PDAC
March 6 - 9, 2016
Copper and Gold
at Our Core
This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian
securities laws.
Forward-looking statements include, but are not limited to, statements with respect to the future prices of copper, gold, molybdenum and silver; the estimation of mineral reserves and resources; the realization of mineral
reserve and resource estimates; anticipated future production, capital and operating costs, cash flows and mine life; completion of a Pre-Feasibility study on the Ann Mason Project; the potential impact of future
exploration results on Ann Mason mine design and economics; the potential development of Ann Mason; potential types of mining operations; construction and continued development of the Oyu Tolgoi underground
mine; the anticipated value of Entrée’s interest in the Hugo North Extension deposit; potential size of a mineralized zone; potential expansion of mineralization; potential discovery of new mineralized zones; potential
metallurgical recoveries and grades; plans for future exploration and/or development programs and budgets; permitting time lines; anticipated business activities; corporate strategies; requirements for additional capital;
uses of funds; proposed acquisitions and dispositions of assets; and future financial performance. While the Company has based these forward-looking statements on its expectations about future events as at the date
that such statements were prepared, the statements are not a guarantee of Entrée’s future performance and are based on numerous assumptions regarding present and future business strategies, local and global
economic conditions, legal proceedings and negotiations and the environment in which the Company will operate in the future, including the status of the Company’s relationship and interaction with the Government of
Mongolia, Oyu Tolgoi LLC, Rio Tinto and Turquoise Hill Resources. With respect to the construction and continued development of the Oyu Tolgoi underground mine, important risks, uncertainties and factors which could
cause actual results to differ materially from future results expressed or implied by such forward-looking statements and information include, amongst others, the approval of the 2015 Oyu Tolgoi Feasibility Study by Oyu
Tolgoi LLC and its shareholders; the timing and cost of the construction and expansion of mining and processing facilities; the timing and availability of a long term power source for the Oyu Tolgoi underground mine; the
timing to satisfy all conditions precedent to the first drawdown of project financing; the impact of the delay in the funding and development of the Oyu Tolgoi underground mine; delays, and the costs which would result
from delays, in the development of the underground mine; and production estimates and the anticipated yearly production of copper, gold and silver at the Oyu Tolgoi underground mine. Other uncertainties and factors
which could cause actual results to differ materially from future results expressed or implied by forward-looking statements and information include, amongst others, whether the size, grade and continuity of deposits and
resource and reserve estimates have been interpreted correctly from exploration results; whether the results of preliminary test work are indicative of what the results of future test work will be; fluctuations in commodity
prices and demand; changing foreign exchange rates; actions by Rio Tinto, Turquoise Hill Resources and/or Oyu Tolgoi LLC (“OT LLC”) and by government authorities including the Government of Mongolia; the
availability of funding on reasonable terms; the impact of changes in interpretation to or changes in enforcement of, laws, regulations and government practices, including laws, regulations and government practices with
respect to mining, foreign investment, royalties and taxation; the terms and timing of obtaining necessary environmental and other government approvals, consents and permits; the availability and cost of necessary
items such as power, water, skilled labour, transportation and appropriate smelting and refining arrangements; and misjudgements in the course of preparing forward-looking statements. In addition, there are also known
and unknown risk factors which may cause the actual results, performances or achievements of Entrée Gold to be materially different from any future results, performance or achievements expressed or implied by the
forward-looking statements and information. Such factors include, among others, risks related to international operations, including legal and political risk in Mongolia; risks associated with changes in the attitudes of
governments to foreign investment; risks associated with the conduct of joint ventures; discrepancies between actual and anticipated production, mineral reserves and resources and metallurgical recoveries; global
financial conditions; changes in project parameters as plans continue to be refined; inability to upgrade Inferred mineral resources to Indicated or Measured mineral resources; inability to convert mineral resources to
mineral reserves; conclusions of economic evaluations; future prices of copper, gold, silver and molybdenum; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks
of the mining industry; delays in obtaining government approvals, permits or licences or financing or in the completion of development or construction activities; environmental risks; title disputes; limitations on insurance
coverage; as well as those factors discussed in the section entitled “Risk” in Entrée Gold’s most recently filed Management’s Discussion & Analysis and in the section entitled “Risk Factors” in Entrée Gold’s Annual
Information Form dated March 29, 2015, both available at www.sedar.com. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially
from those anticipated in such statements. Except as required under applicable securities legislation, Entrée Gold undertakes no obligation to publicly update or revise forward-looking statements.
Entrée Gold's exploration activities are under the supervision of Robert Cinits, P.Geo., Vice President, Corporate Development of Entrée Gold. Mr. Cinits is a “qualified person” as defined in National Instrument 43-101-
Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Cinits has approved the technical information in this presentation.
All minerals reserves and mineral resources have been calculated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and NI 43-101. Cautionary Note to United States
Investors: United States investors are advised that while the terms “Measured mineral resources”, “Indicated mineral resources” “Inferred mineral resources” and “Probable mineral reserves” are recognized and required
by Canadian regulations, the United States Securities and Exchange Commission (“SEC”) does not recognize them. United States investors are cautioned not to assume that any part or all of the mineral deposits in
