3
• Imagine in that environment attempting to attract, on board and train
employees at a rate of 1 per day for 2.5 years
• Keeping 360 employees engaged and focussed on building a new
industry in an environment where
• You drive to work every day and the car in front of you has a sticker
telling people that your employer should not be here
• That your employer is simply using your country to dump radioactive
waste
• Where you go to restaurants and are refused service based on what
your uniform carrying your employers name
Company overview
4
Mount Weld Concentration Plant
Lynas Advanced Materials Plant
CLD Rare Earth Deposit
Mt Weld Project and
Concentration Plant
LAMP, Malaysia
Primarily involved in the exploration, development, mining and processing of Rare Earth minerals
ASX-listed, market capitalisation of A$1.2bn as of February 27, 2013
Owns and operates:
Mt. Weld – the highest grade known Rare Earths deposit in the world – located 35km south of Laverton
in W.A.
Mt. Weld Concentration Plant – commissioned in 2011 and located 1.5km from site
Lynas Advanced Materials Plant (“LAMP”) facility – located in the Gebeng Industrial Estate (“GIE”) near
the Port of Kuantan in Malaysia
Phase 1 production capacity of 11,000 tonnes per annum (“tpa”) REO and Phase 2 production capacity of
22,000tpa REO
Location of key assets
Building a fully integrated source of Rare Earths from mine to customers
Lynas‟ vision is to be the leader in Rare Earths for a sustainable future
5
Production process overview
Vertically integrated operations from mining at Mt. Weld to oxide production at the LAMP
Rare Earths
Solution
Mt. Weld Mine & Concentration Plant
6
Overview of Australian assets
Mt Weld Project and
Concentration Plant
Location of the Mt. Weld Project & Concentration Plant
Mt. Weld Mine
The highest grade known deposit of Rare Earths in the
world
Consists of the Central Lanthanide Deposit (“CLD”)
and Duncan Deposit
Located 35km south of Laverton in W.A.
Simple, conventional open-pit mining operation
Stockpiled ore is sufficient to sustain Phase 1 steady
state production for 6 years
773kt mined at 15.4% REO (116kt contained REO)
Mt. Weld Concentration Plant
Commissioned in May 2011
Located 1.5km from Mt. Weld mine
Phase 1 capacity: 33,000tpa REO concentrate
Expected capacity including Phase 2: 66,000tpa REO
concentrate
Proven REO flotation technology
~15kt of dry bagged concentrate ready for shipment to
Malaysia
7
CLD is the world‟s highest grade known Rare Earths orebody
Recent drilling on the western side of the CLD has increased confidence levels in the
resource with a large portion of the resources in the measured and indicated categories
Above a REO cut-off of 2.5%, the CLD has a resource of 14.9mt at an average grade of
9.8% REO for a total of 1,460,000 tonnes of REO
CLD resource
category
Ore (mmt) REO (%)¹
Measured 6.9 12.2
Indicated 7.0 8.1
Inferred 1.1 4.6
Total 14.9 9.8
9.8%
6.4%
4.9%
2.6%
2.0%
1.4% 1.1%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
CLD
(Lynas)
Mountain Pass
(Molycorp)
Duncan
(Lynas)
Nolans
(Arafura)
Hoidas Lake
(Great Western)
Thor Lake
(Avalon)
Kvanefjeld
(Greenland)
Source: Company filings
Note: Figures may not sum due to rounding
1 REO (%) includes all the lanthanide elements plus yttrium
Central Lanthanide Deposit
Rare Earth Grade – Mt. Weld vs. some other projects
REO grade (%)
Lynas cut-off grade – 2.5%
8
The LAMP facility is strategically located in Malaysia
Stable operating environment and a
sovereign credit rating of A3
Gebeng is a hub into Asia with exceptional
infrastructure
Located in close proximity to Kuantan deep-
water port with bulk material, liquid and
container berths
Key reagent products located nearby due to
large chemical industry on the east coast of
Malaysia
Established supplier / manufacturer network
within the Gebeng Industrial Estate
High quality and well-maintained
infrastructure and utilities
Access to skilled and competitive labour force
Tax free period granted by the Malaysian
Industrial Development Association under
“strategic pioneer status”
Malaysia operations – Lynas Advanced
Materials Plant
Kangar
PERLIS
LANGKAWI
Alor Setar
KEDAH
George Town
PENANG
Ipoh
PERAK
KELANTAN
Kota Baharu
TERENGGANU
Kuala Terengganu
PAHANG
Kuantan
Johor Baharu
JOHOR
[Melaka]
NEGERI
SEMBILAN
Seremban
SELANGOR
Cameron Highlands
Kuala Lumpur
T H A I L A N D
M A L A Y S I A
S I N G A P O R E
GEBENG
SOUTH SEA CHINA
Tioman
MELAKA
9
Future milestones
LAMP continues to ramp up toward Phase 1 nominal
capacity (expected Q2 2013)
Commissioning of Phase 2 expected in Q2 2013
Ramp-up of Phase 2 in Q3 2013 in line with customer
demand
First feed to kiln achieved in November 2012
First arrival of Rare Earths concentrate from Mount Weld in
November 2012
Initial first feed of concentrate into LAMP rotary kilns in
November 2012
Successful commissioning of LAMP cracking and leaching
units in January 2013
Initial Rare Earths products produced in February 2013
Lynas Advanced Materials Plant – operational
update
10
REO demand growth outlook
Sector
CAGR
2012-2018 Rare Earths used
NiMH Batteries 3.3% La, Nd
Magnets 10.1% NdPr, Dy
Autocatalysts 6.0% Ce
FCCs 8.0% La
Metallurgy &
FerroSilicon
3.4% CeLa
Phosphors -1.2%
Eu, Tb, Y, Ce,
La
Polishing 4.8% CeLa
UV Cut 3.0% Ce
Optical Glass 5.0% La, Gd
Other 3.0%
La, Ce, Nd, Pr,
Sm, Gd, Y
Total demand 5.8%
2015E Expected Global Rare Earths
demand by application
Demand drivers – Rare Earth uses
NiMH Batteries
10%
Magnets
27%
Autocatalysts
7%
FCCs
16%
Metallurgy &
FerroSilicon
13%
Phosphors
7%
Polishing
11%
UV Cut
2%
Optical Glass
3%
Other
4%
Sep „12 Nov„12 Q1„13 Q2 „13
11
Indicative timeline to first sales and operating cash flow
First
shipment to
LAMP from
Mt. Weld
First feed to
kiln
Finished
goods
Customer
qualification
Commercial
shipments
and first
sales
First cash
from sales
Next steps
Current operational focus is LAMP ramp-up towards Phase 1 nominal
capacity
Sales & Marketing focus is on completion of customer qualification process
and commencement of commercial shipments
Commissioning of Phase 2 expected in Q2 2013
TOL issued
External View
Strong cash flows expected in the near term
Nov „12
12
GFC
Community
Outrage
International
and Local
Reviews
IAEA etc
Political
Uncertainty
Sovereign
Risk Issues
Rare Earth
Price Erosion
Malaysian
GE13
New
Company
Challenges Along The Way – An External
