Root Cause Analysis in the
         Department of Defense

                     February 10th, 2011


David J. Nicholls
David.Nicholls@osd.mil




                                           0
Acronyms
SME – subject matter expert

SEP – systems engineering plan

DAES – Defense Acquisition Executive Summary

PARCA – Performance Assessments and Root Cause
 Analyses

WSARA – Weapon System Acquisition Reform Act

MGB – Milestone B

                                                  1
PARCA Introduction
PARCA’s institutional role
 – Provides USD(AT&L) execution-phase situational
   awareness of major defense acquisition programs
 – Performs forensics for troubled programs
 – Reports activities annually to the four defense committees
Three functions of PARCA office
 – “Performance Assessment”; function in statute
 – “Root Cause Analysis”; function in statute
 – “EVMS”; function not in statute




                                                                2
PARCA Does NOT . . .

Forecast program requirements
 – Funding requirements
 – Total Life Cycle Cost
Evaluate alternative means to execute
 – Acquisition strategies
 – Contracting terms / incentives
Compare alternative means to achieve an end
 – Evaluations of alternate approaches
 – Cost-effectiveness

             Necessary for independence

                                          3
Overview


PARCA root cause analysis

Progress so far

Areas to pursue




                             4
Root Cause Analysis Functions
Statutory duties defined in WSARA 09
 – Conduct root cause analyses for major defense
   acquisition programs
    As part of the Nunn-McCurdy breach certification process
    When requested by designated officials.
 – Issue policies, procedures, and guidance governing
   the conduct of root cause analyses.
Identification of lessons learned for the
 benefit of acquisition community



                                                                5
Analytical Framework
                Unrealistic
                performance
                expectations
 Unrealistic cost                        M
                                         a
 or schedule      Inadequate risk        n
 estimates        assessment             a      Cost,
                                         g      schedule and
  Any other                              e
  matters        Unanticipated           m      performance
                                         e      impact
                 technological or        n
                 manufacturing issues    t
  Quantity
  change           Funding instability
                   or inadequacy


Problems will occur: why they occur and our response
       are crucial issues for root cause analysis
                                                          6
RCA Operations

PARCA deliberately Analytical Steps
 limited in organic
                      Initial Investigation
 resources
Depends on other       Fact Finding
 OSD organizations for
                            Analysis
 functional expertise
Depends on FFRDCs             Products
 and academia for
 analytical support
                                              7
Initial Investigation
Define the cost and/or
 schedule growth
Gather documentation
 – Program content and
   guidance
 – Acquisition documents
 – General background
Program chronology
Change analysis
Prepare for fact finding
            Define the problem
                                           8
Fact Finding
    Interviews
     – Program Office and Contractors
     – Organizations providing functional
       support to program
    Analysis of performance
     reporting data
     – EVMS
     – Cost reporting
     – Performance metrics
    Program documentation,
     studies, reports
Comprehend perspectives
                                            9
Analysis

Exact analytical methods
 are case dependent
Blend of quantitative and
                                     Product
 qualitative (but fact based)
 methodologies
                                  Programmatic
Decision-maker concerns
 – Actionability
                                Acquisition System
 – Exogenous vs endogenous
 – Effectiveness
       Develop and evaluate hypotheses
                                                     10
Products

One-page memorandum for Nunn-McCurdy
 certification process
 – Describes breach and its root causes
 – Supporting document in the program certification package
   sent to Congress
 – Briefing summarizing results
Lessons for acquisition community
 – Reports
 – Analytical tools
Contribution for PARCA’s annual report to
 Congress
                                                              11
Overview


PARCA root cause analysis

Progress so far

Areas to pursue




                             12
Root Cause Analyses in 2010

 Performed six root cause analyses as
  part of Nunn-McCurdy breach process
  – F-35                  – RMS
  – DDG-1000              – Apache Block III
  – ATIRCM/CMWS           – WGS
 Seven root cause analyses are ongoing
  – Some “on request”
  – Variety of programs

