Doing The Right Things
easyTools
    
IED Inspections
IED/IRAM Inspection Programme
IMPEL Projects on
Inspection Planning
Horst Büther, Germany OECD, 5 December 2022
European Union Network for
the Implementation and Enforcement
of Environmental Law
European Union Network for
the Implementation and Enforcement
of Environmental Law
History
1997: IMPEL – Minimum Criteria for Inspections
2001: EU – Recommendation on Minimum
Criteria for Environmental Inspections
2007: IMPEL – Step by Step Guidance Book for the
Planning of Environmental Inspections
2011: IMPEL – easyTools Risk Assessment
Guidance Book
2011: EU - Industrial Emissions Directive
2012: IMPEL – Guidance for IED Inspections
2013: IED/IRAM Inspection Programme
Since 2015: Common international Inspections
easyTools
    
Horst Büther 2
1. Planning
4. Performance
monitoring
1b. Setting priorities
1c. Defining objectives
and strategies
1d. Planning and review
1a. Describing the
context
3. Execution and
Reporting
2. Execution Framework
ENVIRONMENTAL INSPECTION CYCLE
3
Horst Büther 3
4
Article 23: Environmental inspections
4. Based on the inspection plans, the
competent authority shall regularly draw up
programmes for routine environmental
inspections, including the frequency of site
visits for different types of installations
- The period between two site visits shall be
based on a systematic appraisal of the
environmental risks of the installations
concerned and shall not exceed 1 year for
installations posing the highest risks and 3
years for installations posing the lowest
risks.
IED
Inspections
European Union Network for
the Implementation and Enforcement
of Environmental Law
easyTools Project 2010/11
Risk Assessment in Inspection Planning
Development of a web-based risk
assessment tool for inspections like
IED, Seveso, waste, wastewater, nature
conservation, agriculture and so on
easyTools
    
Horst Büther 5
European Union Network for
the Implementation and Enforcement
of Environmental Law
Objectives
 Evaluation of existing inspection tools and
risk criteria
 Development of a risk assessment tool for
environmental inspections that could easily
be used by every IMPEL member
 Integration into the inspection cycle of the
Step-by-step guidance book (DTRT)
 Availability from the IMPEL website as an
advanced interactive IT tool
easyTools
    
Horst Büther 6
Risk Assessment
Horst Büther 7
Impact
Probability
RA tools identified
 Three general types of methods for RA
were identified:
 Linear Mean Value: mean values or sums of
all (weighted) criteria scores are assigned to
risk categories and inspection frequencies
(Spain, Germany)
 Mean Value of Risk: mean values of impact
criteria multiplied by probability criteria are
assigned to risk categories (OPRA – EN, NL,
PO, PT)
 Maximum Value: inspection task with
highest frequency determine inspection
frequency (France)
Horst Büther 8
Linear Mean Values -
examples
0
1
2
3
4
5
6
IC1 IC2 IC3 IC4 IC5 IC6
Inspection object 1: Risk = 3,8
0
1
2
3
4
5
6
IC1 IC2 IC3 IC4 IC5 IC6
Inspection object 2: Risk = 1,66
0
1
2
3
4
5
6
IC1 IC2 IC3 IC4 IC5 IC6
Inspection object 3: Risk = 3
0
1
2
3
4
5
6
IC1 IC2 IC3 IC4 IC5 IC6
Inspection object 4: Risk = 3
Horst Büther 9
Result of the questionnaire
Based on the results presented above
within easyTools project the
“Integrated Risk Assessment Method”,
IRAM,
was developed by
 combining the advantages of the three
methods, while
 limiting the disadvantages
Horst Büther 10
Risk Criteria
Potential impacts
 Kind and type of installation
 Risk of accidents
 Handling and storage of waste
Actual impacts
 Levels and types of emissions: into air and water
 Sensitivity of the local environment
 Incidents and accidents
Operator performance
 Compliance with permit conditions
 Attitude of the operator
 Environmental management system (EMAS)
easyTools
    
