Managing safely v3.1 – project
Introduction
As part of the Managing safely course, you have to complete a project and have it
assessed. You will be expected to carry out a risk assessment based on your own work
environment. You need to record the results on the attached sheets and submit them for
marking. Do not submit any additional material in support of your project work as only the
six parts of the A4 project will be assessed. The project can be word processed or hand
written.
When you have completed your work you should return it to
There is a two week time limit for the return of the project. Your project must be completed
and returned by
Instructions
Please read all of the instructions before starting work on your project.
The project is broken down into a number of parts. Please complete each section as
detailed below.
Part 1 – description of the work tasks that are your responsibility
Record a brief description of all the work tasks within your work environment including:
• description/labelled sketch of the location(s)
• people who work in or visit the area on a regular basis or from time to time. (Think
about the different groups of people who may be in the area and how often they
may be there.)
• permanent and temporary items of equipment and substances
• activities carried out within your work environment
MS Project
Pack version 3.1
GENNESARET RESOURCES NIGERIA LIMITED
Part 2 – a hazard checklist of the location(s)
Record a brief description of three location hazards that may arise in your work
environment. For example, car park, stairs, uneven floor. For each of these hazards
please include:
• a description of the location
• a description of the hazard – in relation to the location
• the number and occupation of people who could be affected by the hazard – in
relation to the location
• whether a risk assessment is recommended
Part 3 – a hazard checklist of permanent and/or temporary items of equipment and
substances used in your work environment
Record a brief description of three hazards that may arise from equipment or substances
used. For each of these hazards please include:
• a description of permanent and/or temporary items of equipment and substances
used
• a description of the hazard – in relation to the equipment/substance
• the number and occupation of people who could be affected by the hazard - in
relation to the equipment/substance
• whether a risk assessment is recommended
Part 4 – a hazard checklist of the activities carried out within your work environment
Record a brief description of three hazards that may arise from within your work
environment. For each of these hazards please include:
• a description of the work activity
• a description of the hazard – in relation to the work activity
• the number and occupation of people who could be affected by the hazard – in
relation to the work activity
Note: for the purpose of this exercise all three activity hazards that you are
assessing on part 4 must require a risk assessment.
Part 5 – carrying out a risk assessment
Please carry out a risk assessment on all three of the activity hazards you have listed on
part 4. Please make sure you include:
• a description of the work activity
• a description of the hazard, hazardous event and expected consequence – in
relation to the work activity
• the number and occupation of people affected – in relation to the work activity
• an assessment of risk (please use the 5 x 5 matrix) – in relation to the work activity
Note: for the purpose of this exercise all three activity hazards that you are
assessing on part 5 must require risk controls.
MS Project
Pack version 3.1
Part 6 – risk control recommendations
Please complete the risk control form for all three activity hazards you have listed on part
5. Please make sure you include:
• a description of the work activity and risk level from the risk assessment
• existing risk controls
• any further risk controls required - in relation to the work activity
• the residual risk (please use the 5 x 5 matrix) - in relation to the work activity
• a description of the type of monitoring required and how often - in relation to the
residual risk
Note: where you have large numbers of hazards in your work environment you will not
have space to record them all. In these circumstances, select a representative sample of
hazards for the purposes of this project and record only these. Remember that only three
hazards are required for parts 2, 3, and 4.
Each part has a maximum number of marks which can be awarded and details are given
in the table below.
Part Maximum marks
1 18
2 16
3 16
4 13
5 30
6 30
Total 123
Minimum mark 62
Finally, before returning your project check that your name, the end of course date, the
name of your company, the site name and the name of your training provider are recorded
on the first sheet.
Please also ensure that you sign each sheet to confirm that the work you submit is your
own.
Please note: the small square boxes in the bottom right hand corner of each section
on parts 2 to 6 are for the markers use only.
MS Project
Pack version 3.1
Part 1 – description of the work tasks that are your
responsibility (continued on the next page)
