MCST Third Foundry colloquium  26/27 th  OCTOBER 2011 Learning from US history  The aluminium foundry industry  energy conservation imperatives.  Dr   A E Paterson –  Aluminium Federation of South Africa            
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
  The aluminium foundry industry  energy conservation imperatives.  Energy sources used are not restricted to electricity They also include natural gas, lpg, heavy and light oils and coke.  Measured against reliability of supply, where possible, multi source energy could be attractive.  RSA foundries measured in three independent pilot studies showed low efficiency relative to world leaders -  as may be expected for a high capital cost, low energy cost country.  The change to a high capital/cost high energy cost base brings challenges; local pilot studies have indicated capacity of improvement.  Measured against increasing cost of energy, energy can be saved.  The cost benefit ratio increases with greater savings.  Embedded capital equipment requires consideration.
  The aluminium foundry industry  energy conservation imperatives.  The electrical energy problem – not enough, incorrectly priced
  The aluminium foundry industry  energy conservation imperatives.  The graphs assume a 4% annual supply growth to underpin a planned  6% annual growth in GDP.  This implies a strategic move from supporting primary industry to supporting down stream value adding industry.  To maintain surety of supply Eskom require a minimum of a 10% buffer to allow for foreseen and unforeseen maintenance requirements.  Savings are essential if the country is to avoid a crisis in the next few years until new supply comes on stream – Madupi has been delayed. Also - Existing power stations come to end of life in the mid 2020’s  Pricing – the electricity price, previously kept artificially low and not reflecting the replacement value of the capital equipment, escalated dramatically doubling every four years as Eskom seeks to significantly finance expansion costs from current cash flows.
  The aluminium foundry industry  energy conservation imperatives.  Demand reduction options Supply constraints Country image Climate change Financial sustainability S A Economy Probability of desired outcome Load Shedding Rolling Blackouts Prioritisation of new load With pcp Intensified “energy efficiency” DSM  good but slow Severe NMD penalties Suspend new applications Short term Power conservation programme Positive impact Neutral Negative impact
  The aluminium foundry industry  energy conservation imperatives.  Four main option types to effect behaviour change were considered: Load shedding  - unfair and unsustainable.  Substantial price increases  -  useful in conjunction with rationing  Demand supply management programme  – useful alongside  .  rationing Power conservation programme -  Rationing the right to purchase  .  (of supply) seen as best option  PCP is the core underpinning principle linked to pricing penalties
  The aluminium foundry industry  energy conservation imperatives.  The (electrical) energy conservation scheme targets a 10% energy saving phased in over three to four years with a 50% saving in the first year. Failure to meet the 10% savings targets was planned to result in punitive energy tariffs in the form of a steeply inclining power curve block tariff approaching and exceeding the replacement value cost of electricity.  This approach is in the background.  The decline in growth has given breathing space. A phase in period of about two years was anticipated.
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction  The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  The foundry industry is a base industry. Castings form the basis of many products in many markets  The value chain involves casting, machining, manufacture and packaging giving added value of the order of 50x at industry level. Energy is required to melt and cast metals Pilot foundry studies show RSA to be a relatively inefficient energy user in both the iron and aluminium sectors.  This is to be expected bearing in mind the existing capital equipment decision circumstances.  There appears to be considerable opportunity for up to 50% saving Energy rationing and sharply increasing price forms a challenge The 1970’s USA crisis that followed energy rationing and price increases will be explored to gain insights.
The aluminium foundry industry  energy conservation imperatives .  Scrap to final product represents a 60 times value addition to the collected unsorted scrap metal The casting is a carrier that supports other industries and provides job opportunities   Value stream from scrap through various inputs – More jobs/ton Associate Industries Inputs /process Value chain Bought in cost R/kg Inputs/ product Value R/kg Man-hours/kg Replace after market  Finished component Pirate OEM OEM Value R313 R1000 R350 Packaging/ tpt/ inventory Packaging Packaging 3 Plastic / card /  Board R30 OEM R155 aftermarket 560 Bought in  hang on parts Cap equipt Manufacturing 1 65 Fitted parts to complete R200 470  Final shape Cap equip/ maint/tools/lube Machining Consumables 8 1 R130 Casting operation Cap equipt / tools / maint Casting 3 6 Equipt / maint inserts. R90 Secondary smelter Capital equipt / tools / lubes Specification ingot 21 R21 Metal merchant Sorted scrap R11 Scrap collector Raw scrap R6
  The aluminium foundry industry  energy conservation imperatives.  Pilot studies show RSA to be a relatively inefficient energy user: The pilot study was a screening assessment based on a three year input of records of two purchases: Energy of all forms purchased – recorded in volume units of purchase and reduced to calorific value in terms of joules.  (1J= 1ws) Net purchase of metal (net of scrap sold – excluding dross) The tacit assumption was that the quantity of metal on the shop floor and in storage remains more or less constant. This gives the energy required to produce one unit of sold product  60% was taken to represent furnace demand. This is an approach that can be used by any foundry to assess own energy costs and compare these to the 700kWh/ton for melting suggested.
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  Foundries are capital and energy intensive The major energy-using equipment, furnaces, last a long time. Capital choices reflect specific foreseen circumstances made at the time of choice. The three issues affecting choice are the interplay between the costs of capital and energy and whether to choose for batch or continuous processes  In  a cheap energy, expensive capital country, the natural bias has been towards less energy efficiency (as was the case in the USA before the 1973 oil crisis). In expensive energy, cheap capital countries energy saving  equipment is used.  The technologies exist.
  The aluminium foundry industry  energy conservation imperatives.  Crucible furnace – batch process
  The aluminium foundry industry  energy conservation imperatives.  Crucible furnace - note lid Molten metal energy loss reduced Still energy loss through flue
  The aluminium foundry industry  energy conservation imperatives.  Crucible furnace - note lid Eastern foundries have adopted crucible furnaces by trapping flue gas to pre.heat the charge Fresh air added to to reduce flue gas temperatures to around 400 o C
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.  Modern Striko furnace
  The aluminium foundry industry  energy conservation imperatives.  Striko furnace
  The aluminium foundry industry  energy conservation imperatives.  Note that energy is not only used for melting It is also used for holding and for casting Holding  – the structure may lose heat through the foundations,  .  the walls of the flue.  -  holding practice may hold molten metal for too long.  Casting –  too large a runner and riser system requires extra  .  metal melted and remelted - poor practice which results in a high defect ratio  .  requires extra energy in remelting.  - impact of poor metal quality or temperature These are the controllable aspects.
  The aluminium foundry industry  energy conservation imperatives.  The question is both what to do and in what order . The majority of energy (about 60%) is used of melting and holding The majority of energy use depends on the type, insulation and installation of the furnace.  Some aspects are uncontrollable, some may be modified.  Energy in the form of heat is lost through inefficient conversion, through furnace walls and through the flue. Looking to similar energy challenge circumstances the USA response after the 1973 oil crisis will be considered Energy availability declined rapidly and prices accelerated rapidly.