Regional District
Admin. Cologne
Environmental permit
Rn: 53.8851-16- 03513
Horst Büther 11
Integrated Risk Assessment Method
Risk steered inspection frequency
The (potential) impact of the activity on
environment or human health is:
 negligible ► no routine inspection
 minor ► every 5 years
 moderate ► every 4 years
 relevant ► every 3 years
 important ► every 2 years
 serious ► every year
easyTools
    
Horst Büther 12
European Union Network for
the Implementation and Enforcement
of Environmental Law
Potential Impacts
no
5
4
3
2
1
0
1
2
3
4
5
Building
Permit
Environ.
Directive
Environ.
Permit
IED IED +
Directive
IED + 2
Dirctives
Inspection
frequency
(years)
Score
Type and Kind of Installation
easyTools
    
Horst Büther 13
Impact on the Environment
0
1
2
3
4
5
Horst Büther 14
Score
European Union Network for
the Implementation and Enforcement
of Environmental Law
Potential Impacts
no
5
4
3
2
1
0
1
2
3
4
5
No DW DW < 2t/y DW > 2t/y DW >
350t/y
DW >
3,500t/y
DW >
20,000t/y
Inspection
frequency
(years)
Score
Dangerous Waste
easyTools
    
Horst Büther 15
Integrated Risk Assessment Method
0
1
2
3
4
5
Horst Büther 16
Score
Risk of the Installation
Horst Büther 17
Impact
Operator Performance
European Union Network for
the Implementation and Enforcement
of Environmental Law
Influence of Operator Performance
 Operator performance criteria:
► Compliance
► Attitude of the operator
► Environmental management system
 Scoring of operator performance criteria:
► good: -1
► moderate: 0
► bad: +1
 The average (integer) of the operator performance
scoring is added to each impact criteria score
risk score
easyTools
    
Integrated Risk Assessment Method
►
Horst Büther 18
Scored Risk Criteria
0
1
2
3
4
5
Horst Büther 19
Score
Good Operator Performance
0
1
2
3
4
5
Horst Büther 20
Score
Scored Risk Criteria
0
1
2
3
4
5
Horst Büther 21
Score
Bad Operator Performance
0
1
2
3
4
5
Horst Büther 22
Score
European Union Network for
the Implementation and Enforcement
of Environmental Law
European Union Network for
the Implementation and Enforcement
of Environmental Law
IRAM principles
I. The inspection frequency is determined by
the highest impact score
II. The inspection frequency is reduced by one
step, if the set number of highest scores is
not met (the Rule)
III. The inspection frequency can be changed by
one step up or down based on operator
performance
IV. The more criteria are scored high, the more
inspection effort is needed
easyTools
    
Integrated Risk Assessment Method
Horst Büther 23
European Union Network for
the Implementation and Enforcement
of Environmental Law
European Union Network for
the Implementation and Enforcement
of Environmental Law
IRAM Principles II and IV:
Inspection Frequency and Effort
5
4
3
2
1
0
High Inspection Effort
IC 1 IC 2 IC 3 IC 4 IC 5 IC 6
5
4
3
2
1
0
Low Inspection Effort
IC 1 IC 2 IC 3 IC 4 IC 5 IC 6
easyTools
    
Horst Büther 24
Weight
 Not all criteria have the same importance
 Therefore: Weighting
 Weighting is often Political
 Weighting factors (*) and
 Weighting terms (+)
Horst Büther 25
easyTools
    
European Union Network for
the Implementation and Enforcement
of Environmental Law
Web Tool and Database
 The IRAM rules were implemented into a web-based
programme for risk assessment in inspection planning
 The programme distinguishes between:
Coordinator ---► decides on inspection task, criteria,
and steering terms and factors
Inspector ------► does the risk assessment
 Assessment data storage on the internet
 The assessment data can also be downloaded as XML-
or CSV-files and imported into national data bases
(Access and Excel)
 Address of the programme:
https://iram-impel.nrw.de/lip/authenticate.do
easyTools
    
