Quang ninh port
No. 1 Cai Lan Road – Ha Long City– Quang Ninh Province - Vietnam
Vietnamnational shipping lines
Quang Ninh Port
Tel : 033.625889; 033. 825603 ; 033.825627
Fax : 033.826118
Pilot boarding station : 200
43’ 04’’ N
1070
10’ 33’’ E Main gate to Cai Lan Port
General introduction
1. Introduction on Cai Lan Port and its transportation network1. Introduction on Cai Lan Port and its transportation network
2. Introduction on Cai Lan Port’s facilities2. Introduction on Cai Lan Port’s facilities
3. A number of preferential policies offered by Quang Ninh Port3. A number of preferential policies offered by Quang Ninh Port
1. Technical information and transportation networks
. A.. A. Access channelAccess channel
Total length: 18 nautical miles
Passage from Buoy No. 0 to Hon Mot is 11.8 Nautical miles, 300 m wide, -13 m deep
against the port datum.
Passage from Hon Mot to Cua Luc is 4.2 Nautical miles, 80m wide, -8,1m deep
against the port datum.
Passage from Cua Lục to Cai Lan Port is 2 Nautical miles, 130m wide, -10m deep
against the port datum.
On 24 Sept. 2004, The Prime Minister has approved the project to upgrade and
dredged the passage from Hon Mot to Cua Luc up to the depth of -10m, 130m wide
which is capable of receiving vessels up to 40.000 – 45.000 DWT. The dredging works
is expected to commence from Sept.2005 and taken for 5 months.
Transportationsystemto Cai LanPort
RoadRoad WaterwayWaterway RailwayRailway
Connected to
the port through
the National Road
No. 18 (the permitted
load capacity is
10 tons/vehicle axe
Suitable for the
large volume of
cargo transport
to the Northern
provinces
rendered with the
waterways
systems
At present
connected to
Ha Long
railway
Station. It is
expected to
connect to Cai
Lan Port by
2007
The map of the north of Vietnam which generally overview theThe map of the north of Vietnam which generally overview the
locations and the transport systems to Cai Lan Port from other areas.locations and the transport systems to Cai Lan Port from other areas.
- By 2005 to construct the railway which connect Bac Ninh Province to
Pha Lai.
(The detour of Kep - Bac Giang station is over and the distance is
reduced 60km).
- It is expected that the railway to Cai Lan Port to be commenced from
May 2005 and complete by 2007. This railway is built with two gauges
1.435m and 1.05m nationally and internationally.
- It is expected that during 2010-2015 the Highway Noi Bai-Ha Long to be
complete.
The development plan of transportation systems to Cai Lan
Port in coming years
-Be rth No . 1 : 166 m long, wall height +5m, front depth –9m which is capable of receiving
vessels up to 25.000 DWT.
-Te m po rary be rth: 80m long, wall height +5m, front depth –5m, which is capable of receiving
vessels up to1.000 DWT.
-Turning basin : 350 m in diameters.
3.1Existingberths:5berths : Berths No 1, 5, 6, 7 and the temporary berth
Berth No. 5, 6, 7: Total length 680m, wall height +5m
front water depth: -12m which is capable of receiving vessels up to
40.000 DWT and 45.000 DWT
Handling works at berth No. 6
The master plan of Cai lan Port to the year 2010The master plan of Cai lan Port to the year 2010
Up to 2010 Cai Lan port will comprise of total 09 berths
Machinery vessel at berth No. 5
Passenger ship at berth No. 6
Berth No. 7
3. 2 Ware ho using & yards3. 2 Ware ho using & yards
Total area of the warehouse (05 units)Total area of the warehouse (05 units) 12.70012.700
mm22
of whichof which:: CFS:CFS: 4.600 m4.600 m22
Other warehousesOther warehouses ::
Berth No. 5:Berth No. 5: 5.400 m5.400 m22
Berth No.1 :Berth No.1 : 2.700 m2.700 m22
Kho 2.700m2
B·i: 15.000m2
Total yard area of 5 berths: 162,000 m2
Amongthose: Container yard at berth No. 7: 49,000 m2
Others (including container):
Berth No 6: 52.000 m2
Berth No. 5: 26.000 m2
Berth No. 1 35.000 m2
General layout of the yards for the berths No. 6, 7 and some parts of berth No. 5
Cai Lan Port’s facilities & equipment
Item Quantity Description
Quayside Gantry Crane 2 40 ton under spreader (20, 40, 45 ft container, outreach: 37m, Hoist
height: 31m
Rubber-tyred gantry crane (RTG) 4 7 rows / 4 tiers (7 + 1 wide, 1 over 4 high)
Mobile Harbour Crane 1 Load on rope 64 ton at 20 m radius. With 40 ft container spreader and