The aluminium foundry industry  energy conservation imperatives.              How much energy do we theoretically require to melt aluminium and steel starting at day temperatures? Consider  physics laboratory - Heat from day temperature (specific heat) - melt – change from solid to liquid (latent heat) Aluminium  Laboratory 945 MJ/kg  This implies  261 x 10 -3  MWh/ton  about 1,8% of 14,2 MWh/ton for primary smelting) Note that preheating aluminium to 400 o C takes about half the energy Material Melting temperature Specific heat MJ/kg  o K Energy to heat from 20 o C to melt T  MJ/kg Latent heat  MJ/kg Total energy MJ/kg Aluminium 630 o C 0,900 549 396 945 Iron/steel 1460 o C 0,448 645 267 912
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
  The aluminium foundry industry  energy conservation imperatives.  This is not realistic.  How much energy do we actually require to melt aluminium and steel starting at day temperatures? If we want the liquid metal to be 100 o C > melt temperature  (adds 10% to Al requirement to 0,286Mwh/ton, 5% to steel to 0,264MWh/ton) The best known practical energy use is around  0,45 – 0,55 MWh/ton In practice consider 5% of primary smelting  i.e. 0,7MWh/ton as a target for aluminium  (World”s best practice 0,5MWh/ton) For same efficiency for steel also consider  0,7MWh/ton  (Wbp 0,54)
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],All energy sources - net energy in at factory gate Energy conversion  eg harmonic correction of power factor , Burn efficiency Energy  into furnace Energy conversion, Energy loss Energy loss Into foundations Energy loss metallurgy Metal quality Too hot Process returns Melt loss Energy loss can be divided into:  required possible improvement unavoidable loss Energy loss – management Transmission loss, leaks Energy loss – flue (recovery) Energy loss - housekeeping Energy loss-  Furnace walls Energy loss - holding time Energy needed  to heat and melt  metal.  Ignores coal energy  conversion and electrical transmission loss  83% loss Energy needed  to heat furnace Charge  effects
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  The early 1970’s USA industry had generally chosen equipment that assumed cheap plentiful energy in the form of cheap oil. The energy crisis that faced the USA at that stage is not dissimilar to that faced locally today. The crisis reflected a shortage combined with rapidly rising prices. A 1976 aluminium foundry industry workshop was called to concentrate on metal melting as both the most energy intensive and the one that offered most potential for returns. The focus was on retrofitted solutions.
  The aluminium foundry industry  energy conservation imperatives.  US oil production peaked in 1973 In October 1973, as a result of Yom Kippur War tensions, OPEC members stopped exports to the USA Oil prices rose from $3/barrel in 1972 to $12 in 1974 By the second oil crisis in 1979 prices had risen to $35/barrel an over ten times escalation over seven years!
  The aluminium foundry industry  energy conservation imperatives.  Response It was realised that the era of cheap oil had passed. The Energy Department, later to became a cabinet office, was created. (The drive for light weighting of cars grew from the energy  crisis as transport in most western world countries uses more than half the energy  USA 56% in mid 70’s.) The aluminium industry energy conservation workshop was held in 1976 to share lessons learned.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.
A major factor that needed to be taken into account was the reality of embedded capital equipment.  Within this reality the concern was on retrofitted solutions to recover heat. Two systems were discussed: Recouperation through radiation  Recouperation through Heat wheels. Typically the heat captured was cooled to about 400 o C by dilution with ambient air before use and used to preheat (aluminium) charge metal or to preheat furnaces or burner air.   The aluminium foundry industry  energy conservation imperatives.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.
[object Object],[object Object],[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.
[object Object],[object Object],[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.
[object Object],[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.
[object Object],[object Object],[object Object],  The aluminium foundry industry  energy conservation imperatives.
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction  The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  Most 800 o C to 1500 o C high temperature furnaces are inefficient Thermal efficiencies can be high but can be as low as 10% because as the heating or melting of metals requires high waste gas temperatures leaving the furnace makes it difficult to design. Typically over 50% of the heat input may be lost through the flue  If this could be recaptured, it could be used to preheat combustion  air for burners (fossil fuel fired) or to preheat charge metal. The focus on this presentation is on heat trapping in the flue and recouperation.  Within the overall energy flow we need to understand what is needed, where improvement is possible and where loss is unavoidable
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],All energy sources - net energy in at factory gate Energy conversion  eg harmonic correction of power factor , Burn efficiency Energy  into furnace Energy conversion, Energy loss Energy loss Into foundations Energy loss metallurgy Metal quality Too hot Process returns Melt loss Energy loss can be divided into:  required possible improvement unavoidable loss Energy loss – management Transmission loss, leaks Energy loss – flue (recovery) Energy loss - housekeeping Energy loss-  Furnace walls Energy loss - holding time Energy needed  to heat and melt  metal.  Ignores coal energy  conversion and electrical transmission loss  83% loss Energy needed  to heat furnace Charge  effects
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
  The aluminium foundry industry  energy conservation imperatives.  The twenty four foundries were offered consultation assistance to reduce energy demand. The overall results were positive in terms of reduced costs and reduced energy demand. Partnering has been developed  An energy committee has been formed A waste sand committee has been formed  The current EffSAFound project is underway
  The aluminium foundry industry  energy conservation imperatives.  The new reality of energy rationing and increasing cost of energy prices warrants serious attention.  New more energy efficient equipment exists. Retrofit solutions are well understood and available The difficulty at present is cash flow.  The combination of the world economic crisis and tight lending conditions by the banks begs the affordability questions.  On the other hand if foundries do not invest into energy efficiency  for the future, increased prices (and penalties) come into play. The dti is offering financial and other support to the foundry sector
  The aluminium foundry industry  energy conservation imperatives.  Looking to overseas practice and a medium to long term solution one is struck by the way in which foundries have been rearranged to route and bundle energy intensive equipment and needs together to gain best benefit.  Similarly considering other environmental legislation, clean air and water legislation, the realisation that cleaning processes are volume related has led to concentration (bundling) of environmentally sensitive activities. The overall point is the need to develop a longer term strategy to manage energy and environmental matters which looks beyond replacing one piece of equipment with another towards a more integrated approach to energy saving and environmental responsibility.
CDM is a process through which developed countries can fund developing countries to implement emission reduction strategies that promote sustainable development, are measurable and additional, and do not divert funds from government development programmers.  Current value  ϵ 23x0,9/MWh.  (0,9MwH/CO2e) Minimum criteria 10 000 tons CO2e per annum. As individual foundries probably do not meet the minimum volume criteria a foundry group approach may be required.    The aluminium foundry industry  energy conservation imperatives.  The foundry sources of energy are all fossil fuels.  The contribute to global warming.  (1 kWh = 1 ton CO2e) The RSA government is proposing a carbon tax on producers and users of fossil fuels – this will further affect the foundry cost base  The 1997 Kyoto protocol Clean Development Mechanism (CDM)
  The aluminium foundry industry  energy conservation imperatives.  Outline: Introduction  The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present  How does the foundry industry pay for it Conclusion
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
  The aluminium foundry industry  energy conservation imperatives.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MCST Third Foundry colloquium  26/27 th  OCTOBER 2011 Learning from US history  The aluminium foundry industry  energy conservation imperatives.  Dr   A E Paterson –  Aluminium Federation of South Africa            

