LONGTERM EXPERIENCE
WITH PV POWER PLANTS IN GERMANY

Dr. Christian Reise
Fraunhofer Institute for
Solar Energy Systems ISE
Freiburg, Germany

Solar Operations & Maintenance
Milan, October 9th, 2013
© Fraunhofer ISE
The Fraunhofer ISE Quality Circle

Yield Assessments

Quality
Monitoring
2
© Fraunhofer ISE

Module
Measurements

System tests
What are the questions?

3
© Fraunhofer ISE
What are the questions?

 What is the state-of-the-art performance of a PV power plant?
 What about degradation?
 What affects system reliability?

4
© Fraunhofer ISE
What are the questions?

 What is the state-of-the-art performance of a PV power plant?
A review of 20+ years of commercial PV systems in Germany
 What about degradation?
A study on 100+ power plants in Germany
 What affects system reliability?
Modules / inverters / operation management…

5
© Fraunhofer ISE
PV support schemes in Germany

6
© Fraunhofer ISE
Development of system Performance Ratio in Germany

A typical
5 kWp
system
installed
in 1993
within the
German
1000 Roofs
Programme

7
© Fraunhofer ISE
Performance Ratio (PR): A simple Definition

PR =

8
© Fraunhofer ISE
Development of system Performance Ratio in Germany

9
© Fraunhofer ISE
Development of system Performance Ratio in Germany

10
© Fraunhofer ISE
Development of system Performance Ratio in Germany
Where is the limit?
 In Germany, state-of-the-art PV systems reach PR(si) values around 90%

 Note the difference of some 3…4% between PR(si) and PR(pyr)
 In southern Europe, PR will be reduced by 3…5%

11
© Fraunhofer ISE
Development of system Performance Ratio in Germany
Where is the limit?
 In Germany, state-of-the-art PV systems reach PR(si) values around 90%

 Note the difference of some 3…4% between PR(si) and PR(pyr)
 In southern Europe, PR will be reduced by 3…5%

PR =

12
© Fraunhofer ISE
Important factors for successful projects
Lessons learnt
 Modules show rated power

 Maintenance of area
 Theft protection
 Minimized row to row shading

13
© Fraunhofer ISE
Important factors for successful projects
Lessons learnt
 Modules show rated power

 Maintenance of area
 Theft protection
 Minimized row to row shading
 Minimized local shading
 Durable installation
 QC with commissioning
 Regular cleaning intervals
 Monitoring of operation

14
© Fraunhofer ISE
What are the questions?

 What is the state-of-the-art performance of a PV power plant?
A review of 20+ years of commercial PV systems in Germany
 What about degradation?
A study on 100+ power plants in Germany
 What affects system reliability?
Modules / inverters / operation management…

15
© Fraunhofer ISE
A study on 100+ power plants in Germany
Data Handling

Filtering of 5-min average values:

16
© Fraunhofer ISE
A study on 100+ power plants in Germany
Data Handling

Filtering of 5-min average values:
 Irradiance between
800…1000 W/m²

17
© Fraunhofer ISE
A study on 100+ power plants in Germany
Data Handling

Filtering of 5-min average values:
 Irradiance between
800…1000 W/m²
 Module temperature between
40…45 °C

18
© Fraunhofer ISE
A study on 100+ power plants in Germany
Data Handling

Filtering of 5-min average values:
 Irradiance between
800…1000 W/m²
 Module temperature between
40…45 °C
 Values inside median ± 5%

19
© Fraunhofer ISE
A study on 100+ power plants in Germany
Data Handling

Filtering of 5-min average values:
 Irradiance between
800…1000 W/m²
 Module temperature between
40…45 °C
 Values inside median ± 5%
 Calculation of rate of change
rate in %/year

20
© Fraunhofer ISE
A study on 100+ power plants in Germany
Example: a German „1000-Roofs-Programme“ system