grab. Liebherr.
Rail mounted crane 2 Lifting capacity 5 - 25 tons; 32 radius
CTMS (Container Terminal
Management System)
1 For vessel schedule, container receiving/delivery, yard control, vessel
loading/discharging, on-line inquiry, reporting, and billing system.
Tractor/Chassis 13 Max 45 ft container box. Command 50 + TC56K0C2E
Forklift 2.5 t 20 Stripping/stuffing container, unloading/loading trailers
Forklift 5 t 2 Stripping/stuffing container, unloading/loading trailers.
Forklift 10 t 5 Stripping/stuffing container, unloading/loading trailers.
Truck crane 5 Lifting capacity 14,5 - 25ton
Yard Crane 1 Max. 50 ton x 30m -KR-500 - Kato Works
Wheel Loader 2 Operrating capacity 830 kg, Bucket capacity 0.4 m3
Weight bridge 4 Weighing load up to 80 tons
Tugboat 3 1.200 -1.500 PS
Mobile harbor crane Liebherr 64 Mt handling the fertilizer using the hydraulic grab
of 8 m3 at Berth N. 5
Two gantry cranes of 60 MT handling at berth No. 6
Rubber tired gantry crane handling frozen container at the yard of Berth No. 7
The Bien Dong floating crane of 400 MT capacity unloading the heavy loads at the
berth No. 5
Empty container forklift at berth No. 6
The belt conveyor is loading the wood chips at the Berth No. 6
Informatics Room with the Computer terminal Management System -CTMS
0
500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
4.500
2000 2001 2002 2003 2004
Turnover (10
Million)
Output
(thousand of
ton)
Business results from
2000 to 2004
0
2.000
4.000
6.000
8.000
10.000
12.000
14.000
16.000
2005 2006 2007 2008 2009 2010
Turnover (10
Million)
Output
(Thousand of
ton)
Development plan to 2010
Part IIIPart III:: Anum be r o f the prio rity po licie s o ffe re d by Quang Ninh Po rtAnum be r o f the prio rity po licie s o ffe re d by Quang Ninh Po rt
to the custo m e rs fo r the initialye ars o f o pe ratio nto the custo m e rs fo r the initialye ars o f o pe ratio n
1. Quang Ninh Port will provide the assistance policies on
handling and storage charges for the customers for the
initial operation year. The specific assistances depend on
the kind of goods and the throughput of each kind of cargo.
2. Accepting the container handling operation as follows:
vessels (or barge) – truck then go straight or vice versa
including the transhipment by barge to alongside the vessel
at the berth for handling.
At present two Tariffs havebeenapplied:
+ Foreign Tariff.
+ Domestic Tariff.
3. Providing and assisting partly of the tallying, freight
forwarding, lashing, unlashing charges for the first two
years operation.
4. The yard and warehousing charges on the necessary
cargo kept in the warehouses and yards for vanning to
the container will be considered for reduction.
5. 60 days of yard storage charge is exempted for empty
container which is waiting for export vanning at Cai Lan
Port.
6. 30 days of yard storage charge is exempted for custom
clearance container for export.
7. 15 days of yard storage charge is exempted for import
custom clearance container.
8. The imported container doing the custom procedures at
Cai Lan Port is considered to be reduced by 10% of
loading, unloading and custom inspection charges as
per the Port’s tariff.
9. The loading, unloading, vanning/devanning services are
provided 24/24 hr as registered at least in advanced 6
hours by the customers.
10. Propose to the Government for permission of opening the
bonded warehouse and container transit services.
11. Assistance in dealing with the legal formalities such as:
port authority, security border gate, quarantine, custom
procedure as required from the customers.
12. Assistance in dealing with the legal formalities relating to
the opening of the Container routes through Cai Lan Port,
assistance in setting up the branches, representative
offices as required from the customers
Tel: 033.625889, 033.825627
Fax: 033.826118, 033.825600
Email: pkh_qnport@vnn.vn
Quang Ninh POrt
No. 1 Cai Lan Road
Ha Long City - Quang Ninh Province
Thank you !
For the sustainable development of Quang ninh Port, We
always hope to receive the attention and co-operations from
the customers. For further information on our Port, please
contact the following address and telephones.

