The document introduces a contracting company that provides HVAC, firefighting, plumbing and electrical systems and has experience in projects in Egypt and the UAE, listing their scope of work, licenses, policies, references and details about the founder and how to contact them. They have the required licenses and certifications and experience providing various mechanical, electrical, and plumbing systems for projects in Dubai and Egypt.
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Firstcool electromechanical works llc
1.
2. · Vision.
· Scope of work.
· Trade License.
· Health, safety and environmental policy
· Dubai Municipality Previous Approvals.
· Consultants Previous Approvals.
· Egyp an Cer ficate.
· Dubai Projects References.
· Egypt Projects References.
· About the founder.
· Contact Us.
3. YOUR SYSTEM
BEST ERECTOR
We Have
Full Experience of the
Various HVAC,
Fire fighting, plumbing
and .Electrical Systems
Dear Sir,
As we are FIRST for engineering contracting works (HVAC, Fire F, Plumb
and Electrical), We would like to introduce ourselves to you as one of electromechani-
cl Contractors in Egypt & U.A.E. our company was founded by Eng. Ahmed Zaher
after a big experience in the huge construction projects in U.A.E. and Egypt, we have
a very good team of engineers, technicians and very good technical office team to
meet all the standards.
For more Information
4. SCOPE OF WORK
Chilled Water Systems.
Ventilation Systems .
DX Systems .
District Cooling Systems.
• Water cooled chiller`
• Air Cooled chiller
• Remote sensing chiller
• Air handling unit & fan coil unit complete with valves
(Tow and three way control)
• Chilled water piping network complete with fittings , insulation and cladding
• Installation of chilled water pumps with headers and valves
• Duct work with insulation and cladding
• All types of Exhaust Fans.
• Fresh Air Fans.
• Smoke Fans.
• Pressurization Fans.
• Kitchens and Restaurants Ventilation.
• Air Dehumidification Systems.
• Air Curtains
• Package units.
• DX Units.
• Split units, Concealed, Free Stand and ceiling type .
Water System .
Air System .
• Diesel Pumps
• Electric Pumps
• Juke Pumps
• piping network complete with fittings and sprinklers
• Zone control station
• FM-200 ( Gas cylinder + control panel & detectors)
• Co2 ( Gas cylinder + control panel & detectors)
• (sewage pumps & dewatering pumps) Pipes (cast iron-Upvc)
• ( booster pumps- Pipes (Copper-PPR-Stainless steel )-fixtures-heaters
AIR CONDITIONING – HVAC
SEWAGE & WATER SYSTEM
FIRE FIGHTING
Sewage systems.
Water Supply system.
10. CORPORATE VALUES
We embrace and foster leadership in every aspect of our business, from innovation and learning, to
management and customer satisfaction, to employee and skills development. An organization’s ability to create
space to leadership to grow in today’s marketplace is perhaps its greatest strategic advantage.
We realize that standards of Health & Safety and Environment are integral elements of efficient business
management adjectives and contribute to the operational efficiency and overall company profitability.
Our Quality, Health & Safety, and Environment- QHSE management system is highly advanced to guarantee
maximum quality at minimum risk and negative impact on the environment.
All divisions and subsidiaries dedicated to supporting and continuously improving the effectiveness of these
systems
We recognize that our people are the foundation of our business. We are dedicated to providing an environment
that attracts, motivates, and develops individuals and encourage cooperative efforts at every level and across all
activities in the company. We create and implement a succession /career progression planning program that
clearly articulates corporate expectations and charts course for employee development
Mob. 00971556664133 - 00201065457792 Email. firstcool.hvac@gmail.com
11. Summary:
These mandatory minimum standards are intended as the minimum basis upon which sites will
establish a sustainable safe and healthy environment at work, to maximize performance. This will
mean anticipating changes in requirements (being pro-active rather than reactive) and each operating
unit and employee taking major responsibility for these areas.
The term employee should be interpreted to include all employees, both permanent and temporary, at
all levels.
1.
Prevention:
1- Each site must comply with all local safety legislations and with any project owner company
standards. Compliance will be with whichever is the stricter of these and it must be documented.
2- Each site must have regulatory procedures/ check- ups to ensure compliance with the safety
legislations, and must have safety clearance for all materials used to ensure that they are eco friendly.
3- Each site must identify those process steps that are critical for the safety of the labor & / or process
(Critical control points) and establish a system to control and monitor these.
4- Each employee’s responsibility for safety must be identified and understood. Appropriate training
must be given to prepare employees against potential hazards or accidents.
5- We must have procedures in place for monitoring site complaints, investigating them and dealing
with them promptly, to approach to zero accident loss time (ALT.)
6- we have procedures in place to assess safety incidents, plans to manage any equipment failure, and
procedures to report such problems to the project owner according to our policies for safety, health
and the environment.
2.
Prevention:
(1) Each site must have up-to-date written procedures according to health and safety Policy which
complies with the local work law. They must be signed by the current senior line person on site.