Environment that creates Employee Anxiety
The Challenge
A People and Culture Perspective.
13
• To create and build an organisation that is capable of surviving but also thriving in
a changing external environment
• Recruit, On-board, Train new employees
• 2009 40 employees; 2013 – 490 employees
• Able to deal with uncertainty and continue to grow willing to take on wicked
problems
• Changing Production Parameters, Cost Structures
• Sovereign Risk Issues
• Social License to Operate
• Focus employee efforts on building a company while at the same time getting
ready to Operate a new 800M plant in Malaysia
The Challenge - People and Culture Perspective.
14
Biggest Challenge for a start up company
• Align Organisational and Employee Goals in a way that contains
employee anxiety” so that employees can focus on goal achievement
• Development of the Organisational Software
• Values,
• Organisational Structure,
• Role Accountabilities and Responsibilities,
• Feedback Mechanisms, Thinking Tools etc
• Organisational Software allows the Organisational Hardware –
Plant, Equipment, Financial Systems to Operate
Psychological Frame
Human Behaviour – Seeking New Experiences and Reducing Exposure
to Unpleasant Experiences”
15
• Gray believed that personality traits and behaviour could not be explained by
classical behavioural conditioning alone.
• Gray proposed a “Biopsychological Theory of Personality”
• Emphasized the relationship between personality and sensitivity to
reinforcement systems of Reward and Punishment
• System 1 - Willingness to try something new – New Goal Orientation
• Approach Motivation; Impulsivity, Willingness to try something new)
, and
• System 2 - Work to avoid unpleasant outcomes
• Motivation (drive to avoid pain, anxiety, punishment, unpleasant
outcomes )
Gray's model of personality is based on two hypothesized brain systems
Gray, J.A. (1981). A critique of Eysenck's theory of personality, In H.J. Eysenck (Ed.) A model for personality (pp 246–276)
Gray, J.A. (1982). The neuropsychology of anxiety: An enquiry into the functions of the septo-hippocampal system
A Biopsychological Frame
“Behavioural Activation System”
16
Behavioural Activation System (BAS)
• The BAS includes brain regions involved in regulating arousal: cerebral
cortex, thalamus, and stratum.
• The system is responsive to conditioned and unconditioned reward cues.
• BAS regulates approach behaviours and is referred to as the Reward System.
Individual BAS Sensitivity
• In general, individuals with a more active BAS tend to be more fun seeking, like
novelty, change , are more disposed to goal seeking, will respond to seeking
novel or new experiences
A Biopsychological Frame
“Behavioral Inhibition System”
17
Behavioral Inhibition System (BIS)
• The BI also includes brain regions involved in regulating arousal: the brain
stem, and neocortical projections to the frontal lobe.
• BIS is responsive to punishment, novelty, uncertainty, and non-rewarding stimuli.
• BIS regulates avoidance behaviours and is often referred to as the Punishment
System.
Individual BIS Sensitivity
• Individuals with more active BIS may be vulnerable to negative
emotions, including frustration, anxiety, fear, and sadness
• See the risk in things, try to avoid pain or lower anxiety by mitigating risk
• Anxiety lowered for Individuals with High BIS sensitivity by
• working within prescribed systems and when given work that allows avoidance of
something unpleasant – e.g avoid uncertainty in outcomes
Psychological Frame – Mapping to People and
Culture Systems and Organisational Culture
18
• In an environment that is facing rapid
discontinuous change, where social
licence to operate and other issues
create uncertainty in the workplace
• How do we develop and build an
organisation and its People and
Culture Processes and Systems in a
way that enables employees to
remain engaged in the business.
• How do we deal with BIS and BAS
sensitivity in a way that allows
ongoing Employee Engagement
“The Lynas Way”
“A System to Contain Employee Anxiety”
Viewing HR System Elements with this Frame in
Mind – The Lynas Way
19
Viewing HR System Elements with this Frame in
Mind – The Lynas Way
20
BIS Sensitivity - Put decision making at an
efficient level (consistent with control and risk
management) ; Match human capability to
role/task complexity
BAS Sensitivity – Time Span of Discretions –
Pushing Accountability and Empowerment within
Time Span of Discretion.
BIS Sensitivity – Provides a Frame when the normal
gaps in Policy, Procedure and System miss but
where people need something to connect to
BAS - Sensitivity
Codifying Breakthrough Thinking and Risk Taking
Provide space for people to try something new
BAS - Sensitivity
Encouraging “Entrepreneurial” and “breakthrough
Thinking Approaches” – Higher Levels of Thinking;
Spiral Dynamics; Deep Change
BIS Sensitivity
Emotional Safety Creation through Values Based
Discussions and EQ toolsets
BIS Sensitivity – Clear
Context, Purpose, Quality, Quantity Resources and
Timing for Task Work Assignments
-21-
Dimension 1 - The Way We Organise
The Challenge of Leadership
“The difficulty is that we have put ourselves to work in organizations so badly put
together as to mitigate against our working together effectively.
We have too many layers, undefined cross-functional working relationships, false
concepts of leadership, unclear leadership accountability and authority, chaotic
compensation systems, phony performance systems, unfair incentive
systems, false notions of capability and its growth, poor career development
processes and on and on. It is these systems that have to be mended. The art is
to mend them in such a way as to elicit the behaviours we want in the process.”
Source: Elliot Jaques, Requisite Organisation, Cason Hall 1996
Employees come to new organizations from these experiences,
effective and creative leadership and behavior in organizations, requires changing
the systems and not by trying to change the people.
Principles of Lynas Way – The Way We Organise
-22-
• Role clarity- Accountabilities and Responsibilities Clear
• Levels of work (Stratums) – Individuals working within their
time span of discretion are naturally expected to have lower
anxiety
• Task Assigning Role Responsibility (TARR’s) and Task
Initiating Role Responsibility – (TIRR’s) – It is clear who can
