AMANA Contracting & Steel Building Co.
HSE Report for Safety Evaluation
A. Accident
Lost Time Accident
B. Proactive Safety
Management
B-1. Safety Policy statement &
Plan
B-2. Risk Assessment or JHA
B-3. Safety Method Statement or
PCM
B-4. Management of work permit
B-5. Participation in TBM
C. Safety Activity
C-1. Color Coding & Construction
Equipment
C-2. Corrective Actions of Patrol
results by HSE Manager or third
party
C-3. Attendance of regular site
inspection & Meeting
C-4. Feedback for self safety
patrol
C-5. Health Management
C-6. PPE Management
D. Field Safety
Facilities
D-1. Working at height (Fall
protection / Falling materials)
D-2. Scaffolds and Ladders
D-3. Collapse
D4-. Mobile Plant and
equipments
D-5. Confined spaces
D6. Temporary Electricity
D7. ARC / Gas Welding / cutting
D8. Electrical Tools
D-9. Disposal of waste and
housekeeping
A. Accident
Lost Time Accident
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
ZERO
Lost Time Accident
till Date (3rd November 2010)
Number of Staff Number Non Staff Total (AVG) / Day
25 450 475
Total Accident Free Man Hours (Till 3rd November 2010)
379,502
(Three Hundred seventy nine thousand & Five Hundred two)
Average Man Hours worked / Day 4750
Average Man hours worked / Month 123,500
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-1. Safety Policy
statement & Plan
Display of Safety Policy
Communication through Safety
Training
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-2. Risk Assessment or
JHA
Weekly Risk Assessment
Risk
Assessment
being
communicated
to workers
through TBM -
Dated 24-07-
2010
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-3. Safety Method
Statement or PCM
PCM has been conducted as and when required
Method Statement being submitted
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
PTW is being observed regularly
Hot work permit is
complied with
B-4. Management of
work permit
Lifting work complied
with
Work at height
complied with
HOT WORKWork at Height
ExcavationLifting Work
Excavation permit
complied with
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-5. Participation in TBM
Number of TBM Program Number of Days Total No. of Attendees
177 167 (20 May to 3 Nov) 33652
Night Shift TBM
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-5. Participation in TBM
Types of Training No. of Programs No of Attendees
Safety Induction 98 834
Special Safety Training 15 971
External Training 3 15
SAFETY TRAINING
Safety
Induction
Special Safety
Trainings
HSE Training for all
Site staff – 25.09.10
Work at height –
16.08.10
Grinder operating –
07.07.10
Heat Stress Training –
20.05.10
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
C-1. Color Coding &
Construction Equipment
All Power tools & Equipments are being
inspected regularly
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
C-2. Corrective Actions
of Patrol results by HSE
Manager or third party
CORRECTIVE ACTIONS - SCAR
Recorded
(Nos.)
Corrected (Nos.) Outstanding (Nos.)
Previous 212 212 0
Current (28th
Oct 10 to 3rd
Nov 10) 5 5 0
Total 217 217 0
100%
Compliance of S-
CARS.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
C-3. Attendance of
regular site inspection &
Meeting
Weekly HSE Meeting Presentation
Regular Site Inspection
Regular Site inspection being carried out by all site safety team, resulting
control over unsafe actions and unsafe conditions and therefore we have
achieved numbers of Best Practices.
100% attendance in SAMSUNG HSE Meetings & Trainings
Weekly
Presentation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
Inspection Reports are made in prescribed formats and
being reported to Sr. Project Manager for Corrective and
preventive actions.
Every hazardous activity such as cladding work,
formwork etc are supervised by dedicated safety
officers to enforce safety rules and precautions during
the operation.
C-4. Feedback for self
safety patrol
 Self Safety Inspection is being
carried out by Safety Department and
Spot corrections are preferred if
unsafe actions or condition observed.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
1. First Aid Clinic – Well equipped first
clinic available at the project.C-5. Health Management
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity 3. Management of Heat Stress
C-5. Health Management
Air conditioned Rest Area
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity 4. Hygiene Management
C-5. Health Management
b- Hand wash facility
a- Adequate numbers of Toilets & urinals with ablution facilities
c- Safety Training on hand hygiene
d- Safe Drinking water with provision of cleaned water filters.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity PPE Management -
 Specific requirements of PPE – Face shields etc
 Mandatory PPE – Safety Shoes, Safety
Helmet & Safety Goggles are used by all
employees including site staff.
 100% employees are using safety
harness while work at height
C-6. PPE Management
 Life line to ensure 100%
tie – off during erection of
work platform and other
