ImproveYourCostAccuracywiththeUltimateGOLDStandardofCostEngineering
SuccessfulProject
CostEstimation&ControlCostEstimation&Control
Testimonials
Petrosync Distinguished Lecturer
Larry R. Dysert
CCC CEP
Chair of Technical Board AACE International
Association for the Advancement of Cost Engineering
Over 30 years of global experience in cost estimating & controls
Chair of AACE International Technical Board, AwardWinner & Fellow of
AACE International
International Consultant & Trainer for Saudi Aramco, Shell, Exxon, GS
Construction, Petronas, Chevron, PTTEP, ConocoPhillips
Managing Partner of Conquest Consulting Group, USA
Approved Education Provider of AACE International
Responsible for cost estimation & controls and projects small & big with
the biggest project up to USD $25 billion!
LeadingCostEngineeringLeadingCostEngineering
FrameworkWorldwide!FrameworkWorldwide!
7th-11thSeptember2015, KualaLumpur,Malaysia
Supported by
“A real great course!” AKER SOLUTIONS
“Very practical approach and training examples. Thus, easy to understand and be applied to day to
day cost estimation.” NEWFIELD
“This training is very useful and relevant to my daily job and provide two different perspective,
owner’s and contractor’s point of view.” PETRONAS
“Good trainer makes a difference.” PETRONAS RESEARCH
“Petrosync is one persistant and most organized organizer of trainings.” PETRONAS CARIGALI
“Practical insights which you can’t find in text book. Topic coverage is comprehensive!.” PETRONAS
“This course provides me detail knowledge to prepare estimation and cost control. ” SMB OFFSHORE
“Better understanding in cost managing/tracking for small/medium/large project.” SHELL
“Great course with very experienced instructor.” SHELL
Designed to provide comprehensive of the fundamentals of estimation & control, this masterclass covers
many subtle and advanced estimating & control concepts for specific industry like Oil & gas which are
“equipment-centric”, and this influence is important in the selection of estimating methodologies and
techniques used in estimate preparation.This process will be covered from both the contractor and owner’s
points of view, noting the similarities and differences in the respective approach of each.
An emphasis will be placed on examining the conceptual estimating methodologies that can assist in
preparing accurate estimates at early design stages of project.The cost control process will be based on the
concept of Plan-Do-Check-Assess of total cost management framework.
This course is intended for
Cost Estimators
Cost Engineers
Cost Controllers
Quantitative Surveyor
DRIVEaconsistentandeffectiveprocessacrosstheexecutionofallprojectsthenimprovetheresults
of the entire portfolio of projects
UNDERSTAND the AACE International best practices framework for Cost Engineering
CAPITALIZE onTCM cost engineering practices to increase your cost engineering accuracy
GAIN more in-depth knowledge of cost engineering estimation and control terminology
UNDERSTAND the different requirements for estimating throughout the project life cycle
OBTAIN a comprehensive understanding of estimating methodologies used throughout the project
lifecycle, and when to use them
UNDERSTAND how progress measurement, performance assesment, realistic forecasting, and
effective change management contribute to project success
Project Director
Project Head
Project Manager
Project Engineer
Course Objectives
Specially Designed for
Course Overview
08:00–09:00 Registration (Day1)
09:00–11:00 Session I
11:00–11:15 Refreshment & Networking Session I
11:15–13:00 Session II
13:00–14:00
14:00–15:30 Session III
15:30–15:45 Refreshment & Networking Session II
15:45–17:00 Session IV
17:00 End of Day
PROGRAM SCHEDULE
Lunch
Successful Project Cost Estimation & Control
7th-11th September 2015 in Kuala Lumpur, Malaysia
1
Conceptual Estimating Methodologies
Analogy Estimating
Capacity Factoring Estimating
Exercise1-CapacityFactoredEstimateforProcessEquipment
Exercise2-CapacityFactoredEstimateforProcessUnit
Equipment Factored Estimating
Exercise3-EquipmentFactoredEstimateforProcessUnit
Parametric Estimating
Other Conceptual Estimating Methods
Total Cost Management Process
TCM as a Process and Reference Model
Strategic Asset Management Process
Project Control Process
Asset and Project Lifecycles
Organization and Leadership forTCM
Capital Investment
Option Identification and Development
Decision Making and Risk Management
COURSE AGENDA
Estimating Introduction
Capital Project Process and Estimate Classification
Estimate PreparationWorkflow
Structuring the Estimate
Overview of Estimating Methodologies
Day One: Total Cost Management Overview
Day Two: Cost Estimating
Successful Project Cost Estimation & Control
7th-11th September 2015 in Kuala Lumpur, Malaysia
Project Control Process
Scope Development and Execution Strategy
Planning and Control Baseline Development
Project Performance Measurement and Assessment
TCM Knowledge Management
Project Planning
Establishing and Communicating Goals and Objectives
Estimating Uncertainty
Estimate Contingency
Risk Analysis
Escalation
