SlideShare ist ein Scribd-Unternehmen logo
1 von 18
RESERVOIR SIMULATION 
Assignment on 
1. History matching and prediction 
2. MBE with emphasis on Gas reservoir 
BY 
PARVEZ NOPHEL 
B.TECH APE UP (2011 - 15) 
R870211019 
500017479 
1
CONTENTS 
 WHAT IS RESERVOIR SIMULATION? 
 SIMULATOR AND ITS TYPES 
 HISTORY MATCHING AND PREDICTION 
 CASE STUDY 
 MBE 
 MBE FOR GAS RESERVOIR 
 EXAMPLE NUMERICAL ON GAS MBE 
2
WHAT IS RESERVIR SIMULATION: 
 A digital description of reservoir together combined 
with physical and mathematical equations along 
with good reservoir engineering which is used to 
predict the future performance of the reservoir and 
hence managing the asset is called reservoir 
simulation 
 Reservoir simulation deals with solving set of 
equations, a representative of reservoir, using 
computer programming called simulator. 
3
SIMULATOR AND ITS TYPES 
Simulator is nothing but mathematical equations 
solving by the execution of set of computer programs. 
 Black-oil model (IMEX) 
 Compositional model (GEM) 
 Thermal model (STARS) 
 Chemical 
 Miscible 
 Dual Porosity 
 Dual permeability 
4
HISTORY MATCHING AND PREDICTION 
 History matching is the process of building one or 
more sets of numerical models (representing a 
reservoir) which account for observed, measured 
data. 
 It is a part of Uncertainty quantification. 
 It matches the developed model with geospatial, 
geological and production data to create a perfect 
reservoir model. 
 The matched model is used for future performance 
of the reservoir. 
5
Figure 1. 
6
CASE STUDY 
Organization: TNO - 1996 
 As the History matching is a process of selection of 
appropriate model for the future prediction, it should 
be more accurate. 
 Proper parameterization of the stochastic process 
involved. 
 The model parameter is assigned as show in the 
figure 1 which is an iterative process. 
 The data consistent with many models. 
 Subjective decision was made by the reservoir 
engineer. 7
 The uncertainty in any prediction cannot be 
assessed from just one model. 
 One point selection / base case. 
 The study demonstrates how limited and biased 
that practice is. Yet, most long-term forecasts are 
still based on a single history-matched. 
 Sometimes the best matched results may be 
improper due to the reason that the statistical 
nature of history matching and the inherent bias in 
the history-matching workflow are ignored. 
8
TNO’S NEW METHOD: AN AUTOMATIC 
PROBABILISTIC HISTORY-MATCH PROCEDURE: 
 An automatic probabilistic history-match and 
prediction procedure has been implemented by 
TNO. 
 This procedure automatically generates many 
realisations of the reservoir reproducing the history 
data with satisfactory accuracy. 
 Using these realisations, predictions are derived 
and processed into an expectation curve. 
 Most of the theory behind this methodology has 
been developed and demonstrated on synthetic 
cases within the Production forecasting with 
Uncertainty Quantification project (PUNQ) 9
10
Traditional history 
matching, keeps 
geological model 
along with the 
geological data out of 
the loop. 
Modern history 
matching, keeps 
geological model 
along with the 
geological data in 
the loop. 
11
RESULTS OF TNO’S WORKS: 
 The geo- spatial data is correlated with the fluid 
flow model with least uncertainty by using PUNQ. 
 25 values are optimized by using PUNQ for just one 
parameter – Water production. 
 This produces accurate model for the future 
prediction of the reservoir. 
 Thus a successful history matching is achieved. 
12
MBE: 
o Law of conservation of mass forms the basis for 
the MBE calculations for a reservoir estimation. 
o Predict future reservoir performance under 
various drive mechanism. 
ADVANTAGES OF MBE: 
The material balance equation and its many 
different forms have many uses including: 
 Confirming the producing mechanism 
 Estimating the OOIP and OGIP 
 Estimating gas cap sizes 
 Estimating water influx volumes 
 Identifying water influx model parameters 
 Estimating producing indices. 
13
MBE FOR GAS RESERVOIR 
([Solution gas present in 
the 
reservoir initially(st. vol.) 
] + 
[Free gas present in the 
reservoir initially (st. 
vol.)] - [Gas produced 
(st. vol.) ] + 
[Gas injected (st. vol.)] ) 
([Solution gas 
present in the 
reservoir finally (st. 
vol.)] + 
[Free gas present in 
the reservoir finally 
(st. vol.)] ) 
= 
14
CONCEPT 
 COMPRESSIBILITY OF GAS IS VERY 
SIGNIFICANT DRIVE MECHNISM IN GAS 
RESERVOIRS AS COMAPRED TO RESERVOIR 
PORE VOLUME. 
 IF THERE IS NO WATER DRIVE IN THE 
RESVOIR, THE CHANGE IN PORE VOLUME 
WITH PRESSURE IS NEGLIGIBLE 
 EQUATION FOR THE VOLUME OF THE GAS IN 
RESERVOIR IS A FUNCTION OF PRTESSURE. 
15
EQUATION FOR GAS MBE 
In gas reservoir oil volume is zero, thus the following is derived from 
Generalized MBE : 
Water and Formation compressibility is negligible when compared to 
gas compressibility 
For volumetric reservoir, We and Wp will become zero. 
16
REFERENCES: 
 “Principles of Applied Reservoir Simulation”, 
Second edition; Fanchi, R. John; Gulf Professional 
publishing, Elsevier, USA; 2001. 
 http://www.streamsim.com/technlogy/history-matching/ 
 http://www.streamsim.com/technology/sentivity-analysis- 
and-screening/ 
 “Production forecasting with uncertainty 
quantification” – TNO. – 
http://www.tno.nl/downloads%5C309beno.pdf 
17
18