height work
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
1E – Education –Training (Special & TBT) on Work at height for
Staff and Non Staff being conducted on regular basis.
2E – Engineering Control – Safe & Approved scaffold, Fully boarded & Guarded work
platform, Safe means of access & egress, 100% Edge protection for leading edges,
MEP openings, Fall protection (Collective & Personal) protection – Twin Lanyard, Life
line etc observed at all the time while working at height.
1. Safe & Approved scaffold
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
2. Fully Boarded & Guarded work platform for work at height -
During slab decking work
While Shuttering While Concrete pouringWhile Rebar binding
Safe work platform
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
3. Safe means of access & egress for each point of work-
Foot bridge
Step stair to current slab
with overhead protection
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
4. 100% edge protection for leading edges-
While Excavation
Suitable edge protection for each point of work
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
5. Fall protection (Collective & Personal) protection
Usage of twin lanyard
& life line
Suitable PFAS (Personal Fall Arrest system) Safety harness for each type of work at height
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Falling Materials – being arrested by use of suitable edge protection and fall
protection fans
D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
1. Suitable Edge protection with toe guards
2. Protection FAN / Green Nets to arrest falling materials
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Scaffolds – Scaffolds are being Erected by competent person with sound
materials under the supervision of experts in scaffold erection.
D. Field Safety
Facilities
D-2. Scaffolds & Ladders
3. Safe Scaffold Erection Method
Foundation-Mud Sill, Base Plate
Platform - Fully Boarded &
Guarded platform (Top & Mid Rail,
Toe guards)
Secure- tie and bracing, Out
riggers
Access-Means of Access to each
work platform
2. Approved and
Sound scaffold
materials
1. Trained Scaffolds Erectors
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Ladders– Good quality of aluminum ladders are used as a means of access,
Also regular inspection is being done and we ensure the ladders are suitably
secured.
D. Field Safety
Facilities
D-2. Scaffolds & Ladders
2. Approved
Ladders used
1. Ladder Identification &
Inspection
3. Not allowed as
work platform
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-3. Collapse
2.Approved
FormworkMaterial
used
1. Scaffold erected with
ties and bracing with
adequate foundation
3. Approval from
SAMSUNG &
Formwork Supplier (if
required) Prior to work
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-4. Mobile Plant and
Equipment (Crane,
Rope, Chain)
2. Trained operators for each
Mobile Plant
1. Register for All Mobile equipment is maintained for their
3rd party certificates, other required documents & Equipment
Conditions
3. Approval from SAMSUNG &
Self Inspection
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-6. Temporary
Electricity
2. Suitable Warning Signs
1. Competent Electricians are deputed at site
3.DGswithBundwall&
Earthing
4. Fire Protection & Cable routing
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-7. ARC / GAS Welding
/ Cutting
Flash back arrestor & Pressure Gauge
Competent Welders are deputed at site
FollowupofHotWork
Permit(SAMSUNG)
Secured Gas Cylinders
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-8. Electrical Tools
Electrical Power Tools Management - Once we receive power
tools, it is being inspected by us and then operators are given training . Also
AMANA inspection stickers are provided to tools. Finally the tools are being
sent for SAMSUNG HSE approval and color code
Inspection of Tools
Inspection Sticker for the
evidence
Training for the Operator
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-9. Disposal of Waste &
Housekeeping
Housekeeping-
Everyday we do housekeeping before and at the end of work.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Signages
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
SMOKING ZONE
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Note: Hand gloves should not be used while operating tools with abrasive
wheel as it may cause entanglement.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Environmental Safety
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Environmental Safety
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
AMANA HSE
CEREMONY
23rd July 2010
Mustafa
Javed
Surinder
Leela
Ram
Prodip
4 CRITERIA TO WIN
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
AMANA HSE
CEREMONY
23rd July 2010
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
BOOKLET DISDRIBUTION- Samsung (Hindi) and AMANA(Multi lingual) booklets are
distributed among workers
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
“Start Safe – Stay Safe”