Horst Büther 26
European Union Network for
the Implementation and Enforcement
of Environmental Law
IRAM on the Internet easyTools
    
Horst Büther 27
European Union Network for
the Implementation and Enforcement
of Environmental Law
New Language Versions
Lucom Interaction Platform
English
Czech
Deutsch
Français
Hrvatski
Portuguese
Slovenian
easyTools
    
Welcome, Koordinator BR Köln!
Date of the last logon: April 1, 2013 at 6:14 PM
You are on the IMPEL form server that provides you with an application for risk assessment in inspection planning.
Horst Büther 28
European Union Network for
the Implementation and Enforcement
of Environmental Law
easyTools
    
Lucom Interaction Platform
Horst Büther 29
European Union Network for
the Implementation and Enforcement
of Environmental Law
easyTools
    
Lucom Interaction Platform
30
European Union Network for
the Implementation and Enforcement
of Environmental Law
easyTools
    
Lucom Interaction Platform
Horst Büther 31
Assessment Results
Horst Büther 32
easyTools
    
IRAM Inspection Program
Horst Büther 33
easyTools
    
Guidance book
 Introduction to Risk Assessment
 Integrated Risk Assessment
Method (IRAM)
 Manual of the online IRAM tool
 Examples of impact and
probability criteria
 Available on the Web-application
Final version February 2012
easyTools
RISK ASSESSMENT
GUIDANCE BOOK
Horst Büther 34
easyTools
    
European Union Network for
the Implementation and Enforcement
of Environmental Law
Cologne Workshop Conclusions
 The methodology is accepted
 The comparison with other systems confirms the value
of IRAM
 The IRAM tool is an added value and organisations can
start implementation
 Procedural
arrangements
in the member
countries need
to be made
easyTools
    
Horst Büther 35
European Union Network for
the Implementation and Enforcement
of Environmental Law
Utilisation of IRAM
IRAM is (considered to be) used by Inspection
Authorities of
 Albanina, Austria, Belgium, Bosnia and
Herzegovina, Croatia, Cyprus, Czech
Republic, Denmark, Estonia, Finland,
France, Georgia, Germany, Greece, Iceland,
Italy, Kosovo, Luxembourg, Macedonia, The
Netherlands, Norway, Poland, Portugal,
Romania, Serbia, Slovakia, Slovenia, Spain
and Turkey.
easyTools
    
Horst Büther 36
37
37
IMPEL Project IED Inspections
Horst Büther
38
IED Inspections Guidance book
39
Bremen Inspection Team
Gdansk Inspection Team
2018-01 mutual joint visit 40
2018-01 mutual joint visit 41
Refinery Wastewater Inspection
IRAM II: Inspection Time
• For an efficient use of human resources
following questions should be answered:
o How much time is needed?
o What is the content and the focus of
certain site visit?
• With risk assessment we can not calculate time
needed for a site visit
• For that we have to do additional procedure 
o Time estimation
GENERAL TIME CRITERIA
1. Complexity and size of installation
2. Number of emission sources to air
3. Diffuse emissions to air
4. Number of emission sources to water
5. Type of wastewater treatment (complexity)
6. Protection against contamination of soil and water
7. Number of waste storages and waste processing units
8. On-site energy production
9. Water abstraction / use of process water
Next: Time criteria for different industrial activities
Horst Büther 44
horst.buether@impel.eu
Horst Büther 45

Weitere ähnliche Inhalte

Ähnlich wie Doing The Right Things Easy Tools.pdf

Intelligent pollution monitoring using wireless sensor networks
Intelligent pollution monitoring using wireless sensor networks Intelligent pollution monitoring using wireless sensor networks
Intelligent pollution monitoring using wireless sensor networks eSAT Journals
 
IRJET- Aircop – An Air Pollution Monitoring Device
IRJET-  	  Aircop – An Air Pollution Monitoring DeviceIRJET-  	  Aircop – An Air Pollution Monitoring Device
IRJET- Aircop – An Air Pollution Monitoring DeviceIRJET Journal
 
