella_Resume
Eddie Gamella_Resume
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CV
 

Kürzlich hochgeladen

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 

Kürzlich hochgeladen (18)

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 

Richie Resume

  • 1. Richie Felix 7668 Camino Real #104-90, Carlsbad, Ca.• 661-900-0842 Email: Rgfelix72@gmail.com https://www.linkedin.com/in/richie-felix-6582a788 Sr. Construction Estimator/ Project Manager/Business Development Sr. Construction Estimator/Project Manager/Supervisor with more than 12 years of Construction experience. Expertly oversee operations from “Cradle to the Grave” encompassing multiple Customer Projects concurrently in many field locations throughout California. • Business Development • Project Planning/Scheduling • Professional Client/Vendor/Contractor Relationship • Budget Planning, Management & Cost Control • Project Management • Material/Equipment Procurement • Safety Awareness • Training & Development • Extreme attention to detail • Excellent Planning and Organizational Skills • Estimated Concrete, Earthwork, Coating/Paintings • Demolition and Abatement • Steel Building Erection • Agriculture Facility Construction • Process Improvements EXPERIENCE Robert Heely Construction Lead Estimator, Bakersfield, Ca. (2016-2016) • Attended job walks for Lump Sum, Not to Exceed or Time and Materials. • Review Scope of work for proposed project. Methodically broke down entire project, in categories such as in house capabilities, 3rd party, sub-contractors. What material our company is to provide, against what client material is provided. • Review P&ID, ISO drawings, Blueprints and other documents pertaining to proposed project. • Prepare Estimates based upon information provided by Client and gathered from job walks and RFI’s for projects. To include equipment, labor, materials, third party, testing, etc.… • Submitted scope requirements to 3rd party vendors for pricing. • Convey positive, Professional Impression of Company to current and future clients. • Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and made recommendations to project team. Resume
  • 2. • Reviewed and prepared contractual requirements relating to bids, planning, scheduling, RFI’s, progress payments & billing. • Excellent Relationship/Communication Skills with Customers, Manager’s & Engineers. Matrix Service Company(Fortune 500), Estimator, Bakersfield, Ca. (2014-2015) • Attended job walks for Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials. • Analyzed Scope of work requirements such as 3rd party requirements, in house resources, permitting etc.… • Review P&ID, Blueprints and other documents to give an estimate of time, cost, equipment, required to complete the project. Including but not limited to labor costs, subcontracted work, purchased or leased equipment, owned equipment, materials, etc.… • Attended job walks for Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials. • Analyzed Scope of work requirements such as 3rd party requirements, in house resources, permitting etc.… • Prepare Estimates based upon information provided by Client and gathered from job walks and RFI’s for projects. To include equipment, labor, materials, third party, testing, etc.… • Submitted Scope requirements to 3rd party vendors for pricing. • Convey positive, Professional Impression of Company to current and Future clients. • Review detailed drawings from customer to provide shop with accurate material take off for construction. And labor loading projections. • Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and made recommendations to project team. • Prepared contractual requirements relating to awarded bids, planning, scheduling, RFI’s, progress payments & billing. • Excellent Relationship/Communication Skills with Customers, Manager’s & Engineers to ensure proper resource and cost loaded estimate to comply with construction schedules and budget. GWC a Division of Total Western, Sr. Estimator/Project Manager Bakersfield, CA (2009 to 2014) • Solicited existing and Future clients to obtain the opportunity to submit a bid, or be able to have the opportunity to be place on bid list. • Prepare, develop and coordinate the integrated master plan and integrated master estimate schedule to meet all program objectives • Attended job walks for Lump Sum, Not to Exceed or Time and Materials. • Reviewed Scope of work requirements from client. And methodically compiled estimate in multiple categories as “Self-perform”, ”Sub-Contractor’s”, “or “fabrication shope’s”. • Review P&ID, ISO’s, Blueprints and other documents to give an estimate. • Prepare Estimates based upon information provided by Client and gathered from job walks and RFI’s for projects. To include equipment, labor, materials, third party, testing, and any site work etc. … • Instrumental in moving GWC from a negative service rating to a positive service rating impacting future prospective bids. Resume