Presenting the Estimate
Estimate Quality Management
Estimate Review/Validation
Exercise4-EstimatePreparationforSampleProject
Estimating Knowledge Management
Issues with Estimating Mega-Projects
Day Three: Cost Estimating
Biases in Estimating
Detailed Estimating
Detailed Estimating Activities
Estimate Quantification
Equipment Estimating
Labor Rates/Labor Productivity
Cost/Pricing/Allowances
Estimate - Schedule Integration
Reliability Limitations/Estimate Accuracy
Total Cost Management (TCM) Overview
TCM as a Process and Reference Model
Strategic Asset Management Process
Project Control Process
Planning
What,Where, How,When,Who, How Much?
Project Definition
Decomposition
Work Breakdown Structure
Organization Breakdown Structure
Cost Breakdwon Structure
Establishing Baselines
Cost Baseline
Schedule Baseline
Budgeting
Accounting Budget vs. Project Budget
Original Budget vs. Current Budget
Conversion of Cost Estimate to Baseline Project Control
Budget
Exercise5-PreparationofProjectControlBudget
Exercise6-PrepareQuantityAdjustedControlBudget
Time-Ohase (Cash Flow) Budgeting
Cost Accounting
Original Budget
Approved Scope Change
Budget Shift
Current Budget
Commitment
Expenditure
Accrual
Incurred Cost
Currency Issues
Performance Measurement
Physical Progress Measurement and EarnedValue
Physical Progress Measurement Methods
Units Completed
Weighted Units Completed
Start Finish
Incremental Milestone
Level of Effort
Judgement
Day Four: Cost Control
COURSE AGENDA
Successful Project Cost Estimation & Control
7th-11th September 2015 in Kuala Lumpur, Malaysia
WHYYOUSHOULDATTENDPETROSYNC’SEVENTS
To ensure that all objectives of the course matches yours, all PetroSync programs are developed after intensive and extensive research
within the industry
PetroSync programs focus on your immediate working issues to ensure that you are able to apply and deliver immediate results in real work
situations
Applicationandimplementationofindustryknowledgeandexperiencearethedriversforourcoursedesign,nottheoreticalacademiclectures
PetroSync training focuses on practical interactive learning tools and techniques including case studies, group discussions, scenarios,
simulations,practicalexercisesandknowledgeassessmentsduringthecourse.Investasmallamountofyourtimetopreparebeforeattending
thecoursetoensuremaximumlearning
PetroSync follows a rigorous selection process to ensure that all expert trainers have first-hand, up-to-date and practical knowledge and are
leadersoftheirrespectiveindustrialdiscipline
Performance Analysis
Variance Analysis
CostVariance
ScheduleVariance
Performance Indices
Cost Performance Index
Schedule Performance Index
Exercise7-PerformanceAnalysis
Determination of Cause forVariance
Performance Reporting
Forecasting
Forecast at Completion (Estimate at Completion)
Forecast Calculation Methods
Assume Performance to Date
Assume Budgeted Performance
Calculate Estimate to Complete
Hybrid Methods
Exercise8-ForecastDetermination
Change Management
Change Management Principles
Identification of Change
Categorization of Change
Determining Impact of Change
Determining Impact of Cumulative Change
Change Management Procedures
Change Mangement Monitoring & Reporting
Risk Fund Management
Contingency Drawdown
Reserve Management
Exercise9-ContingencyDrawdown
Day Five: Cost Control
FOCUSED TRAINING • REDUCED COST • ENHANCED RESULTS
Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your
specifictrainingneeds.Wemakeitpossibletorunatrainingprogramthatiscustomizedtoyourtrainingneedsatafractionofanin-housebudget!
Ifyouliketoknowmoreaboutthisprogram,pleasecontactuson+6564154500oremailgeneral@petrosync.com
HYBRIDTRAINING SOLUTIONS
Successful Project Cost Estimation & Control
7th-11th September 2015 in Kuala Lumpur, Malaysia
COURSE AGENDA
Limited Attendees
The course has limited seats to ensure maximum learning and experience for all delegates.
Certificate of Attendance
You will receive a Certificate of Attendance bearing the signatures of the Trainer upon successful completion of the course. This certificate is proof of
your continuing professional development.
Interactive Training
You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide
you with a deeper and more long-term understanding of your current issues.
High Quality Course Materials
Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your
colleagues afterward.
Petrosync Quality
Mr. Larry R. Dysert, CCC CEP has over 30 years of professional experience in estimating, management ,
project consulting and training experience in a wide variety of industries. Larry is the managing partner in
Conquest Consulting Group, providing consulting services to process industry owners on recommended
best practices for estimating, project controls, and project benchmarking. Larry has been responsible for
the preparation of conceptual and detailed estimates for capital porjects, domestic and international,
ranging to over $25 billion in size.
Active in AACE International, Larry is currently serving as the Chair of AACE’s Technical Board. Larry is also a
Fellow of AACE International, a recipient of AACE’s Total Cost Management Award, a recipient of AACE