Weitere ähnliche Inhalte

Was ist angesagt?

Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
FAIZ FAREED
 
Basic Safety Officer's Course
Basic  Safety Officer's CourseBasic  Safety Officer's Course
Basic Safety Officer's Course
Taqvi11
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
fcarlson
 

Was ist angesagt? (20)

SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
Lifting Safety
Lifting Safety  Lifting Safety
Lifting Safety
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Signalman training
Signalman trainingSignalman training
Signalman training
 
Accident investigation and Root Cause Analysis - by www.oyetrade.com
Accident investigation and Root Cause Analysis - by www.oyetrade.comAccident investigation and Root Cause Analysis - by www.oyetrade.com
Accident investigation and Root Cause Analysis - by www.oyetrade.com
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Basic Safety Officer's Course
Basic  Safety Officer's CourseBasic  Safety Officer's Course
Basic Safety Officer's Course
 
Gi 2016 industrial rigging safety
Gi 2016 industrial rigging safetyGi 2016 industrial rigging safety
Gi 2016 industrial rigging safety
 
Road Safety and Defensive Driving Training.pptx
Road Safety and Defensive Driving Training.pptxRoad Safety and Defensive Driving Training.pptx
Road Safety and Defensive Driving Training.pptx
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
 
Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydra
 
Check list for crane inspection, B C Das
Check list for crane inspection, B C DasCheck list for crane inspection, B C Das
Check list for crane inspection, B C Das
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 

Andere mochten auch

terex FantuzziPres
terex FantuzziPresterex FantuzziPres
terex FantuzziPres
finance42
 
WEIHUA Profile.PPT
WEIHUA Profile.PPTWEIHUA Profile.PPT
WEIHUA Profile.PPT
?? ?
 
Papilla Company Introduction
Papilla Company IntroductionPapilla Company Introduction
Papilla Company Introduction
Mohd Rizalman
 
Doosan Quay Cranes (brochure)
Doosan Quay Cranes (brochure)Doosan Quay Cranes (brochure)
Doosan Quay Cranes (brochure)
jurong_port
 

Andere mochten auch (17)

Mega-Vessels, Mega-Alliances and Cascades: Impacts for port operations and th...
Mega-Vessels, Mega-Alliances and Cascades: Impacts for port operations and th...Mega-Vessels, Mega-Alliances and Cascades: Impacts for port operations and th...
Mega-Vessels, Mega-Alliances and Cascades: Impacts for port operations and th...
 
terex FantuzziPres
terex FantuzziPresterex FantuzziPres
terex FantuzziPres
 
2015 STS - Port Upgrades Will Change Your Operations
2015 STS - Port Upgrades Will Change Your Operations 2015 STS - Port Upgrades Will Change Your Operations
2015 STS - Port Upgrades Will Change Your Operations
 
6f terminals container cranes
6f terminals container cranes6f terminals container cranes
6f terminals container cranes
 
Liebherr Container Cranes
Liebherr Container CranesLiebherr Container Cranes
Liebherr Container Cranes
 
Unicovina present nhm_20.03.2016
Unicovina present nhm_20.03.2016Unicovina present nhm_20.03.2016
Unicovina present nhm_20.03.2016
 
Mega Ship Math
Mega Ship MathMega Ship Math
Mega Ship Math
 
WEIHUA Profile.PPT
WEIHUA Profile.PPTWEIHUA Profile.PPT
WEIHUA Profile.PPT
 
Trabzon alport
Trabzon alportTrabzon alport
Trabzon alport
 
Ghe port equipments harbour mobile crane catalog jim ghe 3.91
Ghe port equipments harbour mobile crane catalog jim ghe 3.91 Ghe port equipments harbour mobile crane catalog jim ghe 3.91
Ghe port equipments harbour mobile crane catalog jim ghe 3.91
 