Expect about 20 root cause analyses per year
                                               13
PreliminaryTrends
Inception Issues
Unrealistic cost or schedule estimates    X        X       X   X X X
Immature technology, excessive
manufacturing, integration risk                        X
Unrealistic performance expectations                   X
Execution issues
Changes in procurement quantity               X X X        X X X
Inadequate funding/ funding instability
Unanticipated design, engineering,
manufacturing or technology issues             X       X           X
Other                                          X                       X
Poor Performance                          X                X   X X

                                                                           14
Observations

Inception Issues
Unrealistic cost or schedule estimates   X   X       X   X X X
Immature technology, excessive
manufacturing, integration risk                  X
Unrealistic performance expectations             X

Most likely problem “to be discovered” by program
 is an unrealistic cost or schedule estimate
Other factors are apparently not common or
 perhaps need better tools to detect
       Problems to be discovered in execution
                                                             15
Observations
Execution issues
Changes in procurement quantity           X X X       X X X
Inadequate funding/ funding instability
Unanticipated design, engineering,
manufacturing or technology issues         X      X           X
Other                                      X                      X
Quantity changes a common factor but usually
 accompanied by (or caused by) other factors
Programs likely to encounter the unexpected
Suprisingly, funding has not been a major factor
 Quantity change as a cause must be questioned
                                                                      16
Assessing Management
 An important evaluation
  – Assessed to be a significant factor in
    several cases
  – Area for “actionable” root causes        M
                                             a
 A difficult area to evaluate               n
                                             a
  – Quantitative impact of poor mgt?         g       Cost, and
                                             e       schedule
  – Likely contentious                       m
                                                     impact
                                             e
 Approach is to evaluate pieces             n
                                             t
  – Defining system and interfaces
  – Appropriate contracting strategy
  – Maintaining situational awareness
Key evaluation that includes contractor, PMO, and governance

                                                            17
Defining Systems & Interfaces

Complex process which demands SME input
 Poorly developed or defined            Insufficient or incomplete SEP
  requirements                           Lack of a well developed Integrated
 Undefined dependencies                  Master Schedule (IMS)
 Insufficient interoperability          Program Office defaults
  planning                                control/responsibility to contractor
 Requirements instability               Reliance on schedule over
 Lack of stakeholder involvement         performance
 Poorly developed or under              Poor integration test planning
  specified MS exit/entrance criteria    Lack of integrated planning

Two key questions
  – Does Government know what it wants/able to define it ?
  – Is schedule based upon engineering realities?

                                                                             18
Effective Contracting Strategy

Two elements
 – Blocking and tackling
 – Incentive strategy effectiveness
Incentive evaluation
 – Aligned with program goals
   and challenges
 – Demanding yet achievable
 – Sufficient to motivate
 – No perverse effects
 – Consistent with overall
   incentives
 – Signal sent and received

                                             19
Situational Awareness

Tailored metrics
 – Relevant metrics e.g. identification AND tracking of “bets”
 – Effective metrics e.g. avoiding integration effects
Earned Value Management
 – Compliance
 – Effectiveness                          PA    Situational
                                                awareness
Integrated with PARCA’s
 program assessments                           Tailored    RCA
 – Semi-annual, statutory reviews after        concerns
   critical Nunn-McCurdy breach
 – As part of DAES process

                                                                 20
Overview


PARCA root cause analysis

Progress so far

Areas to pursue




                             21
Ongoing Development

Analytical methodologies
 – Impact of funding constraints in
   development
 – Evaluation of incentive strategies
 – Systems engineering assessment
 – EV metrics and data presentation
Relationships
 – SME sources for specific issues
 – Knowledge-sharing of analytical approaches e.g. UK MoD
 – Effective use of root cause analysis results
 – Effective mechanisms for sharing lessons for benefit of
   acquisition community
                                                         22
Policies, Procedures,
                      and Guidance
State of play
 –WSARA 09 requires PARCA to address
 – Virtually no current guidance for root cause analysis
 – Other organizations have done some root cause analysis
 – Key questions exist e.g. is it enough to say that estimate was
   unrealistic (WSARA 09 category) or should we ask why?