give me work
-23-
Role Clarity
• Clearly Defined Position Descriptions based on application of RACI Mapping
across the organisation
• Enables people to perform and deliver the required results and behaviour
• Ensures people understand how their role and personal performance
contributes to the achievement of business strategy
• Specifies real accountabilities able to be measured with clarity
• Clarifies interdependencies within and between teams and people – who does
what!
• Provides a framework that focuses on accountabilities, authorities and
capabilities required to deliver expected outcomes
-24-
Stratums - Human Nature and Capability
 Organizational hierarchy is a natural human phenomenon and forms
according to a relatively predetermined formula, based upon human
capability
 Capability is defined as the extent to which an individual can handle the
complexity of any task
 A key measure of capability is how far an individual is able think/project
into the future
▬ i.e. Each of us have a different starting point, however, the longer
time horizon a person has, the more complex roles they are typically
capable of undertaking
.
Appropriate Structure Contains Anxiety
Allowing Structure to Follow Strategy (Removing ambiguity) and
allowing individuals discretion to complete work in a way that fits
their planning horizon
-25-
Levels of Work (Stratums)
Levels of work define the relative complexity of the tasks that make up the
work requirements of particular roles in the organisation.
Each level of work:
- Requires a different way of thinking
- Must provide information laterally
- Sets overall Context and Purpose for the Level below
- Allocates tasks to the Level below (direct reports)
-26-
Levels of Work (Stratum)
6 10 - 20 Years Value Delivery
5 5 - 10 Years Strategic Direction
4 2 - 5 Years Strategic Delivery
3 1 - 2 Years Operational Direction
2 3 - 12 Months Operational Delivery
1 0 - 3 Months Operational Execution
-27-
How Flat Should a Structure be?
Role Compression and Effective Organisation
Stated Organisation
Structure
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
What really
happens
I
F
G
H
J
A
B
C
D
E
Should be
After Elliott Jacques “Requisite Organisation”; Cason-Hall 1989
-28-
PROJECT
ENGINEER
TEAM LEADER
SPECIALIST
• Safety
• Industrial Relations
OTHER TEAM
LEADER
Role Relationships
Task Assigning and Task Initiating
TARR
- only your team leader
can assign you tasks
(blue box )
TIRR
• if previously
agreed, the people
in green boxes can
initiate certain tasks
with you
TEAM MEMBER
Inevitably people perform tasks that are not given to them by their immediate leader.
This can cause concern and confusion with respect to who can ask who to do what - In these
situations the employee needs to be given clarity on what type of work can be assigned to
them and by whom.
-29-
Dimension 2 - The Lynas Way
Work Allocation - CPQQRT
Whenever work is allocated to employees (assigned or initiated) the following information
should be provided:
CONTEXT
Context gives clarity around why the task exists, by describing the events/activities/changes
that have lead to it at this point in time.
PURPOSE
Purpose is the objective of what needs to be achieved in relation to the task being assigned
and should flow directly from the context.
QUANTITY
Quantity is defined as the numeric value attached to any task and represents the amount of
what ever has to be achieved.
QUALITY
Quality is defined as the standard that has to be met and can be either objective or
subjective
RESOURCES
Resources are defined as the materials, information, people, money, accountabilities and
authorities allocated to the individual to effectively complete the task.
TIME
Time is the deadline or time available for completion of the task.
Dimension 2 - The Lynas Way
Work Allocation - CPQQRT
30
BIS Sensitivity
• Context ,Purpose, Quality, Quantity, Resources and Timing (CPQQRT)
• Reduces Anxiety for BIS ensures that all information and resources for
task completion are described on task initiation.
Dimension 3 - Lynas Way – Values and
Behaviours
31
Values provide a framework that
• provide a sense of certainty in times of rapid discontinuous change
• provide a reference for when the systems, process and procedures that
are either immature-under developed or not in place – a typical start up
.
Care RelationshipRespect Integrity Courage
The Lynas Way – Values and Behaviours
32
BIS Sensitivity
• Provides a Frame to fills gaps in Policy, Procedure and System and where people need
something to connect with.
BAS - Sensitivity
• Explicitly States Organisational Acceptance for Breakthrough Thinking and Risk Taking
• Encourage organisational time and space for people to try something new
Dimension 4 – The Lynas Way People and
Relationships
33
• Toolsets beyond the Mechanistic
• Cultural Memes, Spiral Dynamics
• Developing the Corporate Heart as well as Minds
in Corporate Conversations and when problem
solving
• Formalised Training in 21st Century leadership
Topics, modelled in project teams and change
efforts
• Thinking beyond socialised norms to challenge
the role that corporations play in “Shared Value”
• Application of “breakthrough thinking” techniques
to creating shared value
• Visioning – “Remember the Future” – pre
meditative states to allow access to subconcious
problem solving and goal setting
• Shared Value Conversations at the heart of
corporate
Dimension 4 – The Lynas Way People and
Relationships
34
BAS - Sensitivity
• Encouraging “Entrepreneurial” and “breakthrough Thinking Approaches” –
Higher Levels of Thinking; Spiral Dynamics; Deep Change
• Feeds Novelty Seeking, Encouraging Attainment of Goals not yet
realisable
BIS Sensitivity
• Emotional Safety Creation through Values Based Discussions and EQ
toolsets
• Heart as well as Mind Applied to Problem Solving and People Decisions
mitigating anxiety potential negative outcomes.
Impact of the Lynas Way on Retention.
35
Lynas Labour Turn Over Rates are Respective Industry
Benchmarks (2011-Q1 2013)
23.50
18.9
12.2
14.2
0
5
10
15
20
25
Labour Turn
Over WA
Labour Turn
Over MY
Benchmark
Lynas
http://www.amma.org.au/assets/Policy/Papers/20130227AMMA%20Research%20Paper%20-%20Labour%20Turnover.pdf
Hayes Industry Data – Gebeng Industrial Park – Pahang, Malaysia.
The Lynas Way – An Integrated HR Framework
for a “Developing Company Culture”
36

