SlideShare ist ein Scribd-Unternehmen logo
1 von 7
RPNGC COMMISSIONER’S INTENT
PORGERA OPERATIONS 2016 – The Way Forward. “
PRESENTED BY:
Nelson Chanei
Chief Inspector
Contingent Commander
Porgera Operations 2016
1
INTRODUCTION:
 The NEC has not extended the Call-Out in Porgera which has
lapsed on 24MAR16 after it’s initial inception 2 years ago;
The NSAC is adamant RPNGC assumes its mandatory
obligations of maintaining law and order in Porgera and SML/LMP
areas;
 There has been limited consideration of the consequences of
not being strategic by stakeholders in terms of planning due to
lack of funding support by GoPNG to develop appropriate long
term intervention strategies.
2
Background
1. The Porgera Operations is currently solely funded by Barrick
(Niugini) Ltd which owns 45% of the mine; the other 50% is
owned by Jinzan a Chinese company with 5% owned by the
EPG and landowners.
2. The current phase of the operation is under an existing
arrangement of mutual understanding between PJV and
RPNGC;
3. Funding support by PJV is coordinated by OSCA within the
DPM & NEC through above arrangement;
3
KEY ACHIEVEMENTS IN 2015:
1. Formulating an effective SMP (drafted) that addresses the short
& long term issues and captures the Government intent.
2. Making informed representations on behalf of the RPNGC to the
relevant stakeholders;
3. Developing strategic alliances and collaboration with willing
partners to support Government priorities.
4. Reduction in IM nos. from 21AUG15 to current levels as a result
of effective and discipline approach.
4
CHALLENGES FACED IN 2015:
1. Restoring credibility to RPNGC as lead Law & Order agency
in the Porgera JFCO Operations;
2. Effective use of Human & Non Human Resources to add
value to the conduct of the JFCO operations;
3. Developing frameworks that provide clear direction for
collaboration and inter phasing with stakeholders.
5
RECOMMENDATIONS:
• Review arrangements between PJV & RPNGC with the view of
having RPNGC assume administration of PJV funding support;
• Develop long term plans that entails localization of policing
functions back to PPC Enga by building local capacity;
• Review the MOU between RPNGC and PJV on the Reserve
Constabulary.
6
CONCLUSIONS:
The RPNGC as lead law enforcement agency in the Porgera
Operations must retain both administrative and operational
functions in compliance with its Constitutional Obligations &
Corporate intent.
INTENDED OUTCOMES:
1. Maintain continuity and cohesion with stakeholders;
2. Support local leadership and community intentions;
3. Effective short term and long term intervention;
4. Enhance efficiency of the RPNGC in service delivery;
COMMUNITY BENEFIT:
Royal PNG Constabulary is competent in managing law and order
in Porgera District and SML/LMP areas. 7

Weitere ähnliche Inhalte

Ähnlich wie RPNGC Commissioner's Intent for Porgera Operations

190312VFS_Cafwfwetewtgewwetweeontract.ppt
190312VFS_Cafwfwetewtgewwetweeontract.ppt190312VFS_Cafwfwetewtgewwetweeontract.ppt
190312VFS_Cafwfwetewtgewwetweeontract.pptathenarevington
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalGerald Ogoko
 
PPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdfPPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdfssusered96e2
 
Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016Bukky Fatusin
 
Kazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECD
Kazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECDKazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECD
Kazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECDOECD Governance
 
finrep-regulatory-reporting-of-financial-information
finrep-regulatory-reporting-of-financial-informationfinrep-regulatory-reporting-of-financial-information
finrep-regulatory-reporting-of-financial-informationParrish Pryce-Williams
 
Salient Features_RA 9184.pptx
Salient Features_RA 9184.pptxSalient Features_RA 9184.pptx
Salient Features_RA 9184.pptxDanteRevamonte
 
Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184june alapa
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Juan Paolo Somorostro - Aranas, MPA, BSOSM
 
Vantage GreenX Presentation to WESSA
Vantage GreenX Presentation to WESSAVantage GreenX Presentation to WESSA
Vantage GreenX Presentation to WESSAWind Energy Update
 
Final Draft Concept Note for Strengthening Governance and Leadership through ...
Final Draft Concept Note for Strengthening Governance and Leadership through ...Final Draft Concept Note for Strengthening Governance and Leadership through ...
Final Draft Concept Note for Strengthening Governance and Leadership through ...Jeff Tshabalala
 
Current Trends and Development in Ghana's Petroleum Sector
Current Trends and Development in Ghana's Petroleum Sector Current Trends and Development in Ghana's Petroleum Sector
Current Trends and Development in Ghana's Petroleum Sector jacqueline parditey
 
Introduction and ppra ord & Rules
Introduction and ppra ord & RulesIntroduction and ppra ord & Rules
Introduction and ppra ord & RulesNadeem Khan
 
Emerging issues - CPA congress 2014
Emerging issues -  CPA congress 2014Emerging issues -  CPA congress 2014
Emerging issues - CPA congress 2014Synergy
 
Preliminary results-presentation-fy20
Preliminary results-presentation-fy20Preliminary results-presentation-fy20
Preliminary results-presentation-fy20Redcentric
 

Ähnlich wie RPNGC Commissioner's Intent for Porgera Operations (20)