Papilla Company Introduction
Papilla Company IntroductionPapilla Company Introduction
Papilla Company Introduction
 
Doosan Quay Cranes (brochure)
Doosan Quay Cranes (brochure)Doosan Quay Cranes (brochure)
Doosan Quay Cranes (brochure)
 
Wootton port development
Wootton port developmentWootton port development
Wootton port development
 
Factors Affecting Port Operation
Factors Affecting Port OperationFactors Affecting Port Operation
Factors Affecting Port Operation
 
A Brief presentation on Containerisation
A Brief presentation on ContainerisationA Brief presentation on Containerisation
A Brief presentation on Containerisation
 
Quang Ninh Port's presentation
Quang Ninh Port's presentationQuang Ninh Port's presentation
Quang Ninh Port's presentation
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Ähnlich wie Quang ninh port's presentation

C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
kanadkapoor
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
kanadkapoor
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
kanadkapoor
 
Environmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdfEnvironmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdf
DivakarDhande2
 
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
zzztidola
 
Quy hoach he thong cang vn den nam 2020 dinh huong 2030
Quy hoach he thong cang vn den nam 2020 dinh huong 2030Quy hoach he thong cang vn den nam 2020 dinh huong 2030
Quy hoach he thong cang vn den nam 2020 dinh huong 2030
Nguyen Thanh Luan
 
Colombo Port East Container Terminal - Market Awareness Brochure
Colombo Port East Container Terminal - Market Awareness BrochureColombo Port East Container Terminal - Market Awareness Brochure
Colombo Port East Container Terminal - Market Awareness Brochure
Pratish Halady
 

Ähnlich wie Quang ninh port's presentation (20)

Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case study
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
Mr. Rami Semaan Senior Transport Expert, TMS Consult, Lebanon
Mr. Rami Semaan Senior Transport Expert, TMS Consult, Lebanon   Mr. Rami Semaan Senior Transport Expert, TMS Consult, Lebanon
Mr. Rami Semaan Senior Transport Expert, TMS Consult, Lebanon
 
Presentation on New Mangalore Port
Presentation on New Mangalore PortPresentation on New Mangalore Port
Presentation on New Mangalore Port
 
Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals Maritime Development in Bangladesh : Ports and Terminals
Maritime Development in Bangladesh : Ports and Terminals
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
Laem Chabang Port Development Project
Laem Chabang Port Development ProjectLaem Chabang Port Development Project
Laem Chabang Port Development Project
 
Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)
 
Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis Harbour
 
Suez canal
Suez canalSuez canal
Suez canal
 
Environmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdfEnvironmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdf
 
Kandla port
Kandla portKandla port
Kandla port
 
The port of alexandria
The port of alexandriaThe port of alexandria
The port of alexandria
 
Tchp 2018 e [autosaved]
Tchp   2018 e [autosaved]Tchp   2018 e [autosaved]
Tchp 2018 e [autosaved]
 
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
 
Quy hoach he thong cang vn den nam 2020 dinh huong 2030
Quy hoach he thong cang vn den nam 2020 dinh huong 2030Quy hoach he thong cang vn den nam 2020 dinh huong 2030
Quy hoach he thong cang vn den nam 2020 dinh huong 2030
 
Colombo Port East Container Terminal - Market Awareness Brochure
Colombo Port East Container Terminal - Market Awareness BrochureColombo Port East Container Terminal - Market Awareness Brochure
Colombo Port East Container Terminal - Market Awareness Brochure
 
WORLD CARGO NEWS
WORLD CARGO NEWS WORLD CARGO NEWS
WORLD CARGO NEWS
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 

Kürzlich hochgeladen (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Quang ninh port's presentation