Weitere ähnliche Inhalte

Was ist angesagt?

Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...
Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...
Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...Emil Hristov
 
Fiesta Movement Case Study
Fiesta Movement Case StudyFiesta Movement Case Study
Fiesta Movement Case Studymmaleigh
 
Ecological zones in pakistan
Ecological zones in pakistanEcological zones in pakistan
Ecological zones in pakistanAhmad Kamal
 
GE's Growth Strategy
GE's Growth StrategyGE's Growth Strategy
GE's Growth StrategyEric Moon
 
Sri Lankan Soil Health: Issues, Challenges, Initiatives and Priority Areas
Sri Lankan Soil Health: Issues, Challenges, Initiatives and Priority AreasSri Lankan Soil Health: Issues, Challenges, Initiatives and Priority Areas
Sri Lankan Soil Health: Issues, Challenges, Initiatives and Priority Areasapaari
 
Growth Mindset by Satya Nadella
Growth Mindset by Satya NadellaGrowth Mindset by Satya Nadella
Growth Mindset by Satya NadellaNamitaGulavani
 
All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan Asma Akbar
 
CASE STUDY OF Rob Parson
CASE STUDY OF Rob ParsonCASE STUDY OF Rob Parson
CASE STUDY OF Rob ParsonNausheen Hasan
 
General Electric (Case Study)
General Electric (Case Study)General Electric (Case Study)
General Electric (Case Study)Uğur Gürbüz
 
Biochar: Important Role In Agriculture
Biochar: Important Role In AgricultureBiochar: Important Role In Agriculture
Biochar: Important Role In AgricultureRavi Kumar Raman
 
GE's Growth Strategy: The Immelt Initiative
GE's Growth Strategy: The Immelt InitiativeGE's Growth Strategy: The Immelt Initiative
GE's Growth Strategy: The Immelt InitiativeAnggriawan Sugianto
 
FAA Drone Regulations - Your Part 107 Cheat Sheet
FAA Drone Regulations - Your Part 107 Cheat SheetFAA Drone Regulations - Your Part 107 Cheat Sheet
FAA Drone Regulations - Your Part 107 Cheat SheetDialexa
 
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)Arun Kumar Trichur Varadarajan
 
Biochar preparation and effect of biochars on corn growth, yield , nutrient ...
Biochar preparation  and effect of biochars on corn growth, yield , nutrient ...Biochar preparation  and effect of biochars on corn growth, yield , nutrient ...
Biochar preparation and effect of biochars on corn growth, yield , nutrient ...Dr. Pavinchandra patel
 
General Electric Presentation
General Electric PresentationGeneral Electric Presentation
General Electric Presentationscholarballer51
 

Was ist angesagt? (20)

Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...
Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...
Централизирано и децентрализирано отвеждане и пречистване на отпадъчни води. ...
 
