Course Overview: According to industry reports more than 60% of maintenance costs are spent on equipment wear, tear and failure. This year the Witbank Institute of Technology will be providing training on Improving Rotating Equipment Reliability and Machinery Health to make sure all rotating Equipment functions at its best. Predictably, continuous improvement of reliability by optimizing predictive maintenance for rotating equipment is one of the most important challenges maintenance professionals face today. This three day session course explains The Causes of Rotating Machinery Failures, Precision Maintenance for Rotating Equipment and Machines, Condition Monitoring and Predictive Maintenance, Design of Rotating Equipment and Machines and Root Cause Failure Analysis Procedure. Why Attend: 
•Identify the most common causes of shafts, bearings and seals fatigue and failures based with actual case studies. 
•Understand Precision Maintenance for Rotating Equipment and Machines. 
•Optimize reliability of rotating equipment through applying best practices. 
•Optimize Reliability – Fundamentals of Condition Monitoring and Predictive Maintenance. 
•Understand Rotating Equipment and Machinery Reliability Continuous Improvement. 
Tel: 011 929 3085 Fax to email: 086 547 4185 Web: www.wiot.co.za
Who Should Attend? Condition monitoring professionals • Electrical engineers • Equipment Engineers • Equipment support maintenance • Machinery engineer • Mechanical engineering Managers/superintendents/ supervisors • Machinist/ Machine Operator • Maintenance managers/ superintendents/ supervisors • Mechanical managers/ superintendents/ supervisors •Operations supervisors • Plant Maintenance Superintendent • Plant Operator/ Engineer • Predictive Maintenance Engineer • Production managers/ supervisors • Reliability Engineers Course Topics: DAY 1 Introduction to Rotating Equipment and Machinery Reliability: 1. THE CAUSES OF ROTATING MACHINERY FAILURES 1.1. True Cost of Failure 
•Financial impact of downtime 
•Understanding risk and consequence 
•Preventing defects and failure 1.2. Know the Process, Physical, Chemical Properties and Characteristics 
•Process condition disruptions and process effects on components 
•Corrosion, erosion and wear 
•Material and product internal build-up Exercises & or Case Studies 1 (Equipment material of construction selection exercise) 1.3. Supporting Structure, Foundations, Strength, Rigidity 
•Attenuation of vibration 
•Dissipating operating loads and forces 
•Preventing equipment deformation Exercises & or Case Studies (1 Removing soft-foot activity) 1.4. Fatigue and Failure Modes 
•Ways shafts fatigue and their causes 
•Ways bearings fail and their causes 
•Ways seals fail and their causes 1.5. Bearing Failures 
•Fluctuating loads and forces 
•Lubrication condition 
•Tell-tale bearing failure signs Exercises & or Case Studies (1 Bearing failure case study)
2. PRECISION MAINTENANCE FOR ROTATING EQUIPMENT AND MACHINES 2.1. Reliability, Availability, Maintainability, Safety (RAMS) 
•Impact of special and common cause variation on RAMS 
•Precision maintenance for rotating equipment Accuracy Controlled Procedures 2.2. Balanced Shafts, Balancing Standards 
•Causes of out-of-balance 
•Engineering standards and limits for balancing 
•Mechanical balancing Exercises & or Case Studies (1 In-situ shaft balancing case study) 2.3. Shaft Alignment 
•Effects of shaft misalignment 
•Standards and limits for alignment 
•Methods of precision shaft alignment Exercises & or Case Studies (1 Shaft alignment case study) 2.4. Rotating Equipment Vibration 
•Allowable vibration severity 
•Bearing vibration causes 
•Machinery vibration isolation 2.5. Lifting Maintenance Performance (To have additional focus) 
•Measuring maintenance outcomes and KPIs 
•Maintenance Quality Systems for RAMS 
•Using visual management to control performance
3. Optimizing Reliability – Fundamentals of Condition Monitoring and Predictive Maintenance: 3.1. Condition Monitoring Methods for Rotating Equipment 
•Tribology and lubrication analysis 
•Thermography 
•Rotating equipment non-destructive testing 
•Operating performance monitoring 3.2. Bearing Vibration Analysis 
•Vibratory condition based monitoring 
•Vibration signatures 
•Vibration analysis Exercises & or Case Studies (1 Bearing vibration signature analysis case study ) 3.3. Tribology and Lubrication Overview 
•Wear particle analysis 
•Properties of lubricants 
•Sustaining lubricant health 3.4. Thermography 
•Temperature signature analysis 
•Mechanical equipment 
•Electrical equipment 3.5. Maintenance Strategy Mix (To have additional focus) 
•The PM - PdM - Breakdown mix 
•Total Productive Maintenance (TPM) and Operator driven reliability 
•Precision Maintenance Exercises & or Case Studies (1 Select a maintenance strategy mix activity) DAY 2 Rotating Equipment and Machinery Reliability Continuous Improvement: 1. Design of Rotating Equipment and Machines 1.1. Strength of Materials for Shafts and Rotors 
•Metallurgy - stress and stress raisers 
•Metal fatigues 
•Bending and deflection of shafts 1.2. Horizontal Shaft Design, Vertical Shaft Design 
•Axial and radial loads 
•Shaft and equipment expansion considerations 
•Shaft manufacture, diameter and tolerances Exercises & or Case Studies (1 Design a shaft)
1.3. Bearing Design and Selection, Radial and Axial Bearings 
•Roller bearings and plain bearings – uses and limitations of each 
•Bearing lubrication and selection 
•Bearing housings and construction Exercises & or Case Studies (1 Select a bearing for the shaft exercise) 1.4. Lubrication Selection 
•Properties of lubricants 
•Lubricant operating environment 
•Lubricant life-extension additives 1.5. Shaft Seals – Methods, Types, Designs, Process Effects 
•Seal design overview 
•Seal failure modes 
•Seal selection 1.6. Vibration Prevention and Isolation (To have additional focus) 
•Basics of spring/damper systems 
•Natural frequency 
•Machinery vibration isolation Exercises & or Case Studies (1 Perform a simple vibration isolation calculation) 2. Root Cause Failure Analysis Procedure 1.7. Root Cause Failure Analyses (RCFA) 
•RCFA fundamentals 