Weitere ähnliche Inhalte

Was ist angesagt?

Building Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United StatesBuilding Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United StatesInternational Energy Agency
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings CodesIbrahim Al-Hudhaif
 
Amg amg titanium alloys & coatings presentation may 2013
Amg   amg titanium alloys & coatings presentation may 2013Amg   amg titanium alloys & coatings presentation may 2013
Amg amg titanium alloys & coatings presentation may 2013jdiluzio
 
Planning and building energy efficiency buildings
Planning and building energy efficiency buildingsPlanning and building energy efficiency buildings
Planning and building energy efficiency buildingsManar Ramadan
 
Modelling Circular Economy in TIMES
Modelling Circular Economy in TIMESModelling Circular Economy in TIMES
Modelling Circular Economy in TIMESIEA-ETSAP
 
Business Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTCBusiness Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTCAlliance To Save Energy
 
Energy consumption: Highlights and future development
Energy consumption: Highlights and future developmentEnergy consumption: Highlights and future development
Energy consumption: Highlights and future developmentIEA-ETSAP
 
Abse lev1 2_102-202_launch(full permission)
Abse lev1 2_102-202_launch(full permission)Abse lev1 2_102-202_launch(full permission)
Abse lev1 2_102-202_launch(full permission)wirethehouse
 
Human Habits and Energy Consumption in Residential Buildings
Human Habits and Energy Consumption in Residential BuildingsHuman Habits and Energy Consumption in Residential Buildings
Human Habits and Energy Consumption in Residential BuildingsLeonardo ENERGY
 
Energy Efficiency in Construction
Energy Efficiency in ConstructionEnergy Efficiency in Construction
Energy Efficiency in ConstructionDaniel Lambraia
 