Biochar and soil environment
Biochar and soil environmentBiochar and soil environment
Biochar and soil environment
 
Fiesta Movement Case Study
Fiesta Movement Case StudyFiesta Movement Case Study
Fiesta Movement Case Study
 
Ecological zones in pakistan
Ecological zones in pakistanEcological zones in pakistan
Ecological zones in pakistan
 
GE's Growth Strategy
GE's Growth StrategyGE's Growth Strategy
GE's Growth Strategy
 
Sri Lankan Soil Health: Issues, Challenges, Initiatives and Priority Areas
Sri Lankan Soil Health: Issues, Challenges, Initiatives and Priority AreasSri Lankan Soil Health: Issues, Challenges, Initiatives and Priority Areas
Sri Lankan Soil Health: Issues, Challenges, Initiatives and Priority Areas
 
What is biochar (2)
What is biochar (2)What is biochar (2)
What is biochar (2)
 
Growth Mindset by Satya Nadella
Growth Mindset by Satya NadellaGrowth Mindset by Satya Nadella
Growth Mindset by Satya Nadella
 
David smith diamond foods final power point 4 23-14
David smith diamond foods final power point 4 23-14David smith diamond foods final power point 4 23-14
David smith diamond foods final power point 4 23-14
 
All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan
 
CASE STUDY OF Rob Parson
CASE STUDY OF Rob ParsonCASE STUDY OF Rob Parson
CASE STUDY OF Rob Parson
 
General Electric (Case Study)
General Electric (Case Study)General Electric (Case Study)
General Electric (Case Study)
 
Biochar: Important Role In Agriculture
Biochar: Important Role In AgricultureBiochar: Important Role In Agriculture
Biochar: Important Role In Agriculture
 
GE's Growth Strategy: The Immelt Initiative
GE's Growth Strategy: The Immelt InitiativeGE's Growth Strategy: The Immelt Initiative
GE's Growth Strategy: The Immelt Initiative
 
FAA Drone Regulations - Your Part 107 Cheat Sheet
FAA Drone Regulations - Your Part 107 Cheat SheetFAA Drone Regulations - Your Part 107 Cheat Sheet
FAA Drone Regulations - Your Part 107 Cheat Sheet
 
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
 
3. Soil Organic Matter
3. Soil Organic Matter3. Soil Organic Matter
3. Soil Organic Matter
 
Biochar preparation and effect of biochars on corn growth, yield , nutrient ...
Biochar preparation  and effect of biochars on corn growth, yield , nutrient ...Biochar preparation  and effect of biochars on corn growth, yield , nutrient ...
Biochar preparation and effect of biochars on corn growth, yield , nutrient ...
 
HFA103013
HFA103013HFA103013
HFA103013
 
General Electric Presentation
General Electric PresentationGeneral Electric Presentation
General Electric Presentation
 

Ähnlich wie Lynas Corporation - Building a new business and creating an organisation that meets its vision

Organisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths LimitedOrganisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths LimitedAmbadi S - HR Professional
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Company Spotlight
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01ImageRes
 
Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...Roneet Kumar
 
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...Anver Dole
 
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)sreeni ak
 
EDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaEDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaPankaj Shukla
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Presentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptxPresentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptxRajkishoreSahoo26
 
training and development project IIPM
training and development project IIPM training and development project IIPM
training and development project IIPM Susmitha Chowdary
 
Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...Roneet Kumar
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 
Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma
 
Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...Chris Helweg
 
Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.Thomas john
 

Ähnlich wie Lynas Corporation - Building a new business and creating an organisation that meets its vision (20)

THAMIL-RESUME
THAMIL-RESUMETHAMIL-RESUME
THAMIL-RESUME
 
Organisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths LimitedOrganisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths Limited
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01
 
Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...
 
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
 
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
 
EDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaEDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj Shukla
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Presentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptxPresentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptx
 
training and development project IIPM
training and development project IIPM training and development project IIPM
training and development project IIPM
 
Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
ADITYA KAUSHIK Resume
ADITYA KAUSHIK ResumeADITYA KAUSHIK Resume
ADITYA KAUSHIK Resume
 
Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)
 
Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...
 
Maudore mar13presentation
Maudore mar13presentationMaudore mar13presentation
Maudore mar13presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
IMPACT Silver Corp. Presentation
IMPACT Silver Corp. PresentationIMPACT Silver Corp. Presentation
IMPACT Silver Corp. Presentation
 
Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.
 