these categories will ever be upgraded to a higher category, or converted into mineral reserves. Inferred mineral resources have a great amount of uncertainty as to their existence, and as to their economic and legal
feasibility. Under Canadian rules, estimates of Inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of an
Inferred mineral resource exists, or is economically or legally minable. Disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report
mineralization that does not constitute reserves as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this presentation containing descriptions of the Company’s
mineral properties may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and
regulations thereunder.
The information in this presentation is for informational purposes only. Readers should not rely on the information for any purpose other than to gain general knowledge of Entrée Gold. This information is not intended to
be, and should not be construed as, part of an offering or solicitation of securities. Unless otherwise noted, all dollar amounts in this presentation are expressed in United States dollars.
For additional information regarding the Entrée-OT LLC joint venture property, see the technical report titled “Technical Report 2013 on the Lookout Hill Property” dated March 28, 2013 (“LHTR13”) prepared by AMC
Consultants Pty Ltd, a copy of which is available on SEDAR at www.sedar.com. For additional information regarding the Ann Mason Project, see the technical report titled “Updated Preliminary Economic Assessment on
the Ann Mason Project, Nevada, U.S.A.”, with an effective date of September 9, 2015 prepared by AGP Mining Consultants Inc. and Amec Foster Wheeler Americas Limited, a copy of which is available on SEDAR at
www.sedar.com.
Cautionary Statement
2
3
Why Invest in Entrée?
Positioned
for
Future
Success
Financial
Strength
Quality
Assets
Major
Investors
Diverse
Team
Financial Strength
4
ETGEGI EKA
C$0.66/$0.18
(TSX)
Treasury
$25.5 million
(as of Sept. 30, 2015)
Market
Capitalization
~C$58 million
(as of March 2016)
Capital
Structure
153 million
Issued and Outstanding
165 million
Fully Diluted
52 Week
High/Low
Unless otherwise noted, all dollar amounts in this presentation are expressed in United States dollars.
5
* Rio Tinto holds beneficial ownership over shares held by Turquoise Hill.
52% held
by top eight
shareholders
14.0%
10.1%
8.4%
7.6%
5.0%
3.9%
2.1%
0.9%
Major Investors
Fully Diluted
Leadership Team
6
Board of Directors
Lord (Michael) Howard of Lympne
Chairman
Mark Bailey
Director
Alan Edwards
Director
Gorden Glenn
Director
Management
Stephen Scott
Interim CEO
Bruce Colwill
CFO
Rob Cinits
VP Corporate Development
Susan McLeod
VP Legal Affairs
Monica Hamm
Manager Investor Relations
Anna Stylianides
Director
James Harris
Director
7
Ann Mason is a large copper-
molybdenum deposit with positive
economics located in a top
mining jurisdiction.
Quality Assets
Entrée Gold’s Competitive Advantage
Oyu Tolgoi is on track to be one of the
world’s largest copper mines;
Entrée has a 20% carried interest in
two of its deposits.
Mongolia: Oyu Tolgoi
One of the largest copper mines being developed
8
Size
Entrée has a 20% carried interest in two large
Cu-Au deposits at Oyu Tolgoi:
Hugo North Extension and Heruga
Partnership
Joint Venture with Oyu Tolgoi LLC (OTLLC)
Oyu Tolgoi project managed by global mining
leader Rio Tinto
Grade
High-grade underground mine planned at
Hugo North Extension Lift 1
Underground Financed
Development of Hugo North Extension Lift 1
financed
Growth
Future development options at Hugo North
Extension Lift 2 and Heruga
Longevity
Potential mine life of over 50 years
Mongolia: Oyu Tolgoi
Entrée-OTLLC JV Structure
9
20%
80/70%
34%
66%
Entrée – OTLLC
Joint Venture
Hugo North
Extension & Heruga
Mongolian Government
Turquoise Hill
Oyu Tolgoi LLC
Entrée Gold
80%
 Entrée has 20% carried interest
 Entrée is debt financed at
prime +2% repayable from 90%
of available cash flow
~51% held by Rio Tinto
10
Mongolia: Oyu Tolgoi
Entrée/JV licences surround Oyu Tolgoi licence
The deposits of the Oyu Tolgoi project stretch over ~12 km.
The most southerly, Heruga, and the most northerly, Hugo North Extension,
are on Entrée-OTLLC JV property.
11
A A’
Property
boundary
Property
boundary
Mongolia: Oyu Tolgoi
Idealized Longitudinal Section (Looking West)
Modified from Turquoise Hill Resources Ltd.’s October 28, 2014 technical report, “Oyu Tolgoi 2014 Technical Report” (“Turquoise Hill 2014 OTTR”)
Next phase of development does not include mine plan for Lift 2 extraction.
*Source: Turquoise Hill Investor Presentation, March 2016
 Next phase of development includes Hugo North Extension Lift 1,
on Entrée-OTLLC JV property
 Re-start of underground development targeted for mid-2016*
Mongolia: Oyu Tolgoi
Hugo North Extension Development
12
*LHTR13 Reserve Case
Modified from Turquoise Hill 2014 OTTR
Entrée has a 20% interest in the mineralization of the Hugo North Extension deposit
Entrée has calculated that the after tax NPV8% that would be attributable to Entrée under Turquoise Hill 2014 OTTR is ~$102 million
650 m
Property
boundary
Propertyboundary
*The mineral reserves are not additive to the mineral resources.
** Copper equivalent estimated using $1.35/lb Cu, $650/oz Au, $10/lb Mo.
*** 0.37% CuEq cutoff.
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Hugo North Extension
Cu-Au
Heruga
Cu-Au-Mo
Probable
Mineral
Reserves*
31 Mt @ 1.73% Cu, 0.62 g/t Au
1 Blbs Cu / 0.52 Moz Au
---
Indicated
Resources**
132 Mt @ 2.00% CuEq***
4.8 Blbs Cu / 2.3 Moz Au
CuEq @ 1.65% Cu, 0.55 g/t Au
---
Inferred
Resources**
134 Mt @ 1.09% CuEq***
2.8 Blbs Cu / 1.1 Moz Au
CuEq @ 0.93% Cu, 0.25 g/t Au
1,824 Mt @ 0.67% CuEq***
15.2 Blbs Cu / 21.2 Moz Au
CuEq @ 0.38% Cu, 0.36 g/t Au, 0.011% Mo
Mongolia: Oyu Tolgoi
Entrée-OTLLC JV Reserves and Resources
13
See Company news release dated November 4, 2014 for the resource estimate for the Entrée-OTLLC joint venture property presented in Turquoise Hill 2014
OTTR. While the Company agrees with the conclusions in Turquoise Hill 2014 OTTR, it does not consider the changes to the resource estimate to be material.
Entrée has a 20% interest in the above mineral reserves and resources.
Mongolia: Oyu Tolgoi
Multiple Development Options
14Source: Turquoise Hill 2014 OTTR and Turquoise Hill Investor Presentation, March 2016
 Oyu Tolgoi Underground Mine Development and Financing Plan
provides pathway for re-starting development
 Long life, high grade with significant expansion potential
15
 $4.4 billion financing signed December 2015
Project
Finance
 Updated capital estimate expected Q1 2016
 Incorporates productivity improvements
Feasibility
Study
 “Notice to Proceed” decision expected early Q2 2016
TRQ, Rio Tinto
and OTLLC
Board Approvals
 Target mid-2016
 Early works underway
 Leverage existing infrastructure
 Large resource base provides optionality
Underground
Re-Start
Mongolia: Oyu Tolgoi
Underground next steps as reported by Turquoise Hill
Source: Turquoise Investor Presentation, March 2016