  • 3. • Communicated with management to evaluate contract performance • Directly involved in Estimating, Forecasting, Planning, Managing, and budgeting for Current and Future Projects. • Convey positive, Professional Impression of Company to current and Future clients. • Review detailed drawings from customer to provide shop with accurate material take off for construction. And labor loading projections. • Direct and lead others in a TEAM spirited environment, to maintain Profitability and Completion of Project on Time. • Assessed Construction with Company QA/QC standard, generated, tracked and compiled all necessary documents, and analyzing components along with verifying compliance for codes and/or permitting. • Prepared forecast reports utilizing Microsoft Projects. • Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and made recommendations to project team • Prepared contractual requirements relating to awarded bids, planning/ scheduling, progress payments, Insurance requirements, & and/or progress billing. • Create all Construction Estimates Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials. Utilizing, MS Projects ’07,’13, and Excel program. • Excellent Relationship/Communication with Customers Manager’s & Engineers to ensure proper resource and cost loaded estimate schedules. Ensures major projects schedules and plans are horizontally and vertically integrated across company functional groups including engineering, material, and quality. Monroe Construction Inc.- Bakersfield Branch (2009-2007) • Solicited existing and Future clients to obtain the opportunity to submit a bid, or be able to have the opportunity to be placed on bid list. • Prepare, develop and coordinate the integrated master plan and integrated master estimate, schedule, to meet all project objectives. • Attended job walks for Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials. • Analyzed Scope of work requirements such as 3rd party requirements, in house resources, permitting etc.… • Review P&ID, Blueprints and other documents to give an estimate of time, cost, equipment, required to complete the project. Including but not limited to labor costs, subcontracted work, purchased or leased equipment, owned equipment, materials, etc.… • Create all Construction Estimates Fixed Price, Hard Dollar, Price not to Exceed or Time and Materials. Utilizing, MS Projects ’07,’13, and Excel program. • Create all Construction Estimates utilizing, MS Projects ’07, or Microsoft Excel program. Directly managed all crews in the field(Superintendent), updated MS Projects schedules with client, managed man power, equipment, and/or any resources for completion of projects. • Instrumental in moving Monroe Construction from a negative service rating to a positive service rating, through Effective hands on daily Construction Meetings, Schedule updates, RFI’s, and Communication with Construction rep’s. and/or Engineer’s. • Communicated with Owners/Upper Management to evaluate progress and contract performance. • Directly involved in forecasting, planning and budgeting. • Convey positive, Professional Impression of Company to current and Future clients. Resume
  • 4. • Review detailed drawings from customer to provide shop/Field with accurate material take off for construction. and labor loading projections. • Assessed Construction with Company QA/QC standard, generated, tracked and compiled all necessary documents, analyzing production rates, Change Orders, along with verifying compliance with the Scope of work. • Use a variety of the field’s concepts, practices and procedures from a variety of data sources, and made recommendations to field project team. • Prepared contractual requirements relating to awarded bids, planning/ scheduling, progress payments, insurance, permitting requirements, and billing schedule. • Prepare, develop and coordinate the integrated master plan and integrated master estimate schedule to meet all program objectives • Excellent Relationship/Communication with Customers Manager’s & Engineers to ensure proper resource and cost loaded estimate schedules. Ensures major projects schedules and plans are horizontally and vertically integrated across company functional groups including engineering, material, and quality. • Custom Deluxe Construction(owner) Bakersfield, CA (2006-2007) • Owner/Operator/Performer • Residential Remodeling Contractor • Direct interface with home Owner/Architect/Engineer to discuss and evaluate what the homeowner wanted within a Scope and Budget of Homeowner. • Turnkey Remolding from “Cradle to the Grave” • Managed all Scope Changes as Homeowner requested and provide cost estimate in a timely manner as to what the new Renovation would cost with Engineering, Architect, and Permitting. • Planning, Designing, Engineering, City Approval, Permitting. • Utilized the LEED/Green Construction methods to comply with the best allowable State rebates afforded for the Renovation Construction. Grijalva Builders Bakersfield, CA (2004-2006) • New Construction Residential Superintendent. • Scheduled all Sub-Contractors accordingly to construction schedule. • Completed all Finish Carpenter work. “Pick up” work to complete construction. • Submitted Plans for City Approval, discussed necessary changes to be made to comply with code and plan restraints. • Coordinated all Sub-Contractor’s and the schedule’s for the completion of Construction. • Final walk through with homeowner to complete satisfaction with plans, and scope of work. EDUCATION East Bakersfield High School Bakersfield, CA Resume
  • 5. California State University Fresno Fresno, Ca, Inspection Training Associates Oceanside, Ca. Contractor State License School Bakersfield, Ca. Associations American Petroleum Institute Hispanic Chamber of Commerce Proficiencies Microsoft Projects 2007, 2013 Microsoft Excel Microsoft Word Bid 2 Win ADDITIONAL TRAINING CERTIFICATES Passport Certified PLW Training Certified Property Inspector General “B” Contractor Objective To seek a position as: Business Development Manager, Area Manager, Project Manager, Estimator, Procurement Manager. Resume
  • 6. California State University Fresno Fresno, Ca, Inspection Training Associates Oceanside, Ca. Contractor State License School Bakersfield, Ca. Associations American Petroleum Institute Hispanic Chamber of Commerce Proficiencies Microsoft Projects 2007, 2013 Microsoft Excel Microsoft Word Bid 2 Win ADDITIONAL TRAINING CERTIFICATES Passport Certified PLW Training Certified Property Inspector General “B” Contractor Objective To seek a position as: Business Development Manager, Area Manager, Project Manager, Estimator, Procurement Manager. Resume