Weitere ähnliche Inhalte

Was ist angesagt?

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS PresentationHelenYOH
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 
Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)Yvonne Chew
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety OrientationBeamer
 
PPE Awareness training
PPE Awareness trainingPPE Awareness training
PPE Awareness trainingNicholasKemp14
 
Construction Site Hazards and Controls
Construction Site Hazards and ControlsConstruction Site Hazards and Controls
Construction Site Hazards and ControlsKrishna Gopal
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptKamran Zafar
 
Safety officer performance appraisal
Safety officer performance appraisalSafety officer performance appraisal
Safety officer performance appraisalmartinezrosie780
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talktxheaven
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training Claire
 

Was ist angesagt? (20)

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS Presentation
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety Orientation
 
PPE Awareness training
PPE Awareness trainingPPE Awareness training
PPE Awareness training
 
Construction Site Hazards and Controls
Construction Site Hazards and ControlsConstruction Site Hazards and Controls
Construction Site Hazards and Controls
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
Safety officer performance appraisal
Safety officer performance appraisalSafety officer performance appraisal
Safety officer performance appraisal
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talk
 
Safety Audit: An Overview
Safety Audit: An OverviewSafety Audit: An Overview
Safety Audit: An Overview
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
 

Andere mochten auch

Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&ahijaziosama
 
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...Asian Food Regulation Information Service
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height worksPavan Noel
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Al Marson
 
Fire drill procedure
Fire drill procedureFire drill procedure
Fire drill procedureMaria Hidalgo
 

Andere mochten auch (20)

Session 2 General Safety Requirements
Session 2   General Safety RequirementsSession 2   General Safety Requirements
Session 2 General Safety Requirements
 
SESSION : 1 Health & Safety Management : An overview
SESSION : 1 Health & Safety Management : An overview SESSION : 1 Health & Safety Management : An overview
SESSION : 1 Health & Safety Management : An overview
 
Nebosh unit ib questions ans matrix
Nebosh unit ib questions ans matrixNebosh unit ib questions ans matrix
Nebosh unit ib questions ans matrix
 
Waste bin signs
Waste bin signsWaste bin signs
Waste bin signs
 
Worker safety hand book
Worker    safety hand bookWorker    safety hand book
Worker safety hand book
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
 
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
 
Nebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ansNebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ans
 
Safety Best practice new 2015
Safety Best practice new 2015Safety Best practice new 2015
Safety Best practice new 2015
 
Nebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ansNebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ans
 
Nebosh unit ic questions matrix - ans
Nebosh unit ic questions matrix - ansNebosh unit ic questions matrix - ans
Nebosh unit ic questions matrix - ans
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height works
 
Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Ebook - 7 Pola Struktur K3LH Safety Toon
Ebook - 7 Pola Struktur K3LH Safety ToonEbook - 7 Pola Struktur K3LH Safety Toon
Ebook - 7 Pola Struktur K3LH Safety Toon
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3
 
Modul K3
Modul K3Modul K3
Modul K3
 
Fire drill procedure
Fire drill procedureFire drill procedure
Fire drill procedure
 

Ähnlich wie Safety evaluation Best practices-04.11.10

Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
MohamedFarouk CV 2 ...
MohamedFarouk  CV 2 ...MohamedFarouk  CV 2 ...
MohamedFarouk CV 2 ...Mohamed Farouk
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxferielvpk
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1Jahanzeb Khan
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSandeep Jain
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE PresentationIshtiaq Hashmi
 
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1Gilbert Okorobe
 
Fy2006 Mfc Construction
Fy2006 Mfc ConstructionFy2006 Mfc Construction
Fy2006 Mfc ConstructionPaul Melton
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docxolorunyomi wale
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016Darren Bergin
 
Fy2006 Mfc General Industry
Fy2006 Mfc General IndustryFy2006 Mfc General Industry
Fy2006 Mfc General IndustryPaul Melton
 
Assignment front sheet assignment 2
Assignment front sheet assignment 2Assignment front sheet assignment 2
Assignment front sheet assignment 2NeilOw87
 
Swp working safely at height
Swp working safely at heightSwp working safely at height
Swp working safely at heightjohnbarsellona
 

Ähnlich wie Safety evaluation Best practices-04.11.10 (20)

Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
MohamedFarouk CV 2 ...
MohamedFarouk  CV 2 ...MohamedFarouk  CV 2 ...
MohamedFarouk CV 2 ...
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE Presentation
 
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
 
Fy2006 Mfc Construction
Fy2006 Mfc ConstructionFy2006 Mfc Construction
Fy2006 Mfc Construction
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016
 
MUSADDIQ UPDATED CV
MUSADDIQ UPDATED CVMUSADDIQ UPDATED CV
MUSADDIQ UPDATED CV
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
Fy2006 Mfc General Industry
Fy2006 Mfc General IndustryFy2006 Mfc General Industry
Fy2006 Mfc General Industry
 
Assignment front sheet assignment 2
Assignment front sheet assignment 2Assignment front sheet assignment 2
Assignment front sheet assignment 2
 
Swp working safely at height
Swp working safely at heightSwp working safely at height
Swp working safely at height
 
