PERFORMANCE
OF
COMPUTER INTEGRATED MANUFACTURING
OF
FUELS AND PETROCHEMICALS
BY
TECHNOLOGY SOLUTION SUPPLIER
Author Pierre R Latour, CLIFFTENT Inc
Houston, Texas 77079
281 556-8179
clifftent@hotmail.com 18Jan07
[SR]2
Shared Risk and Shared Reward
Business Relationships for
Sustained Profit Performance
[SR]2™
Shared Risk and Shared Reward
Alternative performance-based CIM technology licensing
arrangement designed to address long term success
of both
▪ HPI operating company
▪ CIM solution supplier
by properly aligning commercial risk with know-how,
experience and value added performance.
Overview
1. Supplier’s Mission
2. Problem Statement
3. Principles of Solution
4. Solution
5. Potential
6. Specific Proposal
7. CIM Supplier Commitment
8. HPI Opco Commitments
9. Actions
Mission Statement
Provide a business partnership that will allow HPI Opcos to:
▪ Identify operating benefits properly,
▪ Capture these benefits quickly and effectively,
▪ Sustain and enhance the benefits over the life of the plant,
through proper application of CIM techniques like
multivariable control, closed-loop optimization,
scheduling, integration, information technology
and performance measurement.
Problem Statement
Generate maximum benefits from CIM solutions
over the long term (say 10 – 30 years)
with minimal risk and low capital cost.
▪ Ensure best available technology
▪ Ensure maintenance of system
▪ Ensure retention of talented support
▪ Ensure Opco benefits are sustained
Maintain full competitive advantage by operating
to economic objectives safely and reliably.
Principles of Solution
1. Performance
▪ Supplier should determine his system performance
and assessment of financial benefit properly.
▪ Opco provides accurate data for benefit
2. Sources of Value
▪ Optimize risky profit tradeoffs for Controlled Variables
and Key Performance Indicators that affect
capacity, yields, operating costs, maintenance
and limit violation penalties.
▪ Business arrangement that fosters cooperation and
minimizes adversarial relations by teaming to prosper
together by creating more value from process operation.
Principles of Solution Continued
3. Risk
CIM Supplier assumes risk commensurate with
contribution, performance, knowledge and experience
in exchange for appropriate opportunity for reward.
Preferable to pay for performance:
▪ Supplier is paid from benefits he creates.
▪ Opco takes little risk for technologies and activities
for which he chooses not to become an expert.
▪ Opco avoids significant capital investment when
he is not in good position to evaluate its returns.
Principles of SolutionContinued
4. Future Technology Integration
Performance is maintained by the Supplier
and the system is upgraded as:
▪ New proven technology becomes available
▪ Plant is modified
▪ Business objectives evolve
5. Split of Benefits
The split of benefits between the Opco and the Supplier is set to:
▪ Optimize Opco net present value of long term benefit and
risk for maximum assured NPV expected profit rate.
▪ Provide Supplier sufficient incentive to sustain Opco’s profit rate.
Principles of SolutionContinued
An appropriate Split of Benefits is required to ensure the
long term viability and performance of the installed system solution.
If the Supplier % is too high,
Opco is short-changed and will loose interest.
If the Opco % is too high,
the supplier is short-changed and will loose interest.
Commercial HPI CIM experience since 1970
indicates the best split to maximize Opco
expected value profit rate increases to Opco
for larger plants with higher profits from economy of scale.
Fig. 1 Optimum Benefit Split %
Solution
Measure Performance Improvement Properly!
Traditional fragmented approach;
three performance claim areas:
Yield. Improve yields of higher valued products
(recovery, upgrades, conversion), dYld
Capacity. Increase throughput or production rate, dCap