  • 1. Company LOGO Quang ninh port No. 1 Cai Lan Road – Ha Long City– Quang Ninh Province - Vietnam
  • 2. Vietnamnational shipping lines Quang Ninh Port Tel : 033.625889; 033. 825603 ; 033.825627 Fax : 033.826118 Pilot boarding station : 200 43’ 04’’ N 1070 10’ 33’’ E Main gate to Cai Lan Port
  • 3. General introduction 1. Introduction on Cai Lan Port and its transportation network1. Introduction on Cai Lan Port and its transportation network 2. Introduction on Cai Lan Port’s facilities2. Introduction on Cai Lan Port’s facilities 3. A number of preferential policies offered by Quang Ninh Port3. A number of preferential policies offered by Quang Ninh Port
  • 4. 1. Technical information and transportation networks . A.. A. Access channelAccess channel Total length: 18 nautical miles Passage from Buoy No. 0 to Hon Mot is 11.8 Nautical miles, 300 m wide, -13 m deep against the port datum. Passage from Hon Mot to Cua Luc is 4.2 Nautical miles, 80m wide, -8,1m deep against the port datum. Passage from Cua Lục to Cai Lan Port is 2 Nautical miles, 130m wide, -10m deep against the port datum. On 24 Sept. 2004, The Prime Minister has approved the project to upgrade and dredged the passage from Hon Mot to Cua Luc up to the depth of -10m, 130m wide which is capable of receiving vessels up to 40.000 – 45.000 DWT. The dredging works is expected to commence from Sept.2005 and taken for 5 months.
  • 5. Transportationsystemto Cai LanPort RoadRoad WaterwayWaterway RailwayRailway Connected to the port through the National Road No. 18 (the permitted load capacity is 10 tons/vehicle axe Suitable for the large volume of cargo transport to the Northern provinces rendered with the waterways systems At present connected to Ha Long railway Station. It is expected to connect to Cai Lan Port by 2007
  • 6. The map of the north of Vietnam which generally overview theThe map of the north of Vietnam which generally overview the locations and the transport systems to Cai Lan Port from other areas.locations and the transport systems to Cai Lan Port from other areas.
  • 7. - By 2005 to construct the railway which connect Bac Ninh Province to Pha Lai. (The detour of Kep - Bac Giang station is over and the distance is reduced 60km). - It is expected that the railway to Cai Lan Port to be commenced from May 2005 and complete by 2007. This railway is built with two gauges 1.435m and 1.05m nationally and internationally. - It is expected that during 2010-2015 the Highway Noi Bai-Ha Long to be complete. The development plan of transportation systems to Cai Lan Port in coming years
  • 8. -Be rth No . 1 : 166 m long, wall height +5m, front depth –9m which is capable of receiving vessels up to 25.000 DWT. -Te m po rary be rth: 80m long, wall height +5m, front depth –5m, which is capable of receiving vessels up to1.000 DWT. -Turning basin : 350 m in diameters. 3.1Existingberths:5berths : Berths No 1, 5, 6, 7 and the temporary berth
  • 9. Berth No. 5, 6, 7: Total length 680m, wall height +5m front water depth: -12m which is capable of receiving vessels up to 40.000 DWT and 45.000 DWT Handling works at berth No. 6
  • 10. The master plan of Cai lan Port to the year 2010The master plan of Cai lan Port to the year 2010 Up to 2010 Cai Lan port will comprise of total 09 berths
  • 11. Machinery vessel at berth No. 5
  • 12. Passenger ship at berth No. 6
  • 14. 3. 2 Ware ho using & yards3. 2 Ware ho using & yards Total area of the warehouse (05 units)Total area of the warehouse (05 units) 12.70012.700 mm22 of whichof which:: CFS:CFS: 4.600 m4.600 m22 Other warehousesOther warehouses :: Berth No. 5:Berth No. 5: 5.400 m5.400 m22 Berth No.1 :Berth No.1 : 2.700 m2.700 m22 Kho 2.700m2 B·i: 15.000m2
  • 15. Total yard area of 5 berths: 162,000 m2 Amongthose: Container yard at berth No. 7: 49,000 m2 Others (including container): Berth No 6: 52.000 m2 Berth No. 5: 26.000 m2 Berth No. 1 35.000 m2 General layout of the yards for the berths No. 6, 7 and some parts of berth No. 5