190312VFS_Cafwfwetewtgewwetweeontract.ppt
190312VFS_Cafwfwetewtgewwetweeontract.ppt190312VFS_Cafwfwetewtgewwetweeontract.ppt
190312VFS_Cafwfwetewtgewwetweeontract.ppt
 
Application of the PREGEC Charter: state of play of the implementation of the...
Application of the PREGEC Charter: state of play of the implementation of the...Application of the PREGEC Charter: state of play of the implementation of the...
Application of the PREGEC Charter: state of play of the implementation of the...
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314final
 
PPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdfPPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdf
 
Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016
 
Kazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECD
Kazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECDKazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECD
Kazakhstan PPP Review - Ana-Maria Ruiz Rivadeneira, OECD
 
finrep-regulatory-reporting-of-financial-information
finrep-regulatory-reporting-of-financial-informationfinrep-regulatory-reporting-of-financial-information
finrep-regulatory-reporting-of-financial-information
 
Salient Features_RA 9184.pptx
Salient Features_RA 9184.pptxSalient Features_RA 9184.pptx
Salient Features_RA 9184.pptx
 
Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
 
DTP Guidelines.pdf
DTP Guidelines.pdfDTP Guidelines.pdf
DTP Guidelines.pdf
 
Vantage GreenX Presentation to WESSA
Vantage GreenX Presentation to WESSAVantage GreenX Presentation to WESSA
Vantage GreenX Presentation to WESSA
 
Final Draft Concept Note for Strengthening Governance and Leadership through ...
Final Draft Concept Note for Strengthening Governance and Leadership through ...Final Draft Concept Note for Strengthening Governance and Leadership through ...
Final Draft Concept Note for Strengthening Governance and Leadership through ...
 
5.docx
5.docx5.docx
5.docx
 
Current Trends and Development in Ghana's Petroleum Sector
Current Trends and Development in Ghana's Petroleum Sector Current Trends and Development in Ghana's Petroleum Sector
Current Trends and Development in Ghana's Petroleum Sector
 
Introduction and ppra ord & Rules
Introduction and ppra ord & RulesIntroduction and ppra ord & Rules
Introduction and ppra ord & Rules
 
Emerging issues - CPA congress 2014
Emerging issues -  CPA congress 2014Emerging issues -  CPA congress 2014
Emerging issues - CPA congress 2014
 
Ra 9184Briefing.pptx
Ra 9184Briefing.pptxRa 9184Briefing.pptx
Ra 9184Briefing.pptx
 
GEF policies
GEF  policies GEF  policies
GEF policies
 
Preliminary results-presentation-fy20
Preliminary results-presentation-fy20Preliminary results-presentation-fy20
Preliminary results-presentation-fy20
 

RPNGC Commissioner's Intent for Porgera Operations

  • 1. RPNGC COMMISSIONER’S INTENT PORGERA OPERATIONS 2016 – The Way Forward. “ PRESENTED BY: Nelson Chanei Chief Inspector Contingent Commander Porgera Operations 2016 1
  • 2. INTRODUCTION:  The NEC has not extended the Call-Out in Porgera which has lapsed on 24MAR16 after it’s initial inception 2 years ago; The NSAC is adamant RPNGC assumes its mandatory obligations of maintaining law and order in Porgera and SML/LMP areas;  There has been limited consideration of the consequences of not being strategic by stakeholders in terms of planning due to lack of funding support by GoPNG to develop appropriate long term intervention strategies. 2
  • 3. Background 1. The Porgera Operations is currently solely funded by Barrick (Niugini) Ltd which owns 45% of the mine; the other 50% is owned by Jinzan a Chinese company with 5% owned by the EPG and landowners. 2. The current phase of the operation is under an existing arrangement of mutual understanding between PJV and RPNGC; 3. Funding support by PJV is coordinated by OSCA within the DPM & NEC through above arrangement; 3
  • 4. KEY ACHIEVEMENTS IN 2015: 1. Formulating an effective SMP (drafted) that addresses the short & long term issues and captures the Government intent. 2. Making informed representations on behalf of the RPNGC to the relevant stakeholders; 3. Developing strategic alliances and collaboration with willing partners to support Government priorities. 4. Reduction in IM nos. from 21AUG15 to current levels as a result of effective and discipline approach. 4
  • 5. CHALLENGES FACED IN 2015: 1. Restoring credibility to RPNGC as lead Law & Order agency in the Porgera JFCO Operations; 2. Effective use of Human & Non Human Resources to add value to the conduct of the JFCO operations; 3. Developing frameworks that provide clear direction for collaboration and inter phasing with stakeholders. 5
  • 6. RECOMMENDATIONS: • Review arrangements between PJV & RPNGC with the view of having RPNGC assume administration of PJV funding support; • Develop long term plans that entails localization of policing functions back to PPC Enga by building local capacity; • Review the MOU between RPNGC and PJV on the Reserve Constabulary. 6
  • 7. CONCLUSIONS: The RPNGC as lead law enforcement agency in the Porgera Operations must retain both administrative and operational functions in compliance with its Constitutional Obligations & Corporate intent. INTENDED OUTCOMES: 1. Maintain continuity and cohesion with stakeholders; 2. Support local leadership and community intentions; 3. Effective short term and long term intervention; 4. Enhance efficiency of the RPNGC in service delivery; COMMUNITY BENEFIT: Royal PNG Constabulary is competent in managing law and order in Porgera District and SML/LMP areas. 7