MS Project
Pack version 3.1
Marks
allocated
Delegate name: OKEAKPU C. Kingsley End of course date: 6th February 2015
Company : NIMASA Site name: Cargo Vessel Ship
Training provider: Gennesaret Resources Nigeria Limited
A description/labelled sketch of the location(s)
1 . Windlass 2. Chain cable compresses 3. Hawse pipe
4. Anchor chain 5. Bollard 6. Fair leader
7. Mooring pipe 8. Deck end roller 9. Wire reel
10 . Cowl head ventilator 11. Derrick boom 12. Boom support
13. Air and sounding pipe 14 . Flag staff 15. Anchor davit
16 . Stockless anchor 17. Anchor shackle 18 . Anchor shank, Anchor shaft
19. Anchor crown 20. Anchor arm 21. Anchor palm
22 . Anchor fluke 23. Anchor light davit 24. Open rail
25. Hand rail stanchion 26. Hand rail 27. Anchor recess
28 . Bow chock 29 . Bell mouth of hawse pipe 30. Deck Flange hawse pipe
MS Project
Pack version 3.1
A description of the people who work in or visit the area on a regular basis or
from time to time and how often they’re there
Depending on the type of ship. i.e either a cruise ship, cargo vessel ship, or a fishing boat,
different kind of people may work as well as walk around the ship. A citable example are
those who Ship Deck are essential or related to their work station/location (Deck Crew)
First Officer
Maintains all navigational equipment including lights, storage of emergency signaling
equipment. In charge of maintenance of the emergency life boats, rescue boats and tenders.
The First Officer spends most of their time on the bridge supervising the bridge operations
and navigational systems.
Quarter Master
Manages the deck staff on duties performed daily such as attending to ropes, maintenance
and tenders.
Able Seaman
Able Seaman is one of the Deckhands responsible for the general cleaning, painting and
maintenance of the ship.
Bosun
The Bosun assists the Safety Officer with assigned duties.
MS Project
Pack version 3.1
Safety Officer
In this role you delegate and oversee safety drills. The safety drills include abandon ship
procedures, fire drills and maintenance of the ship's tenders. In addition this role is
responsible for instructing the crew on safety issues and drills.
Security Officer
The security officer is in charge of all security issues during embarkation and
disembarkment. This position is responsible for making decisions about suspicious
luggage, passengers, crew members etc.
Staff Captain
This is the Captain's executive officer, in charge of the medical and deck department's
safety and order. After the Captain the Chief Officer is second in command in the decision
making process. This role assists the Captain with all duties including the overall welfare of
the crew and passengers on board the ship.
MS Project
Pack version 3.1
Please sign to confirm that this is your own work:
Part 1 – description of the work tasks that are your
responsibility
MS Project
Pack version 3.1
Marks
allocated
A description of permanent and temporary pieces of equipment and
substances used in your work environment
a. Ropes (Wind Control And Navigation System)
b. Life Guards (Safety)
c. Buckets And Paints (For Good House Keeping On Deck)
d. Life Rah (Safety Boats)
e. Anchor (Ship Ducking)
f. Sawdust (Safety Measure To Arrest Spilled Oil On Deck Surface)
g. Detergent
h. Water Pump/ Fire Wash
i. Master Vab (To Transfer Oil Through Pumps And Pipes)
j. Under Ground Storage Tank
A description of the activities carried out within your work environment
a. Supervision of Product Lifting (PMS, CRUDE, DIESEL)
b. Under Ground Tank Inspection
c. Ship to Ship Oil Transfer (STS) Cargo Vessel Operation (commercial)
d. Ensure Good housekeeping on Ship Deck
1. Ensure that the ship deck is kept clean at all times
2. Check the ropes to ensure durability
e. Wheeling a Ship
f. Check the Anchor position make sure it pulled up on Deck before ship set sail
g. Check TPS. (ensure it between 2.3 mph) i.e ship not dragging and record findings
h. Safety Drills.
MS Project
Pack version 3.1
Please sign to confirm that this is your own work:__________________
MS Project
Pack version 3.1
Part 2Hazard Checklist: locations(s)
Company: NIMASA Department: OFFSHORE OPERATION Site name: SHIP DECK STATION
Description of the
Location
Description of the hazard
(in relation to the location)
Number and occupation of
people affected
(in relation to the location)
Risk assessment
recommended?
(If no, please explain)
Ship Deck Underground Storage Tank located under
the Deck
With an unattended oil spill on deck
likelihood of hazardous incident could
affect all life onboard
E.g Cargo Vessel Ship
12-15 people
Yes No
Under Ground Storage Tank Highly flammable Products
(PMS, CRUDE OIL, DISSEL)
Likelihood of hazardous incident could
affect all life onboard
E.g Cargo Vessel Ship
12-15 people
Yes No
Ship Deck Anchor position (make sure it pulled up
on Deck before ship set sail) this could
either drag the ship or cause a big
turbulence to the ship
Likelihood that unaware personnel
onboard could either fall or get injured
2-3 people
Yes No
***
*
*
***
***
The location(s) you manage
*
Please sign to confirm that this is your own work:__________________
MS Project
Pack version 3.1