Award of Merit, and an Honorary Lifetime Member. Larry was the Chair for the task force that developed
AACE’s Certified Estimating Professional Program.
Larry has specialized in estimates of various project size, strategic importance, utilizing new technologies,
and those involving in the use of parametric estimating methodologies. Larry has presented training
seminars in estimating, cost metrics analysis, risk analysis and Total Cost Management to process industry
companies around the world.
Over30yearsofprojectestimating,management,consultingandtrainingexperience
Providecostestimatereviewsandvalidationforlargeandstrategicprocessindustryestimates.
CertifiedCostProfessional&CertifiedEstimatingProfessionalfromAACEInternational
US $20 billion integrated oil sands facility in Canada
Estimate review for US$2.5 billion grass-roots in-situ
bitumen production facility using steam-assisted gravity
drainage technology in Alberta
Global investment modeling for an alternative energy
company using proprietary gasification technology
Cost auditing of engineering services for a US$1 billion
chemical manufacturing facility
Kodak environmental remediation projects
DOE Hanford nuclear waste & facility cleanup
Saudi Aramco SASOL (South Africa)
Shell Petro-Canada
Exxon Kodak
Chevron DOE (Washington)
Petronas Nova Chemical
PTTEP Syncrude (Canada)
Eastman Kodak Petrotrin
Eastman Chemical Enbridge Pipelines
Novacor Chemical Weyerhauser
Pemex Sun Refining
Union Oil Saudi Pecten Petrochemical
ARCO Pacific Refining
SOHIO Champlin Petroleum
Lagoven (Venezuela) Fluor Corporation
Maroven (Venezuela)
Petrosync Distinguished Lecturer
Larry R. Dysert
CCC CEP
Chair of Technical Board AACE International
Association for the Advancement of Cost Engineering
Major Projects Completed David’s Selected Client List:
For a copy of PetroSync’sTraining Calendar for 2014, please visit : http://petrosync.com/PETROSYNC_-_Catalog_Training_Yearly_Version_-_2015_-_1.pdf
Successful Project Cost Estimation & Control
7th-11th September 2015 in Kuala Lumpur, Malaysia
Petroleum Cost Engineering & Project Management Training Courses (April - December 2015)
20th-24thApr Cost Engineering, Risk Management & EarnedValue Management Richard Slingerland
18th-21stMay
27th-29thJul
DATE COURSE TITLE INSTRUCTOR
Analysis and Modelling for Cost, Economics & Risk Richard Slingerland
Cost Engineering Intensive Ko Des Bouvrie
28th-01stSep Cost Engineering Intensive Raymond Hagedoorn
07th-11thSep Successful Project Cost Estimation Control Larry Dysert
* For 7 or more delegates, please inquire for more attractive package.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
DELEGATESDETAILS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
I agree to PetroSync’s terms & conditions,payment terms and cancellation policy.
By Direct Transfer : Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank details:
All bank charges to be borne by payer. Please ensure that PetroSync Pte Ltd receives the full invoiced amount.
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Authorized Signature : ____________________________________________________________________________
Mrs Ms Dr OthersMr
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
INVESTMENT PACKAGES
COURSEDETAILS
Title : Successful Project Cost Estimation & Control
Date : 7th - 11th September 2015
Location : Kuala Lumpur, Malaysia
AMEX
* To enjoy the promotion & discount offer, payment must be made before deadline
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers.
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
Confirmation
Group Discount is based on Standard Price
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
InvestmentPackage
Standard Price 4thSept2015 SGD$ 5,995
Group Discount
(3 or more Delegates)
10% discount for groups of 3 registering from the
same organization at the same time
Early Bird Offer
Deadline CourseFee
4thSept2015
7thAug2015 SGD$ 5,795
DETAILS
PROGRAMMECONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322
TERMSANDCONDITIONS
CHARGES&FEE(s)
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea bank
charges.
- For credit card payment, there is additional
4% credit card processsing fee.
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations of
the trainers or topics. As such, PetroSync reserves the
right to change or cancel any part of its published
programme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable companies,
please tick this box.
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training course,
you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync, which
must occur within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will assume
no liability whatsoever in the event this event is
cancelled, rescheduled or postponed due to any Act of
God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action, or
any other reason beyond management control.
CERTIFICATEOFATTENDANCE
A minimum of 70% attendance is required prior issuance
of PetroSync's Certificate.
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.