Nevada: Ann Mason
Large copper deposit in one of the best jurisdictions
16
Size
100% interest in a large Cu-Mo deposit amenable to
open pit mining and sulphide flotation mill (Ann
Mason deposit)
Jurisdiction
Nevada: one of the best jurisdictions for mining
Strong local support in the Yerington District
Longevity
Potential mine life of over 21 years
Updated PEA completed in 2015
Growth
Convert remaining Inferred resources to Measured
or Indicated with small drill program
Additional studies to move to prefeasibility
Potential to expand oxide and sulphide resources
at the Blue Hill deposit
Partnership
Positioned to attract strategic investment
Infrastructure
Rail, road and power
Nevada: Ann Mason
The Yerington Copper District
1717
 Historic mining region
 Top mining jurisdiction
 Strong community support
 Excellent infrastructure
 Consolidation potential
18
ANN MASON DEPOSIT MINERAL RESOURCES
0.20% Cu Cut-off grade, effective September 9, 2015
Classification
Tonnage
(Mt)
Grade Contained Metal
Cu
(%)
Mo
(%)
Au
(g/t)
Ag
(g/t)
Cu
(Mlb)
Mo
(Mlb)
Au
(Moz)
Ag
(Moz)
Measured 412 0.33 0.006 0.03 0.64 3,037.6 58.1 0.37 8.46
Indicated 988 0.31 0.006 0.03 0.66 6,853.3 128.5 0.97 21.00
Measured
and Indicated
1,400 0.32 0.006 0.03 0.65 9,890.9 186.6 1.33 29.46
Inferred 623 0.29 0.007 0.03 0.66 3,987.2 96.2 0.58 13.16
 Mineral resources are reported within a constraining pit shell developed using Whittle™ software.
 Assumptions include 100% mining recovery.
 An external dilution factor was not considered during this resource estimation.
 Internal dilution within a 20 metre x 20 metre x 15 metre SMU (selective mining unit) was considered.
 The 0.4% net smelter returns royalty held by Sandstorm Gold Ltd. was not considered during the preparation of the conceptual pit.
 Mineral resources that are not mineral reserves do not have demonstrated economic viability.
18
Nevada: Ann Mason
Resource Estimate
Nevada: Ann Mason
2015 PEA Highlights – Attractive Project Economics
19
LOM Production* 877 million tonnes
LOM – Strip ratio 2:1
Development capital costs (pre-production + Year 1) $1.35 billion
Average cash costs (net of by-product sales)** $1.49/lb copper
All-in sustaining costs (net of by-product sales)** $1.57/lb copper
Average net annual undiscounted cash flow** $298 million
LOM – Average copper recovery 92%
Copper concentrate grade 30%
LOM – Copper production 5.1 billion lbs
Note: The PEA is preliminary in nature, it includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable
them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineralized resources that are not mineral reserves do not have demonstrated economic viability.
*835 Mt at 0.30% copper, 0.005% molybdenum, 0.03 g/t gold and 0.59 g/t silver are Measured and Indicated material, and 42 Mt at 0.27% copper, 0.005% molybdenum, 0.03 g/t gold and 0.58 g/t
silver are Inferred material.
**Pre-tax. “Cash costs” and “all-in sustaining costs” are non-U.S. GAAP Performance Measurements. These performance measurements are included because these statistics are widely accepted
as the standard of reporting cash costs of production in North America. These performance measurements do not have a meaning within U.S. GAAP and therefore, amounts presented may not be
comparable to similar data presented by other mining companies. These performance measurements should not be considered in isolation as a substitute for measures of performance in accordance
with U.S. GAAP.
20
Nevada: Ann Mason
2015 PEA Financial Outputs
ANN MASON 2015 PEA
SENSITIVITY OF THE KEY FINANCIAL OUTPUTS (Post-Tax)
Economic
Scenario
Cu*
($/lb)
NPV5%
($ Million)
NPV7.5%
($ Million)
IRR
(%)
Pay- back
(Years)
Net Average Annual
Free Cash Flow
($ Million)
Low Case 2.75 815 339 10.3 8.7 189
Base Case 3.00 1,379 770 13.7 6.9 238
High Case 3.25 1,928 1,189 16.8 5.7 287
Note: The Base Case metal prices are based on a review of current analyst consensus reports and recent SEDAR filings for similar reports. The 2015 PEA is preliminary in nature and
includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral
reserves, and there is no certainty that the 2015 PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
*Other metal prices:
Low Case: Mo $9 ($/lb), Ag $15 ($/oz), Au $1,100 ($/oz)
Base Case: Mo $11 ($/lb), Ag $20 ($/oz), Au $1,200 ($/oz)
High Case: Mo $13 ($/lb), Ag $25 ($/oz), Au $1,300 ($/oz)
Nevada: Ann Mason
3-D View of Deposit
500 m
N
>0.15% Cu grade shell
21
Deposit Dimensions
2.8 km NW x 1.3 km NE x ~1.2 km vertical
$0.00
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
$7.00
$8.00
$9.00
$10.00
CapitalIntensity
Capex/CuEqAnnualProduction(US$/lb)
Nevada: Ann Mason
Capital Intensity Comparison
22
23
Nevada: Ann Mason
Project Potential
*Reported in the Ann Mason 2015 PEA. The mineral resource estimate has an effective date of July 31, 2012 and was prepared by M. Waldegger, P. Geo. under the
supervision of P. Desautels, P.Geo. of AGP. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Entrée has a 100% interest
in the claims comprising the Blue Hill deposit, subject to a 0.4% net smelter returns royalty in favour of Sandstorm Gold.
 PFS level metallurgy complete
 Minimal drilling to update Inferred resource within Phase 5 pit
 Additional studies to move to PFS: geotechnical drilling,
environmental and engineering
Ann Mason
 Inferred resources of 72 Mt @ 0.17% Cu (leachable) plus 50 Mt @
0.23% Cu (sulphide)*
 Potential to expand oxide and sulphide resources
 Potential heap-leach “starter” operation
Blue Hill
 Large portion of the property remains unexplored
 Several high priority exploration targets on the property
Exploration
Targets
 Well positioned to attract investment and partnersPartnership
Other Copper Exploration Projects and Assets
New Mexico and Peru
Lordsburg Property, New Mexico (Cu-Au; 100% owned)
 Cu-Au porphyry system part of a cluster of Laramide porphyries; 45 km SW
of Tyrone and 100 km SE of Morenci
 Over 1.2 km x 600 m of surface alteration and anomalous Cu geochem
 Drill program in 2008 and 2009: 6,092 m in 12 holes
o EG-L-09-012 intersected 0.25% Cu and 0.15 g/t Au over 94 m from 118 m depth
Lukkacha, Peru (Cu-Mo; option agreement to acquire up to 100%)
 Grass roots target within Paleocene-Eocene porphyry belt of Southern Peru;
57 km SE of Toquepala
 Heavily leached stockwork exposed on surface; Cu-Mo geochem anomaly
covering ~1 km x 600 m
 Possibility of enriched secondary Cu sulphides in addition to primary
mineralization
24
Cañariaco Project, Peru (Cu)
 Held 100% by Candente Copper subject to 0.5% NSR to Entrée; large Cu
porphyry at PFS level
25
Unlocking Shareholder Value
Oyu Tolgoi Underground Mine Plan agreement signed (2015)
Hugo North Extension Lift 1 financed (2015)
Final underground development decision expected Q2 2016
Copper fundamentals strong in
mid-long term
Ann Mason updated PEA (2015); positioned to
attract strategic investment & partners
Lukkacha and Lordsburg future growth
Strong balance sheet provides financial
flexibility and security
Sandstorm agreement amended (2016)
For more information, please contact:
Monica Hamm – Manager Investor Relations
mhamm@entreegold.com
604-687-4777
Scan the QR Code above
or visit www.entreegold.com