Operating costs. Reduce energy, utilities, inventory,
manpower, maintenance, reprocessing, downtime, dOpc
Three CV/KPI Performance Claims:
Closer approach to product quality specs from variance reduction, dQ
Closer approach to equipment limits from variance reduction, dL
Change in operating consumables like reflux, recycle, reboil,
regeneration, repair, dR
Three Process Model Factors:
dYld, dCap, dOpc
dQ dL dR
Three Economic Drivers:
d$Yld, d$Cap, d$Opc
T T T
Benefit rate, $/day = Flow, T/day *
[ dQ * dYld * d$Yld
dQ T
+ dL * dCap * d$C
dL T
+ dR * dOpc * d$Op ], $/T
dR T
Flow is feed or main product rate.
This arbitrary, imprecise, linear method relating
Controlled Variables and Key Performance Indicators,
CV/KPI, to profit without risk is not satisfactory for [SR]2.
The Right Way
The key is a method of reliably and accurately measuring
the performance benefits continuously on all CV/KPI.
If Opco actually runs plant by setting targets aligned to his economics,
Supplier is assured data and method is best available.
Bad data causes quantifiable losses.
The rigorous CLIFFTENT™ method for optimizing risky tradeoffs
and showing CV/KPI profit meters is required. Each CV/KPI has an
associated profit function tradeoff shaped like a tent, often with a
discontinuity cliff at a limit.
CIM claims are variance reduction.
Reference, Latour, P.R., “Process control: CLIFFTENT shows it’s
more profitable than expected”, Hydrocarbon Processing, Dec 1996
Benefits Assessment Policy
Supplier and Opco work together to determine the
value-added performance of the system using:
▪ Statistical data analysis
▪ Rigorous process models
▪ Accurate economics
▪ Losses from limit violations
▪ Periodic test runs
Test runs with the CIM system or components disengaged or
replaced by alternate, manual means will quantify losses that
would have been avoided had the system or component been used.
Accurate base and improvement comparison is essential.
Opco Profit Potential
Major Oil Refiner
Location, Process, Throughput
Houston, five refineries, 1 kkbpd
Free, no risk variable annuity:
$/bbl feed = 1.5
kk$/day = 1.5
kk$/yr = 548
PV(10yr, 10%), kk$ = 3704
PV(10yr, 20%), kk$ = 2757
PV(30yr, 10%), kk$ = 5682
PV(30yr, 20%), kk$ = 3274
Source of benefit, %
Yield 45
Capacity 35
Op cost 20
Specific Proposal
Supplier offers to license, install and maintain its
CIM solution technology for ____________ facilities
of Opco to maximize long term benefit to Opco
at no cost or risk to Opco,
in exchange for SR% of the gross benefit created.
Opco realizes 100 - SR%, less minor out-of-pocket
administrative costs to coordinate business with Supplier.
Supplier Commitments
1. Maximize solution benefit.
2. Install best technology.
3. Maintain and upgrade.
4. Assume all expense risk.
5. License rights to technology, software and
know-how on a unit application basis, as long
as solution equipment and software is used
for original process purposes at original site.
6. Retain right to terminate or withdraw.
This would naturally happen if Supplier split
becomes inadequate to cover support costs.
Opco Commitments
1. Maximize solution benefit.
2. Provide economic information.
3. Supply or confirm performance measure input data.
4. Provide plant, system access.
5. Staff cooperation.
6. Pay Supplier share of benefit.
7. Retain right to terminate solution and
discontinue payments.
This would naturally happen if Opco split
becomes inadequate to cover support costs.
Actions
1. Opco and Supplier agree to embark on a [SR]2™
business relationship based on financial performance
of Supplier’s CIM solution.
2. Opco will execute Supplier’s [SR]2 agreement.
3. Opco and Supplier appoint business representatives
to lead, manage and execute for results.
4. Supplier to devise a scope, plan, requirements
and schedule for prompt implementation.