Three different purposes
 – Documentation of PARCA processes
 – Service conduct of root cause analyses
 – Program Office conduct of root cause analyses
       Documentation of organizational lessons
                                                               23
Concluding Thoughts

Independence
Analysis transparently based on facts
Clear and accurate definition of the
 predominant issues
 – Actionable
 – Relevant trends
Timely results


 A commitment to not repeating mistakes
                                          24

Weitere ähnliche Inhalte

Was ist angesagt?

Majerowicz
MajerowiczMajerowicz
Majerowicz
NASAPMC
 
Healy edward
Healy edwardHealy edward
Healy edward
NASAPMC
 
Law.richard
Law.richardLaw.richard
Law.richard
NASAPMC
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
NASAPMC
 
Carol.mullenax
Carol.mullenaxCarol.mullenax
Carol.mullenax
NASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
NASAPMC
 
Chambers.calvin
Chambers.calvinChambers.calvin
Chambers.calvin
NASAPMC
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
NASAPMC
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
NASAPMC
 
Harvey.tony
Harvey.tonyHarvey.tony
Harvey.tony
NASAPMC
 
Lindley.johnson.pe
Lindley.johnson.peLindley.johnson.pe
Lindley.johnson.pe
NASAPMC
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
NASAPMC
 
Sally.godfrey
Sally.godfrey Sally.godfrey
Sally.godfrey
NASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
NASAPMC
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
NASAPMC
 
Duncan.william
Duncan.williamDuncan.william
Duncan.william
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Pamela.west
Pamela.westPamela.west
Pamela.west
NASAPMC
 

Was ist angesagt? (20)

Majerowicz
MajerowiczMajerowicz
Majerowicz
 
Healy edward
Healy edwardHealy edward
Healy edward
 
Law.richard
Law.richardLaw.richard
Law.richard
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Carol.mullenax
Carol.mullenaxCarol.mullenax
Carol.mullenax
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Chambers.calvin
Chambers.calvinChambers.calvin
Chambers.calvin
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
 
Harvey.tony
Harvey.tonyHarvey.tony
Harvey.tony
 
Lindley.johnson.pe
Lindley.johnson.peLindley.johnson.pe
Lindley.johnson.pe
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
 
Sally.godfrey
Sally.godfrey Sally.godfrey
Sally.godfrey
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 
Duncan.william
Duncan.williamDuncan.william
Duncan.william
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Pamela.west
Pamela.westPamela.west
Pamela.west
 

Andere mochten auch

Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Phillip.hall
Phillip.hallPhillip.hall
Phillip.hall
NASAPMC
 
Rick nybakken.jan.chodas
Rick nybakken.jan.chodasRick nybakken.jan.chodas
Rick nybakken.jan.chodas
NASAPMC
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
NASAPMC
 
Rovinsky final
Rovinsky finalRovinsky final
Rovinsky final
NASAPMC
 
Leon.j.douglas.d
Leon.j.douglas.dLeon.j.douglas.d
Leon.j.douglas.d
NASAPMC
 
Backup hesenperger kottmeyer
Backup hesenperger kottmeyerBackup hesenperger kottmeyer
Backup hesenperger kottmeyer
NASAPMC
 
Michael.hazen
Michael.hazenMichael.hazen
Michael.hazen
NASAPMC
 
Vipavetz.kevin
Vipavetz.kevinVipavetz.kevin
Vipavetz.kevin
NASAPMC
 
Elliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.bElliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.b
NASAPMC
 
Stephen.rider
Stephen.riderStephen.rider
Stephen.rider
NASAPMC
 
Glenn.perez
Glenn.perezGlenn.perez
Glenn.perez
NASAPMC
 
David.fuller
David.fullerDavid.fuller
David.fuller
NASAPMC
 
Dumbacher
DumbacherDumbacher
Dumbacher
NASAPMC
 
Cynthia.calhoun
Cynthia.calhounCynthia.calhoun
Cynthia.calhoun
NASAPMC
 
Michael.aguilar
Michael.aguilarMichael.aguilar
Michael.aguilar
NASAPMC
 
Miller.charles
Miller.charlesMiller.charles
Miller.charles
NASAPMC
 

Andere mochten auch (20)