Weitere ähnliche Inhalte

Was ist angesagt?

Entree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 PresentationEntree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 Presentation
Monica Hamm
 

Was ist angesagt? (20)

Exeter presentation june2016_web
Exeter presentation june2016_webExeter presentation june2016_web
Exeter presentation june2016_web
 
Exeter Presentation September 2016 Web
Exeter Presentation September 2016 WebExeter Presentation September 2016 Web
Exeter Presentation September 2016 Web
 
Exeter Presentation February 2017 Website
Exeter Presentation February 2017 WebsiteExeter Presentation February 2017 Website
Exeter Presentation February 2017 Website
 
Exeter presentation june2016_web2
Exeter presentation june2016_web2Exeter presentation june2016_web2
Exeter presentation june2016_web2
 
Exeter May PPT Presentation
Exeter May PPT PresentationExeter May PPT Presentation
Exeter May PPT Presentation
 
Exeter Presentation November_2016_Web
Exeter Presentation November_2016_WebExeter Presentation November_2016_Web
Exeter Presentation November_2016_Web
 
Exeter Presentation_January 2017_Website3
Exeter Presentation_January 2017_Website3Exeter Presentation_January 2017_Website3
Exeter Presentation_January 2017_Website3
 
Exeter Presentation October 2016 web
Exeter Presentation October 2016 webExeter Presentation October 2016 web
Exeter Presentation October 2016 web
 
Exeter Presentation – January 2017
Exeter Presentation – January 2017Exeter Presentation – January 2017
Exeter Presentation – January 2017
 
Exeter Presentation July 2016 - Web
Exeter Presentation July 2016 - WebExeter Presentation July 2016 - Web
Exeter Presentation July 2016 - Web
 
Exeter Presentation March 2017 for Website
Exeter Presentation March 2017 for WebsiteExeter Presentation March 2017 for Website
Exeter Presentation March 2017 for Website
 
Exeter Presentation February 2016
Exeter Presentation February 2016Exeter Presentation February 2016
Exeter Presentation February 2016
 
Exeter Presentation March 2017_for Website2
Exeter Presentation March 2017_for Website2Exeter Presentation March 2017_for Website2
Exeter Presentation March 2017_for Website2
 
Exeter Presentation December_2016_Web
Exeter Presentation December_2016_WebExeter Presentation December_2016_Web
Exeter Presentation December_2016_Web
 
July2016 presentation final
July2016 presentation finalJuly2016 presentation final
July2016 presentation final
 
10 may2016 presentation
10 may2016 presentation10 may2016 presentation
10 may2016 presentation
 
Osisko Gold Royalties - Q1 2018 Results
Osisko Gold Royalties - Q1 2018 ResultsOsisko Gold Royalties - Q1 2018 Results
Osisko Gold Royalties - Q1 2018 Results
 
2015 November Corporate Presentation
2015 November Corporate Presentation2015 November Corporate Presentation
2015 November Corporate Presentation
 
Entree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 PresentationEntree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 Presentation
 
Entree Gold Presentation
Entree Gold Presentation Entree Gold Presentation
Entree Gold Presentation
 

Andere mochten auch

Rajko Pirnat - Aleksandar Ranković
Rajko Pirnat - Aleksandar RankovićRajko Pirnat - Aleksandar Ranković
Rajko Pirnat - Aleksandar Ranković
Lom Buchela
 
מצגת חברה - AMS
מצגת חברה - AMS מצגת חברה - AMS
מצגת חברה - AMS
????? ????
 

Andere mochten auch (16)

DLA - Final Leaflet
DLA - Final LeafletDLA - Final Leaflet
DLA - Final Leaflet
 
UNITECH THE VILLAS
UNITECH THE VILLASUNITECH THE VILLAS
UNITECH THE VILLAS
 
Re-Imaginning Somali Studies: Colonial Past and Post Colonial Future
Re-Imaginning Somali Studies: Colonial Past and Post Colonial FutureRe-Imaginning Somali Studies: Colonial Past and Post Colonial Future
Re-Imaginning Somali Studies: Colonial Past and Post Colonial Future
 
Upcoming Conferences - theired.org | Thailand
Upcoming Conferences - theired.org | ThailandUpcoming Conferences - theired.org | Thailand
Upcoming Conferences - theired.org | Thailand
 
Club nuevo
Club nuevoClub nuevo
Club nuevo
 
Rajko Pirnat - Aleksandar Ranković
Rajko Pirnat - Aleksandar RankovićRajko Pirnat - Aleksandar Ranković
Rajko Pirnat - Aleksandar Ranković
 
My idol
My idolMy idol
My idol
 
Talkativeonlines basic twitter strategy
Talkativeonlines basic twitter strategyTalkativeonlines basic twitter strategy
Talkativeonlines basic twitter strategy
 
Fondo
FondoFondo
Fondo
 
CCSPMY - CAMWL Flyer July 2017
CCSPMY - CAMWL Flyer July 2017CCSPMY - CAMWL Flyer July 2017
CCSPMY - CAMWL Flyer July 2017
 
Disparate Data, Technology Fiefdoms and the Rise of the Geo Boffin!
Disparate Data, Technology Fiefdoms and the Rise of the Geo Boffin!Disparate Data, Technology Fiefdoms and the Rise of the Geo Boffin!
Disparate Data, Technology Fiefdoms and the Rise of the Geo Boffin!
 