•The RCFA process 
•Developing and implementing solutions 1.8. Finding the Evidence and Proof 
•What specifically will be covered? 
•Operating and maintenance records and analysis 
•Creative disassembly 
•Importance of keeping accurate records and history 1.9. Applying RCFA in the Workplace 
•What specifically will be covered? 
•Cross-functional teams 
•The 5 Whys method 
•Operator and maintainer buy-in for improvement Exercises & or Case Studies (1 RCFA exercise)
DAY 3 3. Design Screening (Component Function) Examples 1.10. Design, Operation and Cost Total Optimisation Review 
•What specifically will be covered? 
•Life cycle operating cost 
•Cost impact calculations 
•Design review and optimisation 1.11. Risk Reduction Strategies in Design 
•Understanding and measuring risk 
•Chance vs. consequence risk reduction methods 
•Applying risk reduction during design 1.12. Lifting Lifetime Reliability (to have additional focus) 
•Equipment reliability overview 
•Measuring reliability: for components – Weibull; for systems - Crow/AMSAA 
•RCM/FMEA fundamentals 4. Management of Rotating Equipment and Machines 1.13. Reliability of Systems 
•What specifically will be covered? 
•Series and Parallel systems 
•Implications for series systems 
•Implications for parallel systems 1.14. Instigating Rotating Equipment Operational Excellence 
•Necessary Asset Management systems 
•Documentation requirements 
•Training and up-skilling of personnel 1.15. Rotating Equipment Integrity Management 
•Statutory, Safety, Operating and Maintenance Standards 
•Documentation and Record Keeping requirements 
•Auditing and Analysis of operating management systems 1.16. Rotating Equipment Reliability Improvement Strategy 
•Setting Equipment Performance Specifications 
•Selecting best practice methods to achieve the performance objectives 
•Developing and managing workplace best practice processes
The Witbank Institute of Technology Pty Ltd (WIOT) is a world classes IT and business skills development Company based in Johannesburg, South Africa. It was established in 2009. We are accredited with MICT SETA. (Accreditation number: ACC/2010/07/059) Our aim is to deliver superior quality training solutions that produce tangible results. We want to build confidence in our learners so that they can utilize their newly acquired skills to improve their performance on the job and provide their company with a meaningful return on investment (ROI). We offer a wide range of internationally recognized qualifications and skills programmers across South Africa and the continent. 
Company Name :_________________________________________________________________________________ Type of Business : _________________________________________________________________________________ Address :_________________________________________________________________________________ Tel :______________________Fax:_____________________VAT Number________________________ …………………………………………………………………………………………………………………………………………………………………………………….. Delegate 1: ………………………………………………………………………………………………………………………………………………………………….. Position: ……………………………………………………………………………..Email: ……………………………………………………………………………… Delegate 2:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Delegate 3:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Delegate 4:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Delegate 5:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Authorisation: Signatory must be authorised to sign on behalf of Company Name …………………………………………………………………………………Position …………………………………………………………………. Signature:……………………………………………………………………………Date:……………/…………/…………………………………………… 
Tel: 011 929 3085 Fax to email: 086 547 4185 www.wiot.co.za 
TERMS & CONDITIONS PAYMENTS: 1.1 Payment shall be made in full prior to delegate(s) attendance of event. 1.2 Payments should be made within 7 working days after receipt of invoice, failure to which, attendance will not be permitted unless agreed otherwise with WIOT preceding the confirmation of the booking. CANCELLATION & RESHEDULING: 1.1 WIOT reserves the right to reschedule, change the speaker, change the venue or cancel the event, and will use reasonable efforts to notify delegates 7 working days before event runs. 1.2 The client needs to inform WIOT of all cancellations in writing. 1.3 Delegates will not be charged if WIOT cancels or reschedules any event. Provided that invoice was paid, delegate(s) will be issued credit vouchers to attend any other WIOT event, this voucher will be valid for up to 12 months from date of issue. 1.4 Cancellations received after the booking form has been signed and received by WIOT, client will be charged a service fee of 5% of invoiced amount. 1.5 Cancellation received by WIOT 21 working days before event commences will be liable for a cancellation fee of 70% of the total amount invoiced. 1.6 Cancellations received 14 working days before commencement of event will be liable for 100% cancellation fees. 1.7 In the event of a delegate not showing up at the event OR does not complete the course, he/she will forfeit entire amounts paid to WIOT 1.8 Delegate substitutions can be made by client at no charge to client provided client puts it in writing. RECOVERY: In the event of any action for the recovery of monies, or any action by WIOT in terms of these terms and conditions, the client hereby acknowledges that they will be liable for all legal costs. LIABILITY: WIOT shall not be held liable for any losses or damages nor assume liability whatsoever as a result of an act of God, unforeseen occurrence or any other event that renders performance of the event impracticable or impossible. For purpose of this clause, a fortuitous event shall include but not restricted to: war, fire, labour strike, extreme weather or other emergencies. DAMAGES: In the event that delegates are working with computers or any other WIOT equipment’s, they shall be held liable for any damages suffered by WIOT to the equipment through any negligent act by delegate Price: R9,999 Per Delegate Excl. VAT 
1. Bank Transfer : Witbank Institute of Technology 
Bank: Nedbank 
Account Number: 1913435113 
Branch Code: 198765, Cresta Swift Code: nedszajj