Weitere ähnliche Inhalte

Andere mochten auch

Desastres naturales
Desastres naturalesDesastres naturales
Desastres naturalesLucas Marino
 
Peca processual chave_de_correcao
Peca processual chave_de_correcaoPeca processual chave_de_correcao
Peca processual chave_de_correcaoVicente Silva Filho
 
Matrizvaloracionportafoliodigital
MatrizvaloracionportafoliodigitalMatrizvaloracionportafoliodigital
Matrizvaloracionportafoliodigitalandreifelix95
 
Qué aportaciones ha hecho méxico a la química (1)
Qué aportaciones ha hecho méxico a la química (1)Qué aportaciones ha hecho méxico a la química (1)
Qué aportaciones ha hecho méxico a la química (1)Rogelio Silva Flores
 

Andere mochten auch (6)

Desastres naturales
Desastres naturalesDesastres naturales
Desastres naturales
 
Peca processual chave_de_correcao
Peca processual chave_de_correcaoPeca processual chave_de_correcao
Peca processual chave_de_correcao
 
Matrizvaloracionportafoliodigital
MatrizvaloracionportafoliodigitalMatrizvaloracionportafoliodigital
Matrizvaloracionportafoliodigital
 
Qué aportaciones ha hecho méxico a la química (1)
Qué aportaciones ha hecho méxico a la química (1)Qué aportaciones ha hecho méxico a la química (1)
Qué aportaciones ha hecho méxico a la química (1)
 
D01 delegado - peça processual
D01   delegado  - peça processualD01   delegado  - peça processual
D01 delegado - peça processual
 
Tics
TicsTics
Tics
 

Ähnlich wie SR2SlidePresentation

Anyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowAnyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowLeveragePoint Innovations
 
Mc dermott pareto_final
Mc dermott pareto_finalMc dermott pareto_final
Mc dermott pareto_finalinvestorcbi
 
Bridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And CommercializationBridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And CommercializationNAES Corporation
 
PAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mail
PAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mailPAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mail
PAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mailMatthew Hilliker
 
Hypatia investor overview_jan2015
Hypatia investor overview_jan2015Hypatia investor overview_jan2015
Hypatia investor overview_jan2015GiuntiniCompany
 
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...Itential
 
chapter07_12ed.pptx.pptx
chapter07_12ed.pptx.pptxchapter07_12ed.pptx.pptx
chapter07_12ed.pptx.pptxShaniaJoseph2
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opexJay Ranvir
 
Acc equity research report
Acc equity research reportAcc equity research report
Acc equity research reportshub09
 
Service Contract Analytics - Leverage analytics to improve revenue and profit...
Service Contract Analytics - Leverage analytics to improve revenue and profit...Service Contract Analytics - Leverage analytics to improve revenue and profit...
Service Contract Analytics - Leverage analytics to improve revenue and profit...Genpact Ltd
 
TID company information
TID company informationTID company information
TID company informationPatrick Gates
 
Oil Gas Companies in Indonesia: Ready for The New Normal?
Oil Gas Companies in Indonesia: Ready for The New Normal?Oil Gas Companies in Indonesia: Ready for The New Normal?
Oil Gas Companies in Indonesia: Ready for The New Normal?Gede Manggala
 
Petro_company_of_the_future
Petro_company_of_the_futurePetro_company_of_the_future
Petro_company_of_the_futureMarcel Karolys
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineerBabatunde Sofoluwe
 
The Digital Twin For Production Optimization
The Digital Twin For Production OptimizationThe Digital Twin For Production Optimization
The Digital Twin For Production OptimizationYokogawa1
 
Solar power plant management by OutSmart
Solar power plant management by OutSmartSolar power plant management by OutSmart
Solar power plant management by OutSmartDennisSchiricke
 

Ähnlich wie SR2SlidePresentation (20)

Anyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowAnyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You How
 
Mc dermott pareto_final
Mc dermott pareto_finalMc dermott pareto_final
Mc dermott pareto_final
 
Bridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And CommercializationBridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And Commercialization
 
PAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mail
PAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mailPAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mail
PAR-MKT21701-008 [Oil’s wild ride -IT as strategic advantage] RGB mail
 
Hypatia investor overview_jan2015
Hypatia investor overview_jan2015Hypatia investor overview_jan2015
Hypatia investor overview_jan2015
 
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
 
chapter07_12ed.pptx.pptx
chapter07_12ed.pptx.pptxchapter07_12ed.pptx.pptx
chapter07_12ed.pptx.pptx
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opex
 
Acc equity research report
Acc equity research reportAcc equity research report
Acc equity research report
 
Service Contract Analytics - Leverage analytics to improve revenue and profit...
Service Contract Analytics - Leverage analytics to improve revenue and profit...Service Contract Analytics - Leverage analytics to improve revenue and profit...
Service Contract Analytics - Leverage analytics to improve revenue and profit...
 