Part 3Hazard Checklist: equipment and substances
Company: NIMASA Department: OFFSHORE OPERATION Site name: SHIP DECK STATION
Description of the
equipment/substances
Description of the hazard
(in relation to the equipment/substance)
Number and occupation of
people affected
(in relation to the equipment/substance)
Risk assessment
recommended?
(If no, please explain)
Dry Sawdust (use to tackle
oil spill on deck)
Flammable Material In the event of fire outbreak in a loaded
vessel.
E.g Cargo Vessel Ship
12-15 people
*Yes No
Detergent (use to tackle oil
spill on deck) and ensure good
house keeping
Slippery 4 people (Deck Crew) thus it is often
advised to wash & rinse the deck
properly after an STS
Yes No
Ropes: This is a permanent
tool associated with the work
Station/location. It’s often
replaced from time to time for
safety reasons.
• Keep ropes clean of
contamination by
chemicals(chemicals are bad for
ropes)
• It is not advisable to stand in the
bight or in the path of a rope
under strain.
All (Deck crew) are affected by this
factor
Occasionally 4 people
OS, AB,FO,HSEO. ETC.
Yes No
*
*
Permanent and temporary pieces of equipment and substances used in the work environment
Please sign to confirm that this is your own work:__________________
MS Project
Pack version 3.1
Part 4Hazard Checklist: activities
Company: NIMASA Department: OFFSHORE OPERATION Site name: DECK STATION
Description of the
Work activity
Description of the hazard
(in relation to the work activity)
Number and occupation of
people affected
(in relation to the work activity)
Risk assessment
recommended?
Ship to Ship (STS) & Product
Lifting (PMS, CRUDE,
DIESEL)
Highly flammable Products
(PMS, CRUDE OIL, DISSEL)
This operation could lead to an explosion
or fire outbreak.
Likelihood of hazardous incident could
affect all life onboard as well as lose of
ship or abandoning of ship by the crew
E.g Cargo Vessel Ship
12-15 people
Yes No
Under Ground Tank Inspection
When inspecting the underground tank it
is advised not to go in until the meter
reflect a low Gas presents usually 0.2%
Inhaling of inflammable gases is
hazardous to health and often requires
medical treatment or result to death
Deck crew oil and chemical tanker
inspector
1 person
Yes No
Anchor position
a). Anchor :makes sure it pulled up on
Deck before ship set sail. This could
either cause the ship to drag or cause a
big turbulence to the ship. b). this
turbulence could cause injury to
personnel on board. c). the turbulence
could also increase the temperature of the
gaseous product in the storage tanks
Likelihood that unaware personnel
onboard could either fall or get injured
4-6 people
Yes No
Activities carried out within your work environment
Note: For the purpose of this exercise, all three activity hazards must require a risk assessment.
Please sign to confirm that this is your own work:__________________
√
√
√
MS Project
Pack version 3.1
Ship to Ship
(STS) &
Product
Lifting (PMS,
CRUDE,
DIESEL)
Part 5Risk assessment form
Company: NIMASA Department: OFFSHORE OPERATION Site name: DECK STATION
Work
activity
Hazard, hazardous event and
expected consequence
(in relation to the work activity)
Likelihood
level
Consequence
level
Risk
level
a. Highly inflammable
products,
b. Explosion or Fire Out Break
c. Major/ Catastrophic
4 5 20
Under
Ground Tank
Inspection
a) Highly flammable
b) Inhaling of gaseous content
c) Health risk (Collapse) /
death
4 4 16
Anchor
position
a) Cause the Ship to Drag
b) Increase the water current
c) Turbulence
3 4 12
Date: Time: Review period: Date of next review:
Assessor’s name: Position: Signature:
Yes No
Yes No
Yes No
X =
Occupation:
Deck Crew
Number:
4-6 people
Occupation:
oil & chemical
tanker inspector
Number: 1
Occupation:
Deck Crew
Number:
4-6
Please sign to confirm that this is your own work:__________________
√
√
√
Note: For the purpose of this exercise, all three activity hazards must require risk controls.
Assessment of risk
(in relation to the work activity)People
affected
(in relation to the work
activity)
Are risk controls
required?
MS Project
Pack version 3.1
Part 6Risk control form
Company: NIMASA Department: OFF SHORE OPERATION Site name: DECK STATION
Work activity
and risk level
(from risk
assessment form)
Existing
risk controls
(in relation to the work
activity)
Probable
Likelihood
Potential
Consequence
New risk
level
X
a) PPE. b) ensure
Host, vabs &
temp are ok
before operation.
c) Fire fighting
equipments.
a) Prepare crew for
emergency (PST)
Personal survival at sea
Technique. b) Lunch the
life rah (safety boats)
if explosion occurs
2 4 8
a)Temp. Meter
Checker (0.2%)
b) Gas Mask
c) PPE
a). On the Job Training/
briefing
b). SSOW
.
2 3 6
a)TPS alarm
System.
b) PPE
c) First aid/
medical attention
a) SSOW 1 4 4
Frequency:
Adequate
Date: Review period: Date of next review:
Assessor’s name: Position: Signature:
Frequency:
Adiquate
Frequency:
Acceptable
=
Please sign to confirm that this is your own work:__________________
Residual risk
(in relation to the work activity)Further risk
controls required
(in relation to the work activity)
Description of
monitoring required
(in relation to the residual risk)
Risk level: 20
Risk level: 16
Risk level: 12