Mehr von Media Corp International

Large-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro AluminiumLarge-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro AluminiumMedia Corp International
 
Resourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin EnergyResourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin EnergyMedia Corp International
 
Talent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR StrategyTalent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR StrategyMedia Corp International
 
Sunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentationSunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentationMedia Corp International
 
Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013Media Corp International
 
Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013Media Corp International
 
David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013Media Corp International
 
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013Media Corp International
 
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013Media Corp International
 
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013Media Corp International
 
Malcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders SummitMalcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders SummitMedia Corp International
 
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitAaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitMedia Corp International
 
Yamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders SummitYamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders SummitMedia Corp International
 

Mehr von Media Corp International (14)

Gender Diversity and Caltex's story
Gender Diversity and Caltex's storyGender Diversity and Caltex's story
Gender Diversity and Caltex's story
 
Large-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro AluminiumLarge-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro Aluminium
 
Resourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin EnergyResourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin Energy
 
Talent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR StrategyTalent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
 
Sunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentationSunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentation
 
Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013
 
Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013
 
David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013
 
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
 
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
 
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
 
Malcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders SummitMalcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders Summit
 
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitAaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
 
Yamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders SummitYamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
 

Kürzlich hochgeladen

Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Kürzlich hochgeladen (20)

Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Lynas Corporation - Building a new business and creating an organisation that meets its vision