Weitere ähnliche Inhalte

Was ist angesagt?

INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICSINCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICSNayeem Chowdhury, ECRE, TAS
 
Integrating risk with earned value
Integrating risk with earned valueIntegrating risk with earned value
Integrating risk with earned valueGlen Alleman
 
Business Success Through VA/VE
Business Success Through VA/VEBusiness Success Through VA/VE
Business Success Through VA/VEgojo67
 
Basis of Estimate Processes
Basis of Estimate ProcessesBasis of Estimate Processes
Basis of Estimate ProcessesGlen Alleman
 
م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....
م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....
م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....Egyptian Engineers Association
 
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...Egyptian Engineers Association
 
76 s201903
76 s20190376 s201903
76 s201903IJRAT
 
م.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineering
م.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineeringم.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineering
م.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineeringEgyptian Engineers Association
 
Quality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for ConstructionQuality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for ConstructionRich Purtell
 
5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 seconds5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 secondsGlen Alleman
 
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...shiv1609
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceSusan Schanta
 
Project Cost Management
Project Cost Management Project Cost Management
Project Cost Management Muhammad Hanif
 
م.32 - #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالبات
م.32 -  #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالباتم.32 -  #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالبات
م.32 - #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالباتEgyptian Engineers Association
 

Was ist angesagt? (20)

INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICSINCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
 
Integrating risk with earned value
Integrating risk with earned valueIntegrating risk with earned value
Integrating risk with earned value
 
Business Success Through VA/VE
Business Success Through VA/VEBusiness Success Through VA/VE
Business Success Through VA/VE
 
Presentation on Quality Management
Presentation on Quality ManagementPresentation on Quality Management
Presentation on Quality Management
 
Basis of Estimate Processes
Basis of Estimate ProcessesBasis of Estimate Processes
Basis of Estimate Processes
 
Estimating
EstimatingEstimating
Estimating
 
م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....
م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....
م.34-مبادرة #تواصل _تطوير- د.محمد العجرودي -- إدارة المرافق في الشرق الأوسط.....
 
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
 
76 s201903
76 s20190376 s201903
76 s201903
 
م.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineering
م.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineeringم.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineering
م.51-مبادرة#تواصل_تطوير_ د.جاكلين فهمى_Agility of value engineering
 
Quality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for ConstructionQuality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for Construction
 
5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 seconds5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 seconds
 
Certified Project Consultant
Certified Project Consultant  Certified Project Consultant
Certified Project Consultant
 
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
 
PMP Exam Sample Questions
PMP Exam Sample QuestionsPMP Exam Sample Questions
PMP Exam Sample Questions
 
Neetu lead pmo cv
Neetu lead pmo cvNeetu lead pmo cv
Neetu lead pmo cv
 
Certified Planning Engineer CPE
Certified Planning Engineer CPE Certified Planning Engineer CPE
Certified Planning Engineer CPE
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program Assurance
 
Project Cost Management
Project Cost Management Project Cost Management
Project Cost Management
 
م.32 - #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالبات
م.32 -  #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالباتم.32 -  #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالبات
م.32 - #تواصل_تطوير-م.حسام قنديل- " رؤية متجددة لتحليل المطالبات
 

Andere mochten auch

PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync
 
PetroSync - Directional Drilling Operation
PetroSync - Directional Drilling OperationPetroSync - Directional Drilling Operation
PetroSync - Directional Drilling OperationPetroSync
 
PetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync
 
PetroSync - Root Cause Analysis
PetroSync - Root Cause AnalysisPetroSync - Root Cause Analysis
PetroSync - Root Cause AnalysisPetroSync
 
PetroSync - Introduction to Oil and Gas Accounting
PetroSync - Introduction to Oil and Gas AccountingPetroSync - Introduction to Oil and Gas Accounting
PetroSync - Introduction to Oil and Gas AccountingPetroSync
 
PetroSync - Cost Engineering Intensive
PetroSync - Cost Engineering IntensivePetroSync - Cost Engineering Intensive
PetroSync - Cost Engineering IntensivePetroSync
 
PetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic Systems
PetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic SystemsPetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic Systems
PetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic SystemsPetroSync
 
PetroSync - Risk and Simulation Modelling for Oil and Gas Applications
PetroSync - Risk and Simulation Modelling for Oil and Gas ApplicationsPetroSync - Risk and Simulation Modelling for Oil and Gas Applications
PetroSync - Risk and Simulation Modelling for Oil and Gas ApplicationsPetroSync
 
PetroSync - Heat Exchanger Fouling & Mitigation Technology
PetroSync - Heat Exchanger Fouling & Mitigation TechnologyPetroSync - Heat Exchanger Fouling & Mitigation Technology
PetroSync - Heat Exchanger Fouling & Mitigation TechnologyPetroSync
 
PetroSync - Integration of Petrophysics and Core Analysis
PetroSync - Integration of Petrophysics and Core AnalysisPetroSync - Integration of Petrophysics and Core Analysis
PetroSync - Integration of Petrophysics and Core AnalysisPetroSync
 
PetroSync - Advanced Petroleum Contract Negotiation
PetroSync - Advanced Petroleum Contract NegotiationPetroSync - Advanced Petroleum Contract Negotiation
PetroSync - Advanced Petroleum Contract NegotiationPetroSync
 
PetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync
 
PetroSync - Drilling Contract Negotiation & Management
PetroSync - Drilling Contract Negotiation & ManagementPetroSync - Drilling Contract Negotiation & Management
PetroSync - Drilling Contract Negotiation & ManagementPetroSync
 
PetroSync - Post-Contract Management
PetroSync - Post-Contract ManagementPetroSync - Post-Contract Management
PetroSync - Post-Contract ManagementPetroSync
 
PetroSync - Legal Report Writing
PetroSync - Legal Report WritingPetroSync - Legal Report Writing
PetroSync - Legal Report WritingPetroSync
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 

Andere mochten auch (20)

PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling Engineers
 
PetroSync - Directional Drilling Operation
PetroSync - Directional Drilling OperationPetroSync - Directional Drilling Operation
PetroSync - Directional Drilling Operation
 
PetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and Gas
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String Design
 
PetroSync - Root Cause Analysis
PetroSync - Root Cause AnalysisPetroSync - Root Cause Analysis
PetroSync - Root Cause Analysis
 
PetroSync - Introduction to Oil and Gas Accounting
PetroSync - Introduction to Oil and Gas AccountingPetroSync - Introduction to Oil and Gas Accounting
PetroSync - Introduction to Oil and Gas Accounting
 
PetroSync - Cost Engineering Intensive
PetroSync - Cost Engineering IntensivePetroSync - Cost Engineering Intensive
PetroSync - Cost Engineering Intensive
 
PetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic Systems
PetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic SystemsPetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic Systems
PetroSync - Applied Sequence Stratigraphy in Carbonates & Siliciclastic Systems
 
PetroSync - Risk and Simulation Modelling for Oil and Gas Applications
PetroSync - Risk and Simulation Modelling for Oil and Gas ApplicationsPetroSync - Risk and Simulation Modelling for Oil and Gas Applications
PetroSync - Risk and Simulation Modelling for Oil and Gas Applications
 
PetroSync - Heat Exchanger Fouling & Mitigation Technology
PetroSync - Heat Exchanger Fouling & Mitigation TechnologyPetroSync - Heat Exchanger Fouling & Mitigation Technology
PetroSync - Heat Exchanger Fouling & Mitigation Technology
 
PetroSync - Integration of Petrophysics and Core Analysis
PetroSync - Integration of Petrophysics and Core AnalysisPetroSync - Integration of Petrophysics and Core Analysis
PetroSync - Integration of Petrophysics and Core Analysis
 
PetroSync - Advanced Petroleum Contract Negotiation
PetroSync - Advanced Petroleum Contract NegotiationPetroSync - Advanced Petroleum Contract Negotiation
PetroSync - Advanced Petroleum Contract Negotiation
 
PetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract Management
 
PetroSync - Drilling Contract Negotiation & Management
PetroSync - Drilling Contract Negotiation & ManagementPetroSync - Drilling Contract Negotiation & Management
PetroSync - Drilling Contract Negotiation & Management
 
PetroSync - Post-Contract Management
PetroSync - Post-Contract ManagementPetroSync - Post-Contract Management
PetroSync - Post-Contract Management
 
PetroSync - Legal Report Writing
PetroSync - Legal Report WritingPetroSync - Legal Report Writing
PetroSync - Legal Report Writing
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations Geology
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production Accounting
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 

Ähnlich wie PetroSync - Successful Project Cost Estimation & Control

Cost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas ProjectsCost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas ProjectspetroEDGE
 
Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)Glen Alleman
 
Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®Glen Alleman
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementGlen Alleman
 
iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...IRJET Journal
 
Resume everard alphonso rev 4
Resume   everard alphonso rev 4 Resume   everard alphonso rev 4
Resume everard alphonso rev 4 Everard Alphonso
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivespetroEDGE
 
Resume everard alphonso rev 5
Resume   everard alphonso rev 5Resume   everard alphonso rev 5
Resume everard alphonso rev 5Everard Alphonso
 
Resume everard alphonso rev 5
Resume   everard alphonso rev 5Resume   everard alphonso rev 5
Resume everard alphonso rev 5Everard Alphonso
 
Implication of economic conditions in changing project objectives (how to ada...
Implication of economic conditions in changing project objectives (how to ada...Implication of economic conditions in changing project objectives (how to ada...
Implication of economic conditions in changing project objectives (how to ada...Hisham Haridy MBA, PMP®, RMP®, SP®
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.commkhilauria
 
The Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccessThe Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccessGlen Alleman
 
A Guide for Capital Project Mamnagers
A Guide for Capital Project MamnagersA Guide for Capital Project Mamnagers
A Guide for Capital Project MamnagersGlen Alleman
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdfssuserad21d8
 

Ähnlich wie PetroSync - Successful Project Cost Estimation & Control (20)

Cost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas ProjectsCost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)
 
Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value Management
 
iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...
 
Resume everard alphonso rev 4
Resume   everard alphonso rev 4 Resume   everard alphonso rev 4
Resume everard alphonso rev 4
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual Perspectives
 
Resume everard alphonso rev 5
Resume   everard alphonso rev 5Resume   everard alphonso rev 5
Resume everard alphonso rev 5
 
Resume everard alphonso rev 5
Resume   everard alphonso rev 5Resume   everard alphonso rev 5
Resume everard alphonso rev 5
 
Implication of economic conditions in changing project objectives (how to ada...
Implication of economic conditions in changing project objectives (how to ada...Implication of economic conditions in changing project objectives (how to ada...
Implication of economic conditions in changing project objectives (how to ada...
 