Weitere ähnliche Inhalte

Was ist angesagt?

Risk assessment arley moldova
Risk assessment arley moldovaRisk assessment arley moldova
Risk assessment arley moldova
AshleighG
 
Buffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPTBuffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPT
Nicholas Otto
 
Safe use of power tools
Safe use of power tools Safe use of power tools
Safe use of power tools
htmisper
 

Was ist angesagt? (20)

TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
17 traffic operations working on live roads risk assessment templates
17 traffic operations   working on live roads risk assessment templates17 traffic operations   working on live roads risk assessment templates
17 traffic operations working on live roads risk assessment templates
 
Loading and unloading white
Loading and unloading whiteLoading and unloading white
Loading and unloading white
 
Risk assessment arley moldova
Risk assessment arley moldovaRisk assessment arley moldova
Risk assessment arley moldova
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Buffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPTBuffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPT
 
HazMat Ch12
HazMat Ch12 HazMat Ch12
HazMat Ch12
 
Load restraint Safe (Loading and unloading on vehicles)
Load restraint Safe (Loading and unloading on vehicles)Load restraint Safe (Loading and unloading on vehicles)
Load restraint Safe (Loading and unloading on vehicles)
 
Safe use of power tools
Safe use of power tools Safe use of power tools
Safe use of power tools
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
Safety Tool Box Talk
Safety Tool Box TalkSafety Tool Box Talk
Safety Tool Box Talk
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docxSUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
 

Andere mochten auch

Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
cembitmead
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
tamz486
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
chamahan
 
Risk assessment form complete
Risk assessment form completeRisk assessment form complete
Risk assessment form complete
JoshGmanMcLean
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
Graveney School
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
Khem Slawson
 
Managing_Safely_Project_-_Himanshu_Chaudhry
Managing_Safely_Project_-_Himanshu_ChaudhryManaging_Safely_Project_-_Himanshu_Chaudhry
Managing_Safely_Project_-_Himanshu_Chaudhry
Himanshu Chaudhry
 
M2 risk assessment template
M2 risk assessment templateM2 risk assessment template
M2 risk assessment template
claire96
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
Jade0livia
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
skyeeneel
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
Hamdija Velagic
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
hijaziosama
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
Ashish Parihar
 

Andere mochten auch (20)

Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment form complete
Risk assessment form completeRisk assessment form complete
Risk assessment form complete
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
GTC546 HSE PPT
GTC546 HSE PPTGTC546 HSE PPT
GTC546 HSE PPT
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
Filming risk assessment form
Filming risk assessment formFilming risk assessment form
Filming risk assessment form
 
Managing_Safely_Project_-_Himanshu_Chaudhry
Managing_Safely_Project_-_Himanshu_ChaudhryManaging_Safely_Project_-_Himanshu_Chaudhry
Managing_Safely_Project_-_Himanshu_Chaudhry
 