(2) Each site must comply with all local health and safety legislations and with any project owner
company standards. Compliance will be with whichever is the stricter of these and it must be
documented.
(3) Each site must establish emergency plans for all reasonably foreseeable emergencies and ensure
their effectiveness by undertaking regular exercise drills at least bi-monthly.
(4) All employees must be given appropriate training covering safety induction, and safety awareness
training. Such training must be regularly reviewed and updated to ensure efficiency where any
adjustments will be immediately communicated to all employees.
Incidents
(5) Each site must establish and fully implement an accident/incident reporting and investigation
procedure. Each site must collate and keep records of their safety performance as required by their
management group to identify common work related injuries and implement any preventive measures
necessary.
Mob. 00971556664133 - 00201065457792 Email. firstcool.hvac@gmail.com
12. 3.
Prevention:
1- Each site must have an up-to-date written environmental policy, which complies with the local
environmental law. It must be signed by the current senior person on site.
2- Each site must comply with all local environmental legislation and with any project owner company
standards. Compliance will be with whichever is the stricter of these and it must be documented.
3- Each site must establish emergency plans for all reasonably foreseeable environmental emergencies
to avoid any possible harm to the environment.
4- And ensure their effectiveness by undertaking regular exercise drills at least bi-monthly.
5- All employees, including those with specific environmental responsibilities must be given
appropriate training, suitable for the execution of their responsibilities. Such training must be regularly
reviewed and updated.
WE will supply Our employees the following PPE:
1. Helmet.
2. Safety shoes. (Shock, electricity, oil proof.)
3. Safety belts.
4. Welding faces. (Incase if there is any welding.)
5. Chip glasses. (For protection / during cutting materials. pipe, etc…)
6. Safety gloves.
7. Safety electrical plugs (water proof with cover.)
Notes:
* All equipments used (in cutting forming, welding, etc.) are protected by emergency switches &
Automatic cut-offs in case of accidents.
Mob. 00971556664133 - 00201065457792 Email. firstcool.hvac@gmail.com
13. Our Quality Management System meets the requirement of international standard ISO 9001: 2000 it
encompasses all of the processes involved in the provision of production and services, from initial enquiry
through to implementation, operation and reporting
The Products and services we provide are managed in accordance with quality Plants tailored to meet our
client’s specific requirements and the local regulations. In order to ensure compliance with our Quality
Management Systems, regularly quality audits are carried out throughout the organization.
Mob. 00971556664133 - 00201065457792 Email. firstcool.hvac@gmail.com
14. We apply strict policies when it comes to quality. By enforcing such policies, we are always able to
meet agreed contractual specifications defined by the customer, government, and international quality
standards.
Our quality procedure will assure sustainable quality of all pipes, equipments, junctions & install-
ments, etc.
This procedure will include:
(1) Samples representing the lot (5%) will be traced on site every day.
(2) These tracing samples will be totally identified for trace back of problems by labeling with differ-
ent codes.
(3) Any out of specification material will go directly to the rejection area, to be treated as scrap. (4)
On-line tests will be applied in every stage of the process to ensure compliance with working specifi-
cations.
(5) All type of inspection & methods of doing it will be available in the quality test appendix (submit-
ted later on).
Mob. 00971556664133 - 00201065457792 Email. firstcool.hvac@gmail.com
30. Al Waha Girls' Primary and High School
Project : AL WAHA SCHOOL @ Al Aweer one.
Project no : P586
Client : Ministry of Education/ UAE
Consultant : Elite Design and Engineering consultancy
Main Contractor : BITCO Contracting LLC
A/C Contractor : First Cool Electromechanical Works L.L.C.
Work : AC Duct Work & Ventilation & AC Machine maintenance.
31. Project : Um Ammar School @ Ajman
Project no : P587
Client : Ministry of Education/ UAE
Consultant : Elite Design and Engineering consultancy
Main Contractor : BITCO Contracting LLC
A/C Contractor : First Cool Electromechanical Works L.L.C.
Work : AC Duct Work & Ventilation & AC Machine maintenance.
Umm Ammar Preparatory School
32. Project : UM Quawin Basic School @ Um Al Quawin
Project no : P588
Client : Ministry of Education/ UAE
Consultant : Elite Design and Engineering consultancy
Main Contractor : BITCO Contracting LLC
A/C Contractor : First Cool Electromechanical Works L.L.C.
Work : AC Duct Work & Ventilation & AC Machine maintenance.
Umm Al Quawin School
33. PLOT NO. 24105 -
. Location: Nahda 2 -
Client: MOHAMED HAJI ABDULLAHUSSUIN -
Consultant: PROLINE ENGINEERING & -
CONSULTANTS - MEP Contractor: Al Shafaar
. Electromechanical Works
.AC Contractor: First Cool Electromechanical work L.L.C -
34. PLOT NO. 2310159 -
. Location: Nahda 1 -
Client: Bin Shafar holding -
Consultant: ARKIPLAN CONSULTANTING OF ARCH & -
. ENGINEERING - Main Contractor: Al Shafaar national contracting
. MEP Contractor: Al Shafaar Electromechanical Works -
.AC Contractor: First Cool Electromechanical work L.L.C -
35.