ARSHAD.CV
ARSHAD.CVARSHAD.CV
ARSHAD.CV
 
CURRECULUM VITAE
CURRECULUM VITAECURRECULUM VITAE
CURRECULUM VITAE
 
Construction safety at 071C20R new
Construction  safety at 071C20R newConstruction  safety at 071C20R new
Construction safety at 071C20R new
 

Kürzlich hochgeladen

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Safety evaluation Best practices-04.11.10

  • 1. AMANA Contracting & Steel Building Co.
  • 2. HSE Report for Safety Evaluation A. Accident Lost Time Accident B. Proactive Safety Management B-1. Safety Policy statement & Plan B-2. Risk Assessment or JHA B-3. Safety Method Statement or PCM B-4. Management of work permit B-5. Participation in TBM C. Safety Activity C-1. Color Coding & Construction Equipment C-2. Corrective Actions of Patrol results by HSE Manager or third party C-3. Attendance of regular site inspection & Meeting C-4. Feedback for self safety patrol C-5. Health Management C-6. PPE Management D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) D-2. Scaffolds and Ladders D-3. Collapse D4-. Mobile Plant and equipments D-5. Confined spaces D6. Temporary Electricity D7. ARC / Gas Welding / cutting D8. Electrical Tools D-9. Disposal of waste and housekeeping
  • 3. A. Accident Lost Time Accident HSE Report for Safety EvaluationHSE Report for Safety Evaluation ZERO Lost Time Accident till Date (3rd November 2010) Number of Staff Number Non Staff Total (AVG) / Day 25 450 475 Total Accident Free Man Hours (Till 3rd November 2010) 379,502 (Three Hundred seventy nine thousand & Five Hundred two) Average Man Hours worked / Day 4750 Average Man hours worked / Month 123,500
  • 4. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-1. Safety Policy statement & Plan Display of Safety Policy Communication through Safety Training
  • 5. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-2. Risk Assessment or JHA Weekly Risk Assessment Risk Assessment being communicated to workers through TBM - Dated 24-07- 2010
  • 6. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-3. Safety Method Statement or PCM PCM has been conducted as and when required Method Statement being submitted
  • 7. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management PTW is being observed regularly Hot work permit is complied with B-4. Management of work permit Lifting work complied with Work at height complied with HOT WORKWork at Height ExcavationLifting Work Excavation permit complied with
  • 8. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-5. Participation in TBM Number of TBM Program Number of Days Total No. of Attendees 177 167 (20 May to 3 Nov) 33652 Night Shift TBM
  • 9. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-5. Participation in TBM Types of Training No. of Programs No of Attendees Safety Induction 98 834 Special Safety Training 15 971 External Training 3 15 SAFETY TRAINING Safety Induction Special Safety Trainings HSE Training for all Site staff – 25.09.10 Work at height – 16.08.10 Grinder operating – 07.07.10 Heat Stress Training – 20.05.10
  • 10. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity C-1. Color Coding & Construction Equipment All Power tools & Equipments are being inspected regularly
  • 11. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity C-2. Corrective Actions of Patrol results by HSE Manager or third party CORRECTIVE ACTIONS - SCAR Recorded (Nos.) Corrected (Nos.) Outstanding (Nos.) Previous 212 212 0 Current (28th Oct 10 to 3rd Nov 10) 5 5 0 Total 217 217 0 100% Compliance of S- CARS.
  • 12. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity C-3. Attendance of regular site inspection & Meeting Weekly HSE Meeting Presentation Regular Site Inspection Regular Site inspection being carried out by all site safety team, resulting control over unsafe actions and unsafe conditions and therefore we have achieved numbers of Best Practices. 100% attendance in SAMSUNG HSE Meetings & Trainings Weekly Presentation
  • 13. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity Inspection Reports are made in prescribed formats and being reported to Sr. Project Manager for Corrective and preventive actions. Every hazardous activity such as cladding work, formwork etc are supervised by dedicated safety officers to enforce safety rules and precautions during the operation. C-4. Feedback for self safety patrol  Self Safety Inspection is being carried out by Safety Department and Spot corrections are preferred if unsafe actions or condition observed.
  • 14. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity 1. First Aid Clinic – Well equipped first clinic available at the project.C-5. Health Management
  • 15. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity 3. Management of Heat Stress C-5. Health Management Air conditioned Rest Area
  • 16. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity 4. Hygiene Management C-5. Health Management b- Hand wash facility a- Adequate numbers of Toilets & urinals with ablution facilities c- Safety Training on hand hygiene d- Safe Drinking water with provision of cleaned water filters.
  • 17. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity PPE Management -  Specific requirements of PPE – Face shields etc  Mandatory PPE – Safety Shoes, Safety Helmet & Safety Goggles are used by all employees including site staff.  100% employees are using safety harness while work at height C-6. PPE Management  Life line to ensure 100% tie – off during erection of work platform and other height work