5 kWp PV system built in 1993
New monitoring equipment in 2001

outliers excluded
fitted linear slope

Rate of Change: ca. –0.3%/a

21
© Fraunhofer ISE
A study on 100+ power plants in Germany
Results statistics for c-Si
 Calculation of a rate of
change per year for each
PV system shows large
scatter

rate of change in % per year

 Average c-Si degradation
rates are around –0.25%
per year

2.0%

4.0%

mono/poly

3.0%

1.0%
0.0%
-1.0%
-2.0%
-3.0%
-4.0%

1

2

3

4

5

6

7

8

9 10 11_

years of operation
22
© Fraunhofer ISE
A study on 100+ power plants in Germany
Results for alternative silicon wafer technologies
 Average c-Si degradation
rates are around –0.25%
per year
 Systems with EFG or
string-ribbon modules
reveal a tendency towards
larger negative rates of
change

rate of change in % per year
4.0%
mono/poly
3.0%
EFG/String Ribbon
2.0%
1.0%

0.0%
-1.0%
-2.0%
-3.0%
-4.0%

1

2

3

4

5

6

7

8

9 10 11_

years of operation
23
© Fraunhofer ISE
What are the questions?

 What is the state-of-the-art performance of a PV power plant?
A review of 20+ years of commercial PV systems in Germany
 What about degradation?
A study on 100+ power plants in Germany
 What affects system reliability?
Modules / inverters / operation management…

24
© Fraunhofer ISE
What affects system reliability?

On average, there
are 5 incidents per
PV power plant and
year

Source:
meteocontrol,
Augsburg,
Germany
25
© Fraunhofer ISE
What affects system reliability?

 Module reliability
 BOS component & installation reliability
 Operation management

26
© Fraunhofer ISE
What affects system reliability?

 Module reliability
“no problem”
 BOS component & installation reliability
Commissioning tests
 Operation management
Monitoring & intervention concepts

27
© Fraunhofer ISE
Commissioning tests

Detailed on-site analysis of the
entire power plant:
 Comprehensive visual
inspection
 Thermographic imaging
 Measurement of actual PV
power and conversion to
Standard Test Conditions
 Assessment of Performance
Ratio (PR)

28
© Fraunhofer ISE
System Inspection and Testing

 Verification of design data (module types, tilt angles, distances)

 Screening for large and small anomalies (insufficient foundation,
cell grid faults)

29
© Fraunhofer ISE
System Inspection and Testing
Mechanical problems
 Faulty mounting of modules

 Missing protection leading to cable damage

30
© Fraunhofer ISE
System Inspection and Testing
Mechanical problems
 Loose connectors

31
© Fraunhofer ISE
System Inspection and Testing
Mechanical problems
 Combination of connectors from
different manufacturers
 Loose cables

32
© Fraunhofer ISE
System Inspection and Testing
Mechanical problems
 Cable glands on top, moisture in the sub-distribution box

 Spare cable glands not sealed, moisture and animals in the box

33
© Fraunhofer ISE
System Inspection and Testing
Infrared imaging

Mobile lifting platform used
for infrared camera imaging

34
© Fraunhofer ISE

Temperature analysis of a
large module field

Temperature analysis of a
solar module with defective
cells
System Inspection and Testing
Infrared imaging
 Detection of defective bypass diodes

35
© Fraunhofer ISE
System Inspection and Testing
Infrared imaging
 Detection of defective terminals with high transition resistance

36
© Fraunhofer ISE
System Inspection and Testing
Infrared imaging
 Detection of weak connections on power rails

37
© Fraunhofer ISE
Commissioning tests

Detailed on-site analysis of the
entire power plant:
 Comprehensive visual
inspection
 Thermographic imaging
 Measurement of actual PV
power and conversion to
Standard Test Conditions
 Assessment of Performance
Ratio (PR)

38
© Fraunhofer ISE
What affects system reliability?

 Module reliability
“no problem”
 BOS component & installation reliability
Commissioning tests
 Operation management
Monitoring & intervention concepts

39
© Fraunhofer ISE
Operation management
Monitoring & intervention
 Operation of a state-of-the-art supervisory control and data acquisition
(SCADA) system in each PV power plant
 Operation of a dedicated control centre, offering all features needed to
evaluate system operation and to optimize maintenance work flow
 Rapid reaction to error messages
 Management, performing and documentation of maintenance and repair
 On-site visits in regular intervals
 Landscape maintenance
Learn more about operation management at this event…

40
© Fraunhofer ISE
Conclusions…

 PV power plant operation is well understood and reproducible

 Today’s systems may reach PR(si) values around 90% in Central Europe
 Mono- and polycrystalline silicon systems show small degradation rates, by
default, Fraunhofer ISE assumes –0.25% per year
 Long term success starts with a comprehensive system testing
 Only professional O&M concepts ensure high performance and yields

41
© Fraunhofer ISE
Thank you for your attention!