GC3 - Hazard NEW
GC3 - Hazard NEWGC3 - Hazard NEW
GC3 - Hazard NEW
 
M2 risk assessment template
M2 risk assessment templateM2 risk assessment template
M2 risk assessment template
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Risk management in Healthcare
Risk management in HealthcareRisk management in Healthcare
Risk management in Healthcare
 
What is the NEBOSH Certificate?
What is the NEBOSH Certificate?What is the NEBOSH Certificate?
What is the NEBOSH Certificate?
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Sarah Netherhall risk-assessment-form (Draft 2)
Sarah Netherhall risk-assessment-form (Draft 2)Sarah Netherhall risk-assessment-form (Draft 2)
Sarah Netherhall risk-assessment-form (Draft 2)
 

Ähnlich wie Project word doc(iosh)

16SMCE310 16SCVE310 – Engineering Skills Project Brief .docx
16SMCE310  16SCVE310 – Engineering Skills Project Brief .docx16SMCE310  16SCVE310 – Engineering Skills Project Brief .docx
16SMCE310 16SCVE310 – Engineering Skills Project Brief .docx
felicidaddinwoodie
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
Yousif Fikry
 
Jha rock drill use and maintenance romo
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
nafable
 
LauraEngells_FinalPresentation
LauraEngells_FinalPresentationLauraEngells_FinalPresentation
LauraEngells_FinalPresentation
Laura Engells
 
Case Study 2 KU Consulting KU Consulting has .docx
Case Study 2   KU Consulting  KU Consulting has .docxCase Study 2   KU Consulting  KU Consulting has .docx
Case Study 2 KU Consulting KU Consulting has .docx
tidwellveronique
 
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
M3 Marine Group
 
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
harish chandra CHOPRA
 
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docxCBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
FreddbelCubillas
 

Ähnlich wie Project word doc(iosh) (20)

Coveris.TPM.Step 0.12.21.15.pptx
Coveris.TPM.Step 0.12.21.15.pptxCoveris.TPM.Step 0.12.21.15.pptx
Coveris.TPM.Step 0.12.21.15.pptx
 
On board safety
   On board safety    On board safety
On board safety
 
Corporate EHS Program - Working Copy.doc
Corporate EHS Program - Working Copy.docCorporate EHS Program - Working Copy.doc
Corporate EHS Program - Working Copy.doc
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
16SMCE310 16SCVE310 – Engineering Skills Project Brief .docx
16SMCE310  16SCVE310 – Engineering Skills Project Brief .docx16SMCE310  16SCVE310 – Engineering Skills Project Brief .docx
16SMCE310 16SCVE310 – Engineering Skills Project Brief .docx
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Jha rock drill use and maintenance romo
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
LauraEngells_FinalPresentation
LauraEngells_FinalPresentationLauraEngells_FinalPresentation
LauraEngells_FinalPresentation
 
Case Study 2 KU Consulting KU Consulting has .docx
Case Study 2   KU Consulting  KU Consulting has .docxCase Study 2   KU Consulting  KU Consulting has .docx
Case Study 2 KU Consulting KU Consulting has .docx
 
Eletson Familiarization
Eletson FamiliarizationEletson Familiarization
Eletson Familiarization
 
1675091151425_Process Management Risk.pptx
1675091151425_Process Management Risk.pptx1675091151425_Process Management Risk.pptx
1675091151425_Process Management Risk.pptx
 
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
20041201 - IMCA Presentation: DP in a hurry - December 2004, Singapore
 
LLI Climb
LLI Climb LLI Climb
LLI Climb
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
 
User Catalouge
User CatalougeUser Catalouge
User Catalouge
 
Flight Line Safety.ppt
Flight Line Safety.pptFlight Line Safety.ppt
Flight Line Safety.ppt
 
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
 
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docxCBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
 

Project word doc(iosh)