Energy Presentation Warm
Energy Presentation WarmEnergy Presentation Warm
Energy Presentation Warmjedmccrory
 
Business Idea: Industrial Energy Conservation Solutions
Business Idea: Industrial Energy Conservation Solutions Business Idea: Industrial Energy Conservation Solutions
Business Idea: Industrial Energy Conservation Solutions eeaadil
 
Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...Totok R Biyanto
 
10 su building-energy-use-intensity
10 su building-energy-use-intensity10 su building-energy-use-intensity
10 su building-energy-use-intensityKumar Ramaiah
 
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkSdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkPaul Kuhlman
 
Needham stretch code overview 09-21-11
Needham stretch code overview 09-21-11Needham stretch code overview 09-21-11
Needham stretch code overview 09-21-11Green Needham
 

Was ist angesagt? (18)

Building Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United StatesBuilding Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United States
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Amg amg titanium alloys & coatings presentation may 2013
Amg   amg titanium alloys & coatings presentation may 2013Amg   amg titanium alloys & coatings presentation may 2013
Amg amg titanium alloys & coatings presentation may 2013
 
Planning and building energy efficiency buildings
Planning and building energy efficiency buildingsPlanning and building energy efficiency buildings
Planning and building energy efficiency buildings
 
Modelling Circular Economy in TIMES
Modelling Circular Economy in TIMESModelling Circular Economy in TIMES
Modelling Circular Economy in TIMES
 
Business Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTCBusiness Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTC
 
Energy consumption: Highlights and future development
Energy consumption: Highlights and future developmentEnergy consumption: Highlights and future development
Energy consumption: Highlights and future development
 
Abse lev1 2_102-202_launch(full permission)
Abse lev1 2_102-202_launch(full permission)Abse lev1 2_102-202_launch(full permission)
Abse lev1 2_102-202_launch(full permission)
 
ECBC
ECBCECBC
ECBC
 
Human Habits and Energy Consumption in Residential Buildings
Human Habits and Energy Consumption in Residential BuildingsHuman Habits and Energy Consumption in Residential Buildings
Human Habits and Energy Consumption in Residential Buildings
 
Energy Efficiency in Construction
Energy Efficiency in ConstructionEnergy Efficiency in Construction
Energy Efficiency in Construction
 
Energy Presentation Warm
Energy Presentation WarmEnergy Presentation Warm
Energy Presentation Warm
 
Business Idea: Industrial Energy Conservation Solutions
Business Idea: Industrial Energy Conservation Solutions Business Idea: Industrial Energy Conservation Solutions
Business Idea: Industrial Energy Conservation Solutions
 
Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...
 
Presentation tahir
Presentation tahirPresentation tahir
Presentation tahir
 
10 su building-energy-use-intensity
10 su building-energy-use-intensity10 su building-energy-use-intensity
10 su building-energy-use-intensity
 
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkSdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
 
Needham stretch code overview 09-21-11
Needham stretch code overview 09-21-11Needham stretch code overview 09-21-11
Needham stretch code overview 09-21-11
 

Andere mochten auch

Iep 010807 Leonam1
Iep 010807 Leonam1Iep 010807 Leonam1
Iep 010807 Leonam1UFV2004
 
Dc40 09 Viabilidade Executiva14052009
Dc40 09 Viabilidade Executiva14052009Dc40 09 Viabilidade Executiva14052009
Dc40 09 Viabilidade Executiva14052009UFV2004
 
Grandes Barragens Parte 2.2.1
Grandes Barragens   Parte 2.2.1Grandes Barragens   Parte 2.2.1
Grandes Barragens Parte 2.2.1UFV2004
 
Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...
Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...
Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...Instituto Besc
 
History Of Energy
History Of EnergyHistory Of Energy
History Of Energyfalkor
 
Japan's energy landscape
Japan's energy landscapeJapan's energy landscape
Japan's energy landscapeGerhard Fasol
 
History Of Wind Energy
History Of Wind EnergyHistory Of Wind Energy
History Of Wind Energyfalkor
 

Andere mochten auch (9)

Iep 010807 Leonam1
Iep 010807 Leonam1Iep 010807 Leonam1
Iep 010807 Leonam1
 
Dc40 09 Viabilidade Executiva14052009
Dc40 09 Viabilidade Executiva14052009Dc40 09 Viabilidade Executiva14052009
Dc40 09 Viabilidade Executiva14052009
 
Grandes Barragens Parte 2.2.1
Grandes Barragens   Parte 2.2.1Grandes Barragens   Parte 2.2.1
Grandes Barragens Parte 2.2.1
 
Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...
Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...
Biomassa energética, plantações florestais, biocombustíveis, segurança alimen...
 