TID company information
TID company informationTID company information
TID company information
 
Oil Gas Companies in Indonesia: Ready for The New Normal?
Oil Gas Companies in Indonesia: Ready for The New Normal?Oil Gas Companies in Indonesia: Ready for The New Normal?
Oil Gas Companies in Indonesia: Ready for The New Normal?
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Petro_company_of_the_future
Petro_company_of_the_futurePetro_company_of_the_future
Petro_company_of_the_future
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineer
 
Mktg Intro
Mktg IntroMktg Intro
Mktg Intro
 
The Digital Twin For Production Optimization
The Digital Twin For Production OptimizationThe Digital Twin For Production Optimization
The Digital Twin For Production Optimization
 
Performance-Based Regulation
Performance-Based RegulationPerformance-Based Regulation
Performance-Based Regulation
 
Thermal Energy Corporate Presentation - November 2020
Thermal Energy Corporate Presentation - November 2020 Thermal Energy Corporate Presentation - November 2020
Thermal Energy Corporate Presentation - November 2020
 
Solar power plant management by OutSmart
Solar power plant management by OutSmartSolar power plant management by OutSmart
Solar power plant management by OutSmart
 

Mehr von Pierre Latour

Mehr von Pierre Latour (20)

TOCbw I&ECPDD Oct67
TOCbw I&ECPDD Oct67TOCbw I&ECPDD Oct67
TOCbw I&ECPDD Oct67
 
ISA Edits 1-14
ISA Edits 1-14ISA Edits 1-14
ISA Edits 1-14
 
HPKaneJun94
HPKaneJun94HPKaneJun94
HPKaneJun94
 
CLIFFTENTinCONTROLDec04
CLIFFTENTinCONTROLDec04CLIFFTENTinCONTROLDec04
CLIFFTENTinCONTROLDec04
 
HPControl AlkyJan09
HPControl AlkyJan09HPControl AlkyJan09
HPControl AlkyJan09
 
AlignOlefinOpsEPC
AlignOlefinOpsEPCAlignOlefinOpsEPC
AlignOlefinOpsEPC
 
TOC I&ECPDD Oct67
TOC I&ECPDD Oct67TOC I&ECPDD Oct67
TOC I&ECPDD Oct67
 
DMCC O&GJ 18Sep95
DMCC O&GJ 18Sep95DMCC O&GJ 18Sep95
DMCC O&GJ 18Sep95
 
ProcessComputer O&GJ23Feb76
ProcessComputer O&GJ23Feb76ProcessComputer O&GJ23Feb76
ProcessComputer O&GJ23Feb76
 
OptCntrlTheory CanJChEOct68
OptCntrlTheory CanJChEOct68OptCntrlTheory CanJChEOct68
OptCntrlTheory CanJChEOct68
 
OChE Awards 2007
OChE Awards 2007OChE Awards 2007
OChE Awards 2007
 
JACC Aug71
JACC Aug71JACC Aug71
JACC Aug71
 
HiddenBenefit ISAOct76
HiddenBenefit ISAOct76HiddenBenefit ISAOct76
HiddenBenefit ISAOct76
 
CIMFuels Editorials
CIMFuels EditorialsCIMFuels Editorials
CIMFuels Editorials
 
Optimization1&2 HPJunJul79BW300
Optimization1&2 HPJunJul79BW300Optimization1&2 HPJunJul79BW300
Optimization1&2 HPJunJul79BW300
 