Advanced Writing - Session Five
Advanced Writing - Session FiveAdvanced Writing - Session Five
Advanced Writing - Session Five
 
Intertextualidade - interdiscurso e intertexto
Intertextualidade  -  interdiscurso e intertextoIntertextualidade  -  interdiscurso e intertexto
Intertextualidade - interdiscurso e intertexto
 
Towards Gene Therapy For Duchenne Muscular Dystrophy Heart Disease
Towards Gene Therapy For Duchenne Muscular Dystrophy Heart DiseaseTowards Gene Therapy For Duchenne Muscular Dystrophy Heart Disease
Towards Gene Therapy For Duchenne Muscular Dystrophy Heart Disease
 
Vijay banga
Vijay banga Vijay banga
Vijay banga
 
מצגת חברה - AMS
מצגת חברה - AMS מצגת חברה - AMS
מצגת חברה - AMS
 

Ähnlich wie PDAC March 2016 Presentation

2015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa802015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa80
Adam Martin
 

Ähnlich wie PDAC March 2016 Presentation (20)

April2016 presentation web
April2016 presentation webApril2016 presentation web
April2016 presentation web
 
Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016
 
2015 09 14_entree_gold_presentation_september_final
2015 09 14_entree_gold_presentation_september_final2015 09 14_entree_gold_presentation_september_final
2015 09 14_entree_gold_presentation_september_final
 
Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017
 
Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017
 
Entree Gold Inc. February 2017 Presentation
Entree Gold Inc. February 2017 PresentationEntree Gold Inc. February 2017 Presentation
Entree Gold Inc. February 2017 Presentation
 
2015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa802015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa80
 
Entree Gold Inc.
Entree Gold Inc.Entree Gold Inc.
Entree Gold Inc.
 
Entree Gold: Restructuring for Success March 2017
Entree Gold:  Restructuring for Success March 2017Entree Gold:  Restructuring for Success March 2017
Entree Gold: Restructuring for Success March 2017
 
Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017
 
Entree Resources Corporate Presentation - Sept 2017
Entree Resources Corporate Presentation - Sept 2017Entree Resources Corporate Presentation - Sept 2017
Entree Resources Corporate Presentation - Sept 2017
 
Entree Resources Corporate Presentation - Oct 2017
Entree Resources Corporate Presentation - Oct 2017Entree Resources Corporate Presentation - Oct 2017
Entree Resources Corporate Presentation - Oct 2017
 
Entrée Gold, Inc. - Corporate Presentation
Entrée Gold, Inc. - Corporate PresentationEntrée Gold, Inc. - Corporate Presentation
Entrée Gold, Inc. - Corporate Presentation
 
Entree gold presentation14
Entree gold presentation14Entree gold presentation14
Entree gold presentation14
 
Corporate Presentation (June 2017)
Corporate Presentation (June 2017)Corporate Presentation (June 2017)
Corporate Presentation (June 2017)
 
Entree Resources April 2019 Corporate Presentation
Entree Resources   April 2019 Corporate PresentationEntree Resources   April 2019 Corporate Presentation
Entree Resources April 2019 Corporate Presentation
 
Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019
 
Entree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationEntree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 Presenatation
 
Entree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationEntree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 Presentation
 
Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018
 

Kürzlich hochgeladen

Digital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxDigital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptx
MohamedFarag457087
 
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
PirithiRaju
 
Bacterial Identification and Classifications
Bacterial Identification and ClassificationsBacterial Identification and Classifications
Bacterial Identification and Classifications
Areesha Ahmad
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Kürzlich hochgeladen (20)

High Profile 🔝 8250077686 📞 Call Girls Service in GTB Nagar🍑
High Profile 🔝 8250077686 📞 Call Girls Service in GTB Nagar🍑High Profile 🔝 8250077686 📞 Call Girls Service in GTB Nagar🍑
High Profile 🔝 8250077686 📞 Call Girls Service in GTB Nagar🍑
 
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
 
Dubai Call Girls Beauty Face Teen O525547819 Call Girls Dubai Young
Dubai Call Girls Beauty Face Teen O525547819 Call Girls Dubai YoungDubai Call Girls Beauty Face Teen O525547819 Call Girls Dubai Young
Dubai Call Girls Beauty Face Teen O525547819 Call Girls Dubai Young
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdf
 
Digital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxDigital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptx
 
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
 
Clean In Place(CIP).pptx .
Clean In Place(CIP).pptx                 .Clean In Place(CIP).pptx                 .
Clean In Place(CIP).pptx .
 
Kochi ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Kochi ESCORT SERVICE❤CALL GIRL
Kochi ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Kochi ESCORT SERVICE❤CALL GIRLKochi ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Kochi ESCORT SERVICE❤CALL GIRL
Kochi ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Kochi ESCORT SERVICE❤CALL GIRL
 
GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)
 
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
 
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
 
FAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
FAIRSpectra - Enabling the FAIRification of Spectroscopy and SpectrometryFAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
FAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
 
Factory Acceptance Test( FAT).pptx .
Factory Acceptance Test( FAT).pptx       .Factory Acceptance Test( FAT).pptx       .
Factory Acceptance Test( FAT).pptx .
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
Bacterial Identification and Classifications
Bacterial Identification and ClassificationsBacterial Identification and Classifications
Bacterial Identification and Classifications
 
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 60009654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
 
GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
 
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxPSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
 