36.
37.
38. PLOT NO. 1488 -
Client : Qussay jabbar jawad -
Consultant: Al sahel Cons & Eng. Office -
. Main Contractor : Ali Bin Salem General Contracting -
.AC Contractor : First Cool Electromechanical work L.L.C -
39. PLOT NO. 0121
Client : Mr.Imad Al Saeed
Consultant: Al sahel Cons & Eng. Office
Main Contractor : Ali Bin Salem General Contracting .
AC Contractor : First Cool Electromechanical work .L.L.C
40. Plot No:2340053
Consultant: Al Consultant &. Engineering
Main Contracing: Al yassen General contracting
.Ac Contracting: First Cool Electromechanical LLC
55. Mob. 00971556664133 – 00201065457792 Email. firstcool.hvac@gmail.com
HVAC Main Processing Area
Supply & Installation for HVAC for main processing area
Consultant: GRAPHCO Engineering Design
Client :Nestle Factory & Benha
Ammonia Chiller Insulation
Refurbish the Insulation of Ammonia water Pipe for the
Chiller
Client: Nestle Water Egypt-Factory Benha
HVAC For the new Factory
Supply and installation of central Air conditioning and
ventilation for the new factory @ Benha
Air compressor replacements
replace and installation of Air compressor and
the evaporator
57. Manager Director
ENG. AHMED ZAHER
Some of the projects in which Eng. Ahmed Zaher participated as
Director of Projects
Egypt Projects
Citadel Plaza Cairo , Egypt
- Client : CFC.
- Consultant : Shaker Consultant.
- HVAC System : Chilled Water ( 20,000 TR ).
Cairo Festival City Mall [ CFC ] . JV Al-futtaim Carillion - Orascom
- Client : Al-futtaim.
- Project Manger : Mace International
- Consultant : Engineering Consultant Group [ ECG ].
- HVAC System : Chilled Water District Cooling .
- Control System : BMS.
Mob. 00971556664133 – 00201065457792 Email. firstcool.hvac@gmail.com
58. Some of the projects in which Eng. Ahmed Zaher participated as
Director of Projects
U.A.E. Projects
Al Tigarah Town 70 Buildings ( 46 Residential + 24 Commercial ) at Dubai
( 24,000 TR ) ( Not Completed 2008 )
- Client : Dubai Properties
- Project Manger : PMDS
- Consultant : Al Hashmi Cons. Eng.
- Main Contractor : Ginco general Cont. Co.
- HVAC System : Chilled Water District Cooling .
Ghruob 37 Buildings ( G + 4 ) ) at Mirdif - Dubai ( 11,700 TR )
- Client : Dubai Properties
- Project Manger : Mace International
- Consultant : Kling. MEP Cons. Eng.
- Main Contractor : Ginco general Cont. Co.
- HVACSystem : Chilled Water District Cooling . .
G+4P+(34 &28 ) Floors at Barsha - Dubai. ( 3,500 TR )
- Consultant : Alturath Cons. Eng .
- Main Contractor : Almeezan general Cont. Co.
- HVAC System : Chilled Water District Cooling .
G + 6P + 2 Ser. + H.C. + 33 floors. ( Helal Tower) at Alkhan - Sharjah.
- Consultant : Mazaya Eng. Cons.
- Main Contractor : Alwathbah Const. Co.
- HVAC System : Split Ducted .
G + 8P + 2 Ser. + H.C.+ Office + 38 floors . ( Malak Tower ) at Alnahdah - Sharjah
- Consultant : Dimensions Eng. Cons.
- Main Contractor : Danat Alsharjah Const. Co.
- HVAC System : Split Ducted .
Manager Director
ENG. AHMED ZAHER
Mob. 00971556664133 – 00201065457792 Email. firstcool.hvac@gmail.com
59. Manager Director
ENG. AHMED ZAHER
G + M + 14 floors. at Almajaz - Sharjah.
- Consultant : Rashed Alowais.
- Main Contractor : Master Const. Co.
- HVAC System : Split Ducted .
G+ 5P + 20 Floors at Alnahdah - Sharjah.
- Consultant : Alnahdah Eng. Cons.
- Main Contractor : MBCC Const. Co.
- HVAC System : Split Ducted .
G + 6P + 20 Floors. at Abushagharah - Sharjah.
- Consultant : Horizon Cons. Eng.
- Main Contractor : Alwathbah Cons. Co.
- HVAC System : Split Ducted .
G + 3P +17 Floors at Almajaz - Sharjah .
- Consultant : Horizon Cons. Eng .
- Main Contractor : Solanki general Cont. Co.
- HVAC System : Split Ducted .
Mob. 00971556664133 – 00201065457792 Email. firstcool.hvac@gmail.com