RIS-RFG FUELJul94
RIS-RFG FUELJul94RIS-RFG FUELJul94
RIS-RFG FUELJul94
 
QuantifyQC HPMay92
QuantifyQC HPMay92QuantifyQC HPMay92
QuantifyQC HPMay92
 
HP1296CLIFFTENT
HP1296CLIFFTENTHP1296CLIFFTENT
HP1296CLIFFTENT
 
ControlGlobalAug11
ControlGlobalAug11ControlGlobalAug11
ControlGlobalAug11
 
AlignHPIOps HP1208
AlignHPIOps HP1208AlignHPIOps HP1208
AlignHPIOps HP1208
 

SR2SlidePresentation

  • 1. PERFORMANCE OF COMPUTER INTEGRATED MANUFACTURING OF FUELS AND PETROCHEMICALS BY TECHNOLOGY SOLUTION SUPPLIER Author Pierre R Latour, CLIFFTENT Inc Houston, Texas 77079 281 556-8179 clifftent@hotmail.com 18Jan07
  • 2. [SR]2 Shared Risk and Shared Reward Business Relationships for Sustained Profit Performance
  • 3. [SR]2™ Shared Risk and Shared Reward Alternative performance-based CIM technology licensing arrangement designed to address long term success of both ▪ HPI operating company ▪ CIM solution supplier by properly aligning commercial risk with know-how, experience and value added performance.
  • 4. Overview 1. Supplier’s Mission 2. Problem Statement 3. Principles of Solution 4. Solution 5. Potential 6. Specific Proposal 7. CIM Supplier Commitment 8. HPI Opco Commitments 9. Actions
  • 5. Mission Statement Provide a business partnership that will allow HPI Opcos to: ▪ Identify operating benefits properly, ▪ Capture these benefits quickly and effectively, ▪ Sustain and enhance the benefits over the life of the plant, through proper application of CIM techniques like multivariable control, closed-loop optimization, scheduling, integration, information technology and performance measurement.
  • 6. Problem Statement Generate maximum benefits from CIM solutions over the long term (say 10 – 30 years) with minimal risk and low capital cost. ▪ Ensure best available technology ▪ Ensure maintenance of system ▪ Ensure retention of talented support ▪ Ensure Opco benefits are sustained Maintain full competitive advantage by operating to economic objectives safely and reliably.
  • 7. Principles of Solution 1. Performance ▪ Supplier should determine his system performance and assessment of financial benefit properly. ▪ Opco provides accurate data for benefit 2. Sources of Value ▪ Optimize risky profit tradeoffs for Controlled Variables and Key Performance Indicators that affect capacity, yields, operating costs, maintenance and limit violation penalties. ▪ Business arrangement that fosters cooperation and minimizes adversarial relations by teaming to prosper together by creating more value from process operation.
  • 8. Principles of Solution Continued 3. Risk CIM Supplier assumes risk commensurate with contribution, performance, knowledge and experience in exchange for appropriate opportunity for reward. Preferable to pay for performance: ▪ Supplier is paid from benefits he creates. ▪ Opco takes little risk for technologies and activities for which he chooses not to become an expert. ▪ Opco avoids significant capital investment when he is not in good position to evaluate its returns.
  • 9. Principles of SolutionContinued 4. Future Technology Integration Performance is maintained by the Supplier and the system is upgraded as: ▪ New proven technology becomes available ▪ Plant is modified ▪ Business objectives evolve 5. Split of Benefits The split of benefits between the Opco and the Supplier is set to: ▪ Optimize Opco net present value of long term benefit and risk for maximum assured NPV expected profit rate. ▪ Provide Supplier sufficient incentive to sustain Opco’s profit rate.
  • 10. Principles of SolutionContinued An appropriate Split of Benefits is required to ensure the long term viability and performance of the installed system solution. If the Supplier % is too high, Opco is short-changed and will loose interest. If the Opco % is too high, the supplier is short-changed and will loose interest. Commercial HPI CIM experience since 1970 indicates the best split to maximize Opco expected value profit rate increases to Opco for larger plants with higher profits from economy of scale.
  • 11. Fig. 1 Optimum Benefit Split %