Weitere ähnliche Inhalte

Was ist angesagt?

Vibration analysis unit 4
Vibration analysis unit 4Vibration analysis unit 4
Vibration analysis unit 4Dibyendu De
 
Vibration Monitoring
Vibration MonitoringVibration Monitoring
Vibration MonitoringPri Hadi
 
CONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONCONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONIgnesias Tsotetsi
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoringAnkit Narain
 
Condition monitoring presentation
Condition monitoring presentationCondition monitoring presentation
Condition monitoring presentationSATISH Kurma
 
Condition Monitoring Basics
Condition Monitoring BasicsCondition Monitoring Basics
Condition Monitoring BasicsUzair Ahmad
 
Vibration Analysis, Emerson Makes it Easy for You
Vibration Analysis, Emerson Makes it Easy for YouVibration Analysis, Emerson Makes it Easy for You
Vibration Analysis, Emerson Makes it Easy for YouDieter Charle
 
Machinery Vibration Analysis and Maintenance
Machinery Vibration Analysis and Maintenance Machinery Vibration Analysis and Maintenance
Machinery Vibration Analysis and Maintenance Living Online
 
Condition monitoring & vibration analysis
Condition monitoring & vibration analysisCondition monitoring & vibration analysis
Condition monitoring & vibration analysisJai Kishan
 