Apresentação Joaquim Carvalho – Pesquisador Associado ao IEE/USP
Apresentação Joaquim Carvalho – Pesquisador Associado ao IEE/USPApresentação Joaquim Carvalho – Pesquisador Associado ao IEE/USP
Apresentação Joaquim Carvalho – Pesquisador Associado ao IEE/USP
 
History Of Energy
History Of EnergyHistory Of Energy
History Of Energy
 
Japan's energy landscape
Japan's energy landscapeJapan's energy landscape
Japan's energy landscape
 
Biomassa Florestal
Biomassa FlorestalBiomassa Florestal
Biomassa Florestal
 
History Of Wind Energy
History Of Wind EnergyHistory Of Wind Energy
History Of Wind Energy
 

Ähnlich wie Learning from history october 2011

Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Shushmul Maheshwari
 
Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Shushmul Maheshwari
 
Porters five functions aluminium
Porters five functions  aluminiumPorters five functions  aluminium
Porters five functions aluminiumSanjay Krishna
 
Lightbridge (NASDAQ:LTBR) Investor Presentation
Lightbridge (NASDAQ:LTBR) Investor Presentation Lightbridge (NASDAQ:LTBR) Investor Presentation
Lightbridge (NASDAQ:LTBR) Investor Presentation RedChip Companies, Inc.
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINALSuresh Jambunathan
 
How will resource scarcity impact industry in Brsitol
How will resource scarcity impact industry in BrsitolHow will resource scarcity impact industry in Brsitol
How will resource scarcity impact industry in Brsitolalicemariearcher
 
Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14shushmul
 
Mr.A.C.R.Das-Ministry-of-Steel.ppt
Mr.A.C.R.Das-Ministry-of-Steel.pptMr.A.C.R.Das-Ministry-of-Steel.ppt
Mr.A.C.R.Das-Ministry-of-Steel.pptssuserc1190d
 
Paper energy analysis of a cement plant jesa 2002 final 2
Paper energy analysis of a cement plant jesa 2002 final 2Paper energy analysis of a cement plant jesa 2002 final 2
Paper energy analysis of a cement plant jesa 2002 final 2Patrick VanSchijndel
 
PowEra Feasibility Analysis 2
PowEra Feasibility Analysis 2 PowEra Feasibility Analysis 2
PowEra Feasibility Analysis 2 Kris Hans
 
Power, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in EuropePower, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in EuropePMILebanonChapter
 
Power Generation in The Chemical Industry
Power Generation in The Chemical IndustryPower Generation in The Chemical Industry
Power Generation in The Chemical IndustryIJRTEMJOURNAL
 
Ensuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement PlantEnsuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement PlantFouad Ghoneim, PMP®, SSYB®
 
The Solar Industry Ees Business Unit
The Solar Industry Ees Business UnitThe Solar Industry Ees Business Unit
The Solar Industry Ees Business UnitGiovanni Pivetta
 

Ähnlich wie Learning from history october 2011 (20)

The aluminium foundry industry energy conservation imperatives
The aluminium foundry industry energy conservation imperativesThe aluminium foundry industry energy conservation imperatives
The aluminium foundry industry energy conservation imperatives
 
Paul Fennell (Imperial College London) - Cost comparison of different technol...
Paul Fennell (Imperial College London) - Cost comparison of different technol...Paul Fennell (Imperial College London) - Cost comparison of different technol...
Paul Fennell (Imperial College London) - Cost comparison of different technol...
 
Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14
 
Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14
 
Porters five functions aluminium
Porters five functions  aluminiumPorters five functions  aluminium
Porters five functions aluminium
 
Lightbridge (NASDAQ:LTBR) Investor Presentation
Lightbridge (NASDAQ:LTBR) Investor Presentation Lightbridge (NASDAQ:LTBR) Investor Presentation
Lightbridge (NASDAQ:LTBR) Investor Presentation
 
The Future of Energy
The Future of EnergyThe Future of Energy
The Future of Energy
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
 
Slotted anodes
Slotted anodesSlotted anodes
Slotted anodes
 
How will resource scarcity impact industry in Brsitol
How will resource scarcity impact industry in BrsitolHow will resource scarcity impact industry in Brsitol
How will resource scarcity impact industry in Brsitol
 
Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14Global Aluminium Industry - Feb'14
Global Aluminium Industry - Feb'14
 
Mr.A.C.R.Das-Ministry-of-Steel.ppt
Mr.A.C.R.Das-Ministry-of-Steel.pptMr.A.C.R.Das-Ministry-of-Steel.ppt
Mr.A.C.R.Das-Ministry-of-Steel.ppt
 
Paper energy analysis of a cement plant jesa 2002 final 2
Paper energy analysis of a cement plant jesa 2002 final 2Paper energy analysis of a cement plant jesa 2002 final 2
Paper energy analysis of a cement plant jesa 2002 final 2
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
PowEra Feasibility Analysis 2
PowEra Feasibility Analysis 2 PowEra Feasibility Analysis 2
PowEra Feasibility Analysis 2
 
Power, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in EuropePower, Gas and Certificates Trading Industry in Europe
Power, Gas and Certificates Trading Industry in Europe
 
Steel Making Methods
Steel Making MethodsSteel Making Methods
Steel Making Methods
 
Power Generation in The Chemical Industry
Power Generation in The Chemical IndustryPower Generation in The Chemical Industry
Power Generation in The Chemical Industry
 
Ensuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement PlantEnsuring Maximum Operational Performance in Cement Plant
Ensuring Maximum Operational Performance in Cement Plant
 
The Solar Industry Ees Business Unit
The Solar Industry Ees Business UnitThe Solar Industry Ees Business Unit
The Solar Industry Ees Business Unit
 

Mehr von National Foundry Technology Network (NFTN)

Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...
Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...
Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...National Foundry Technology Network (NFTN)
 

Mehr von National Foundry Technology Network (NFTN) (20)

Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...
Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...
Foundry Industry Training Development in South Africa, Tony Patterson & Lucky...
 
practical applications of improving energy efficiency in foundries
practical applications of improving energy efficiency in foundriespractical applications of improving energy efficiency in foundries
practical applications of improving energy efficiency in foundries
 