Fraunhofer Institute for Solar Energy Systems ISE

Dr. Christian Reise
christian.reise@ise.fraunhofer.de
www.ise.fraunhofer.de
42
© Fraunhofer ISE
Development of system Performance Ratio in Germany
Comparison prediction vs. real world system operation

43
© Fraunhofer ISE
Development of system Performance Ratio in Germany
Comparison prediction vs. real world system operation

44
© Fraunhofer ISE

Weitere ähnliche Inhalte

Was ist angesagt?

Towards a systems approach in Ecodesign and Energy Labelling: How to make the...
Towards a systems approach in Ecodesign and Energy Labelling: How to make the...Towards a systems approach in Ecodesign and Energy Labelling: How to make the...
Towards a systems approach in Ecodesign and Energy Labelling: How to make the...
Leonardo ENERGY
 

Was ist angesagt? (20)

Technical Assumptions Used in PV Financial Models: Review of Current Practice...
Technical Assumptions Used in PV Financial Models: Review of Current Practice...Technical Assumptions Used in PV Financial Models: Review of Current Practice...
Technical Assumptions Used in PV Financial Models: Review of Current Practice...
 
Motivation, benefits, and challenges for new photovoltaic material & module d...
Motivation, benefits, and challenges for new photovoltaic material & module d...Motivation, benefits, and challenges for new photovoltaic material & module d...
Motivation, benefits, and challenges for new photovoltaic material & module d...
 
Evaluation protocols for building-related energy efficiency measures (EED art.7)
Evaluation protocols for building-related energy efficiency measures (EED art.7)Evaluation protocols for building-related energy efficiency measures (EED art.7)
Evaluation protocols for building-related energy efficiency measures (EED art.7)
 
Motivating change in user behaviour with BACS
Motivating change in user behaviour with BACSMotivating change in user behaviour with BACS
Motivating change in user behaviour with BACS
 
Investigating Business Models for Building Integrated Photovoltaics (BIPV)
Investigating Business Models for Building Integrated Photovoltaics (BIPV)Investigating Business Models for Building Integrated Photovoltaics (BIPV)
Investigating Business Models for Building Integrated Photovoltaics (BIPV)
 
Advanced weather forecasting for RES applications: Smart4RES developments tow...
Advanced weather forecasting for RES applications: Smart4RES developments tow...Advanced weather forecasting for RES applications: Smart4RES developments tow...
Advanced weather forecasting for RES applications: Smart4RES developments tow...
 
4 effect of pv module degradation and failure on system performance v3.1
4   effect of pv module degradation and failure on system performance v3.14   effect of pv module degradation and failure on system performance v3.1
4 effect of pv module degradation and failure on system performance v3.1
 
1 snl epri-intro
1   snl epri-intro1   snl epri-intro
1 snl epri-intro
 
9 incorporating energy storage into pv system design
9   incorporating energy storage into pv system design9   incorporating energy storage into pv system design
9 incorporating energy storage into pv system design
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
 
13 pv salvage value and end of life management
13   pv salvage value and end of life management13   pv salvage value and end of life management
13 pv salvage value and end of life management
 
Towards a systems approach in Ecodesign and Energy Labelling: How to make the...
Towards a systems approach in Ecodesign and Energy Labelling: How to make the...Towards a systems approach in Ecodesign and Energy Labelling: How to make the...
Towards a systems approach in Ecodesign and Energy Labelling: How to make the...
 