Profile Seema Wadhwa
Profile Seema WadhwaProfile Seema Wadhwa
Profile Seema Wadhwa
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.com
 
Dawn Thompson
Dawn ThompsonDawn Thompson
Dawn Thompson
 
Implication of economic conditions in changing project objectives
Implication of economic conditions in changing project objectivesImplication of economic conditions in changing project objectives
Implication of economic conditions in changing project objectives
 
Neelesh Thakare CV.
Neelesh Thakare CV.Neelesh Thakare CV.
Neelesh Thakare CV.
 
The Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccessThe Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccess
 
A Guide for Capital Project Mamnagers
A Guide for Capital Project MamnagersA Guide for Capital Project Mamnagers
A Guide for Capital Project Mamnagers
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 

Mehr von PetroSync

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync
 
PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync
 

Mehr von PetroSync (20)

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure Analysis
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced Vibration
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine Operation
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & Gas
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
 
PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing Contracts
 

Kürzlich hochgeladen

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Kürzlich hochgeladen (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

PetroSync - Successful Project Cost Estimation & Control

  • 1. ImproveYourCostAccuracywiththeUltimateGOLDStandardofCostEngineering SuccessfulProject CostEstimation&ControlCostEstimation&Control Testimonials Petrosync Distinguished Lecturer Larry R. Dysert CCC CEP Chair of Technical Board AACE International Association for the Advancement of Cost Engineering Over 30 years of global experience in cost estimating & controls Chair of AACE International Technical Board, AwardWinner & Fellow of AACE International International Consultant & Trainer for Saudi Aramco, Shell, Exxon, GS Construction, Petronas, Chevron, PTTEP, ConocoPhillips Managing Partner of Conquest Consulting Group, USA Approved Education Provider of AACE International Responsible for cost estimation & controls and projects small & big with the biggest project up to USD $25 billion! LeadingCostEngineeringLeadingCostEngineering FrameworkWorldwide!FrameworkWorldwide! 7th-11thSeptember2015, KualaLumpur,Malaysia Supported by “A real great course!” AKER SOLUTIONS “Very practical approach and training examples. Thus, easy to understand and be applied to day to day cost estimation.” NEWFIELD “This training is very useful and relevant to my daily job and provide two different perspective, owner’s and contractor’s point of view.” PETRONAS “Good trainer makes a difference.” PETRONAS RESEARCH “Petrosync is one persistant and most organized organizer of trainings.” PETRONAS CARIGALI “Practical insights which you can’t find in text book. Topic coverage is comprehensive!.” PETRONAS “This course provides me detail knowledge to prepare estimation and cost control. ” SMB OFFSHORE “Better understanding in cost managing/tracking for small/medium/large project.” SHELL “Great course with very experienced instructor.” SHELL
  • 2. Designed to provide comprehensive of the fundamentals of estimation & control, this masterclass covers many subtle and advanced estimating & control concepts for specific industry like Oil & gas which are “equipment-centric”, and this influence is important in the selection of estimating methodologies and techniques used in estimate preparation.This process will be covered from both the contractor and owner’s points of view, noting the similarities and differences in the respective approach of each. An emphasis will be placed on examining the conceptual estimating methodologies that can assist in preparing accurate estimates at early design stages of project.The cost control process will be based on the concept of Plan-Do-Check-Assess of total cost management framework. This course is intended for Cost Estimators Cost Engineers Cost Controllers Quantitative Surveyor DRIVEaconsistentandeffectiveprocessacrosstheexecutionofallprojectsthenimprovetheresults of the entire portfolio of projects UNDERSTAND the AACE International best practices framework for Cost Engineering CAPITALIZE onTCM cost engineering practices to increase your cost engineering accuracy GAIN more in-depth knowledge of cost engineering estimation and control terminology UNDERSTAND the different requirements for estimating throughout the project life cycle OBTAIN a comprehensive understanding of estimating methodologies used throughout the project lifecycle, and when to use them UNDERSTAND how progress measurement, performance assesment, realistic forecasting, and effective change management contribute to project success Project Director Project Head Project Manager Project Engineer Course Objectives Specially Designed for Course Overview 08:00–09:00 Registration (Day1) 09:00–11:00 Session I 11:00–11:15 Refreshment & Networking Session I 11:15–13:00 Session II 13:00–14:00 14:00–15:30 Session III 15:30–15:45 Refreshment & Networking Session II 15:45–17:00 Session IV 17:00 End of Day PROGRAM SCHEDULE Lunch Successful Project Cost Estimation & Control 7th-11th September 2015 in Kuala Lumpur, Malaysia