  • 16. Cai Lan Port’s facilities & equipment Item Quantity Description Quayside Gantry Crane 2 40 ton under spreader (20, 40, 45 ft container, outreach: 37m, Hoist height: 31m Rubber-tyred gantry crane (RTG) 4 7 rows / 4 tiers (7 + 1 wide, 1 over 4 high) Mobile Harbour Crane 1 Load on rope 64 ton at 20 m radius. With 40 ft container spreader and grab. Liebherr. Rail mounted crane 2 Lifting capacity 5 - 25 tons; 32 radius CTMS (Container Terminal Management System) 1 For vessel schedule, container receiving/delivery, yard control, vessel loading/discharging, on-line inquiry, reporting, and billing system. Tractor/Chassis 13 Max 45 ft container box. Command 50 + TC56K0C2E Forklift 2.5 t 20 Stripping/stuffing container, unloading/loading trailers Forklift 5 t 2 Stripping/stuffing container, unloading/loading trailers. Forklift 10 t 5 Stripping/stuffing container, unloading/loading trailers. Truck crane 5 Lifting capacity 14,5 - 25ton Yard Crane 1 Max. 50 ton x 30m -KR-500 - Kato Works Wheel Loader 2 Operrating capacity 830 kg, Bucket capacity 0.4 m3 Weight bridge 4 Weighing load up to 80 tons Tugboat 3 1.200 -1.500 PS
  • 17. Mobile harbor crane Liebherr 64 Mt handling the fertilizer using the hydraulic grab of 8 m3 at Berth N. 5
  • 18. Two gantry cranes of 60 MT handling at berth No. 6
  • 19. Rubber tired gantry crane handling frozen container at the yard of Berth No. 7
  • 20. The Bien Dong floating crane of 400 MT capacity unloading the heavy loads at the berth No. 5
  • 21. Empty container forklift at berth No. 6
  • 22. The belt conveyor is loading the wood chips at the Berth No. 6
  • 23. Informatics Room with the Computer terminal Management System -CTMS
  • 24. 0 500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 2000 2001 2002 2003 2004 Turnover (10 Million) Output (thousand of ton) Business results from 2000 to 2004
  • 25. 0 2.000 4.000 6.000 8.000 10.000 12.000 14.000 16.000 2005 2006 2007 2008 2009 2010 Turnover (10 Million) Output (Thousand of ton) Development plan to 2010
  • 26. Part IIIPart III:: Anum be r o f the prio rity po licie s o ffe re d by Quang Ninh Po rtAnum be r o f the prio rity po licie s o ffe re d by Quang Ninh Po rt to the custo m e rs fo r the initialye ars o f o pe ratio nto the custo m e rs fo r the initialye ars o f o pe ratio n 1. Quang Ninh Port will provide the assistance policies on handling and storage charges for the customers for the initial operation year. The specific assistances depend on the kind of goods and the throughput of each kind of cargo. 2. Accepting the container handling operation as follows: vessels (or barge) – truck then go straight or vice versa including the transhipment by barge to alongside the vessel at the berth for handling. At present two Tariffs havebeenapplied: + Foreign Tariff. + Domestic Tariff.
  • 27. 3. Providing and assisting partly of the tallying, freight forwarding, lashing, unlashing charges for the first two years operation. 4. The yard and warehousing charges on the necessary cargo kept in the warehouses and yards for vanning to the container will be considered for reduction. 5. 60 days of yard storage charge is exempted for empty container which is waiting for export vanning at Cai Lan Port. 6. 30 days of yard storage charge is exempted for custom clearance container for export. 7. 15 days of yard storage charge is exempted for import custom clearance container. 8. The imported container doing the custom procedures at Cai Lan Port is considered to be reduced by 10% of loading, unloading and custom inspection charges as per the Port’s tariff.
  • 28. 9. The loading, unloading, vanning/devanning services are provided 24/24 hr as registered at least in advanced 6 hours by the customers. 10. Propose to the Government for permission of opening the bonded warehouse and container transit services. 11. Assistance in dealing with the legal formalities such as: port authority, security border gate, quarantine, custom procedure as required from the customers. 12. Assistance in dealing with the legal formalities relating to the opening of the Container routes through Cai Lan Port, assistance in setting up the branches, representative offices as required from the customers
  • 29. Tel: 033.625889, 033.825627 Fax: 033.826118, 033.825600 Email: pkh_qnport@vnn.vn Quang Ninh POrt No. 1 Cai Lan Road Ha Long City - Quang Ninh Province Thank you ! For the sustainable development of Quang ninh Port, We always hope to receive the attention and co-operations from the customers. For further information on our Port, please contact the following address and telephones.