Folder Energyville
Folder EnergyvilleFolder Energyville
Folder Energyville
 
2020 status report building integrated photovoltaics BIPV
2020 status report building integrated photovoltaics BIPV2020 status report building integrated photovoltaics BIPV
2020 status report building integrated photovoltaics BIPV
 
Coloured Building Integrated Photovoltaics - Market, Research and Development
Coloured Building Integrated Photovoltaics - Market, Research and DevelopmentColoured Building Integrated Photovoltaics - Market, Research and Development
Coloured Building Integrated Photovoltaics - Market, Research and Development
 
Electricity Supply Systems of the Future
Electricity Supply Systems of the FutureElectricity Supply Systems of the Future
Electricity Supply Systems of the Future
 
The True Costs of Solar PV: IRENA's Cost Analysis
The True Costs of Solar PV: IRENA's Cost AnalysisThe True Costs of Solar PV: IRENA's Cost Analysis
The True Costs of Solar PV: IRENA's Cost Analysis
 
High resolution spatial and electrical modeling for efficient BIPV system design
High resolution spatial and electrical modeling for efficient BIPV system designHigh resolution spatial and electrical modeling for efficient BIPV system design
High resolution spatial and electrical modeling for efficient BIPV system design
 
What's the right method to find how much energy smart meters save?
What's the right method to find how much energy smart meters save? What's the right method to find how much energy smart meters save?
What's the right method to find how much energy smart meters save?
 
electrical energy storage system
electrical energy storage systemelectrical energy storage system
electrical energy storage system
 

Andere mochten auch

BIG,Fraunhofer: Innovation in Germany
BIG,Fraunhofer: Innovation in GermanyBIG,Fraunhofer: Innovation in Germany
BIG,Fraunhofer: Innovation in Germany
Yogesh Garg
 
Enron - The accounting disaster
Enron - The accounting disasterEnron - The accounting disaster
Enron - The accounting disaster
Pratyush Mittal
 

Andere mochten auch (16)

The IoT, Big Data and I – Food for Game
The IoT, Big Data and I – Food for GameThe IoT, Big Data and I – Food for Game
The IoT, Big Data and I – Food for Game
 
Morgenstadt: City Lab Lisbon - Executive Summary
Morgenstadt: City Lab Lisbon - Executive SummaryMorgenstadt: City Lab Lisbon - Executive Summary
Morgenstadt: City Lab Lisbon - Executive Summary
 
BIG,Fraunhofer: Innovation in Germany
BIG,Fraunhofer: Innovation in GermanyBIG,Fraunhofer: Innovation in Germany
BIG,Fraunhofer: Innovation in Germany
 
Agenda Club de Innovación segundo semestre 2014
Agenda Club de Innovación segundo semestre 2014Agenda Club de Innovación segundo semestre 2014
Agenda Club de Innovación segundo semestre 2014
 
Agenda Club de Innovación 2015 * Sujeto a modificación*
Agenda Club de Innovación 2015 * Sujeto a modificación*Agenda Club de Innovación 2015 * Sujeto a modificación*
Agenda Club de Innovación 2015 * Sujeto a modificación*
 
The rise of Internet of things
The rise of Internet of thingsThe rise of Internet of things
The rise of Internet of things
 
Políticas de innovación- Ministro de Economía para el Club de Innovación
Políticas de innovación- Ministro de Economía para el Club de InnovaciónPolíticas de innovación- Ministro de Economía para el Club de Innovación
Políticas de innovación- Ministro de Economía para el Club de Innovación
 
CEO Meeting Fraunhofer Institut: Investigación Aplicada para la Innovación
CEO Meeting Fraunhofer Institut: Investigación Aplicada para la InnovaciónCEO Meeting Fraunhofer Institut: Investigación Aplicada para la Innovación
CEO Meeting Fraunhofer Institut: Investigación Aplicada para la Innovación
 
Sbux informe 2009
Sbux informe 2009Sbux informe 2009
Sbux informe 2009
 
Ceo Meeting- octubre 2014- Speaker (Iván Vera)
Ceo Meeting- octubre 2014- Speaker (Iván Vera)Ceo Meeting- octubre 2014- Speaker (Iván Vera)
Ceo Meeting- octubre 2014- Speaker (Iván Vera)
 