  • 3. 1 Conceptual Estimating Methodologies Analogy Estimating Capacity Factoring Estimating Exercise1-CapacityFactoredEstimateforProcessEquipment Exercise2-CapacityFactoredEstimateforProcessUnit Equipment Factored Estimating Exercise3-EquipmentFactoredEstimateforProcessUnit Parametric Estimating Other Conceptual Estimating Methods Total Cost Management Process TCM as a Process and Reference Model Strategic Asset Management Process Project Control Process Asset and Project Lifecycles Organization and Leadership forTCM Capital Investment Option Identification and Development Decision Making and Risk Management COURSE AGENDA Estimating Introduction Capital Project Process and Estimate Classification Estimate PreparationWorkflow Structuring the Estimate Overview of Estimating Methodologies Day One: Total Cost Management Overview Day Two: Cost Estimating Successful Project Cost Estimation & Control 7th-11th September 2015 in Kuala Lumpur, Malaysia Project Control Process Scope Development and Execution Strategy Planning and Control Baseline Development Project Performance Measurement and Assessment TCM Knowledge Management Project Planning Establishing and Communicating Goals and Objectives Estimating Uncertainty Estimate Contingency Risk Analysis Escalation Presenting the Estimate Estimate Quality Management Estimate Review/Validation Exercise4-EstimatePreparationforSampleProject Estimating Knowledge Management Issues with Estimating Mega-Projects Day Three: Cost Estimating Biases in Estimating Detailed Estimating Detailed Estimating Activities Estimate Quantification Equipment Estimating Labor Rates/Labor Productivity Cost/Pricing/Allowances Estimate - Schedule Integration Reliability Limitations/Estimate Accuracy
  • 4. Total Cost Management (TCM) Overview TCM as a Process and Reference Model Strategic Asset Management Process Project Control Process Planning What,Where, How,When,Who, How Much? Project Definition Decomposition Work Breakdown Structure Organization Breakdown Structure Cost Breakdwon Structure Establishing Baselines Cost Baseline Schedule Baseline Budgeting Accounting Budget vs. Project Budget Original Budget vs. Current Budget Conversion of Cost Estimate to Baseline Project Control Budget Exercise5-PreparationofProjectControlBudget Exercise6-PrepareQuantityAdjustedControlBudget Time-Ohase (Cash Flow) Budgeting Cost Accounting Original Budget Approved Scope Change Budget Shift Current Budget Commitment Expenditure Accrual Incurred Cost Currency Issues Performance Measurement Physical Progress Measurement and EarnedValue Physical Progress Measurement Methods Units Completed Weighted Units Completed Start Finish Incremental Milestone Level of Effort Judgement Day Four: Cost Control COURSE AGENDA Successful Project Cost Estimation & Control 7th-11th September 2015 in Kuala Lumpur, Malaysia WHYYOUSHOULDATTENDPETROSYNC’SEVENTS To ensure that all objectives of the course matches yours, all PetroSync programs are developed after intensive and extensive research within the industry PetroSync programs focus on your immediate working issues to ensure that you are able to apply and deliver immediate results in real work situations Applicationandimplementationofindustryknowledgeandexperiencearethedriversforourcoursedesign,nottheoreticalacademiclectures PetroSync training focuses on practical interactive learning tools and techniques including case studies, group discussions, scenarios, simulations,practicalexercisesandknowledgeassessmentsduringthecourse.Investasmallamountofyourtimetopreparebeforeattending thecoursetoensuremaximumlearning PetroSync follows a rigorous selection process to ensure that all expert trainers have first-hand, up-to-date and practical knowledge and are leadersoftheirrespectiveindustrialdiscipline
  • 5. Performance Analysis Variance Analysis CostVariance ScheduleVariance Performance Indices Cost Performance Index Schedule Performance Index Exercise7-PerformanceAnalysis Determination of Cause forVariance Performance Reporting Forecasting Forecast at Completion (Estimate at Completion) Forecast Calculation Methods Assume Performance to Date Assume Budgeted Performance Calculate Estimate to Complete Hybrid Methods Exercise8-ForecastDetermination Change Management Change Management Principles Identification of Change Categorization of Change Determining Impact of Change Determining Impact of Cumulative Change Change Management Procedures Change Mangement Monitoring & Reporting Risk Fund Management Contingency Drawdown Reserve Management Exercise9-ContingencyDrawdown Day Five: Cost Control FOCUSED TRAINING • REDUCED COST • ENHANCED RESULTS Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your specifictrainingneeds.Wemakeitpossibletorunatrainingprogramthatiscustomizedtoyourtrainingneedsatafractionofanin-housebudget! Ifyouliketoknowmoreaboutthisprogram,pleasecontactuson+6564154500oremailgeneral@petrosync.com HYBRIDTRAINING SOLUTIONS Successful Project Cost Estimation & Control 7th-11th September 2015 in Kuala Lumpur, Malaysia COURSE AGENDA Limited Attendees The course has limited seats to ensure maximum learning and experience for all delegates. Certificate of Attendance You will receive a Certificate of Attendance bearing the signatures of the Trainer upon successful completion of the course. This certificate is proof of your continuing professional development. Interactive Training You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide you with a deeper and more long-term understanding of your current issues. High Quality Course Materials Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your colleagues afterward. Petrosync Quality