  • 12. Solution Measure Performance Improvement Properly! Traditional fragmented approach; three performance claim areas: Yield. Improve yields of higher valued products (recovery, upgrades, conversion), dYld Capacity. Increase throughput or production rate, dCap Operating costs. Reduce energy, utilities, inventory, manpower, maintenance, reprocessing, downtime, dOpc
  • 13. Three CV/KPI Performance Claims: Closer approach to product quality specs from variance reduction, dQ Closer approach to equipment limits from variance reduction, dL Change in operating consumables like reflux, recycle, reboil, regeneration, repair, dR Three Process Model Factors: dYld, dCap, dOpc dQ dL dR Three Economic Drivers: d$Yld, d$Cap, d$Opc T T T
  • 14. Benefit rate, $/day = Flow, T/day * [ dQ * dYld * d$Yld dQ T + dL * dCap * d$C dL T + dR * dOpc * d$Op ], $/T dR T Flow is feed or main product rate. This arbitrary, imprecise, linear method relating Controlled Variables and Key Performance Indicators, CV/KPI, to profit without risk is not satisfactory for [SR]2.
  • 15. The Right Way The key is a method of reliably and accurately measuring the performance benefits continuously on all CV/KPI. If Opco actually runs plant by setting targets aligned to his economics, Supplier is assured data and method is best available. Bad data causes quantifiable losses. The rigorous CLIFFTENT™ method for optimizing risky tradeoffs and showing CV/KPI profit meters is required. Each CV/KPI has an associated profit function tradeoff shaped like a tent, often with a discontinuity cliff at a limit. CIM claims are variance reduction. Reference, Latour, P.R., “Process control: CLIFFTENT shows it’s more profitable than expected”, Hydrocarbon Processing, Dec 1996
  • 16. Benefits Assessment Policy Supplier and Opco work together to determine the value-added performance of the system using: ▪ Statistical data analysis ▪ Rigorous process models ▪ Accurate economics ▪ Losses from limit violations ▪ Periodic test runs Test runs with the CIM system or components disengaged or replaced by alternate, manual means will quantify losses that would have been avoided had the system or component been used. Accurate base and improvement comparison is essential.
  • 17. Opco Profit Potential Major Oil Refiner Location, Process, Throughput Houston, five refineries, 1 kkbpd Free, no risk variable annuity: $/bbl feed = 1.5 kk$/day = 1.5 kk$/yr = 548 PV(10yr, 10%), kk$ = 3704 PV(10yr, 20%), kk$ = 2757 PV(30yr, 10%), kk$ = 5682 PV(30yr, 20%), kk$ = 3274 Source of benefit, % Yield 45 Capacity 35 Op cost 20
  • 18. Specific Proposal Supplier offers to license, install and maintain its CIM solution technology for ____________ facilities of Opco to maximize long term benefit to Opco at no cost or risk to Opco, in exchange for SR% of the gross benefit created. Opco realizes 100 - SR%, less minor out-of-pocket administrative costs to coordinate business with Supplier.
  • 19. Supplier Commitments 1. Maximize solution benefit. 2. Install best technology. 3. Maintain and upgrade. 4. Assume all expense risk. 5. License rights to technology, software and know-how on a unit application basis, as long as solution equipment and software is used for original process purposes at original site. 6. Retain right to terminate or withdraw. This would naturally happen if Supplier split becomes inadequate to cover support costs.
  • 20. Opco Commitments 1. Maximize solution benefit. 2. Provide economic information. 3. Supply or confirm performance measure input data. 4. Provide plant, system access. 5. Staff cooperation. 6. Pay Supplier share of benefit. 7. Retain right to terminate solution and discontinue payments. This would naturally happen if Opco split becomes inadequate to cover support costs.
  • 21. Actions 1. Opco and Supplier agree to embark on a [SR]2™ business relationship based on financial performance of Supplier’s CIM solution. 2. Opco will execute Supplier’s [SR]2 agreement. 3. Opco and Supplier appoint business representatives to lead, manage and execute for results. 4. Supplier to devise a scope, plan, requirements and schedule for prompt implementation.