La caída de ENRON
La caída de ENRONLa caída de ENRON
La caída de ENRON
 
ABC de la Innovación
ABC de la Innovación ABC de la Innovación
ABC de la Innovación
 
Enron Scam
Enron Scam Enron Scam
Enron Scam
 
Enron
EnronEnron
Enron
 
Enron - The accounting disaster
Enron - The accounting disasterEnron - The accounting disaster
Enron - The accounting disaster
 
Case Study of Enron
Case Study of EnronCase Study of Enron
Case Study of Enron
 

Ähnlich wie 03 christian reise - fraunhofer

Victor ppt
Victor pptVictor ppt
Victor ppt
EAI
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
Dennis Cody
 

Ähnlich wie 03 christian reise - fraunhofer (20)

16 reise uncertainties_v02
16 reise uncertainties_v0216 reise uncertainties_v02
16 reise uncertainties_v02
 
Victor ppt
Victor pptVictor ppt
Victor ppt
 
7 a.metz - halm ok
7   a.metz - halm ok7   a.metz - halm ok
7 a.metz - halm ok
 
Wireless smart sensors for condition monitoring
Wireless smart sensors for condition monitoringWireless smart sensors for condition monitoring
Wireless smart sensors for condition monitoring
 
Short Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptxShort Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptx
 
25 7th energy-rating-and-module-performance-modeling-workshop-eisenlohr_final
25 7th energy-rating-and-module-performance-modeling-workshop-eisenlohr_final25 7th energy-rating-and-module-performance-modeling-workshop-eisenlohr_final
25 7th energy-rating-and-module-performance-modeling-workshop-eisenlohr_final
 
OPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim WebinarOPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim Webinar
 
iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011
 
Detailed modeling of complex BIPV systems
Detailed modeling of complex BIPV systemsDetailed modeling of complex BIPV systems
Detailed modeling of complex BIPV systems
 
The Solar Future DE - Christoph von Bergen "What is the market and technology...
The Solar Future DE - Christoph von Bergen "What is the market and technology...The Solar Future DE - Christoph von Bergen "What is the market and technology...
The Solar Future DE - Christoph von Bergen "What is the market and technology...
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
RT15 Berkeley | Multi-Terminal Power Hardware-in-the-Loop Test-Bench for Powe...
 
42 reise realistic_yield_expectations_for_bifacial_pv_systems
42 reise realistic_yield_expectations_for_bifacial_pv_systems42 reise realistic_yield_expectations_for_bifacial_pv_systems
42 reise realistic_yield_expectations_for_bifacial_pv_systems
 
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
 
201105 ureason introduction
201105 ureason introduction201105 ureason introduction
201105 ureason introduction
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversion
 
LCOE_2015_2_pager_US
LCOE_2015_2_pager_USLCOE_2015_2_pager_US
LCOE_2015_2_pager_US
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
Methodical Design of Vibration Energy Harvesting Systems
Methodical Design of Vibration Energy Harvesting SystemsMethodical Design of Vibration Energy Harvesting Systems
Methodical Design of Vibration Energy Harvesting Systems
 
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative StudyEstimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
 

Kürzlich hochgeladen

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Kürzlich hochgeladen (20)

Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 

03 christian reise - fraunhofer

  • 1. LONGTERM EXPERIENCE WITH PV POWER PLANTS IN GERMANY Dr. Christian Reise Fraunhofer Institute for Solar Energy Systems ISE Freiburg, Germany Solar Operations & Maintenance Milan, October 9th, 2013 © Fraunhofer ISE
  • 2. The Fraunhofer ISE Quality Circle Yield Assessments Quality Monitoring 2 © Fraunhofer ISE Module Measurements System tests
  • 3. What are the questions? 3 © Fraunhofer ISE
  • 4. What are the questions?  What is the state-of-the-art performance of a PV power plant?  What about degradation?  What affects system reliability? 4 © Fraunhofer ISE
  • 5. What are the questions?  What is the state-of-the-art performance of a PV power plant? A review of 20+ years of commercial PV systems in Germany  What about degradation? A study on 100+ power plants in Germany  What affects system reliability? Modules / inverters / operation management… 5 © Fraunhofer ISE
  • 6. PV support schemes in Germany 6 © Fraunhofer ISE
  • 7. Development of system Performance Ratio in Germany A typical 5 kWp system installed in 1993 within the German 1000 Roofs Programme 7 © Fraunhofer ISE
  • 8. Performance Ratio (PR): A simple Definition PR = 8 © Fraunhofer ISE
  • 9. Development of system Performance Ratio in Germany 9 © Fraunhofer ISE
  • 10. Development of system Performance Ratio in Germany 10 © Fraunhofer ISE
  • 11. Development of system Performance Ratio in Germany Where is the limit?  In Germany, state-of-the-art PV systems reach PR(si) values around 90%  Note the difference of some 3…4% between PR(si) and PR(pyr)  In southern Europe, PR will be reduced by 3…5% 11 © Fraunhofer ISE
  • 12. Development of system Performance Ratio in Germany Where is the limit?  In Germany, state-of-the-art PV systems reach PR(si) values around 90%  Note the difference of some 3…4% between PR(si) and PR(pyr)  In southern Europe, PR will be reduced by 3…5% PR = 12 © Fraunhofer ISE
  • 13. Important factors for successful projects Lessons learnt  Modules show rated power  Maintenance of area  Theft protection  Minimized row to row shading 13 © Fraunhofer ISE
  • 14. Important factors for successful projects Lessons learnt  Modules show rated power  Maintenance of area  Theft protection  Minimized row to row shading  Minimized local shading  Durable installation  QC with commissioning  Regular cleaning intervals  Monitoring of operation 14 © Fraunhofer ISE
  • 15. What are the questions?  What is the state-of-the-art performance of a PV power plant? A review of 20+ years of commercial PV systems in Germany  What about degradation? A study on 100+ power plants in Germany  What affects system reliability? Modules / inverters / operation management… 15 © Fraunhofer ISE
  • 16. A study on 100+ power plants in Germany Data Handling Filtering of 5-min average values: 16 © Fraunhofer ISE
  • 17. A study on 100+ power plants in Germany Data Handling Filtering of 5-min average values:  Irradiance between 800…1000 W/m² 17 © Fraunhofer ISE
  • 18. A study on 100+ power plants in Germany Data Handling Filtering of 5-min average values:  Irradiance between 800…1000 W/m²  Module temperature between 40…45 °C 18 © Fraunhofer ISE
  • 19. A study on 100+ power plants in Germany Data Handling Filtering of 5-min average values:  Irradiance between 800…1000 W/m²  Module temperature between 40…45 °C  Values inside median ± 5% 19 © Fraunhofer ISE
  • 20. A study on 100+ power plants in Germany Data Handling Filtering of 5-min average values:  Irradiance between 800…1000 W/m²  Module temperature between 40…45 °C  Values inside median ± 5%  Calculation of rate of change rate in %/year 20 © Fraunhofer ISE
  • 21. A study on 100+ power plants in Germany Example: a German „1000-Roofs-Programme“ system 5 kWp PV system built in 1993 New monitoring equipment in 2001 outliers excluded fitted linear slope Rate of Change: ca. –0.3%/a 21 © Fraunhofer ISE
  • 22. A study on 100+ power plants in Germany Results statistics for c-Si  Calculation of a rate of change per year for each PV system shows large scatter rate of change in % per year  Average c-Si degradation rates are around –0.25% per year 2.0% 4.0% mono/poly 3.0% 1.0% 0.0% -1.0% -2.0% -3.0% -4.0% 1 2 3 4 5 6 7 8 9 10 11_ years of operation 22 © Fraunhofer ISE
  • 23. A study on 100+ power plants in Germany Results for alternative silicon wafer technologies  Average c-Si degradation rates are around –0.25% per year  Systems with EFG or string-ribbon modules reveal a tendency towards larger negative rates of change rate of change in % per year 4.0% mono/poly 3.0% EFG/String Ribbon 2.0% 1.0% 0.0% -1.0% -2.0% -3.0% -4.0% 1 2 3 4 5 6 7 8 9 10 11_ years of operation 23 © Fraunhofer ISE