Wear resistant cast materials for the mining industry
Wear resistant cast materials for the mining industryWear resistant cast materials for the mining industry
Wear resistant cast materials for the mining industry
 
Practical applications of improving energy efficiency in foundries
Practical applications of improving energy efficiency in foundriesPractical applications of improving energy efficiency in foundries
Practical applications of improving energy efficiency in foundries
 
Complete foundry solution disa
Complete foundry solution disaComplete foundry solution disa
Complete foundry solution disa
 
energy efficient melt shop operation
energy efficient melt shop operationenergy efficient melt shop operation
energy efficient melt shop operation
 
the transition development of the china foundry industry
the transition development of the china foundry industrythe transition development of the china foundry industry
the transition development of the china foundry industry
 
status of indian foundry industry
status of indian foundry industrystatus of indian foundry industry
status of indian foundry industry
 
south african foundry market
south african foundry marketsouth african foundry market
south african foundry market
 
trends for brazil foundry industry
trends for brazil foundry industrytrends for brazil foundry industry
trends for brazil foundry industry
 
NFTN - collective approach towards green foundries in South Africa
NFTN - collective approach towards green foundries in South AfricaNFTN - collective approach towards green foundries in South Africa
NFTN - collective approach towards green foundries in South Africa
 
Colocuium presentation 27th october 2011 john davies
Colocuium presentation 27th october 2011 john daviesColocuium presentation 27th october 2011 john davies
Colocuium presentation 27th october 2011 john davies
 
Silicon Carbide
Silicon CarbideSilicon Carbide
Silicon Carbide
 
Welding of aluminium castings - October 2011
Welding of aluminium castings - October 2011Welding of aluminium castings - October 2011
Welding of aluminium castings - October 2011
 
Energy course 10 11-2009 - sa specific
Energy course 10 11-2009 - sa specificEnergy course 10 11-2009 - sa specific
Energy course 10 11-2009 - sa specific
 
Nftn impact report - 2011
Nftn impact report - 2011Nftn impact report - 2011
Nftn impact report - 2011
 
110407 eedsm institute of foundrymen_workshop
110407 eedsm institute of foundrymen_workshop110407 eedsm institute of foundrymen_workshop
110407 eedsm institute of foundrymen_workshop
 
Energy sd -4 march 2011
Energy  sd -4 march 2011Energy  sd -4 march 2011
Energy sd -4 march 2011
 
Eff sa found-e&m efficiency-04.2011-4
Eff sa found-e&m efficiency-04.2011-4Eff sa found-e&m efficiency-04.2011-4
Eff sa found-e&m efficiency-04.2011-4
 
Bvt energieeffizienz zf
Bvt energieeffizienz zfBvt energieeffizienz zf
Bvt energieeffizienz zf
 

Kürzlich hochgeladen

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 

Kürzlich hochgeladen (20)