SIVA project_Recommendation paper on infrastructure sharing (A532)
SIVA project_Recommendation paper on infrastructure sharing (A532)SIVA project_Recommendation paper on infrastructure sharing (A532)
SIVA project_Recommendation paper on infrastructure sharing (A532)Sivaul
 
Purchase and design decisions
Purchase and design decisionsPurchase and design decisions
Purchase and design decisionsLeonardo ENERGY
 
EDD Project A35 group. final.pdf Department of ENTC
EDD Project A35 group. final.pdf Department of ENTCEDD Project A35 group. final.pdf Department of ENTC
EDD Project A35 group. final.pdf Department of ENTCMihirDatir1
 
IRJET- Air Pollution Monitoring System using the Internet of Things
IRJET- Air Pollution Monitoring System using the Internet of ThingsIRJET- Air Pollution Monitoring System using the Internet of Things
IRJET- Air Pollution Monitoring System using the Internet of ThingsIRJET Journal
 
Session 7 c iariw august14 erumban
Session 7 c iariw august14 erumbanSession 7 c iariw august14 erumban
Session 7 c iariw august14 erumbanIARIW 2014
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessmentDavis Ciprikis
 
Flifgt Safety Middle East 2010 Presentation
Flifgt Safety Middle East 2010 PresentationFlifgt Safety Middle East 2010 Presentation
Flifgt Safety Middle East 2010 Presentationgaorge1980
 
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...MilliporeSigma
 
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...Merck Life Sciences
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development MechanismNayan Bhatia
 
Calculating the environmental impacts of public action -- Jonas Teusch, OECD
Calculating the environmental impacts of public action -- Jonas Teusch, OECDCalculating the environmental impacts of public action -- Jonas Teusch, OECD
Calculating the environmental impacts of public action -- Jonas Teusch, OECDOECD Governance
 
Calculating the environmental impacts of public action -- Nils Axel Braathen,...
Calculating the environmental impacts of public action -- Nils Axel Braathen,...Calculating the environmental impacts of public action -- Nils Axel Braathen,...
Calculating the environmental impacts of public action -- Nils Axel Braathen,...OECD Governance
 
ISO 31000 principles.pdf
ISO 31000 principles.pdfISO 31000 principles.pdf
ISO 31000 principles.pdfchandrasekars29
 
[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...
[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...
[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...CODE BLUE
 

Ähnlich wie Doing The Right Things Easy Tools.pdf (20)

Intelligent pollution monitoring using wireless sensor networks
Intelligent pollution monitoring using wireless sensor networks Intelligent pollution monitoring using wireless sensor networks
Intelligent pollution monitoring using wireless sensor networks
 
Eia stages
Eia stagesEia stages
Eia stages
 
IRJET- Aircop – An Air Pollution Monitoring Device
IRJET-  	  Aircop – An Air Pollution Monitoring DeviceIRJET-  	  Aircop – An Air Pollution Monitoring Device
IRJET- Aircop – An Air Pollution Monitoring Device
 
SIVA project_Recommendation paper on infrastructure sharing (A532)
SIVA project_Recommendation paper on infrastructure sharing (A532)SIVA project_Recommendation paper on infrastructure sharing (A532)
SIVA project_Recommendation paper on infrastructure sharing (A532)
 
Purchase and design decisions
Purchase and design decisionsPurchase and design decisions
Purchase and design decisions
 
EDD Project A35 group. final.pdf Department of ENTC
EDD Project A35 group. final.pdf Department of ENTCEDD Project A35 group. final.pdf Department of ENTC
EDD Project A35 group. final.pdf Department of ENTC
 
IRJET- Air Pollution Monitoring System using the Internet of Things
IRJET- Air Pollution Monitoring System using the Internet of ThingsIRJET- Air Pollution Monitoring System using the Internet of Things
IRJET- Air Pollution Monitoring System using the Internet of Things
 
Session 7 c iariw august14 erumban
Session 7 c iariw august14 erumbanSession 7 c iariw august14 erumban
Session 7 c iariw august14 erumban
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessment
 