Yew manson
Yew mansonYew manson
Yew manson
 
Phillip.hall
Phillip.hallPhillip.hall
Phillip.hall
 
Rick nybakken.jan.chodas
Rick nybakken.jan.chodasRick nybakken.jan.chodas
Rick nybakken.jan.chodas
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
 
Rovinsky final
Rovinsky finalRovinsky final
Rovinsky final
 
Leon.j.douglas.d
Leon.j.douglas.dLeon.j.douglas.d
Leon.j.douglas.d
 
Backup hesenperger kottmeyer
Backup hesenperger kottmeyerBackup hesenperger kottmeyer
Backup hesenperger kottmeyer
 
Michael.hazen
Michael.hazenMichael.hazen
Michael.hazen
 
Vipavetz.kevin
Vipavetz.kevinVipavetz.kevin
Vipavetz.kevin
 
Elliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.bElliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.b
 
Stephen.rider
Stephen.riderStephen.rider
Stephen.rider
 
Heard
HeardHeard
Heard
 
B leach
B leachB leach
B leach
 
Taube
TaubeTaube
Taube
 
Glenn.perez
Glenn.perezGlenn.perez
Glenn.perez
 
David.fuller
David.fullerDavid.fuller
David.fuller
 
Dumbacher
DumbacherDumbacher
Dumbacher
 
Cynthia.calhoun
Cynthia.calhounCynthia.calhoun
Cynthia.calhoun
 
Michael.aguilar
Michael.aguilarMichael.aguilar
Michael.aguilar
 
Miller.charles
Miller.charlesMiller.charles
Miller.charles
 

Ähnlich wie Nichols.david

D l engyel
D l engyelD l engyel
D l engyel
NASAPMC
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standards
Jayesh Khatri
 
Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1
p6academy
 
Risk Management In Software Product Development
Risk Management In Software Product DevelopmentRisk Management In Software Product Development
Risk Management In Software Product Development
Amandeep Midha
 
James.taylor
James.taylorJames.taylor
James.taylor
NASAPMC
 

Ähnlich wie Nichols.david (20)

Rapid Portfolio Analysis powered by CAST Highlight
Rapid Portfolio Analysis powered by CAST HighlightRapid Portfolio Analysis powered by CAST Highlight
Rapid Portfolio Analysis powered by CAST Highlight
 
Handling risk
Handling riskHandling risk
Handling risk
 
Integrating Risk With Earned Value
Integrating Risk With Earned ValueIntegrating Risk With Earned Value
Integrating Risk With Earned Value
 
D l engyel
D l engyelD l engyel
D l engyel
 
nickelring OAP final submission
nickelring OAP final submissionnickelring OAP final submission
nickelring OAP final submission
 
1 Qs Overview
1 Qs Overview1 Qs Overview
1 Qs Overview
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standards
 
Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) Workshop
 
MANAGING RISKS IN IT PROJECTS ... get the complete set and others at www.gafm...
MANAGING RISKS IN IT PROJECTS ... get the complete set and others at www.gafm...MANAGING RISKS IN IT PROJECTS ... get the complete set and others at www.gafm...
MANAGING RISKS IN IT PROJECTS ... get the complete set and others at www.gafm...
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
Successfully Integrating Agile and Earned Value
Successfully Integrating Agile and Earned ValueSuccessfully Integrating Agile and Earned Value
Successfully Integrating Agile and Earned Value
 
Business Continuity The 9 Step Process
Business Continuity   The 9 Step ProcessBusiness Continuity   The 9 Step Process
Business Continuity The 9 Step Process
 
Root cause analysis master plan
Root cause analysis master planRoot cause analysis master plan
Root cause analysis master plan
 