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 

Learning from history october 2011

  • 1. MCST Third Foundry colloquium 26/27 th OCTOBER 2011 Learning from US history The aluminium foundry industry energy conservation imperatives. Dr A E Paterson – Aluminium Federation of South Africa            
  • 2.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 3.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 4.
  • 5.   The aluminium foundry industry energy conservation imperatives. Energy sources used are not restricted to electricity They also include natural gas, lpg, heavy and light oils and coke. Measured against reliability of supply, where possible, multi source energy could be attractive. RSA foundries measured in three independent pilot studies showed low efficiency relative to world leaders - as may be expected for a high capital cost, low energy cost country. The change to a high capital/cost high energy cost base brings challenges; local pilot studies have indicated capacity of improvement. Measured against increasing cost of energy, energy can be saved. The cost benefit ratio increases with greater savings. Embedded capital equipment requires consideration.
  • 6.   The aluminium foundry industry energy conservation imperatives. The electrical energy problem – not enough, incorrectly priced
  • 7.   The aluminium foundry industry energy conservation imperatives. The graphs assume a 4% annual supply growth to underpin a planned 6% annual growth in GDP. This implies a strategic move from supporting primary industry to supporting down stream value adding industry. To maintain surety of supply Eskom require a minimum of a 10% buffer to allow for foreseen and unforeseen maintenance requirements. Savings are essential if the country is to avoid a crisis in the next few years until new supply comes on stream – Madupi has been delayed. Also - Existing power stations come to end of life in the mid 2020’s Pricing – the electricity price, previously kept artificially low and not reflecting the replacement value of the capital equipment, escalated dramatically doubling every four years as Eskom seeks to significantly finance expansion costs from current cash flows.
  • 8.   The aluminium foundry industry energy conservation imperatives. Demand reduction options Supply constraints Country image Climate change Financial sustainability S A Economy Probability of desired outcome Load Shedding Rolling Blackouts Prioritisation of new load With pcp Intensified “energy efficiency” DSM good but slow Severe NMD penalties Suspend new applications Short term Power conservation programme Positive impact Neutral Negative impact
  • 9.   The aluminium foundry industry energy conservation imperatives. Four main option types to effect behaviour change were considered: Load shedding - unfair and unsustainable. Substantial price increases - useful in conjunction with rationing Demand supply management programme – useful alongside . rationing Power conservation programme - Rationing the right to purchase . (of supply) seen as best option PCP is the core underpinning principle linked to pricing penalties
  • 10.   The aluminium foundry industry energy conservation imperatives. The (electrical) energy conservation scheme targets a 10% energy saving phased in over three to four years with a 50% saving in the first year. Failure to meet the 10% savings targets was planned to result in punitive energy tariffs in the form of a steeply inclining power curve block tariff approaching and exceeding the replacement value cost of electricity. This approach is in the background. The decline in growth has given breathing space. A phase in period of about two years was anticipated.
  • 11.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 12.   The aluminium foundry industry energy conservation imperatives. The foundry industry is a base industry. Castings form the basis of many products in many markets The value chain involves casting, machining, manufacture and packaging giving added value of the order of 50x at industry level. Energy is required to melt and cast metals Pilot foundry studies show RSA to be a relatively inefficient energy user in both the iron and aluminium sectors. This is to be expected bearing in mind the existing capital equipment decision circumstances. There appears to be considerable opportunity for up to 50% saving Energy rationing and sharply increasing price forms a challenge The 1970’s USA crisis that followed energy rationing and price increases will be explored to gain insights.
  • 13. The aluminium foundry industry energy conservation imperatives . Scrap to final product represents a 60 times value addition to the collected unsorted scrap metal The casting is a carrier that supports other industries and provides job opportunities Value stream from scrap through various inputs – More jobs/ton Associate Industries Inputs /process Value chain Bought in cost R/kg Inputs/ product Value R/kg Man-hours/kg Replace after market Finished component Pirate OEM OEM Value R313 R1000 R350 Packaging/ tpt/ inventory Packaging Packaging 3 Plastic / card / Board R30 OEM R155 aftermarket 560 Bought in hang on parts Cap equipt Manufacturing 1 65 Fitted parts to complete R200 470 Final shape Cap equip/ maint/tools/lube Machining Consumables 8 1 R130 Casting operation Cap equipt / tools / maint Casting 3 6 Equipt / maint inserts. R90 Secondary smelter Capital equipt / tools / lubes Specification ingot 21 R21 Metal merchant Sorted scrap R11 Scrap collector Raw scrap R6
  • 14.   The aluminium foundry industry energy conservation imperatives. Pilot studies show RSA to be a relatively inefficient energy user: The pilot study was a screening assessment based on a three year input of records of two purchases: Energy of all forms purchased – recorded in volume units of purchase and reduced to calorific value in terms of joules. (1J= 1ws) Net purchase of metal (net of scrap sold – excluding dross) The tacit assumption was that the quantity of metal on the shop floor and in storage remains more or less constant. This gives the energy required to produce one unit of sold product 60% was taken to represent furnace demand. This is an approach that can be used by any foundry to assess own energy costs and compare these to the 700kWh/ton for melting suggested.
  • 15.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 16.   The aluminium foundry industry energy conservation imperatives. Foundries are capital and energy intensive The major energy-using equipment, furnaces, last a long time. Capital choices reflect specific foreseen circumstances made at the time of choice. The three issues affecting choice are the interplay between the costs of capital and energy and whether to choose for batch or continuous processes In a cheap energy, expensive capital country, the natural bias has been towards less energy efficiency (as was the case in the USA before the 1973 oil crisis). In expensive energy, cheap capital countries energy saving equipment is used. The technologies exist.
  • 17.   The aluminium foundry industry energy conservation imperatives. Crucible furnace – batch process
  • 18.   The aluminium foundry industry energy conservation imperatives. Crucible furnace - note lid Molten metal energy loss reduced Still energy loss through flue
  • 19.   The aluminium foundry industry energy conservation imperatives. Crucible furnace - note lid Eastern foundries have adopted crucible furnaces by trapping flue gas to pre.heat the charge Fresh air added to to reduce flue gas temperatures to around 400 o C
  • 20.
  • 21.   The aluminium foundry industry energy conservation imperatives. Striko furnace
  • 22.   The aluminium foundry industry energy conservation imperatives. Note that energy is not only used for melting It is also used for holding and for casting Holding – the structure may lose heat through the foundations, . the walls of the flue. - holding practice may hold molten metal for too long. Casting – too large a runner and riser system requires extra . metal melted and remelted - poor practice which results in a high defect ratio . requires extra energy in remelting. - impact of poor metal quality or temperature These are the controllable aspects.