  • 1.
  • 2. Lynas Corporation Building a New Business and Creating an Organisation that meets its vision HR Leaders Summit 8 May 2013
  • 3. Introduction 3 • Imagine in that environment attempting to attract, on board and train employees at a rate of 1 per day for 2.5 years • Keeping 360 employees engaged and focussed on building a new industry in an environment where • You drive to work every day and the car in front of you has a sticker telling people that your employer should not be here • That your employer is simply using your country to dump radioactive waste • Where you go to restaurants and are refused service based on what your uniform carrying your employers name
  • 4. Company overview 4 Mount Weld Concentration Plant Lynas Advanced Materials Plant CLD Rare Earth Deposit Mt Weld Project and Concentration Plant LAMP, Malaysia Primarily involved in the exploration, development, mining and processing of Rare Earth minerals ASX-listed, market capitalisation of A$1.2bn as of February 27, 2013 Owns and operates: Mt. Weld – the highest grade known Rare Earths deposit in the world – located 35km south of Laverton in W.A. Mt. Weld Concentration Plant – commissioned in 2011 and located 1.5km from site Lynas Advanced Materials Plant (“LAMP”) facility – located in the Gebeng Industrial Estate (“GIE”) near the Port of Kuantan in Malaysia Phase 1 production capacity of 11,000 tonnes per annum (“tpa”) REO and Phase 2 production capacity of 22,000tpa REO Location of key assets Building a fully integrated source of Rare Earths from mine to customers Lynas‟ vision is to be the leader in Rare Earths for a sustainable future
  • 5. 5 Production process overview Vertically integrated operations from mining at Mt. Weld to oxide production at the LAMP Rare Earths Solution
  • 6. Mt. Weld Mine & Concentration Plant 6 Overview of Australian assets Mt Weld Project and Concentration Plant Location of the Mt. Weld Project & Concentration Plant Mt. Weld Mine The highest grade known deposit of Rare Earths in the world Consists of the Central Lanthanide Deposit (“CLD”) and Duncan Deposit Located 35km south of Laverton in W.A. Simple, conventional open-pit mining operation Stockpiled ore is sufficient to sustain Phase 1 steady state production for 6 years 773kt mined at 15.4% REO (116kt contained REO) Mt. Weld Concentration Plant Commissioned in May 2011 Located 1.5km from Mt. Weld mine Phase 1 capacity: 33,000tpa REO concentrate Expected capacity including Phase 2: 66,000tpa REO concentrate Proven REO flotation technology ~15kt of dry bagged concentrate ready for shipment to Malaysia
  • 7. 7 CLD is the world‟s highest grade known Rare Earths orebody Recent drilling on the western side of the CLD has increased confidence levels in the resource with a large portion of the resources in the measured and indicated categories Above a REO cut-off of 2.5%, the CLD has a resource of 14.9mt at an average grade of 9.8% REO for a total of 1,460,000 tonnes of REO CLD resource category Ore (mmt) REO (%)¹ Measured 6.9 12.2 Indicated 7.0 8.1 Inferred 1.1 4.6 Total 14.9 9.8 9.8% 6.4% 4.9% 2.6% 2.0% 1.4% 1.1% 0.0% 2.0% 4.0% 6.0% 8.0% 10.0% 12.0% CLD (Lynas) Mountain Pass (Molycorp) Duncan (Lynas) Nolans (Arafura) Hoidas Lake (Great Western) Thor Lake (Avalon) Kvanefjeld (Greenland) Source: Company filings Note: Figures may not sum due to rounding 1 REO (%) includes all the lanthanide elements plus yttrium Central Lanthanide Deposit Rare Earth Grade – Mt. Weld vs. some other projects REO grade (%) Lynas cut-off grade – 2.5%
  • 8. 8 The LAMP facility is strategically located in Malaysia Stable operating environment and a sovereign credit rating of A3 Gebeng is a hub into Asia with exceptional infrastructure Located in close proximity to Kuantan deep- water port with bulk material, liquid and container berths Key reagent products located nearby due to large chemical industry on the east coast of Malaysia Established supplier / manufacturer network within the Gebeng Industrial Estate High quality and well-maintained infrastructure and utilities Access to skilled and competitive labour force Tax free period granted by the Malaysian Industrial Development Association under “strategic pioneer status” Malaysia operations – Lynas Advanced Materials Plant Kangar PERLIS LANGKAWI Alor Setar KEDAH George Town PENANG Ipoh PERAK KELANTAN Kota Baharu TERENGGANU Kuala Terengganu PAHANG Kuantan Johor Baharu JOHOR [Melaka] NEGERI SEMBILAN Seremban SELANGOR Cameron Highlands Kuala Lumpur T H A I L A N D M A L A Y S I A S I N G A P O R E GEBENG SOUTH SEA CHINA Tioman MELAKA
  • 9. 9 Future milestones LAMP continues to ramp up toward Phase 1 nominal capacity (expected Q2 2013) Commissioning of Phase 2 expected in Q2 2013 Ramp-up of Phase 2 in Q3 2013 in line with customer demand First feed to kiln achieved in November 2012 First arrival of Rare Earths concentrate from Mount Weld in November 2012 Initial first feed of concentrate into LAMP rotary kilns in November 2012 Successful commissioning of LAMP cracking and leaching units in January 2013 Initial Rare Earths products produced in February 2013 Lynas Advanced Materials Plant – operational update
  • 10. 10 REO demand growth outlook Sector CAGR 2012-2018 Rare Earths used NiMH Batteries 3.3% La, Nd Magnets 10.1% NdPr, Dy Autocatalysts 6.0% Ce FCCs 8.0% La Metallurgy & FerroSilicon 3.4% CeLa Phosphors -1.2% Eu, Tb, Y, Ce, La Polishing 4.8% CeLa UV Cut 3.0% Ce Optical Glass 5.0% La, Gd Other 3.0% La, Ce, Nd, Pr, Sm, Gd, Y Total demand 5.8% 2015E Expected Global Rare Earths demand by application Demand drivers – Rare Earth uses NiMH Batteries 10% Magnets 27% Autocatalysts 7% FCCs 16% Metallurgy & FerroSilicon 13% Phosphors 7% Polishing 11% UV Cut 2% Optical Glass 3% Other 4%
  • 11. Sep „12 Nov„12 Q1„13 Q2 „13 11 Indicative timeline to first sales and operating cash flow First shipment to LAMP from Mt. Weld First feed to kiln Finished goods Customer qualification Commercial shipments and first sales First cash from sales Next steps Current operational focus is LAMP ramp-up towards Phase 1 nominal capacity Sales & Marketing focus is on completion of customer qualification process and commencement of commercial shipments Commissioning of Phase 2 expected in Q2 2013 TOL issued External View Strong cash flows expected in the near term Nov „12
  • 12. 12 GFC Community Outrage International and Local Reviews IAEA etc Political Uncertainty Sovereign Risk Issues Rare Earth Price Erosion Malaysian GE13 New Company Challenges Along The Way – An External Environment that creates Employee Anxiety
  • 13. The Challenge A People and Culture Perspective. 13 • To create and build an organisation that is capable of surviving but also thriving in a changing external environment • Recruit, On-board, Train new employees • 2009 40 employees; 2013 – 490 employees • Able to deal with uncertainty and continue to grow willing to take on wicked problems • Changing Production Parameters, Cost Structures • Sovereign Risk Issues • Social License to Operate • Focus employee efforts on building a company while at the same time getting ready to Operate a new 800M plant in Malaysia
  • 14. The Challenge - People and Culture Perspective. 14 Biggest Challenge for a start up company • Align Organisational and Employee Goals in a way that contains employee anxiety” so that employees can focus on goal achievement • Development of the Organisational Software • Values, • Organisational Structure, • Role Accountabilities and Responsibilities, • Feedback Mechanisms, Thinking Tools etc • Organisational Software allows the Organisational Hardware – Plant, Equipment, Financial Systems to Operate