Flifgt Safety Middle East 2010 Presentation
Flifgt Safety Middle East 2010 PresentationFlifgt Safety Middle East 2010 Presentation
Flifgt Safety Middle East 2010 Presentation
 
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
 
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
EU GMP Annex 1 Draft - Closed System Design Consideration with Single-Use Sys...
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development Mechanism
 
Calculating the environmental impacts of public action -- Jonas Teusch, OECD
Calculating the environmental impacts of public action -- Jonas Teusch, OECDCalculating the environmental impacts of public action -- Jonas Teusch, OECD
Calculating the environmental impacts of public action -- Jonas Teusch, OECD
 
Calculating the environmental impacts of public action -- Nils Axel Braathen,...
Calculating the environmental impacts of public action -- Nils Axel Braathen,...Calculating the environmental impacts of public action -- Nils Axel Braathen,...
Calculating the environmental impacts of public action -- Nils Axel Braathen,...
 
Kutsch, Werner: RINGO highlight
Kutsch, Werner: RINGO highlightKutsch, Werner: RINGO highlight
Kutsch, Werner: RINGO highlight
 
ISO 31000 principles.pdf
ISO 31000 principles.pdfISO 31000 principles.pdf
ISO 31000 principles.pdf
 
Maritime Pollution Risk
Maritime Pollution RiskMaritime Pollution Risk
Maritime Pollution Risk
 
Project management
Project managementProject management
Project management
 
[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...
[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...
[cb22] "The Present and Future of Coordinated Vulnerability Disclosure" Inter...
 