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixReliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixRicky Smith CMRP, CMRT
 
Introduction to vibration monitoring
Introduction to vibration monitoringIntroduction to vibration monitoring
Introduction to vibration monitoringKevin Pereira
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management ServicesIsmail Yusof
 
B. basic of vibration
B. basic of vibrationB. basic of vibration
B. basic of vibrationDương Phúc
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Flevy.com Best Practices
 

Was ist angesagt? (20)

Vibration analysis unit 4
Vibration analysis unit 4Vibration analysis unit 4
Vibration analysis unit 4
 
Presentation on Condition Monitoring
Presentation on Condition MonitoringPresentation on Condition Monitoring
Presentation on Condition Monitoring
 
Vibration analysis
Vibration analysisVibration analysis
Vibration analysis
 
Vibration Monitoring
Vibration MonitoringVibration Monitoring
Vibration Monitoring
 
Vibration Analysis
Vibration AnalysisVibration Analysis
Vibration Analysis
 
CONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONCONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATION
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Condition monitoring presentation
Condition monitoring presentationCondition monitoring presentation
Condition monitoring presentation
 
Condition Monitoring Basics
Condition Monitoring BasicsCondition Monitoring Basics
Condition Monitoring Basics
 
Vibration Analysis
Vibration AnalysisVibration Analysis
Vibration Analysis
 
Vibration Analysis, Emerson Makes it Easy for You
Vibration Analysis, Emerson Makes it Easy for YouVibration Analysis, Emerson Makes it Easy for You
Vibration Analysis, Emerson Makes it Easy for You
 
Machinery Vibration Analysis and Maintenance
Machinery Vibration Analysis and Maintenance Machinery Vibration Analysis and Maintenance
Machinery Vibration Analysis and Maintenance
 
Condition monitoring and its techniques
Condition monitoring and its techniquesCondition monitoring and its techniques
Condition monitoring and its techniques
 
Condition monitoring & vibration analysis
Condition monitoring & vibration analysisCondition monitoring & vibration analysis
Condition monitoring & vibration analysis
 
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixReliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
 
Introduction to vibration monitoring
Introduction to vibration monitoringIntroduction to vibration monitoring
Introduction to vibration monitoring
 
Vibration analysis
Vibration analysisVibration analysis
Vibration analysis
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
 
B. basic of vibration
B. basic of vibrationB. basic of vibration
B. basic of vibration
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 

Andere mochten auch

Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Ricky Smith CMRP, CMRT
 
Top 10 rotating equipment engineer interview questions and answers
Top 10 rotating equipment engineer interview questions and answersTop 10 rotating equipment engineer interview questions and answers
Top 10 rotating equipment engineer interview questions and answersjomgori
 
Top 5 rotating equipment engineer interview questions with answers
Top 5 rotating equipment engineer interview questions with answersTop 5 rotating equipment engineer interview questions with answers
Top 5 rotating equipment engineer interview questions with answersfacemedi10
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
Top 16 ways to make money online forever
Top 16 ways to make money online foreverTop 16 ways to make money online forever
Top 16 ways to make money online foreverjobguide247
 
How I enabled a Saudi company to do business with Aramco
How I enabled a Saudi company to do business with AramcoHow I enabled a Saudi company to do business with Aramco
How I enabled a Saudi company to do business with AramcoCatarina Alexon
 
Saudi Arabia Power Sector Growth Opportunities
Saudi Arabia  Power Sector Growth OpportunitiesSaudi Arabia  Power Sector Growth Opportunities
Saudi Arabia Power Sector Growth OpportunitiesTanuChopra
 
Rotating equipment engineer perfomance appraisal 2
Rotating equipment engineer perfomance appraisal 2Rotating equipment engineer perfomance appraisal 2
Rotating equipment engineer perfomance appraisal 2tonychoper2704
 
New base 751 special 20 december 2015r
New base 751 special  20 december 2015rNew base 751 special  20 december 2015r
New base 751 special 20 december 2015rKhaled Al Awadi
 
011 Seals, Bearings, and Bushings
011 Seals, Bearings, and Bushings011 Seals, Bearings, and Bushings
011 Seals, Bearings, and BushingsRob Holt
 
OMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHURE
OMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHUREOMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHURE
OMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHUREEbrahim Taher
 
Team Spark Racing - FSAE Italy & SAE Supra 2015
Team Spark Racing - FSAE Italy & SAE Supra 2015Team Spark Racing - FSAE Italy & SAE Supra 2015
Team Spark Racing - FSAE Italy & SAE Supra 2015Dhamodharan V
 

Andere mochten auch (18)

Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
 
Top 10 rotating equipment engineer interview questions and answers
Top 10 rotating equipment engineer interview questions and answersTop 10 rotating equipment engineer interview questions and answers
Top 10 rotating equipment engineer interview questions and answers
 
5.alignment
5.alignment5.alignment
5.alignment
 
Top 5 rotating equipment engineer interview questions with answers
Top 5 rotating equipment engineer interview questions with answersTop 5 rotating equipment engineer interview questions with answers
Top 5 rotating equipment engineer interview questions with answers
 
Alignment
AlignmentAlignment
Alignment
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Top 16 ways to make money online forever
Top 16 ways to make money online foreverTop 16 ways to make money online forever
Top 16 ways to make money online forever
 
How I enabled a Saudi company to do business with Aramco
How I enabled a Saudi company to do business with AramcoHow I enabled a Saudi company to do business with Aramco
How I enabled a Saudi company to do business with Aramco
 
Fm study
Fm studyFm study
Fm study
 
Saudi Arabia Power Sector Growth Opportunities
Saudi Arabia  Power Sector Growth OpportunitiesSaudi Arabia  Power Sector Growth Opportunities
Saudi Arabia Power Sector Growth Opportunities
 
Final AIM brochure
Final AIM brochureFinal AIM brochure
Final AIM brochure
 
Omar CV
Omar CVOmar CV
Omar CV
 
Rotating equipment engineer perfomance appraisal 2
Rotating equipment engineer perfomance appraisal 2Rotating equipment engineer perfomance appraisal 2
Rotating equipment engineer perfomance appraisal 2
 
New base 751 special 20 december 2015r
New base 751 special  20 december 2015rNew base 751 special  20 december 2015r
New base 751 special 20 december 2015r
 
011 Seals, Bearings, and Bushings
011 Seals, Bearings, and Bushings011 Seals, Bearings, and Bushings
011 Seals, Bearings, and Bushings
 
OMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHURE
OMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHUREOMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHURE
OMAN DOWNSTREAM EXHIBITION & CONFERENCE 2017 BROCHURE
 
Team Spark Racing - FSAE Italy & SAE Supra 2015
Team Spark Racing - FSAE Italy & SAE Supra 2015Team Spark Racing - FSAE Italy & SAE Supra 2015
Team Spark Racing - FSAE Italy & SAE Supra 2015
 
Lubricants 101
Lubricants 101Lubricants 101
Lubricants 101
 

Ähnlich wie Improving Rotating Equipment Reliability and Machinery Health

MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTmihirpatel306953
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programshossam hassanein
 
Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance IAAPI HQ
 
ManufacturingAndServicesOperations LB7.pptx
ManufacturingAndServicesOperations LB7.pptxManufacturingAndServicesOperations LB7.pptx
ManufacturingAndServicesOperations LB7.pptxأحمد دعبس
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdfaashir14
 
Reliability Centered Maintenance mantenimiento
Reliability Centered Maintenance mantenimientoReliability Centered Maintenance mantenimiento
Reliability Centered Maintenance mantenimientoElvisDiaz32
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered MaintenanceRonald Shewchuk
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
chapter one.pdf 2016.pdf
chapter one.pdf 2016.pdfchapter one.pdf 2016.pdf
chapter one.pdf 2016.pdfgete2
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustnessASQ Reliability Division
 
Workmanship Essentials
Workmanship EssentialsWorkmanship Essentials
Workmanship EssentialsErnie Marks
 
Equipment economics - 14th November.pdf
Equipment economics - 14th November.pdfEquipment economics - 14th November.pdf
Equipment economics - 14th November.pdfLekhrajMeena18
 
effective-maintenance.pdf
effective-maintenance.pdfeffective-maintenance.pdf
effective-maintenance.pdfmartinusteddy
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyWaseem Akram
 

Ähnlich wie Improving Rotating Equipment Reliability and Machinery Health (20)

MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Unit 1 mpa
Unit 1 mpaUnit 1 mpa
Unit 1 mpa
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPT
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
DBEN98_P
DBEN98_PDBEN98_P
DBEN98_P
 
Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance Best Practices Amusement Rides Operation & Maintenance
Best Practices Amusement Rides Operation & Maintenance
 
ManufacturingAndServicesOperations LB7.pptx
ManufacturingAndServicesOperations LB7.pptxManufacturingAndServicesOperations LB7.pptx
ManufacturingAndServicesOperations LB7.pptx
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdf
 
Reliability Centered Maintenance mantenimiento
Reliability Centered Maintenance mantenimientoReliability Centered Maintenance mantenimiento
Reliability Centered Maintenance mantenimiento
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
chapter one.pdf 2016.pdf
chapter one.pdf 2016.pdfchapter one.pdf 2016.pdf
chapter one.pdf 2016.pdf
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
Workmanship Essentials
Workmanship EssentialsWorkmanship Essentials
Workmanship Essentials
 
CV.
CV.CV.
CV.
 
Equipment economics - 14th November.pdf
Equipment economics - 14th November.pdfEquipment economics - 14th November.pdf
Equipment economics - 14th November.pdf
 
effective-maintenance.pdf
effective-maintenance.pdfeffective-maintenance.pdf
effective-maintenance.pdf
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 

Kürzlich hochgeladen

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Kürzlich hochgeladen (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Improving Rotating Equipment Reliability and Machinery Health