  • 1. Managing safely v3.1 – project Introduction As part of the Managing safely course, you have to complete a project and have it assessed. You will be expected to carry out a risk assessment based on your own work environment. You need to record the results on the attached sheets and submit them for marking. Do not submit any additional material in support of your project work as only the six parts of the A4 project will be assessed. The project can be word processed or hand written. When you have completed your work you should return it to There is a two week time limit for the return of the project. Your project must be completed and returned by Instructions Please read all of the instructions before starting work on your project. The project is broken down into a number of parts. Please complete each section as detailed below. Part 1 – description of the work tasks that are your responsibility Record a brief description of all the work tasks within your work environment including: • description/labelled sketch of the location(s) • people who work in or visit the area on a regular basis or from time to time. (Think about the different groups of people who may be in the area and how often they may be there.) • permanent and temporary items of equipment and substances • activities carried out within your work environment MS Project Pack version 3.1 GENNESARET RESOURCES NIGERIA LIMITED
  • 2. Part 2 – a hazard checklist of the location(s) Record a brief description of three location hazards that may arise in your work environment. For example, car park, stairs, uneven floor. For each of these hazards please include: • a description of the location • a description of the hazard – in relation to the location • the number and occupation of people who could be affected by the hazard – in relation to the location • whether a risk assessment is recommended Part 3 – a hazard checklist of permanent and/or temporary items of equipment and substances used in your work environment Record a brief description of three hazards that may arise from equipment or substances used. For each of these hazards please include: • a description of permanent and/or temporary items of equipment and substances used • a description of the hazard – in relation to the equipment/substance • the number and occupation of people who could be affected by the hazard - in relation to the equipment/substance • whether a risk assessment is recommended Part 4 – a hazard checklist of the activities carried out within your work environment Record a brief description of three hazards that may arise from within your work environment. For each of these hazards please include: • a description of the work activity • a description of the hazard – in relation to the work activity • the number and occupation of people who could be affected by the hazard – in relation to the work activity Note: for the purpose of this exercise all three activity hazards that you are assessing on part 4 must require a risk assessment. Part 5 – carrying out a risk assessment Please carry out a risk assessment on all three of the activity hazards you have listed on part 4. Please make sure you include: • a description of the work activity • a description of the hazard, hazardous event and expected consequence – in relation to the work activity • the number and occupation of people affected – in relation to the work activity • an assessment of risk (please use the 5 x 5 matrix) – in relation to the work activity Note: for the purpose of this exercise all three activity hazards that you are assessing on part 5 must require risk controls. MS Project Pack version 3.1
  • 3. Part 6 – risk control recommendations Please complete the risk control form for all three activity hazards you have listed on part 5. Please make sure you include: • a description of the work activity and risk level from the risk assessment • existing risk controls • any further risk controls required - in relation to the work activity • the residual risk (please use the 5 x 5 matrix) - in relation to the work activity • a description of the type of monitoring required and how often - in relation to the residual risk Note: where you have large numbers of hazards in your work environment you will not have space to record them all. In these circumstances, select a representative sample of hazards for the purposes of this project and record only these. Remember that only three hazards are required for parts 2, 3, and 4. Each part has a maximum number of marks which can be awarded and details are given in the table below. Part Maximum marks 1 18 2 16 3 16 4 13 5 30 6 30 Total 123 Minimum mark 62 Finally, before returning your project check that your name, the end of course date, the name of your company, the site name and the name of your training provider are recorded on the first sheet. Please also ensure that you sign each sheet to confirm that the work you submit is your own. Please note: the small square boxes in the bottom right hand corner of each section on parts 2 to 6 are for the markers use only. MS Project Pack version 3.1
  • 4. Part 1 – description of the work tasks that are your responsibility (continued on the next page) MS Project Pack version 3.1 Marks allocated