  • 23.   The aluminium foundry industry energy conservation imperatives. The question is both what to do and in what order . The majority of energy (about 60%) is used of melting and holding The majority of energy use depends on the type, insulation and installation of the furnace. Some aspects are uncontrollable, some may be modified. Energy in the form of heat is lost through inefficient conversion, through furnace walls and through the flue. Looking to similar energy challenge circumstances the USA response after the 1973 oil crisis will be considered Energy availability declined rapidly and prices accelerated rapidly.
  • 24. The aluminium foundry industry energy conservation imperatives.             How much energy do we theoretically require to melt aluminium and steel starting at day temperatures? Consider physics laboratory - Heat from day temperature (specific heat) - melt – change from solid to liquid (latent heat) Aluminium Laboratory 945 MJ/kg This implies 261 x 10 -3 MWh/ton about 1,8% of 14,2 MWh/ton for primary smelting) Note that preheating aluminium to 400 o C takes about half the energy Material Melting temperature Specific heat MJ/kg o K Energy to heat from 20 o C to melt T MJ/kg Latent heat MJ/kg Total energy MJ/kg Aluminium 630 o C 0,900 549 396 945 Iron/steel 1460 o C 0,448 645 267 912
  • 25.
  • 26.   The aluminium foundry industry energy conservation imperatives. This is not realistic. How much energy do we actually require to melt aluminium and steel starting at day temperatures? If we want the liquid metal to be 100 o C > melt temperature (adds 10% to Al requirement to 0,286Mwh/ton, 5% to steel to 0,264MWh/ton) The best known practical energy use is around 0,45 – 0,55 MWh/ton In practice consider 5% of primary smelting i.e. 0,7MWh/ton as a target for aluminium (World”s best practice 0,5MWh/ton) For same efficiency for steel also consider 0,7MWh/ton (Wbp 0,54)
  • 27.
  • 28.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 29.   The aluminium foundry industry energy conservation imperatives. The early 1970’s USA industry had generally chosen equipment that assumed cheap plentiful energy in the form of cheap oil. The energy crisis that faced the USA at that stage is not dissimilar to that faced locally today. The crisis reflected a shortage combined with rapidly rising prices. A 1976 aluminium foundry industry workshop was called to concentrate on metal melting as both the most energy intensive and the one that offered most potential for returns. The focus was on retrofitted solutions.
  • 30.   The aluminium foundry industry energy conservation imperatives. US oil production peaked in 1973 In October 1973, as a result of Yom Kippur War tensions, OPEC members stopped exports to the USA Oil prices rose from $3/barrel in 1972 to $12 in 1974 By the second oil crisis in 1979 prices had risen to $35/barrel an over ten times escalation over seven years!
  • 31.   The aluminium foundry industry energy conservation imperatives. Response It was realised that the era of cheap oil had passed. The Energy Department, later to became a cabinet office, was created. (The drive for light weighting of cars grew from the energy crisis as transport in most western world countries uses more than half the energy USA 56% in mid 70’s.) The aluminium industry energy conservation workshop was held in 1976 to share lessons learned.
  • 32.
  • 33. A major factor that needed to be taken into account was the reality of embedded capital equipment. Within this reality the concern was on retrofitted solutions to recover heat. Two systems were discussed: Recouperation through radiation Recouperation through Heat wheels. Typically the heat captured was cooled to about 400 o C by dilution with ambient air before use and used to preheat (aluminium) charge metal or to preheat furnaces or burner air.   The aluminium foundry industry energy conservation imperatives.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 40.   The aluminium foundry industry energy conservation imperatives. Most 800 o C to 1500 o C high temperature furnaces are inefficient Thermal efficiencies can be high but can be as low as 10% because as the heating or melting of metals requires high waste gas temperatures leaving the furnace makes it difficult to design. Typically over 50% of the heat input may be lost through the flue If this could be recaptured, it could be used to preheat combustion air for burners (fossil fuel fired) or to preheat charge metal. The focus on this presentation is on heat trapping in the flue and recouperation. Within the overall energy flow we need to understand what is needed, where improvement is possible and where loss is unavoidable
  • 41.
  • 42.
  • 43.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 44.
  • 45.   The aluminium foundry industry energy conservation imperatives. The twenty four foundries were offered consultation assistance to reduce energy demand. The overall results were positive in terms of reduced costs and reduced energy demand. Partnering has been developed An energy committee has been formed A waste sand committee has been formed The current EffSAFound project is underway
  • 46.   The aluminium foundry industry energy conservation imperatives. The new reality of energy rationing and increasing cost of energy prices warrants serious attention. New more energy efficient equipment exists. Retrofit solutions are well understood and available The difficulty at present is cash flow. The combination of the world economic crisis and tight lending conditions by the banks begs the affordability questions. On the other hand if foundries do not invest into energy efficiency for the future, increased prices (and penalties) come into play. The dti is offering financial and other support to the foundry sector
  • 47.   The aluminium foundry industry energy conservation imperatives. Looking to overseas practice and a medium to long term solution one is struck by the way in which foundries have been rearranged to route and bundle energy intensive equipment and needs together to gain best benefit. Similarly considering other environmental legislation, clean air and water legislation, the realisation that cleaning processes are volume related has led to concentration (bundling) of environmentally sensitive activities. The overall point is the need to develop a longer term strategy to manage energy and environmental matters which looks beyond replacing one piece of equipment with another towards a more integrated approach to energy saving and environmental responsibility.
  • 48. CDM is a process through which developed countries can fund developing countries to implement emission reduction strategies that promote sustainable development, are measurable and additional, and do not divert funds from government development programmers. Current value ϵ 23x0,9/MWh. (0,9MwH/CO2e) Minimum criteria 10 000 tons CO2e per annum. As individual foundries probably do not meet the minimum volume criteria a foundry group approach may be required.   The aluminium foundry industry energy conservation imperatives. The foundry sources of energy are all fossil fuels. The contribute to global warming. (1 kWh = 1 ton CO2e) The RSA government is proposing a carbon tax on producers and users of fossil fuels – this will further affect the foundry cost base The 1997 Kyoto protocol Clean Development Mechanism (CDM)
  • 49.   The aluminium foundry industry energy conservation imperatives. Outline: Introduction The foundry industry The aluminium industry 1976 energy conservation workshop Furnace efficiencies What is the local foundry industry doing at present How does the foundry industry pay for it Conclusion
  • 50.
  • 51.
  • 52. MCST Third Foundry colloquium 26/27 th OCTOBER 2011 Learning from US history The aluminium foundry industry energy conservation imperatives. Dr A E Paterson – Aluminium Federation of South Africa