Risk Management In Software Product Development
Risk Management In Software Product DevelopmentRisk Management In Software Product Development
Risk Management In Software Product Development
 
SE18_SE_Lec 12_ Project Management 1
SE18_SE_Lec 12_ Project Management 1SE18_SE_Lec 12_ Project Management 1
SE18_SE_Lec 12_ Project Management 1
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project Controls
 
Procedural Risk Management
Procedural Risk ManagementProcedural Risk Management
Procedural Risk Management
 
James.taylor
James.taylorJames.taylor
James.taylor
 
Safety Score Card
Safety Score CardSafety Score Card
Safety Score Card
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
NASAPMC
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
NASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
 

Kürzlich hochgeladen

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 

Kürzlich hochgeladen (20)

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 

Nichols.david

  • 1. Root Cause Analysis in the Department of Defense February 10th, 2011 David J. Nicholls David.Nicholls@osd.mil 0
  • 2. Acronyms SME – subject matter expert SEP – systems engineering plan DAES – Defense Acquisition Executive Summary PARCA – Performance Assessments and Root Cause Analyses WSARA – Weapon System Acquisition Reform Act MGB – Milestone B 1
  • 3. PARCA Introduction PARCA’s institutional role – Provides USD(AT&L) execution-phase situational awareness of major defense acquisition programs – Performs forensics for troubled programs – Reports activities annually to the four defense committees Three functions of PARCA office – “Performance Assessment”; function in statute – “Root Cause Analysis”; function in statute – “EVMS”; function not in statute 2
  • 4. PARCA Does NOT . . . Forecast program requirements – Funding requirements – Total Life Cycle Cost Evaluate alternative means to execute – Acquisition strategies – Contracting terms / incentives Compare alternative means to achieve an end – Evaluations of alternate approaches – Cost-effectiveness Necessary for independence 3
  • 5. Overview PARCA root cause analysis Progress so far Areas to pursue 4
  • 6. Root Cause Analysis Functions Statutory duties defined in WSARA 09 – Conduct root cause analyses for major defense acquisition programs  As part of the Nunn-McCurdy breach certification process  When requested by designated officials. – Issue policies, procedures, and guidance governing the conduct of root cause analyses. Identification of lessons learned for the benefit of acquisition community 5
  • 7. Analytical Framework Unrealistic performance expectations Unrealistic cost M a or schedule Inadequate risk n estimates assessment a Cost, g schedule and Any other e matters Unanticipated m performance e impact technological or n manufacturing issues t Quantity change Funding instability or inadequacy Problems will occur: why they occur and our response are crucial issues for root cause analysis 6
  • 8. RCA Operations PARCA deliberately Analytical Steps limited in organic Initial Investigation resources Depends on other Fact Finding OSD organizations for Analysis functional expertise Depends on FFRDCs Products and academia for analytical support 7
  • 9. Initial Investigation Define the cost and/or schedule growth Gather documentation – Program content and guidance – Acquisition documents – General background Program chronology Change analysis Prepare for fact finding Define the problem 8
  • 10. Fact Finding Interviews – Program Office and Contractors – Organizations providing functional support to program Analysis of performance reporting data – EVMS – Cost reporting – Performance metrics Program documentation, studies, reports Comprehend perspectives 9
  • 11. Analysis Exact analytical methods are case dependent Blend of quantitative and Product qualitative (but fact based) methodologies Programmatic Decision-maker concerns – Actionability Acquisition System – Exogenous vs endogenous – Effectiveness Develop and evaluate hypotheses 10
  • 12. Products One-page memorandum for Nunn-McCurdy certification process – Describes breach and its root causes – Supporting document in the program certification package sent to Congress – Briefing summarizing results Lessons for acquisition community – Reports – Analytical tools Contribution for PARCA’s annual report to Congress 11
  • 13. Overview PARCA root cause analysis Progress so far Areas to pursue 12