  • 24. What are the questions?  What is the state-of-the-art performance of a PV power plant? A review of 20+ years of commercial PV systems in Germany  What about degradation? A study on 100+ power plants in Germany  What affects system reliability? Modules / inverters / operation management… 24 © Fraunhofer ISE
  • 25. What affects system reliability? On average, there are 5 incidents per PV power plant and year Source: meteocontrol, Augsburg, Germany 25 © Fraunhofer ISE
  • 26. What affects system reliability?  Module reliability  BOS component & installation reliability  Operation management 26 © Fraunhofer ISE
  • 27. What affects system reliability?  Module reliability “no problem”  BOS component & installation reliability Commissioning tests  Operation management Monitoring & intervention concepts 27 © Fraunhofer ISE
  • 28. Commissioning tests Detailed on-site analysis of the entire power plant:  Comprehensive visual inspection  Thermographic imaging  Measurement of actual PV power and conversion to Standard Test Conditions  Assessment of Performance Ratio (PR) 28 © Fraunhofer ISE
  • 29. System Inspection and Testing  Verification of design data (module types, tilt angles, distances)  Screening for large and small anomalies (insufficient foundation, cell grid faults) 29 © Fraunhofer ISE
  • 30. System Inspection and Testing Mechanical problems  Faulty mounting of modules  Missing protection leading to cable damage 30 © Fraunhofer ISE
  • 31. System Inspection and Testing Mechanical problems  Loose connectors 31 © Fraunhofer ISE
  • 32. System Inspection and Testing Mechanical problems  Combination of connectors from different manufacturers  Loose cables 32 © Fraunhofer ISE
  • 33. System Inspection and Testing Mechanical problems  Cable glands on top, moisture in the sub-distribution box  Spare cable glands not sealed, moisture and animals in the box 33 © Fraunhofer ISE
  • 34. System Inspection and Testing Infrared imaging Mobile lifting platform used for infrared camera imaging 34 © Fraunhofer ISE Temperature analysis of a large module field Temperature analysis of a solar module with defective cells
  • 35. System Inspection and Testing Infrared imaging  Detection of defective bypass diodes 35 © Fraunhofer ISE
  • 36. System Inspection and Testing Infrared imaging  Detection of defective terminals with high transition resistance 36 © Fraunhofer ISE
  • 37. System Inspection and Testing Infrared imaging  Detection of weak connections on power rails 37 © Fraunhofer ISE
  • 38. Commissioning tests Detailed on-site analysis of the entire power plant:  Comprehensive visual inspection  Thermographic imaging  Measurement of actual PV power and conversion to Standard Test Conditions  Assessment of Performance Ratio (PR) 38 © Fraunhofer ISE
  • 39. What affects system reliability?  Module reliability “no problem”  BOS component & installation reliability Commissioning tests  Operation management Monitoring & intervention concepts 39 © Fraunhofer ISE
  • 40. Operation management Monitoring & intervention  Operation of a state-of-the-art supervisory control and data acquisition (SCADA) system in each PV power plant  Operation of a dedicated control centre, offering all features needed to evaluate system operation and to optimize maintenance work flow  Rapid reaction to error messages  Management, performing and documentation of maintenance and repair  On-site visits in regular intervals  Landscape maintenance Learn more about operation management at this event… 40 © Fraunhofer ISE
  • 41. Conclusions…  PV power plant operation is well understood and reproducible  Today’s systems may reach PR(si) values around 90% in Central Europe  Mono- and polycrystalline silicon systems show small degradation rates, by default, Fraunhofer ISE assumes –0.25% per year  Long term success starts with a comprehensive system testing  Only professional O&M concepts ensure high performance and yields 41 © Fraunhofer ISE
  • 42. Thank you for your attention! Fraunhofer Institute for Solar Energy Systems ISE Dr. Christian Reise christian.reise@ise.fraunhofer.de www.ise.fraunhofer.de 42 © Fraunhofer ISE
  • 43. Development of system Performance Ratio in Germany Comparison prediction vs. real world system operation 43 © Fraunhofer ISE
  • 44. Development of system Performance Ratio in Germany Comparison prediction vs. real world system operation 44 © Fraunhofer ISE