  • 1. Improving Rotating Equipment Reliability and Machinery Health Course Overview: According to industry reports more than 60% of maintenance costs are spent on equipment wear, tear and failure. This year the Witbank Institute of Technology will be providing training on Improving Rotating Equipment Reliability and Machinery Health to make sure all rotating Equipment functions at its best. Predictably, continuous improvement of reliability by optimizing predictive maintenance for rotating equipment is one of the most important challenges maintenance professionals face today. This three day session course explains The Causes of Rotating Machinery Failures, Precision Maintenance for Rotating Equipment and Machines, Condition Monitoring and Predictive Maintenance, Design of Rotating Equipment and Machines and Root Cause Failure Analysis Procedure. Why Attend: •Identify the most common causes of shafts, bearings and seals fatigue and failures based with actual case studies. •Understand Precision Maintenance for Rotating Equipment and Machines. •Optimize reliability of rotating equipment through applying best practices. •Optimize Reliability – Fundamentals of Condition Monitoring and Predictive Maintenance. •Understand Rotating Equipment and Machinery Reliability Continuous Improvement. Tel: 011 929 3085 Fax to email: 086 547 4185 Web: www.wiot.co.za
  • 2. Who Should Attend? Condition monitoring professionals • Electrical engineers • Equipment Engineers • Equipment support maintenance • Machinery engineer • Mechanical engineering Managers/superintendents/ supervisors • Machinist/ Machine Operator • Maintenance managers/ superintendents/ supervisors • Mechanical managers/ superintendents/ supervisors •Operations supervisors • Plant Maintenance Superintendent • Plant Operator/ Engineer • Predictive Maintenance Engineer • Production managers/ supervisors • Reliability Engineers Course Topics: DAY 1 Introduction to Rotating Equipment and Machinery Reliability: 1. THE CAUSES OF ROTATING MACHINERY FAILURES 1.1. True Cost of Failure •Financial impact of downtime •Understanding risk and consequence •Preventing defects and failure 1.2. Know the Process, Physical, Chemical Properties and Characteristics •Process condition disruptions and process effects on components •Corrosion, erosion and wear •Material and product internal build-up Exercises & or Case Studies 1 (Equipment material of construction selection exercise) 1.3. Supporting Structure, Foundations, Strength, Rigidity •Attenuation of vibration •Dissipating operating loads and forces •Preventing equipment deformation Exercises & or Case Studies (1 Removing soft-foot activity) 1.4. Fatigue and Failure Modes •Ways shafts fatigue and their causes •Ways bearings fail and their causes •Ways seals fail and their causes 1.5. Bearing Failures •Fluctuating loads and forces •Lubrication condition •Tell-tale bearing failure signs Exercises & or Case Studies (1 Bearing failure case study)
  • 3. 2. PRECISION MAINTENANCE FOR ROTATING EQUIPMENT AND MACHINES 2.1. Reliability, Availability, Maintainability, Safety (RAMS) •Impact of special and common cause variation on RAMS •Precision maintenance for rotating equipment Accuracy Controlled Procedures 2.2. Balanced Shafts, Balancing Standards •Causes of out-of-balance •Engineering standards and limits for balancing •Mechanical balancing Exercises & or Case Studies (1 In-situ shaft balancing case study) 2.3. Shaft Alignment •Effects of shaft misalignment •Standards and limits for alignment •Methods of precision shaft alignment Exercises & or Case Studies (1 Shaft alignment case study) 2.4. Rotating Equipment Vibration •Allowable vibration severity •Bearing vibration causes •Machinery vibration isolation 2.5. Lifting Maintenance Performance (To have additional focus) •Measuring maintenance outcomes and KPIs •Maintenance Quality Systems for RAMS •Using visual management to control performance
  • 4. 3. Optimizing Reliability – Fundamentals of Condition Monitoring and Predictive Maintenance: 3.1. Condition Monitoring Methods for Rotating Equipment •Tribology and lubrication analysis •Thermography •Rotating equipment non-destructive testing •Operating performance monitoring 3.2. Bearing Vibration Analysis •Vibratory condition based monitoring •Vibration signatures •Vibration analysis Exercises & or Case Studies (1 Bearing vibration signature analysis case study ) 3.3. Tribology and Lubrication Overview •Wear particle analysis •Properties of lubricants •Sustaining lubricant health 3.4. Thermography •Temperature signature analysis •Mechanical equipment •Electrical equipment 3.5. Maintenance Strategy Mix (To have additional focus) •The PM - PdM - Breakdown mix •Total Productive Maintenance (TPM) and Operator driven reliability •Precision Maintenance Exercises & or Case Studies (1 Select a maintenance strategy mix activity) DAY 2 Rotating Equipment and Machinery Reliability Continuous Improvement: 1. Design of Rotating Equipment and Machines 1.1. Strength of Materials for Shafts and Rotors •Metallurgy - stress and stress raisers •Metal fatigues •Bending and deflection of shafts 1.2. Horizontal Shaft Design, Vertical Shaft Design •Axial and radial loads •Shaft and equipment expansion considerations •Shaft manufacture, diameter and tolerances Exercises & or Case Studies (1 Design a shaft)
  • 5. 1.3. Bearing Design and Selection, Radial and Axial Bearings •Roller bearings and plain bearings – uses and limitations of each •Bearing lubrication and selection •Bearing housings and construction Exercises & or Case Studies (1 Select a bearing for the shaft exercise) 1.4. Lubrication Selection •Properties of lubricants •Lubricant operating environment •Lubricant life-extension additives 1.5. Shaft Seals – Methods, Types, Designs, Process Effects •Seal design overview •Seal failure modes •Seal selection 1.6. Vibration Prevention and Isolation (To have additional focus) •Basics of spring/damper systems •Natural frequency •Machinery vibration isolation Exercises & or Case Studies (1 Perform a simple vibration isolation calculation) 2. Root Cause Failure Analysis Procedure 1.7. Root Cause Failure Analyses (RCFA) •RCFA fundamentals •The RCFA process •Developing and implementing solutions 1.8. Finding the Evidence and Proof •What specifically will be covered? •Operating and maintenance records and analysis •Creative disassembly •Importance of keeping accurate records and history 1.9. Applying RCFA in the Workplace •What specifically will be covered? •Cross-functional teams •The 5 Whys method •Operator and maintainer buy-in for improvement Exercises & or Case Studies (1 RCFA exercise)
  • 6. DAY 3 3. Design Screening (Component Function) Examples 1.10. Design, Operation and Cost Total Optimisation Review •What specifically will be covered? •Life cycle operating cost •Cost impact calculations •Design review and optimisation 1.11. Risk Reduction Strategies in Design •Understanding and measuring risk •Chance vs. consequence risk reduction methods •Applying risk reduction during design 1.12. Lifting Lifetime Reliability (to have additional focus) •Equipment reliability overview •Measuring reliability: for components – Weibull; for systems - Crow/AMSAA •RCM/FMEA fundamentals 4. Management of Rotating Equipment and Machines 1.13. Reliability of Systems •What specifically will be covered? •Series and Parallel systems •Implications for series systems •Implications for parallel systems 1.14. Instigating Rotating Equipment Operational Excellence •Necessary Asset Management systems •Documentation requirements •Training and up-skilling of personnel 1.15. Rotating Equipment Integrity Management •Statutory, Safety, Operating and Maintenance Standards •Documentation and Record Keeping requirements •Auditing and Analysis of operating management systems 1.16. Rotating Equipment Reliability Improvement Strategy •Setting Equipment Performance Specifications •Selecting best practice methods to achieve the performance objectives •Developing and managing workplace best practice processes
  • 7. The Witbank Institute of Technology Pty Ltd (WIOT) is a world classes IT and business skills development Company based in Johannesburg, South Africa. It was established in 2009. We are accredited with MICT SETA. (Accreditation number: ACC/2010/07/059) Our aim is to deliver superior quality training solutions that produce tangible results. We want to build confidence in our learners so that they can utilize their newly acquired skills to improve their performance on the job and provide their company with a meaningful return on investment (ROI). We offer a wide range of internationally recognized qualifications and skills programmers across South Africa and the continent. Company Name :_________________________________________________________________________________ Type of Business : _________________________________________________________________________________ Address :_________________________________________________________________________________ Tel :______________________Fax:_____________________VAT Number________________________ …………………………………………………………………………………………………………………………………………………………………………………….. Delegate 1: ………………………………………………………………………………………………………………………………………………………………….. Position: ……………………………………………………………………………..Email: ……………………………………………………………………………… Delegate 2:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Delegate 3:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Delegate 4:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Delegate 5:………………………………………………………………………….Email: ……………………………………………………………………………… Position: ……………………………………………………………………….......Email: …………………………………………………………………………...... Authorisation: Signatory must be authorised to sign on behalf of Company Name …………………………………………………………………………………Position …………………………………………………………………. Signature:……………………………………………………………………………Date:……………/…………/…………………………………………… Tel: 011 929 3085 Fax to email: 086 547 4185 www.wiot.co.za TERMS & CONDITIONS PAYMENTS: 1.1 Payment shall be made in full prior to delegate(s) attendance of event. 1.2 Payments should be made within 7 working days after receipt of invoice, failure to which, attendance will not be permitted unless agreed otherwise with WIOT preceding the confirmation of the booking. CANCELLATION & RESHEDULING: 1.1 WIOT reserves the right to reschedule, change the speaker, change the venue or cancel the event, and will use reasonable efforts to notify delegates 7 working days before event runs. 1.2 The client needs to inform WIOT of all cancellations in writing. 1.3 Delegates will not be charged if WIOT cancels or reschedules any event. Provided that invoice was paid, delegate(s) will be issued credit vouchers to attend any other WIOT event, this voucher will be valid for up to 12 months from date of issue. 1.4 Cancellations received after the booking form has been signed and received by WIOT, client will be charged a service fee of 5% of invoiced amount. 1.5 Cancellation received by WIOT 21 working days before event commences will be liable for a cancellation fee of 70% of the total amount invoiced. 1.6 Cancellations received 14 working days before commencement of event will be liable for 100% cancellation fees. 1.7 In the event of a delegate not showing up at the event OR does not complete the course, he/she will forfeit entire amounts paid to WIOT 1.8 Delegate substitutions can be made by client at no charge to client provided client puts it in writing. RECOVERY: In the event of any action for the recovery of monies, or any action by WIOT in terms of these terms and conditions, the client hereby acknowledges that they will be liable for all legal costs. LIABILITY: WIOT shall not be held liable for any losses or damages nor assume liability whatsoever as a result of an act of God, unforeseen occurrence or any other event that renders performance of the event impracticable or impossible. For purpose of this clause, a fortuitous event shall include but not restricted to: war, fire, labour strike, extreme weather or other emergencies. DAMAGES: In the event that delegates are working with computers or any other WIOT equipment’s, they shall be held liable for any damages suffered by WIOT to the equipment through any negligent act by delegate Price: R9,999 Per Delegate Excl. VAT 1. Bank Transfer : Witbank Institute of Technology Bank: Nedbank Account Number: 1913435113 Branch Code: 198765, Cresta Swift Code: nedszajj