PDAC March 2016 Presentation

  • 1. TSX: ETG | NYSE MKT: EGI | FRANKFURT: EKA PDAC March 6 - 9, 2016 Copper and Gold at Our Core
  • 2. This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements include, but are not limited to, statements with respect to the future prices of copper, gold, molybdenum and silver; the estimation of mineral reserves and resources; the realization of mineral reserve and resource estimates; anticipated future production, capital and operating costs, cash flows and mine life; completion of a Pre-Feasibility study on the Ann Mason Project; the potential impact of future exploration results on Ann Mason mine design and economics; the potential development of Ann Mason; potential types of mining operations; construction and continued development of the Oyu Tolgoi underground mine; the anticipated value of Entrée’s interest in the Hugo North Extension deposit; potential size of a mineralized zone; potential expansion of mineralization; potential discovery of new mineralized zones; potential metallurgical recoveries and grades; plans for future exploration and/or development programs and budgets; permitting time lines; anticipated business activities; corporate strategies; requirements for additional capital; uses of funds; proposed acquisitions and dispositions of assets; and future financial performance. While the Company has based these forward-looking statements on its expectations about future events as at the date that such statements were prepared, the statements are not a guarantee of Entrée’s future performance and are based on numerous assumptions regarding present and future business strategies, local and global economic conditions, legal proceedings and negotiations and the environment in which the Company will operate in the future, including the status of the Company’s relationship and interaction with the Government of Mongolia, Oyu Tolgoi LLC, Rio Tinto and Turquoise Hill Resources. With respect to the construction and continued development of the Oyu Tolgoi underground mine, important risks, uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by such forward-looking statements and information include, amongst others, the approval of the 2015 Oyu Tolgoi Feasibility Study by Oyu Tolgoi LLC and its shareholders; the timing and cost of the construction and expansion of mining and processing facilities; the timing and availability of a long term power source for the Oyu Tolgoi underground mine; the timing to satisfy all conditions precedent to the first drawdown of project financing; the impact of the delay in the funding and development of the Oyu Tolgoi underground mine; delays, and the costs which would result from delays, in the development of the underground mine; and production estimates and the anticipated yearly production of copper, gold and silver at the Oyu Tolgoi underground mine. Other uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by forward-looking statements and information include, amongst others, whether the size, grade and continuity of deposits and resource and reserve estimates have been interpreted correctly from exploration results; whether the results of preliminary test work are indicative of what the results of future test work will be; fluctuations in commodity prices and demand; changing foreign exchange rates; actions by Rio Tinto, Turquoise Hill Resources and/or Oyu Tolgoi LLC (“OT LLC”) and by government authorities including the Government of Mongolia; the availability of funding on reasonable terms; the impact of changes in interpretation to or changes in enforcement of, laws, regulations and government practices, including laws, regulations and government practices with respect to mining, foreign investment, royalties and taxation; the terms and timing of obtaining necessary environmental and other government approvals, consents and permits; the availability and cost of necessary items such as power, water, skilled labour, transportation and appropriate smelting and refining arrangements; and misjudgements in the course of preparing forward-looking statements. In addition, there are also known and unknown risk factors which may cause the actual results, performances or achievements of Entrée Gold to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements and information. Such factors include, among others, risks related to international operations, including legal and political risk in Mongolia; risks associated with changes in the attitudes of governments to foreign investment; risks associated with the conduct of joint ventures; discrepancies between actual and anticipated production, mineral reserves and resources and metallurgical recoveries; global financial conditions; changes in project parameters as plans continue to be refined; inability to upgrade Inferred mineral resources to Indicated or Measured mineral resources; inability to convert mineral resources to mineral reserves; conclusions of economic evaluations; future prices of copper, gold, silver and molybdenum; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals, permits or licences or financing or in the completion of development or construction activities; environmental risks; title disputes; limitations on insurance coverage; as well as those factors discussed in the section entitled “Risk” in Entrée Gold’s most recently filed Management’s Discussion & Analysis and in the section entitled “Risk Factors” in Entrée Gold’s Annual Information Form dated March 29, 2015, both available at www.sedar.com. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except as required under applicable securities legislation, Entrée Gold undertakes no obligation to publicly update or revise forward-looking statements. Entrée Gold's exploration activities are under the supervision of Robert Cinits, P.Geo., Vice President, Corporate Development of Entrée Gold. Mr. Cinits is a “qualified person” as defined in National Instrument 43-101- Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Cinits has approved the technical information in this presentation. All minerals reserves and mineral resources have been calculated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and NI 43-101. Cautionary Note to United States Investors: United States investors are advised that while the terms “Measured mineral resources”, “Indicated mineral resources” “Inferred mineral resources” and “Probable mineral reserves” are recognized and required by Canadian regulations, the United States Securities and Exchange Commission (“SEC”) does not recognize them. United States investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be upgraded to a higher category, or converted into mineral reserves. Inferred mineral resources have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. Under Canadian rules, estimates of Inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of an Inferred mineral resource exists, or is economically or legally minable. Disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute reserves as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this presentation containing descriptions of the Company’s mineral properties may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. The information in this presentation is for informational purposes only. Readers should not rely on the information for any purpose other than to gain general knowledge of Entrée Gold. This information is not intended to be, and should not be construed as, part of an offering or solicitation of securities. Unless otherwise noted, all dollar amounts in this presentation are expressed in United States dollars. For additional information regarding the Entrée-OT LLC joint venture property, see the technical report titled “Technical Report 2013 on the Lookout Hill Property” dated March 28, 2013 (“LHTR13”) prepared by AMC Consultants Pty Ltd, a copy of which is available on SEDAR at www.sedar.com. For additional information regarding the Ann Mason Project, see the technical report titled “Updated Preliminary Economic Assessment on the Ann Mason Project, Nevada, U.S.A.”, with an effective date of September 9, 2015 prepared by AGP Mining Consultants Inc. and Amec Foster Wheeler Americas Limited, a copy of which is available on SEDAR at www.sedar.com. Cautionary Statement 2
  • 3. 3 Why Invest in Entrée? Positioned for Future Success Financial Strength Quality Assets Major Investors Diverse Team
  • 4. Financial Strength 4 ETGEGI EKA C$0.66/$0.18 (TSX) Treasury $25.5 million (as of Sept. 30, 2015) Market Capitalization ~C$58 million (as of March 2016) Capital Structure 153 million Issued and Outstanding 165 million Fully Diluted 52 Week High/Low Unless otherwise noted, all dollar amounts in this presentation are expressed in United States dollars.
  • 5. 5 * Rio Tinto holds beneficial ownership over shares held by Turquoise Hill. 52% held by top eight shareholders 14.0% 10.1% 8.4% 7.6% 5.0% 3.9% 2.1% 0.9% Major Investors Fully Diluted
  • 6. Leadership Team 6 Board of Directors Lord (Michael) Howard of Lympne Chairman Mark Bailey Director Alan Edwards Director Gorden Glenn Director Management Stephen Scott Interim CEO Bruce Colwill CFO Rob Cinits VP Corporate Development Susan McLeod VP Legal Affairs Monica Hamm Manager Investor Relations Anna Stylianides Director James Harris Director
  • 7. 7 Ann Mason is a large copper- molybdenum deposit with positive economics located in a top mining jurisdiction. Quality Assets Entrée Gold’s Competitive Advantage Oyu Tolgoi is on track to be one of the world’s largest copper mines; Entrée has a 20% carried interest in two of its deposits.
  • 8. Mongolia: Oyu Tolgoi One of the largest copper mines being developed 8 Size Entrée has a 20% carried interest in two large Cu-Au deposits at Oyu Tolgoi: Hugo North Extension and Heruga Partnership Joint Venture with Oyu Tolgoi LLC (OTLLC) Oyu Tolgoi project managed by global mining leader Rio Tinto Grade High-grade underground mine planned at Hugo North Extension Lift 1 Underground Financed Development of Hugo North Extension Lift 1 financed Growth Future development options at Hugo North Extension Lift 2 and Heruga Longevity Potential mine life of over 50 years
  • 9. Mongolia: Oyu Tolgoi Entrée-OTLLC JV Structure 9 20% 80/70% 34% 66% Entrée – OTLLC Joint Venture Hugo North Extension & Heruga Mongolian Government Turquoise Hill Oyu Tolgoi LLC Entrée Gold 80%  Entrée has 20% carried interest  Entrée is debt financed at prime +2% repayable from 90% of available cash flow ~51% held by Rio Tinto
  • 10. 10 Mongolia: Oyu Tolgoi Entrée/JV licences surround Oyu Tolgoi licence The deposits of the Oyu Tolgoi project stretch over ~12 km. The most southerly, Heruga, and the most northerly, Hugo North Extension, are on Entrée-OTLLC JV property.
  • 11. 11 A A’ Property boundary Property boundary Mongolia: Oyu Tolgoi Idealized Longitudinal Section (Looking West) Modified from Turquoise Hill Resources Ltd.’s October 28, 2014 technical report, “Oyu Tolgoi 2014 Technical Report” (“Turquoise Hill 2014 OTTR”) Next phase of development does not include mine plan for Lift 2 extraction. *Source: Turquoise Hill Investor Presentation, March 2016  Next phase of development includes Hugo North Extension Lift 1, on Entrée-OTLLC JV property  Re-start of underground development targeted for mid-2016*
  • 12. Mongolia: Oyu Tolgoi Hugo North Extension Development 12 *LHTR13 Reserve Case Modified from Turquoise Hill 2014 OTTR Entrée has a 20% interest in the mineralization of the Hugo North Extension deposit Entrée has calculated that the after tax NPV8% that would be attributable to Entrée under Turquoise Hill 2014 OTTR is ~$102 million 650 m Property boundary Propertyboundary
  • 13. *The mineral reserves are not additive to the mineral resources. ** Copper equivalent estimated using $1.35/lb Cu, $650/oz Au, $10/lb Mo. *** 0.37% CuEq cutoff. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Hugo North Extension Cu-Au Heruga Cu-Au-Mo Probable Mineral Reserves* 31 Mt @ 1.73% Cu, 0.62 g/t Au 1 Blbs Cu / 0.52 Moz Au --- Indicated Resources** 132 Mt @ 2.00% CuEq*** 4.8 Blbs Cu / 2.3 Moz Au CuEq @ 1.65% Cu, 0.55 g/t Au --- Inferred Resources** 134 Mt @ 1.09% CuEq*** 2.8 Blbs Cu / 1.1 Moz Au CuEq @ 0.93% Cu, 0.25 g/t Au 1,824 Mt @ 0.67% CuEq*** 15.2 Blbs Cu / 21.2 Moz Au CuEq @ 0.38% Cu, 0.36 g/t Au, 0.011% Mo Mongolia: Oyu Tolgoi Entrée-OTLLC JV Reserves and Resources 13 See Company news release dated November 4, 2014 for the resource estimate for the Entrée-OTLLC joint venture property presented in Turquoise Hill 2014 OTTR. While the Company agrees with the conclusions in Turquoise Hill 2014 OTTR, it does not consider the changes to the resource estimate to be material. Entrée has a 20% interest in the above mineral reserves and resources.
  • 14. Mongolia: Oyu Tolgoi Multiple Development Options 14Source: Turquoise Hill 2014 OTTR and Turquoise Hill Investor Presentation, March 2016  Oyu Tolgoi Underground Mine Development and Financing Plan provides pathway for re-starting development  Long life, high grade with significant expansion potential
  • 15. 15  $4.4 billion financing signed December 2015 Project Finance  Updated capital estimate expected Q1 2016  Incorporates productivity improvements Feasibility Study  “Notice to Proceed” decision expected early Q2 2016 TRQ, Rio Tinto and OTLLC Board Approvals  Target mid-2016  Early works underway  Leverage existing infrastructure  Large resource base provides optionality Underground Re-Start Mongolia: Oyu Tolgoi Underground next steps as reported by Turquoise Hill Source: Turquoise Investor Presentation, March 2016 