  • 5. Delegate name: OKEAKPU C. Kingsley End of course date: 6th February 2015 Company : NIMASA Site name: Cargo Vessel Ship Training provider: Gennesaret Resources Nigeria Limited A description/labelled sketch of the location(s) 1 . Windlass 2. Chain cable compresses 3. Hawse pipe 4. Anchor chain 5. Bollard 6. Fair leader 7. Mooring pipe 8. Deck end roller 9. Wire reel 10 . Cowl head ventilator 11. Derrick boom 12. Boom support 13. Air and sounding pipe 14 . Flag staff 15. Anchor davit 16 . Stockless anchor 17. Anchor shackle 18 . Anchor shank, Anchor shaft 19. Anchor crown 20. Anchor arm 21. Anchor palm 22 . Anchor fluke 23. Anchor light davit 24. Open rail 25. Hand rail stanchion 26. Hand rail 27. Anchor recess 28 . Bow chock 29 . Bell mouth of hawse pipe 30. Deck Flange hawse pipe MS Project Pack version 3.1
  • 6. A description of the people who work in or visit the area on a regular basis or from time to time and how often they’re there Depending on the type of ship. i.e either a cruise ship, cargo vessel ship, or a fishing boat, different kind of people may work as well as walk around the ship. A citable example are those who Ship Deck are essential or related to their work station/location (Deck Crew) First Officer Maintains all navigational equipment including lights, storage of emergency signaling equipment. In charge of maintenance of the emergency life boats, rescue boats and tenders. The First Officer spends most of their time on the bridge supervising the bridge operations and navigational systems. Quarter Master Manages the deck staff on duties performed daily such as attending to ropes, maintenance and tenders. Able Seaman Able Seaman is one of the Deckhands responsible for the general cleaning, painting and maintenance of the ship. Bosun The Bosun assists the Safety Officer with assigned duties. MS Project Pack version 3.1
  • 7. Safety Officer In this role you delegate and oversee safety drills. The safety drills include abandon ship procedures, fire drills and maintenance of the ship's tenders. In addition this role is responsible for instructing the crew on safety issues and drills. Security Officer The security officer is in charge of all security issues during embarkation and disembarkment. This position is responsible for making decisions about suspicious luggage, passengers, crew members etc. Staff Captain This is the Captain's executive officer, in charge of the medical and deck department's safety and order. After the Captain the Chief Officer is second in command in the decision making process. This role assists the Captain with all duties including the overall welfare of the crew and passengers on board the ship. MS Project Pack version 3.1 Please sign to confirm that this is your own work:
  • 8. Part 1 – description of the work tasks that are your responsibility MS Project Pack version 3.1 Marks allocated
  • 9. A description of permanent and temporary pieces of equipment and substances used in your work environment a. Ropes (Wind Control And Navigation System) b. Life Guards (Safety) c. Buckets And Paints (For Good House Keeping On Deck) d. Life Rah (Safety Boats) e. Anchor (Ship Ducking) f. Sawdust (Safety Measure To Arrest Spilled Oil On Deck Surface) g. Detergent h. Water Pump/ Fire Wash i. Master Vab (To Transfer Oil Through Pumps And Pipes) j. Under Ground Storage Tank A description of the activities carried out within your work environment a. Supervision of Product Lifting (PMS, CRUDE, DIESEL) b. Under Ground Tank Inspection c. Ship to Ship Oil Transfer (STS) Cargo Vessel Operation (commercial) d. Ensure Good housekeeping on Ship Deck 1. Ensure that the ship deck is kept clean at all times 2. Check the ropes to ensure durability e. Wheeling a Ship f. Check the Anchor position make sure it pulled up on Deck before ship set sail g. Check TPS. (ensure it between 2.3 mph) i.e ship not dragging and record findings h. Safety Drills. MS Project Pack version 3.1 Please sign to confirm that this is your own work:__________________
  • 10. MS Project Pack version 3.1 Part 2Hazard Checklist: locations(s) Company: NIMASA Department: OFFSHORE OPERATION Site name: SHIP DECK STATION Description of the Location Description of the hazard (in relation to the location) Number and occupation of people affected (in relation to the location) Risk assessment recommended? (If no, please explain) Ship Deck Underground Storage Tank located under the Deck With an unattended oil spill on deck likelihood of hazardous incident could affect all life onboard E.g Cargo Vessel Ship 12-15 people Yes No Under Ground Storage Tank Highly flammable Products (PMS, CRUDE OIL, DISSEL) Likelihood of hazardous incident could affect all life onboard E.g Cargo Vessel Ship 12-15 people Yes No Ship Deck Anchor position (make sure it pulled up on Deck before ship set sail) this could either drag the ship or cause a big turbulence to the ship Likelihood that unaware personnel onboard could either fall or get injured 2-3 people Yes No *** * * *** *** The location(s) you manage * Please sign to confirm that this is your own work:__________________