  • 6. Mr. Larry R. Dysert, CCC CEP has over 30 years of professional experience in estimating, management , project consulting and training experience in a wide variety of industries. Larry is the managing partner in Conquest Consulting Group, providing consulting services to process industry owners on recommended best practices for estimating, project controls, and project benchmarking. Larry has been responsible for the preparation of conceptual and detailed estimates for capital porjects, domestic and international, ranging to over $25 billion in size. Active in AACE International, Larry is currently serving as the Chair of AACE’s Technical Board. Larry is also a Fellow of AACE International, a recipient of AACE’s Total Cost Management Award, a recipient of AACE Award of Merit, and an Honorary Lifetime Member. Larry was the Chair for the task force that developed AACE’s Certified Estimating Professional Program. Larry has specialized in estimates of various project size, strategic importance, utilizing new technologies, and those involving in the use of parametric estimating methodologies. Larry has presented training seminars in estimating, cost metrics analysis, risk analysis and Total Cost Management to process industry companies around the world. Over30yearsofprojectestimating,management,consultingandtrainingexperience Providecostestimatereviewsandvalidationforlargeandstrategicprocessindustryestimates. CertifiedCostProfessional&CertifiedEstimatingProfessionalfromAACEInternational US $20 billion integrated oil sands facility in Canada Estimate review for US$2.5 billion grass-roots in-situ bitumen production facility using steam-assisted gravity drainage technology in Alberta Global investment modeling for an alternative energy company using proprietary gasification technology Cost auditing of engineering services for a US$1 billion chemical manufacturing facility Kodak environmental remediation projects DOE Hanford nuclear waste & facility cleanup Saudi Aramco SASOL (South Africa) Shell Petro-Canada Exxon Kodak Chevron DOE (Washington) Petronas Nova Chemical PTTEP Syncrude (Canada) Eastman Kodak Petrotrin Eastman Chemical Enbridge Pipelines Novacor Chemical Weyerhauser Pemex Sun Refining Union Oil Saudi Pecten Petrochemical ARCO Pacific Refining SOHIO Champlin Petroleum Lagoven (Venezuela) Fluor Corporation Maroven (Venezuela) Petrosync Distinguished Lecturer Larry R. Dysert CCC CEP Chair of Technical Board AACE International Association for the Advancement of Cost Engineering Major Projects Completed David’s Selected Client List: For a copy of PetroSync’sTraining Calendar for 2014, please visit : http://petrosync.com/PETROSYNC_-_Catalog_Training_Yearly_Version_-_2015_-_1.pdf Successful Project Cost Estimation & Control 7th-11th September 2015 in Kuala Lumpur, Malaysia Petroleum Cost Engineering & Project Management Training Courses (April - December 2015) 20th-24thApr Cost Engineering, Risk Management & EarnedValue Management Richard Slingerland 18th-21stMay 27th-29thJul DATE COURSE TITLE INSTRUCTOR Analysis and Modelling for Cost, Economics & Risk Richard Slingerland Cost Engineering Intensive Ko Des Bouvrie 28th-01stSep Cost Engineering Intensive Raymond Hagedoorn 07th-11thSep Successful Project Cost Estimation Control Larry Dysert
  • 7. * For 7 or more delegates, please inquire for more attractive package. * Important: Please note that registration without payment will incur a SGD 200 administration fee. 1st Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Company:____________________________________________ Industry : __________________________________ Address: _______________________________________________________Postcode: _________________________ Country: ________________________Email: __________________________________________________________ Attention Invoice to: ______________________________________________________________________________ Direct Line Number: ______________________________ Fax: _____________________________________________ PAYMENTMETHODS DELEGATESDETAILS Please note: - Indicate if you have already registered by Phone Fax Email Web I agree to PetroSync’s terms & conditions,payment terms and cancellation policy. By Direct Transfer : Please quote invoice number(s) on remittance advice PetroSync Global Pte Ltd Bank details: All bank charges to be borne by payer. Please ensure that PetroSync Pte Ltd receives the full invoiced amount. By Credit Card : Please debit my credit card: Visa MasterCard Card Number: Name printed on card: _____________________________________________________________________ Expiry Date: Security Code: INVOICEDETAILS Authorized Signature : ____________________________________________________________________________ Mrs Ms Dr OthersMr PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. 2nd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr 3rd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr INVESTMENT PACKAGES COURSEDETAILS Title : Successful Project Cost Estimation & Control Date : 7th - 11th September 2015 Location : Kuala Lumpur, Malaysia AMEX * To enjoy the promotion & discount offer, payment must be made before deadline * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. - If you have not received an acknowledgement before the training, please call us to confirm your booking. Confirmation Group Discount is based on Standard Price Account Name: PetroSync Global Pte Ltd Bank Name : DBS Bank Ltd Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288 Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6 Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982 InvestmentPackage Standard Price 4thSept2015 SGD$ 5,995 Group Discount (3 or more Delegates) 10% discount for groups of 3 registering from the same organization at the same time Early Bird Offer Deadline CourseFee 4thSept2015 7thAug2015 SGD$ 5,795 DETAILS PROGRAMMECONSULTANT Name : Cay Aagen Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6826 4322 TERMSANDCONDITIONS CHARGES&FEE(s) - For Payment by Direct TelegraphicTransfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processsing fee. DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published programme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATAPROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box. CANCELLATIONPOLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. CERTIFICATEOFATTENDANCE A minimum of 70% attendance is required prior issuance of PetroSync's Certificate. Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly.