Myths and realities about designing high
availability data centers
Tier III and Tier IV: What do you need to know?
Steven Shapiro, P.E., ATD
Mission Critical Practice Lead
2
Data Center World – Certified Vendor Neutral
Each presenter is required to certify that their
presentation will be vendor-neutral.
As an attendee you have a right to enforce this policy of
having no sales pitch within a session by alerting the
speaker if you feel the session is not being presented in
a vendor neutral fashion. If the issue continues to be a
problem, please alert Data Center World staff after the
session is complete.
3
Agenda
• Tier definitions
• Nines
• Tier III/IV issues – one line diagram
• Factors affecting performance
• Reliability and availability
• Causes of critical failures
• Key takeaways
• Questions
4
Tier Definitions
5
Things that are not tier-dependent
• Site location
• Facility construction
• Quality of equipment
• Facility commissioning
• Age of site
• Operations and maintenance program
• Personnel training
• Level of personnel coverage
Tier Definitions
6
• Align business mission and facility performance expectation
• Benchmark against the industry
• Assist in developing business case for capital expenditures
Tier Requirements
User must define tier requirements for a facility
7
Five 9’s Refers To Availability
• Availability (A) is the long-term average percentage of time that a component or
system is in service and satisfactorily performing its intended function.
• Five nines availability means:
Minutes of Downtime Each Year
Hours of Downtime Every 20 Years
• Availability does not specify how often an outage occurs
“Nines”
8
Tier Requirements
Tier I Tier II Tier III Tier IV
Number of Delivery Paths 1 1
1 Active
1 Passive
2 Active
Redundancy N N+1 N+1 2N Minimum
Compartmentalization No No No Yes
Concurrent Maintainability No No Yes Yes
Fault Tolerance No No No Yes
Availability 99.671 99.749 99.982 99.95
Downtime in Hr/Yr 28.8 22 1.6 0.4
9
• Tier I: $10,000 US/kW of useable UPS Power Output
• Tier II: $11,000 US/kW of useable UPS Power Output
• Tier III: $20,000 US/kW of useable UPS Power Output
• Tier IV: $22,000 US/kW of useable UPS Power Output
• Plus $225 US/SF of computer room
Based on a 15,000 SF white space, +/- 30%
Data Center Costs
From The Uptime Institute
10
One Line Diagram
2N Utility
N+2 Gens
2N Gen Distribution
2N UPS
2N
Distribution
Mechanical
UPS
One Line Diagram
11
2N Utility
Not a tier requirement
12
Generator Count and Distribution
• 2N generators not a tier requirement
• Some sort of 2N distribution is a Tier III and IV requirement
13
• UPS can be configured in
many ways
• N = number of modules
installed meets the load – Tier
I And II
• N+1 = number of modules to
meet the load plus 1 additional
module, Tier III
Multi-Module UPS System Configuration
14
• UPS can be configured in many
ways
• 2N Systems = 2X the number of
systems than required to meet
the load – Tier IV
• 2(N+1) Systems = 2x the
number of N+1 systems installed
than required to meet the load –
Tier IV
Multi-Module UPS System Configuration
15
UPS Systems With External Maintenance Bypass
16
• Mechanical UPS is required to keep
data center HVAC systems
operational until generator plant
supports load
• May run CRAC units, secondary or
primary pumps, etc.
• Sized to match cooling load for data
center and battery time of data center
UPS
Mechanical UPS
17
Certain things can
be overdone.
How Much Redundancy is Enough?
How Much Redundancy Is Enough?
18
The Cost of Reliability
99.0
.9
99.9
99.99
99.999
Reliability
99.9999
Cost $
19
• Location
• Design
• Redundancy level
• Construction
• Quality of equipment
• Thoroughness of commissioning program
• Age
• Operations & maintenance program
• Personnel training
• Level of coverage
Factors Affecting Performance But Not Tier Level
Lurking vulnerabilities
20
• Document Management
• Maintenance Programs (CMMS)
• Commissioning
• Vendor Management
• Change Management
• Standard and Emergency Operating Procedures
• Training
• Staffing
Factors Affecting Performance But Not Tier Level
21
• Harmonics Analysis
• EMF Studies
• Short Circuit Studies
• Coordination Studies
• CFD Modeling
Cold Aisle
Hot Aisle
IT Equipment
Computer Room
Air Conditioning
Units
Factors Affecting Performance But Not Tier Level
22
• Probability of failure/reliability
• Availability
• MTTF
• MTTR
• Susceptibility to natural disasters
• Fault tolerance
• Single points of failure
• Maintainability
• Operational readiness
• Maintenance program
Reliability Considerations
23
Single Utility Feeder, Parallel Redundant UPS
and Generators, Single-Corded IT Rack
24
2N UPS, N+1 Generators, ASTSs and
Dual-Corded IT Rack
25
Two Utility Feeders, 2(N+1) UPS, 2(N+1) Generators,
ASTSs, Dual Corded IT Rack
26
Distributed Redundant UPS, N+2 Generators, Two Utility
Feeders, ASTSs and Dual Corded IT Rack
27
Reliability Considerations
28
• 2(N+1) / system + system with dual utility feeders is the most
reliable topology
• There is no significant reliability improvement in using a 2(N+1)
UPS configuration over 2N
• Distributed redundant configuration is less reliable than 2N
• Improvement if a second utility feeder is provided
• N+2 and/or 2N generator systems are marginally more reliable
than N+1
Reliability Considerations
29
Fail after 24 hours
Reliability Considerations
Study Performed by Idaho National Engineering Laboratory – February 1996 at Nuclear Power Plants
Emergency Diesel Generators
Fail to start
Fail after ½ hour
Fail after 8 hours
30
• A hybrid configuration may be most effective
• STS’s on the secondary side of the PDU transformer yield a 2-to-1
reliability improvement over 480 V STS’s
• Dual cord has higher impact than the use of STS’s
• Ultimate reliability: STS + Dual Cord
• Assess the condition of the mechanical plant in conjunction with the
electrical system
• The facility reliability will be driven by the least reliable component
(typically the electrical infrastructure)
Reliability Considerations
31
• Segregate system in independent blocks
• Eliminate common source components to minimize fault
propagation (i.e., LBS, hot-tie, manual bus ties)
• Move single points of failures as close to the load as possible
• Always maintain two independent sources of power to the critical
load
• Optimize the design of monitoring and controls circuits
• Keep it simple and minimize human intervention
Fundamentals of High Availability Design
32
Causes of Critical Failures
28%
20%
18%
13%
10%
4%
4% 3%
Equipment failure
System design
Human error
Equipment design
Installation error
Commissioning or test deficiency
Maintenance oversight
Natural disaster
33
• Typically a combination of factors
• External event (power failure)
• Equipment failure
• Human factor
• Latent failures
• Root cause not always easy to ascertain
• Most major failures occur during change of state events
• Loss of utilities
• System transfers during maintenance activities
• More maintenance does not necessarily mean higher availability
Causes of Critical Failures
34
• What reliability level do you really need based on your business case?
• Do you want concurrent maintainability?
• Do you want fault tolerance?
• Minimize single points of failure within systems
• Ensure adequacy of operations, maintenance and testing programs
• Review/develop SOPS and EOPS
• Review/develop existing documentation
• Review/develop training practices
Key Takeaways
35
Steven Shapiro, PE, ATD
Mission Critical Practice Lead
(914) 420-3213
sshapiro@morrisonhershfield.com
http://www.linkedin.com/in/stevenshapirope
Twitter: @stevenshapirope
Questions?
References:
Uptime Institute White Paper: Tier Myths and Misconceptions
Uptime Institute White Paper: Data Center Site Infrastructure Tier Standard - Topology

Weitere ähnliche Inhalte

Was ist angesagt?

Data center maintenance
Data center maintenanceData center maintenance
Data center maintenanceanilinvns
 
8 requirements engineering1
8 requirements engineering18 requirements engineering1
8 requirements engineering1Lilia Sfaxi
 
Introduction to Systems Engineering
Introduction to Systems EngineeringIntroduction to Systems Engineering
Introduction to Systems EngineeringBernardo A. Delicado
 
Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...
Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...
Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...Mahindra Satyam
 
Using Models for Incident, Change, Problem and Request Fulfillment Management
Using Models for Incident, Change, Problem and Request Fulfillment ManagementUsing Models for Incident, Change, Problem and Request Fulfillment Management
Using Models for Incident, Change, Problem and Request Fulfillment ManagementITSM Academy, Inc.
 
ITIL Service Operation
ITIL Service OperationITIL Service Operation
ITIL Service OperationMarvin Sirait
 
An introduction to service management (itil)
An introduction to service management (itil)An introduction to service management (itil)
An introduction to service management (itil)nuwulang
 
Comparison between ERP-EAM and CMMS
Comparison between ERP-EAM and CMMSComparison between ERP-EAM and CMMS
Comparison between ERP-EAM and CMMSGhassan Chahine
 
Curso Itil Para Las Empresas
Curso Itil Para Las EmpresasCurso Itil Para Las Empresas
Curso Itil Para Las Empresasguest9796c0
 
Middleware
MiddlewareMiddleware
MiddlewareTensor
 

Was ist angesagt? (18)

Data center maintenance
Data center maintenanceData center maintenance
Data center maintenance
 
MOD Unidad 2: Tipos de modelado
MOD Unidad 2: Tipos de modeladoMOD Unidad 2: Tipos de modelado
MOD Unidad 2: Tipos de modelado
 
SOA Principles : 8. service statelessness
SOA Principles : 8. service statelessnessSOA Principles : 8. service statelessness
SOA Principles : 8. service statelessness
 
8 requirements engineering1
8 requirements engineering18 requirements engineering1
8 requirements engineering1
 
Introduction to Systems Engineering
Introduction to Systems EngineeringIntroduction to Systems Engineering
Introduction to Systems Engineering
 
Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...
Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...
Software FMEA and Software FTA – An Effective Tool for Embedded Software Qual...
 
Using Models for Incident, Change, Problem and Request Fulfillment Management
Using Models for Incident, Change, Problem and Request Fulfillment ManagementUsing Models for Incident, Change, Problem and Request Fulfillment Management
Using Models for Incident, Change, Problem and Request Fulfillment Management
 
ITIL Service Operation
ITIL Service OperationITIL Service Operation
ITIL Service Operation
 
An introduction to service management (itil)
An introduction to service management (itil)An introduction to service management (itil)
An introduction to service management (itil)
 
Data Center Server Rack Strategies
Data Center Server Rack StrategiesData Center Server Rack Strategies
Data Center Server Rack Strategies
 
Input modeling
Input modelingInput modeling
Input modeling
 
Requirements Engineering
Requirements EngineeringRequirements Engineering
Requirements Engineering
 
Encuestas nivel de entrega de servicios
Encuestas   nivel de entrega de serviciosEncuestas   nivel de entrega de servicios
Encuestas nivel de entrega de servicios
 
Comparison between ERP-EAM and CMMS
Comparison between ERP-EAM and CMMSComparison between ERP-EAM and CMMS
Comparison between ERP-EAM and CMMS
 
CMMI
CMMICMMI
CMMI
 
Curso Itil Para Las Empresas
Curso Itil Para Las EmpresasCurso Itil Para Las Empresas
Curso Itil Para Las Empresas
 
Information Governance
Information GovernanceInformation Governance
Information Governance
 
Middleware
MiddlewareMiddleware
Middleware
 

Andere mochten auch

The_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_Emerson
The_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_EmersonThe_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_Emerson
The_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_EmersonJohann Hendry
 
Tia 942 Data Center Standards
Tia 942 Data Center StandardsTia 942 Data Center Standards
Tia 942 Data Center StandardsSri Chalasani
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification Ali Mirfallah
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationMuhammad Asad Rashid
 
What is mission critical commissioning and why is it critical
What is mission critical commissioning and why is it criticalWhat is mission critical commissioning and why is it critical
What is mission critical commissioning and why is it criticalMorrison Hershfield
 
Efficient Data Center Transformer Practices
Efficient Data Center Transformer PracticesEfficient Data Center Transformer Practices
Efficient Data Center Transformer Practicesmiller0204
 
Uptime Institute 2015 Industry Survey
Uptime Institute 2015 Industry SurveyUptime Institute 2015 Industry Survey
Uptime Institute 2015 Industry SurveyUptime Institute
 
Tier Stanadard Operational-Sustainability
Tier Stanadard Operational-SustainabilityTier Stanadard Operational-Sustainability
Tier Stanadard Operational-SustainabilityJohann Hendry
 
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...Cloud Computing Wire
 
Slides: Maintain 24/7 Availability for Your Enterprise Applications Environment
Slides: Maintain 24/7 Availability for Your Enterprise Applications EnvironmentSlides: Maintain 24/7 Availability for Your Enterprise Applications Environment
Slides: Maintain 24/7 Availability for Your Enterprise Applications EnvironmentNetApp
 
POWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERPOWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERvivekprajapatiankur
 

Andere mochten auch (20)

The_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_Emerson
The_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_EmersonThe_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_Emerson
The_Future_of_Data-Centres_-_Prof._Ian_Bitterlin_Emerson
 
Tia 942 Data Center Standards
Tia 942 Data Center StandardsTia 942 Data Center Standards
Tia 942 Data Center Standards
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
 
Riello master-mps-ups-datasheet
Riello master-mps-ups-datasheetRiello master-mps-ups-datasheet
Riello master-mps-ups-datasheet
 
What is mission critical commissioning and why is it critical
What is mission critical commissioning and why is it criticalWhat is mission critical commissioning and why is it critical
What is mission critical commissioning and why is it critical
 
Efficient Data Center Transformer Practices
Efficient Data Center Transformer PracticesEfficient Data Center Transformer Practices
Efficient Data Center Transformer Practices
 
Designing a Modular, Scalable, Redundant, 1U UPS
Designing a Modular, Scalable, Redundant, 1U UPSDesigning a Modular, Scalable, Redundant, 1U UPS
Designing a Modular, Scalable, Redundant, 1U UPS
 
Uptime Institute 2015 Industry Survey
Uptime Institute 2015 Industry SurveyUptime Institute 2015 Industry Survey
Uptime Institute 2015 Industry Survey
 
Data Center Site Selection
Data Center Site SelectionData Center Site Selection
Data Center Site Selection
 
UPS - by Damodaran
UPS - by DamodaranUPS - by Damodaran
UPS - by Damodaran
 
Tier Stanadard Operational-Sustainability
Tier Stanadard Operational-SustainabilityTier Stanadard Operational-Sustainability
Tier Stanadard Operational-Sustainability
 
Data center tier standards
Data center tier standardsData center tier standards
Data center tier standards
 
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
 
Bcp drp
Bcp drpBcp drp
Bcp drp
 
Datacenter overview
Datacenter overviewDatacenter overview
Datacenter overview
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
Basic Ups
Basic UpsBasic Ups
Basic Ups
 
Slides: Maintain 24/7 Availability for Your Enterprise Applications Environment
Slides: Maintain 24/7 Availability for Your Enterprise Applications EnvironmentSlides: Maintain 24/7 Availability for Your Enterprise Applications Environment
Slides: Maintain 24/7 Availability for Your Enterprise Applications Environment
 
POWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERPOWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTER
 

Ähnlich wie Myths and realities about designing high availability data centers

Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationTESCO - The Eastern Specialty Company
 
Dependable Systems -Reliability Prediction (9/16)
Dependable Systems -Reliability Prediction (9/16)Dependable Systems -Reliability Prediction (9/16)
Dependable Systems -Reliability Prediction (9/16)Peter Tröger
 
PME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptxPME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptxNavedKhan659845
 

Ähnlich wie Myths and realities about designing high availability data centers (20)

Advanced Metering Infrastructure (AMI) Overview
Advanced Metering Infrastructure (AMI) OverviewAdvanced Metering Infrastructure (AMI) Overview
Advanced Metering Infrastructure (AMI) Overview
 
AMI Technology Overview
AMI Technology OverviewAMI Technology Overview
AMI Technology Overview
 
AMI Technology Overview
AMI Technology OverviewAMI Technology Overview
AMI Technology Overview
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
ECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the FutureECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the Future
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and Information
 
Metering in a Post AMI World
Metering in a Post AMI WorldMetering in a Post AMI World
Metering in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Dependable Systems -Reliability Prediction (9/16)
Dependable Systems -Reliability Prediction (9/16)Dependable Systems -Reliability Prediction (9/16)
Dependable Systems -Reliability Prediction (9/16)
 
Meter Operations In a Post AMI World
Meter Operations In a Post AMI WorldMeter Operations In a Post AMI World
Meter Operations In a Post AMI World
 
PME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptxPME 2021 Design & Quote.pptx
PME 2021 Design & Quote.pptx
 
Meter Shops of the Future
Meter Shops of the FutureMeter Shops of the Future
Meter Shops of the Future
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 

Kürzlich hochgeladen

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Kürzlich hochgeladen (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Myths and realities about designing high availability data centers

  • 1. 1 Myths and realities about designing high availability data centers Tier III and Tier IV: What do you need to know? Steven Shapiro, P.E., ATD Mission Critical Practice Lead
  • 2. 2 Data Center World – Certified Vendor Neutral Each presenter is required to certify that their presentation will be vendor-neutral. As an attendee you have a right to enforce this policy of having no sales pitch within a session by alerting the speaker if you feel the session is not being presented in a vendor neutral fashion. If the issue continues to be a problem, please alert Data Center World staff after the session is complete.
  • 3. 3 Agenda • Tier definitions • Nines • Tier III/IV issues – one line diagram • Factors affecting performance • Reliability and availability • Causes of critical failures • Key takeaways • Questions
  • 5. 5 Things that are not tier-dependent • Site location • Facility construction • Quality of equipment • Facility commissioning • Age of site • Operations and maintenance program • Personnel training • Level of personnel coverage Tier Definitions
  • 6. 6 • Align business mission and facility performance expectation • Benchmark against the industry • Assist in developing business case for capital expenditures Tier Requirements User must define tier requirements for a facility
  • 7. 7 Five 9’s Refers To Availability • Availability (A) is the long-term average percentage of time that a component or system is in service and satisfactorily performing its intended function. • Five nines availability means: Minutes of Downtime Each Year Hours of Downtime Every 20 Years • Availability does not specify how often an outage occurs “Nines”
  • 8. 8 Tier Requirements Tier I Tier II Tier III Tier IV Number of Delivery Paths 1 1 1 Active 1 Passive 2 Active Redundancy N N+1 N+1 2N Minimum Compartmentalization No No No Yes Concurrent Maintainability No No Yes Yes Fault Tolerance No No No Yes Availability 99.671 99.749 99.982 99.95 Downtime in Hr/Yr 28.8 22 1.6 0.4
  • 9. 9 • Tier I: $10,000 US/kW of useable UPS Power Output • Tier II: $11,000 US/kW of useable UPS Power Output • Tier III: $20,000 US/kW of useable UPS Power Output • Tier IV: $22,000 US/kW of useable UPS Power Output • Plus $225 US/SF of computer room Based on a 15,000 SF white space, +/- 30% Data Center Costs From The Uptime Institute
  • 10. 10 One Line Diagram 2N Utility N+2 Gens 2N Gen Distribution 2N UPS 2N Distribution Mechanical UPS One Line Diagram
  • 11. 11 2N Utility Not a tier requirement
  • 12. 12 Generator Count and Distribution • 2N generators not a tier requirement • Some sort of 2N distribution is a Tier III and IV requirement
  • 13. 13 • UPS can be configured in many ways • N = number of modules installed meets the load – Tier I And II • N+1 = number of modules to meet the load plus 1 additional module, Tier III Multi-Module UPS System Configuration
  • 14. 14 • UPS can be configured in many ways • 2N Systems = 2X the number of systems than required to meet the load – Tier IV • 2(N+1) Systems = 2x the number of N+1 systems installed than required to meet the load – Tier IV Multi-Module UPS System Configuration
  • 15. 15 UPS Systems With External Maintenance Bypass
  • 16. 16 • Mechanical UPS is required to keep data center HVAC systems operational until generator plant supports load • May run CRAC units, secondary or primary pumps, etc. • Sized to match cooling load for data center and battery time of data center UPS Mechanical UPS
  • 17. 17 Certain things can be overdone. How Much Redundancy is Enough? How Much Redundancy Is Enough?
  • 18. 18 The Cost of Reliability 99.0 .9 99.9 99.99 99.999 Reliability 99.9999 Cost $
  • 19. 19 • Location • Design • Redundancy level • Construction • Quality of equipment • Thoroughness of commissioning program • Age • Operations & maintenance program • Personnel training • Level of coverage Factors Affecting Performance But Not Tier Level Lurking vulnerabilities
  • 20. 20 • Document Management • Maintenance Programs (CMMS) • Commissioning • Vendor Management • Change Management • Standard and Emergency Operating Procedures • Training • Staffing Factors Affecting Performance But Not Tier Level
  • 21. 21 • Harmonics Analysis • EMF Studies • Short Circuit Studies • Coordination Studies • CFD Modeling Cold Aisle Hot Aisle IT Equipment Computer Room Air Conditioning Units Factors Affecting Performance But Not Tier Level
  • 22. 22 • Probability of failure/reliability • Availability • MTTF • MTTR • Susceptibility to natural disasters • Fault tolerance • Single points of failure • Maintainability • Operational readiness • Maintenance program Reliability Considerations
  • 23. 23 Single Utility Feeder, Parallel Redundant UPS and Generators, Single-Corded IT Rack
  • 24. 24 2N UPS, N+1 Generators, ASTSs and Dual-Corded IT Rack
  • 25. 25 Two Utility Feeders, 2(N+1) UPS, 2(N+1) Generators, ASTSs, Dual Corded IT Rack
  • 26. 26 Distributed Redundant UPS, N+2 Generators, Two Utility Feeders, ASTSs and Dual Corded IT Rack
  • 28. 28 • 2(N+1) / system + system with dual utility feeders is the most reliable topology • There is no significant reliability improvement in using a 2(N+1) UPS configuration over 2N • Distributed redundant configuration is less reliable than 2N • Improvement if a second utility feeder is provided • N+2 and/or 2N generator systems are marginally more reliable than N+1 Reliability Considerations
  • 29. 29 Fail after 24 hours Reliability Considerations Study Performed by Idaho National Engineering Laboratory – February 1996 at Nuclear Power Plants Emergency Diesel Generators Fail to start Fail after ½ hour Fail after 8 hours
  • 30. 30 • A hybrid configuration may be most effective • STS’s on the secondary side of the PDU transformer yield a 2-to-1 reliability improvement over 480 V STS’s • Dual cord has higher impact than the use of STS’s • Ultimate reliability: STS + Dual Cord • Assess the condition of the mechanical plant in conjunction with the electrical system • The facility reliability will be driven by the least reliable component (typically the electrical infrastructure) Reliability Considerations
  • 31. 31 • Segregate system in independent blocks • Eliminate common source components to minimize fault propagation (i.e., LBS, hot-tie, manual bus ties) • Move single points of failures as close to the load as possible • Always maintain two independent sources of power to the critical load • Optimize the design of monitoring and controls circuits • Keep it simple and minimize human intervention Fundamentals of High Availability Design
  • 32. 32 Causes of Critical Failures 28% 20% 18% 13% 10% 4% 4% 3% Equipment failure System design Human error Equipment design Installation error Commissioning or test deficiency Maintenance oversight Natural disaster
  • 33. 33 • Typically a combination of factors • External event (power failure) • Equipment failure • Human factor • Latent failures • Root cause not always easy to ascertain • Most major failures occur during change of state events • Loss of utilities • System transfers during maintenance activities • More maintenance does not necessarily mean higher availability Causes of Critical Failures
  • 34. 34 • What reliability level do you really need based on your business case? • Do you want concurrent maintainability? • Do you want fault tolerance? • Minimize single points of failure within systems • Ensure adequacy of operations, maintenance and testing programs • Review/develop SOPS and EOPS • Review/develop existing documentation • Review/develop training practices Key Takeaways
  • 35. 35 Steven Shapiro, PE, ATD Mission Critical Practice Lead (914) 420-3213 sshapiro@morrisonhershfield.com http://www.linkedin.com/in/stevenshapirope Twitter: @stevenshapirope Questions? References: Uptime Institute White Paper: Tier Myths and Misconceptions Uptime Institute White Paper: Data Center Site Infrastructure Tier Standard - Topology