Mehr von OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 

Mehr von OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 

Kürzlich hochgeladen

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 

Doing The Right Things Easy Tools.pdf

  • 1. Doing The Right Things easyTools      IED Inspections IED/IRAM Inspection Programme IMPEL Projects on Inspection Planning Horst Büther, Germany OECD, 5 December 2022 European Union Network for the Implementation and Enforcement of Environmental Law
  • 2. European Union Network for the Implementation and Enforcement of Environmental Law History 1997: IMPEL – Minimum Criteria for Inspections 2001: EU – Recommendation on Minimum Criteria for Environmental Inspections 2007: IMPEL – Step by Step Guidance Book for the Planning of Environmental Inspections 2011: IMPEL – easyTools Risk Assessment Guidance Book 2011: EU - Industrial Emissions Directive 2012: IMPEL – Guidance for IED Inspections 2013: IED/IRAM Inspection Programme Since 2015: Common international Inspections easyTools      Horst Büther 2
  • 3. 1. Planning 4. Performance monitoring 1b. Setting priorities 1c. Defining objectives and strategies 1d. Planning and review 1a. Describing the context 3. Execution and Reporting 2. Execution Framework ENVIRONMENTAL INSPECTION CYCLE 3 Horst Büther 3
  • 4. 4 Article 23: Environmental inspections 4. Based on the inspection plans, the competent authority shall regularly draw up programmes for routine environmental inspections, including the frequency of site visits for different types of installations - The period between two site visits shall be based on a systematic appraisal of the environmental risks of the installations concerned and shall not exceed 1 year for installations posing the highest risks and 3 years for installations posing the lowest risks. IED Inspections
  • 5. European Union Network for the Implementation and Enforcement of Environmental Law easyTools Project 2010/11 Risk Assessment in Inspection Planning Development of a web-based risk assessment tool for inspections like IED, Seveso, waste, wastewater, nature conservation, agriculture and so on easyTools      Horst Büther 5
  • 6. European Union Network for the Implementation and Enforcement of Environmental Law Objectives  Evaluation of existing inspection tools and risk criteria  Development of a risk assessment tool for environmental inspections that could easily be used by every IMPEL member  Integration into the inspection cycle of the Step-by-step guidance book (DTRT)  Availability from the IMPEL website as an advanced interactive IT tool easyTools      Horst Büther 6
  • 7. Risk Assessment Horst Büther 7 Impact Probability
  • 8. RA tools identified  Three general types of methods for RA were identified:  Linear Mean Value: mean values or sums of all (weighted) criteria scores are assigned to risk categories and inspection frequencies (Spain, Germany)  Mean Value of Risk: mean values of impact criteria multiplied by probability criteria are assigned to risk categories (OPRA – EN, NL, PO, PT)  Maximum Value: inspection task with highest frequency determine inspection frequency (France) Horst Büther 8
  • 9. Linear Mean Values - examples 0 1 2 3 4 5 6 IC1 IC2 IC3 IC4 IC5 IC6 Inspection object 1: Risk = 3,8 0 1 2 3 4 5 6 IC1 IC2 IC3 IC4 IC5 IC6 Inspection object 2: Risk = 1,66 0 1 2 3 4 5 6 IC1 IC2 IC3 IC4 IC5 IC6 Inspection object 3: Risk = 3 0 1 2 3 4 5 6 IC1 IC2 IC3 IC4 IC5 IC6 Inspection object 4: Risk = 3 Horst Büther 9
  • 10. Result of the questionnaire Based on the results presented above within easyTools project the “Integrated Risk Assessment Method”, IRAM, was developed by  combining the advantages of the three methods, while  limiting the disadvantages Horst Büther 10
  • 11. Risk Criteria Potential impacts  Kind and type of installation  Risk of accidents  Handling and storage of waste Actual impacts  Levels and types of emissions: into air and water  Sensitivity of the local environment  Incidents and accidents Operator performance  Compliance with permit conditions  Attitude of the operator  Environmental management system (EMAS) easyTools      Regional District Admin. Cologne Environmental permit Rn: 53.8851-16- 03513 Horst Büther 11
  • 12. Integrated Risk Assessment Method Risk steered inspection frequency The (potential) impact of the activity on environment or human health is:  negligible ► no routine inspection  minor ► every 5 years  moderate ► every 4 years  relevant ► every 3 years  important ► every 2 years  serious ► every year easyTools      Horst Büther 12
  • 13. European Union Network for the Implementation and Enforcement of Environmental Law Potential Impacts no 5 4 3 2 1 0 1 2 3 4 5 Building Permit Environ. Directive Environ. Permit IED IED + Directive IED + 2 Dirctives Inspection frequency (years) Score Type and Kind of Installation easyTools      Horst Büther 13
  • 14. Impact on the Environment 0 1 2 3 4 5 Horst Büther 14 Score
  • 15. European Union Network for the Implementation and Enforcement of Environmental Law Potential Impacts no 5 4 3 2 1 0 1 2 3 4 5 No DW DW < 2t/y DW > 2t/y DW > 350t/y DW > 3,500t/y DW > 20,000t/y Inspection frequency (years) Score Dangerous Waste easyTools      Horst Büther 15
  • 16. Integrated Risk Assessment Method 0 1 2 3 4 5 Horst Büther 16 Score
  • 17. Risk of the Installation Horst Büther 17 Impact Operator Performance
  • 18. European Union Network for the Implementation and Enforcement of Environmental Law Influence of Operator Performance  Operator performance criteria: ► Compliance ► Attitude of the operator ► Environmental management system  Scoring of operator performance criteria: ► good: -1 ► moderate: 0 ► bad: +1  The average (integer) of the operator performance scoring is added to each impact criteria score risk score easyTools      Integrated Risk Assessment Method ► Horst Büther 18
  • 23. European Union Network for the Implementation and Enforcement of Environmental Law European Union Network for the Implementation and Enforcement of Environmental Law IRAM principles I. The inspection frequency is determined by the highest impact score II. The inspection frequency is reduced by one step, if the set number of highest scores is not met (the Rule) III. The inspection frequency can be changed by one step up or down based on operator performance IV. The more criteria are scored high, the more inspection effort is needed easyTools      Integrated Risk Assessment Method Horst Büther 23
  • 24. European Union Network for the Implementation and Enforcement of Environmental Law European Union Network for the Implementation and Enforcement of Environmental Law IRAM Principles II and IV: Inspection Frequency and Effort 5 4 3 2 1 0 High Inspection Effort IC 1 IC 2 IC 3 IC 4 IC 5 IC 6 5 4 3 2 1 0 Low Inspection Effort IC 1 IC 2 IC 3 IC 4 IC 5 IC 6 easyTools      Horst Büther 24
  • 25. Weight  Not all criteria have the same importance  Therefore: Weighting  Weighting is often Political  Weighting factors (*) and  Weighting terms (+) Horst Büther 25 easyTools     
  • 26. European Union Network for the Implementation and Enforcement of Environmental Law Web Tool and Database  The IRAM rules were implemented into a web-based programme for risk assessment in inspection planning  The programme distinguishes between: Coordinator ---► decides on inspection task, criteria, and steering terms and factors Inspector ------► does the risk assessment  Assessment data storage on the internet  The assessment data can also be downloaded as XML- or CSV-files and imported into national data bases (Access and Excel)  Address of the programme: https://iram-impel.nrw.de/lip/authenticate.do easyTools      Horst Büther 26
  • 27. European Union Network for the Implementation and Enforcement of Environmental Law IRAM on the Internet easyTools      Horst Büther 27
  • 28. European Union Network for the Implementation and Enforcement of Environmental Law New Language Versions Lucom Interaction Platform English Czech Deutsch Français Hrvatski Portuguese Slovenian easyTools      Welcome, Koordinator BR Köln! Date of the last logon: April 1, 2013 at 6:14 PM You are on the IMPEL form server that provides you with an application for risk assessment in inspection planning. Horst Büther 28
  • 29. European Union Network for the Implementation and Enforcement of Environmental Law easyTools      Lucom Interaction Platform Horst Büther 29
  • 30. European Union Network for the Implementation and Enforcement of Environmental Law easyTools      Lucom Interaction Platform 30
  • 31. European Union Network for the Implementation and Enforcement of Environmental Law easyTools      Lucom Interaction Platform Horst Büther 31
  • 32. Assessment Results Horst Büther 32 easyTools     
  • 33. IRAM Inspection Program Horst Büther 33 easyTools     
  • 34. Guidance book  Introduction to Risk Assessment  Integrated Risk Assessment Method (IRAM)  Manual of the online IRAM tool  Examples of impact and probability criteria  Available on the Web-application Final version February 2012 easyTools RISK ASSESSMENT GUIDANCE BOOK Horst Büther 34 easyTools     
  • 35. European Union Network for the Implementation and Enforcement of Environmental Law Cologne Workshop Conclusions  The methodology is accepted  The comparison with other systems confirms the value of IRAM  The IRAM tool is an added value and organisations can start implementation  Procedural arrangements in the member countries need to be made easyTools      Horst Büther 35
  • 36. European Union Network for the Implementation and Enforcement of Environmental Law Utilisation of IRAM IRAM is (considered to be) used by Inspection Authorities of  Albanina, Austria, Belgium, Bosnia and Herzegovina, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Georgia, Germany, Greece, Iceland, Italy, Kosovo, Luxembourg, Macedonia, The Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain and Turkey. easyTools      Horst Büther 36
  • 37. 37 37 IMPEL Project IED Inspections Horst Büther
  • 40. Gdansk Inspection Team 2018-01 mutual joint visit 40
  • 41. 2018-01 mutual joint visit 41 Refinery Wastewater Inspection
  • 42. IRAM II: Inspection Time • For an efficient use of human resources following questions should be answered: o How much time is needed? o What is the content and the focus of certain site visit? • With risk assessment we can not calculate time needed for a site visit • For that we have to do additional procedure  o Time estimation
  • 43. GENERAL TIME CRITERIA 1. Complexity and size of installation 2. Number of emission sources to air 3. Diffuse emissions to air 4. Number of emission sources to water 5. Type of wastewater treatment (complexity) 6. Protection against contamination of soil and water 7. Number of waste storages and waste processing units 8. On-site energy production 9. Water abstraction / use of process water Next: Time criteria for different industrial activities