Weitere ähnliche Inhalte

Was ist angesagt?

Q922+re2+l10 v1
Q922+re2+l10 v1Q922+re2+l10 v1
Q922+re2+l10 v1AFATous
 
Reservoir simulation (april 2017)
Reservoir simulation (april 2017)Reservoir simulation (april 2017)
Reservoir simulation (april 2017)NghiaHuynh47
 
Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petreladeeba setu
 
Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir EngineeringMikeEllingham
 
Eclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation courseEclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation courseMohammad Massah
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)James Craig
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleNarendra Kumar Dewangan
 
Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)Rakesh Kumar
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineeringbehnamproeng
 
Q922+re2+l06 v1
Q922+re2+l06 v1Q922+re2+l06 v1
Q922+re2+l06 v1AFATous
 
Rock Compressibility
Rock CompressibilityRock Compressibility
Rock CompressibilityM.T.H Group
 
Q913 re1 w4 lec 15
Q913 re1 w4 lec 15Q913 re1 w4 lec 15
Q913 re1 w4 lec 15AFATous
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technologyjosepazv
 
Pressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfPressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfSeyedAbolfazlHossein4
 
Horizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization AnalysisHorizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization AnalysisMahmood Ghazi
 

Was ist angesagt? (20)

Q922+re2+l10 v1
Q922+re2+l10 v1Q922+re2+l10 v1
Q922+re2+l10 v1
 
Reservoir heterogeneity
Reservoir heterogeneityReservoir heterogeneity
Reservoir heterogeneity
 
Reservoir simulation (april 2017)
Reservoir simulation (april 2017)Reservoir simulation (april 2017)
Reservoir simulation (april 2017)
 
Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petrel
 
Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir Engineering
 
Eclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation courseEclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation course
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiible
 
Decline curve
Decline curveDecline curve
Decline curve
 
Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineering
 
Q922+re2+l06 v1
Q922+re2+l06 v1Q922+re2+l06 v1
Q922+re2+l06 v1
 
Rock Compressibility
Rock CompressibilityRock Compressibility
Rock Compressibility
 
Q913 re1 w4 lec 15
Q913 re1 w4 lec 15Q913 re1 w4 lec 15
Q913 re1 w4 lec 15
 
Petrophysic
PetrophysicPetrophysic
Petrophysic
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Pressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfPressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdf
 
Artificial lift method
Artificial lift methodArtificial lift method
Artificial lift method
 
Horizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization AnalysisHorizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization Analysis
 
Reservoir rock & fluid
Reservoir rock & fluidReservoir rock & fluid
Reservoir rock & fluid
 

Ähnlich wie Reservoir simulation

Unconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast PerformanceUnconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast PerformanceKaanthan Shanmugam
 
Eclipse reservoir simulation project presentation slides team ucsi
Eclipse reservoir simulation project presentation slides   team ucsiEclipse reservoir simulation project presentation slides   team ucsi
Eclipse reservoir simulation project presentation slides team ucsiBilly Lim Zhen Hao
 
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentationScript for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentationPablo Adames
 
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...TUM
 
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...Faisal Al-Jenaibi
 
A Study Of Production Optimization Of An Oil Copy
A Study Of Production Optimization Of An Oil   CopyA Study Of Production Optimization Of An Oil   Copy
A Study Of Production Optimization Of An Oil Copyaadrish
 
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...Society of Petroleum Engineers
 
Poseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinPoseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinLaurent Alessio
 
Paper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and EngineeringPaper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and EngineeringMohamed Elias
 
Performance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludgePerformance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludgejournalBEEI
 
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.41110216_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102Efrain Rodriguez Sanchez
 
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...eWater
 

Ähnlich wie Reservoir simulation (20)

Unconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast PerformanceUnconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast Performance
 
Eclipse reservoir simulation project presentation slides team ucsi
Eclipse reservoir simulation project presentation slides   team ucsiEclipse reservoir simulation project presentation slides   team ucsi
Eclipse reservoir simulation project presentation slides team ucsi
 
APCBEE
APCBEEAPCBEE
APCBEE
 
A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...
A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...
A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...
 
Abstract-9-13
Abstract-9-13Abstract-9-13
Abstract-9-13
 
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentationScript for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentation
 
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
 
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
 
A Study Of Production Optimization Of An Oil Copy
A Study Of Production Optimization Of An Oil   CopyA Study Of Production Optimization Of An Oil   Copy
A Study Of Production Optimization Of An Oil Copy
 
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
 
Poseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinPoseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedin
 
dastgerdi2020 (2).pdf
dastgerdi2020 (2).pdfdastgerdi2020 (2).pdf
dastgerdi2020 (2).pdf
 
PFE PP modified
PFE PP modifiedPFE PP modified
PFE PP modified
 
Ijciet 10 01_169
Ijciet 10 01_169Ijciet 10 01_169
Ijciet 10 01_169
 
H05913540
H05913540H05913540
H05913540
 
Unu gtp-sc-04-13
Unu gtp-sc-04-13Unu gtp-sc-04-13
Unu gtp-sc-04-13
 
Paper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and EngineeringPaper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and Engineering
 
Performance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludgePerformance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludge
 
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.41110216_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
 
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
 

Kürzlich hochgeladen

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Kürzlich hochgeladen (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