  • 11. MS Project Pack version 3.1 Part 3Hazard Checklist: equipment and substances Company: NIMASA Department: OFFSHORE OPERATION Site name: SHIP DECK STATION Description of the equipment/substances Description of the hazard (in relation to the equipment/substance) Number and occupation of people affected (in relation to the equipment/substance) Risk assessment recommended? (If no, please explain) Dry Sawdust (use to tackle oil spill on deck) Flammable Material In the event of fire outbreak in a loaded vessel. E.g Cargo Vessel Ship 12-15 people *Yes No Detergent (use to tackle oil spill on deck) and ensure good house keeping Slippery 4 people (Deck Crew) thus it is often advised to wash & rinse the deck properly after an STS Yes No Ropes: This is a permanent tool associated with the work Station/location. It’s often replaced from time to time for safety reasons. • Keep ropes clean of contamination by chemicals(chemicals are bad for ropes) • It is not advisable to stand in the bight or in the path of a rope under strain. All (Deck crew) are affected by this factor Occasionally 4 people OS, AB,FO,HSEO. ETC. Yes No * * Permanent and temporary pieces of equipment and substances used in the work environment Please sign to confirm that this is your own work:__________________
  • 12. MS Project Pack version 3.1 Part 4Hazard Checklist: activities Company: NIMASA Department: OFFSHORE OPERATION Site name: DECK STATION Description of the Work activity Description of the hazard (in relation to the work activity) Number and occupation of people affected (in relation to the work activity) Risk assessment recommended? Ship to Ship (STS) & Product Lifting (PMS, CRUDE, DIESEL) Highly flammable Products (PMS, CRUDE OIL, DISSEL) This operation could lead to an explosion or fire outbreak. Likelihood of hazardous incident could affect all life onboard as well as lose of ship or abandoning of ship by the crew E.g Cargo Vessel Ship 12-15 people Yes No Under Ground Tank Inspection When inspecting the underground tank it is advised not to go in until the meter reflect a low Gas presents usually 0.2% Inhaling of inflammable gases is hazardous to health and often requires medical treatment or result to death Deck crew oil and chemical tanker inspector 1 person Yes No Anchor position a). Anchor :makes sure it pulled up on Deck before ship set sail. This could either cause the ship to drag or cause a big turbulence to the ship. b). this turbulence could cause injury to personnel on board. c). the turbulence could also increase the temperature of the gaseous product in the storage tanks Likelihood that unaware personnel onboard could either fall or get injured 4-6 people Yes No Activities carried out within your work environment Note: For the purpose of this exercise, all three activity hazards must require a risk assessment. Please sign to confirm that this is your own work:__________________ √ √ √
  • 13. MS Project Pack version 3.1 Ship to Ship (STS) & Product Lifting (PMS, CRUDE, DIESEL) Part 5Risk assessment form Company: NIMASA Department: OFFSHORE OPERATION Site name: DECK STATION Work activity Hazard, hazardous event and expected consequence (in relation to the work activity) Likelihood level Consequence level Risk level a. Highly inflammable products, b. Explosion or Fire Out Break c. Major/ Catastrophic 4 5 20 Under Ground Tank Inspection a) Highly flammable b) Inhaling of gaseous content c) Health risk (Collapse) / death 4 4 16 Anchor position a) Cause the Ship to Drag b) Increase the water current c) Turbulence 3 4 12 Date: Time: Review period: Date of next review: Assessor’s name: Position: Signature: Yes No Yes No Yes No X = Occupation: Deck Crew Number: 4-6 people Occupation: oil & chemical tanker inspector Number: 1 Occupation: Deck Crew Number: 4-6 Please sign to confirm that this is your own work:__________________ √ √ √ Note: For the purpose of this exercise, all three activity hazards must require risk controls. Assessment of risk (in relation to the work activity)People affected (in relation to the work activity) Are risk controls required?
  • 14. MS Project Pack version 3.1 Part 6Risk control form Company: NIMASA Department: OFF SHORE OPERATION Site name: DECK STATION Work activity and risk level (from risk assessment form) Existing risk controls (in relation to the work activity) Probable Likelihood Potential Consequence New risk level X a) PPE. b) ensure Host, vabs & temp are ok before operation. c) Fire fighting equipments. a) Prepare crew for emergency (PST) Personal survival at sea Technique. b) Lunch the life rah (safety boats) if explosion occurs 2 4 8 a)Temp. Meter Checker (0.2%) b) Gas Mask c) PPE a). On the Job Training/ briefing b). SSOW . 2 3 6 a)TPS alarm System. b) PPE c) First aid/ medical attention a) SSOW 1 4 4 Frequency: Adequate Date: Review period: Date of next review: Assessor’s name: Position: Signature: Frequency: Adiquate Frequency: Acceptable = Please sign to confirm that this is your own work:__________________ Residual risk (in relation to the work activity)Further risk controls required (in relation to the work activity) Description of monitoring required (in relation to the residual risk) Risk level: 20 Risk level: 16 Risk level: 12