  • 18. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 1E – Education –Training (Special & TBT) on Work at height for Staff and Non Staff being conducted on regular basis. 2E – Engineering Control – Safe & Approved scaffold, Fully boarded & Guarded work platform, Safe means of access & egress, 100% Edge protection for leading edges, MEP openings, Fall protection (Collective & Personal) protection – Twin Lanyard, Life line etc observed at all the time while working at height. 1. Safe & Approved scaffold
  • 19. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 2. Fully Boarded & Guarded work platform for work at height - During slab decking work While Shuttering While Concrete pouringWhile Rebar binding Safe work platform
  • 20. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 3. Safe means of access & egress for each point of work- Foot bridge Step stair to current slab with overhead protection
  • 21. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 4. 100% edge protection for leading edges- While Excavation Suitable edge protection for each point of work
  • 22. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 5. Fall protection (Collective & Personal) protection Usage of twin lanyard & life line Suitable PFAS (Personal Fall Arrest system) Safety harness for each type of work at height
  • 23. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Falling Materials – being arrested by use of suitable edge protection and fall protection fans D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) 1. Suitable Edge protection with toe guards 2. Protection FAN / Green Nets to arrest falling materials
  • 24. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Scaffolds – Scaffolds are being Erected by competent person with sound materials under the supervision of experts in scaffold erection. D. Field Safety Facilities D-2. Scaffolds & Ladders 3. Safe Scaffold Erection Method Foundation-Mud Sill, Base Plate Platform - Fully Boarded & Guarded platform (Top & Mid Rail, Toe guards) Secure- tie and bracing, Out riggers Access-Means of Access to each work platform 2. Approved and Sound scaffold materials 1. Trained Scaffolds Erectors
  • 25. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Ladders– Good quality of aluminum ladders are used as a means of access, Also regular inspection is being done and we ensure the ladders are suitably secured. D. Field Safety Facilities D-2. Scaffolds & Ladders 2. Approved Ladders used 1. Ladder Identification & Inspection 3. Not allowed as work platform
  • 26. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-3. Collapse 2.Approved FormworkMaterial used 1. Scaffold erected with ties and bracing with adequate foundation 3. Approval from SAMSUNG & Formwork Supplier (if required) Prior to work
  • 27. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-4. Mobile Plant and Equipment (Crane, Rope, Chain) 2. Trained operators for each Mobile Plant 1. Register for All Mobile equipment is maintained for their 3rd party certificates, other required documents & Equipment Conditions 3. Approval from SAMSUNG & Self Inspection
  • 28. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-6. Temporary Electricity 2. Suitable Warning Signs 1. Competent Electricians are deputed at site 3.DGswithBundwall& Earthing 4. Fire Protection & Cable routing
  • 29. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-7. ARC / GAS Welding / Cutting Flash back arrestor & Pressure Gauge Competent Welders are deputed at site FollowupofHotWork Permit(SAMSUNG) Secured Gas Cylinders
  • 30. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-8. Electrical Tools Electrical Power Tools Management - Once we receive power tools, it is being inspected by us and then operators are given training . Also AMANA inspection stickers are provided to tools. Finally the tools are being sent for SAMSUNG HSE approval and color code Inspection of Tools Inspection Sticker for the evidence Training for the Operator
  • 31. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-9. Disposal of Waste & Housekeeping Housekeeping- Everyday we do housekeeping before and at the end of work.
  • 32. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Signages
  • 33. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 34. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 35. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 36. HSE Report for Safety EvaluationHSE Report for Safety Evaluation SMOKING ZONE
  • 37. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 38. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Note: Hand gloves should not be used while operating tools with abrasive wheel as it may cause entanglement.
  • 39. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 40. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Environmental Safety
  • 41. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Environmental Safety
  • 42. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 43. HSE Report for Safety EvaluationHSE Report for Safety Evaluation AMANA HSE CEREMONY 23rd July 2010 Mustafa Javed Surinder Leela Ram Prodip 4 CRITERIA TO WIN
  • 44. HSE Report for Safety EvaluationHSE Report for Safety Evaluation AMANA HSE CEREMONY 23rd July 2010
  • 45. HSE Report for Safety EvaluationHSE Report for Safety Evaluation BOOKLET DISDRIBUTION- Samsung (Hindi) and AMANA(Multi lingual) booklets are distributed among workers
  • 46. HSE Report for Safety EvaluationHSE Report for Safety Evaluation “Start Safe – Stay Safe”