Reservoir simulation

  • 1. RESERVOIR SIMULATION Assignment on 1. History matching and prediction 2. MBE with emphasis on Gas reservoir BY PARVEZ NOPHEL B.TECH APE UP (2011 - 15) R870211019 500017479 1
  • 2. CONTENTS  WHAT IS RESERVOIR SIMULATION?  SIMULATOR AND ITS TYPES  HISTORY MATCHING AND PREDICTION  CASE STUDY  MBE  MBE FOR GAS RESERVOIR  EXAMPLE NUMERICAL ON GAS MBE 2
  • 3. WHAT IS RESERVIR SIMULATION:  A digital description of reservoir together combined with physical and mathematical equations along with good reservoir engineering which is used to predict the future performance of the reservoir and hence managing the asset is called reservoir simulation  Reservoir simulation deals with solving set of equations, a representative of reservoir, using computer programming called simulator. 3
  • 4. SIMULATOR AND ITS TYPES Simulator is nothing but mathematical equations solving by the execution of set of computer programs.  Black-oil model (IMEX)  Compositional model (GEM)  Thermal model (STARS)  Chemical  Miscible  Dual Porosity  Dual permeability 4
  • 5. HISTORY MATCHING AND PREDICTION  History matching is the process of building one or more sets of numerical models (representing a reservoir) which account for observed, measured data.  It is a part of Uncertainty quantification.  It matches the developed model with geospatial, geological and production data to create a perfect reservoir model.  The matched model is used for future performance of the reservoir. 5
  • 7. CASE STUDY Organization: TNO - 1996  As the History matching is a process of selection of appropriate model for the future prediction, it should be more accurate.  Proper parameterization of the stochastic process involved.  The model parameter is assigned as show in the figure 1 which is an iterative process.  The data consistent with many models.  Subjective decision was made by the reservoir engineer. 7
  • 8.  The uncertainty in any prediction cannot be assessed from just one model.  One point selection / base case.  The study demonstrates how limited and biased that practice is. Yet, most long-term forecasts are still based on a single history-matched.  Sometimes the best matched results may be improper due to the reason that the statistical nature of history matching and the inherent bias in the history-matching workflow are ignored. 8
  • 9. TNO’S NEW METHOD: AN AUTOMATIC PROBABILISTIC HISTORY-MATCH PROCEDURE:  An automatic probabilistic history-match and prediction procedure has been implemented by TNO.  This procedure automatically generates many realisations of the reservoir reproducing the history data with satisfactory accuracy.  Using these realisations, predictions are derived and processed into an expectation curve.  Most of the theory behind this methodology has been developed and demonstrated on synthetic cases within the Production forecasting with Uncertainty Quantification project (PUNQ) 9
  • 10. 10
  • 11. Traditional history matching, keeps geological model along with the geological data out of the loop. Modern history matching, keeps geological model along with the geological data in the loop. 11
  • 12. RESULTS OF TNO’S WORKS:  The geo- spatial data is correlated with the fluid flow model with least uncertainty by using PUNQ.  25 values are optimized by using PUNQ for just one parameter – Water production.  This produces accurate model for the future prediction of the reservoir.  Thus a successful history matching is achieved. 12
  • 13. MBE: o Law of conservation of mass forms the basis for the MBE calculations for a reservoir estimation. o Predict future reservoir performance under various drive mechanism. ADVANTAGES OF MBE: The material balance equation and its many different forms have many uses including:  Confirming the producing mechanism  Estimating the OOIP and OGIP  Estimating gas cap sizes  Estimating water influx volumes  Identifying water influx model parameters  Estimating producing indices. 13
  • 14. MBE FOR GAS RESERVOIR ([Solution gas present in the reservoir initially(st. vol.) ] + [Free gas present in the reservoir initially (st. vol.)] - [Gas produced (st. vol.) ] + [Gas injected (st. vol.)] ) ([Solution gas present in the reservoir finally (st. vol.)] + [Free gas present in the reservoir finally (st. vol.)] ) = 14
  • 15. CONCEPT  COMPRESSIBILITY OF GAS IS VERY SIGNIFICANT DRIVE MECHNISM IN GAS RESERVOIRS AS COMAPRED TO RESERVOIR PORE VOLUME.  IF THERE IS NO WATER DRIVE IN THE RESVOIR, THE CHANGE IN PORE VOLUME WITH PRESSURE IS NEGLIGIBLE  EQUATION FOR THE VOLUME OF THE GAS IN RESERVOIR IS A FUNCTION OF PRTESSURE. 15
  • 16. EQUATION FOR GAS MBE In gas reservoir oil volume is zero, thus the following is derived from Generalized MBE : Water and Formation compressibility is negligible when compared to gas compressibility For volumetric reservoir, We and Wp will become zero. 16
  • 17. REFERENCES:  “Principles of Applied Reservoir Simulation”, Second edition; Fanchi, R. John; Gulf Professional publishing, Elsevier, USA; 2001.  http://www.streamsim.com/technlogy/history-matching/  http://www.streamsim.com/technology/sentivity-analysis- and-screening/  “Production forecasting with uncertainty quantification” – TNO. – http://www.tno.nl/downloads%5C309beno.pdf 17
  • 18. 18

Hinweis der Redaktion

  1. One point selection – when model is being run, the reservoir engineer is able to obtain any point as a base case for the future prediction since only one model was used in traditional history matching. This is disadvantageous.