  • 14. Root Cause Analyses in 2010 Performed six root cause analyses as part of Nunn-McCurdy breach process – F-35 – RMS – DDG-1000 – Apache Block III – ATIRCM/CMWS – WGS Seven root cause analyses are ongoing – Some “on request” – Variety of programs Expect about 20 root cause analyses per year 13
  • 15. PreliminaryTrends Inception Issues Unrealistic cost or schedule estimates X X X X X X Immature technology, excessive manufacturing, integration risk X Unrealistic performance expectations X Execution issues Changes in procurement quantity X X X X X X Inadequate funding/ funding instability Unanticipated design, engineering, manufacturing or technology issues X X X Other X X Poor Performance X X X X 14
  • 16. Observations Inception Issues Unrealistic cost or schedule estimates X X X X X X Immature technology, excessive manufacturing, integration risk X Unrealistic performance expectations X Most likely problem “to be discovered” by program is an unrealistic cost or schedule estimate Other factors are apparently not common or perhaps need better tools to detect Problems to be discovered in execution 15
  • 17. Observations Execution issues Changes in procurement quantity X X X X X X Inadequate funding/ funding instability Unanticipated design, engineering, manufacturing or technology issues X X X Other X X Quantity changes a common factor but usually accompanied by (or caused by) other factors Programs likely to encounter the unexpected Suprisingly, funding has not been a major factor Quantity change as a cause must be questioned 16
  • 18. Assessing Management An important evaluation – Assessed to be a significant factor in several cases – Area for “actionable” root causes M a A difficult area to evaluate n a – Quantitative impact of poor mgt? g Cost, and e schedule – Likely contentious m impact e Approach is to evaluate pieces n t – Defining system and interfaces – Appropriate contracting strategy – Maintaining situational awareness Key evaluation that includes contractor, PMO, and governance 17
  • 19. Defining Systems & Interfaces Complex process which demands SME input  Poorly developed or defined  Insufficient or incomplete SEP requirements  Lack of a well developed Integrated  Undefined dependencies Master Schedule (IMS)  Insufficient interoperability  Program Office defaults planning control/responsibility to contractor  Requirements instability  Reliance on schedule over  Lack of stakeholder involvement performance  Poorly developed or under  Poor integration test planning specified MS exit/entrance criteria  Lack of integrated planning Two key questions – Does Government know what it wants/able to define it ? – Is schedule based upon engineering realities? 18
  • 20. Effective Contracting Strategy Two elements – Blocking and tackling – Incentive strategy effectiveness Incentive evaluation – Aligned with program goals and challenges – Demanding yet achievable – Sufficient to motivate – No perverse effects – Consistent with overall incentives – Signal sent and received 19
  • 21. Situational Awareness Tailored metrics – Relevant metrics e.g. identification AND tracking of “bets” – Effective metrics e.g. avoiding integration effects Earned Value Management – Compliance – Effectiveness PA Situational awareness Integrated with PARCA’s program assessments Tailored RCA – Semi-annual, statutory reviews after concerns critical Nunn-McCurdy breach – As part of DAES process 20
  • 22. Overview PARCA root cause analysis Progress so far Areas to pursue 21
  • 23. Ongoing Development Analytical methodologies – Impact of funding constraints in development – Evaluation of incentive strategies – Systems engineering assessment – EV metrics and data presentation Relationships – SME sources for specific issues – Knowledge-sharing of analytical approaches e.g. UK MoD – Effective use of root cause analysis results – Effective mechanisms for sharing lessons for benefit of acquisition community 22
  • 24. Policies, Procedures, and Guidance State of play –WSARA 09 requires PARCA to address – Virtually no current guidance for root cause analysis – Other organizations have done some root cause analysis – Key questions exist e.g. is it enough to say that estimate was unrealistic (WSARA 09 category) or should we ask why? Three different purposes – Documentation of PARCA processes – Service conduct of root cause analyses – Program Office conduct of root cause analyses Documentation of organizational lessons 23
  • 25. Concluding Thoughts Independence Analysis transparently based on facts Clear and accurate definition of the predominant issues – Actionable – Relevant trends Timely results A commitment to not repeating mistakes 24