  • 16. Nevada: Ann Mason Large copper deposit in one of the best jurisdictions 16 Size 100% interest in a large Cu-Mo deposit amenable to open pit mining and sulphide flotation mill (Ann Mason deposit) Jurisdiction Nevada: one of the best jurisdictions for mining Strong local support in the Yerington District Longevity Potential mine life of over 21 years Updated PEA completed in 2015 Growth Convert remaining Inferred resources to Measured or Indicated with small drill program Additional studies to move to prefeasibility Potential to expand oxide and sulphide resources at the Blue Hill deposit Partnership Positioned to attract strategic investment Infrastructure Rail, road and power
  • 17. Nevada: Ann Mason The Yerington Copper District 1717  Historic mining region  Top mining jurisdiction  Strong community support  Excellent infrastructure  Consolidation potential
  • 18. 18 ANN MASON DEPOSIT MINERAL RESOURCES 0.20% Cu Cut-off grade, effective September 9, 2015 Classification Tonnage (Mt) Grade Contained Metal Cu (%) Mo (%) Au (g/t) Ag (g/t) Cu (Mlb) Mo (Mlb) Au (Moz) Ag (Moz) Measured 412 0.33 0.006 0.03 0.64 3,037.6 58.1 0.37 8.46 Indicated 988 0.31 0.006 0.03 0.66 6,853.3 128.5 0.97 21.00 Measured and Indicated 1,400 0.32 0.006 0.03 0.65 9,890.9 186.6 1.33 29.46 Inferred 623 0.29 0.007 0.03 0.66 3,987.2 96.2 0.58 13.16  Mineral resources are reported within a constraining pit shell developed using Whittle™ software.  Assumptions include 100% mining recovery.  An external dilution factor was not considered during this resource estimation.  Internal dilution within a 20 metre x 20 metre x 15 metre SMU (selective mining unit) was considered.  The 0.4% net smelter returns royalty held by Sandstorm Gold Ltd. was not considered during the preparation of the conceptual pit.  Mineral resources that are not mineral reserves do not have demonstrated economic viability. 18 Nevada: Ann Mason Resource Estimate
  • 19. Nevada: Ann Mason 2015 PEA Highlights – Attractive Project Economics 19 LOM Production* 877 million tonnes LOM – Strip ratio 2:1 Development capital costs (pre-production + Year 1) $1.35 billion Average cash costs (net of by-product sales)** $1.49/lb copper All-in sustaining costs (net of by-product sales)** $1.57/lb copper Average net annual undiscounted cash flow** $298 million LOM – Average copper recovery 92% Copper concentrate grade 30% LOM – Copper production 5.1 billion lbs Note: The PEA is preliminary in nature, it includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineralized resources that are not mineral reserves do not have demonstrated economic viability. *835 Mt at 0.30% copper, 0.005% molybdenum, 0.03 g/t gold and 0.59 g/t silver are Measured and Indicated material, and 42 Mt at 0.27% copper, 0.005% molybdenum, 0.03 g/t gold and 0.58 g/t silver are Inferred material. **Pre-tax. “Cash costs” and “all-in sustaining costs” are non-U.S. GAAP Performance Measurements. These performance measurements are included because these statistics are widely accepted as the standard of reporting cash costs of production in North America. These performance measurements do not have a meaning within U.S. GAAP and therefore, amounts presented may not be comparable to similar data presented by other mining companies. These performance measurements should not be considered in isolation as a substitute for measures of performance in accordance with U.S. GAAP.
  • 20. 20 Nevada: Ann Mason 2015 PEA Financial Outputs ANN MASON 2015 PEA SENSITIVITY OF THE KEY FINANCIAL OUTPUTS (Post-Tax) Economic Scenario Cu* ($/lb) NPV5% ($ Million) NPV7.5% ($ Million) IRR (%) Pay- back (Years) Net Average Annual Free Cash Flow ($ Million) Low Case 2.75 815 339 10.3 8.7 189 Base Case 3.00 1,379 770 13.7 6.9 238 High Case 3.25 1,928 1,189 16.8 5.7 287 Note: The Base Case metal prices are based on a review of current analyst consensus reports and recent SEDAR filings for similar reports. The 2015 PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 2015 PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. *Other metal prices: Low Case: Mo $9 ($/lb), Ag $15 ($/oz), Au $1,100 ($/oz) Base Case: Mo $11 ($/lb), Ag $20 ($/oz), Au $1,200 ($/oz) High Case: Mo $13 ($/lb), Ag $25 ($/oz), Au $1,300 ($/oz)
  • 21. Nevada: Ann Mason 3-D View of Deposit 500 m N >0.15% Cu grade shell 21 Deposit Dimensions 2.8 km NW x 1.3 km NE x ~1.2 km vertical
  • 23. 23 Nevada: Ann Mason Project Potential *Reported in the Ann Mason 2015 PEA. The mineral resource estimate has an effective date of July 31, 2012 and was prepared by M. Waldegger, P. Geo. under the supervision of P. Desautels, P.Geo. of AGP. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Entrée has a 100% interest in the claims comprising the Blue Hill deposit, subject to a 0.4% net smelter returns royalty in favour of Sandstorm Gold.  PFS level metallurgy complete  Minimal drilling to update Inferred resource within Phase 5 pit  Additional studies to move to PFS: geotechnical drilling, environmental and engineering Ann Mason  Inferred resources of 72 Mt @ 0.17% Cu (leachable) plus 50 Mt @ 0.23% Cu (sulphide)*  Potential to expand oxide and sulphide resources  Potential heap-leach “starter” operation Blue Hill  Large portion of the property remains unexplored  Several high priority exploration targets on the property Exploration Targets  Well positioned to attract investment and partnersPartnership
  • 24. Other Copper Exploration Projects and Assets New Mexico and Peru Lordsburg Property, New Mexico (Cu-Au; 100% owned)  Cu-Au porphyry system part of a cluster of Laramide porphyries; 45 km SW of Tyrone and 100 km SE of Morenci  Over 1.2 km x 600 m of surface alteration and anomalous Cu geochem  Drill program in 2008 and 2009: 6,092 m in 12 holes o EG-L-09-012 intersected 0.25% Cu and 0.15 g/t Au over 94 m from 118 m depth Lukkacha, Peru (Cu-Mo; option agreement to acquire up to 100%)  Grass roots target within Paleocene-Eocene porphyry belt of Southern Peru; 57 km SE of Toquepala  Heavily leached stockwork exposed on surface; Cu-Mo geochem anomaly covering ~1 km x 600 m  Possibility of enriched secondary Cu sulphides in addition to primary mineralization 24 Cañariaco Project, Peru (Cu)  Held 100% by Candente Copper subject to 0.5% NSR to Entrée; large Cu porphyry at PFS level
  • 25. 25 Unlocking Shareholder Value Oyu Tolgoi Underground Mine Plan agreement signed (2015) Hugo North Extension Lift 1 financed (2015) Final underground development decision expected Q2 2016 Copper fundamentals strong in mid-long term Ann Mason updated PEA (2015); positioned to attract strategic investment & partners Lukkacha and Lordsburg future growth Strong balance sheet provides financial flexibility and security Sandstorm agreement amended (2016)
  • 26. For more information, please contact: Monica Hamm – Manager Investor Relations mhamm@entreegold.com 604-687-4777 Scan the QR Code above or visit www.entreegold.com