  • 15. Psychological Frame Human Behaviour – Seeking New Experiences and Reducing Exposure to Unpleasant Experiences” 15 • Gray believed that personality traits and behaviour could not be explained by classical behavioural conditioning alone. • Gray proposed a “Biopsychological Theory of Personality” • Emphasized the relationship between personality and sensitivity to reinforcement systems of Reward and Punishment • System 1 - Willingness to try something new – New Goal Orientation • Approach Motivation; Impulsivity, Willingness to try something new) , and • System 2 - Work to avoid unpleasant outcomes • Motivation (drive to avoid pain, anxiety, punishment, unpleasant outcomes ) Gray's model of personality is based on two hypothesized brain systems Gray, J.A. (1981). A critique of Eysenck's theory of personality, In H.J. Eysenck (Ed.) A model for personality (pp 246–276) Gray, J.A. (1982). The neuropsychology of anxiety: An enquiry into the functions of the septo-hippocampal system
  • 16. A Biopsychological Frame “Behavioural Activation System” 16 Behavioural Activation System (BAS) • The BAS includes brain regions involved in regulating arousal: cerebral cortex, thalamus, and stratum. • The system is responsive to conditioned and unconditioned reward cues. • BAS regulates approach behaviours and is referred to as the Reward System. Individual BAS Sensitivity • In general, individuals with a more active BAS tend to be more fun seeking, like novelty, change , are more disposed to goal seeking, will respond to seeking novel or new experiences
  • 17. A Biopsychological Frame “Behavioral Inhibition System” 17 Behavioral Inhibition System (BIS) • The BI also includes brain regions involved in regulating arousal: the brain stem, and neocortical projections to the frontal lobe. • BIS is responsive to punishment, novelty, uncertainty, and non-rewarding stimuli. • BIS regulates avoidance behaviours and is often referred to as the Punishment System. Individual BIS Sensitivity • Individuals with more active BIS may be vulnerable to negative emotions, including frustration, anxiety, fear, and sadness • See the risk in things, try to avoid pain or lower anxiety by mitigating risk • Anxiety lowered for Individuals with High BIS sensitivity by • working within prescribed systems and when given work that allows avoidance of something unpleasant – e.g avoid uncertainty in outcomes
  • 18. Psychological Frame – Mapping to People and Culture Systems and Organisational Culture 18 • In an environment that is facing rapid discontinuous change, where social licence to operate and other issues create uncertainty in the workplace • How do we develop and build an organisation and its People and Culture Processes and Systems in a way that enables employees to remain engaged in the business. • How do we deal with BIS and BAS sensitivity in a way that allows ongoing Employee Engagement “The Lynas Way” “A System to Contain Employee Anxiety”
  • 19. Viewing HR System Elements with this Frame in Mind – The Lynas Way 19
  • 20. Viewing HR System Elements with this Frame in Mind – The Lynas Way 20 BIS Sensitivity - Put decision making at an efficient level (consistent with control and risk management) ; Match human capability to role/task complexity BAS Sensitivity – Time Span of Discretions – Pushing Accountability and Empowerment within Time Span of Discretion. BIS Sensitivity – Provides a Frame when the normal gaps in Policy, Procedure and System miss but where people need something to connect to BAS - Sensitivity Codifying Breakthrough Thinking and Risk Taking Provide space for people to try something new BAS - Sensitivity Encouraging “Entrepreneurial” and “breakthrough Thinking Approaches” – Higher Levels of Thinking; Spiral Dynamics; Deep Change BIS Sensitivity Emotional Safety Creation through Values Based Discussions and EQ toolsets BIS Sensitivity – Clear Context, Purpose, Quality, Quantity Resources and Timing for Task Work Assignments
  • 21. -21- Dimension 1 - The Way We Organise The Challenge of Leadership “The difficulty is that we have put ourselves to work in organizations so badly put together as to mitigate against our working together effectively. We have too many layers, undefined cross-functional working relationships, false concepts of leadership, unclear leadership accountability and authority, chaotic compensation systems, phony performance systems, unfair incentive systems, false notions of capability and its growth, poor career development processes and on and on. It is these systems that have to be mended. The art is to mend them in such a way as to elicit the behaviours we want in the process.” Source: Elliot Jaques, Requisite Organisation, Cason Hall 1996 Employees come to new organizations from these experiences, effective and creative leadership and behavior in organizations, requires changing the systems and not by trying to change the people.
  • 22. Principles of Lynas Way – The Way We Organise -22- • Role clarity- Accountabilities and Responsibilities Clear • Levels of work (Stratums) – Individuals working within their time span of discretion are naturally expected to have lower anxiety • Task Assigning Role Responsibility (TARR’s) and Task Initiating Role Responsibility – (TIRR’s) – It is clear who can give me work
  • 23. -23- Role Clarity • Clearly Defined Position Descriptions based on application of RACI Mapping across the organisation • Enables people to perform and deliver the required results and behaviour • Ensures people understand how their role and personal performance contributes to the achievement of business strategy • Specifies real accountabilities able to be measured with clarity • Clarifies interdependencies within and between teams and people – who does what! • Provides a framework that focuses on accountabilities, authorities and capabilities required to deliver expected outcomes
  • 24. -24- Stratums - Human Nature and Capability  Organizational hierarchy is a natural human phenomenon and forms according to a relatively predetermined formula, based upon human capability  Capability is defined as the extent to which an individual can handle the complexity of any task  A key measure of capability is how far an individual is able think/project into the future ▬ i.e. Each of us have a different starting point, however, the longer time horizon a person has, the more complex roles they are typically capable of undertaking . Appropriate Structure Contains Anxiety Allowing Structure to Follow Strategy (Removing ambiguity) and allowing individuals discretion to complete work in a way that fits their planning horizon
  • 25. -25- Levels of Work (Stratums) Levels of work define the relative complexity of the tasks that make up the work requirements of particular roles in the organisation. Each level of work: - Requires a different way of thinking - Must provide information laterally - Sets overall Context and Purpose for the Level below - Allocates tasks to the Level below (direct reports)
  • 26. -26- Levels of Work (Stratum) 6 10 - 20 Years Value Delivery 5 5 - 10 Years Strategic Direction 4 2 - 5 Years Strategic Delivery 3 1 - 2 Years Operational Direction 2 3 - 12 Months Operational Delivery 1 0 - 3 Months Operational Execution
  • 27. -27- How Flat Should a Structure be? Role Compression and Effective Organisation Stated Organisation Structure A B C D E F G H I J A B C D E F G H I J What really happens I F G H J A B C D E Should be After Elliott Jacques “Requisite Organisation”; Cason-Hall 1989
  • 28. -28- PROJECT ENGINEER TEAM LEADER SPECIALIST • Safety • Industrial Relations OTHER TEAM LEADER Role Relationships Task Assigning and Task Initiating TARR - only your team leader can assign you tasks (blue box ) TIRR • if previously agreed, the people in green boxes can initiate certain tasks with you TEAM MEMBER Inevitably people perform tasks that are not given to them by their immediate leader. This can cause concern and confusion with respect to who can ask who to do what - In these situations the employee needs to be given clarity on what type of work can be assigned to them and by whom.
  • 29. -29- Dimension 2 - The Lynas Way Work Allocation - CPQQRT Whenever work is allocated to employees (assigned or initiated) the following information should be provided: CONTEXT Context gives clarity around why the task exists, by describing the events/activities/changes that have lead to it at this point in time. PURPOSE Purpose is the objective of what needs to be achieved in relation to the task being assigned and should flow directly from the context. QUANTITY Quantity is defined as the numeric value attached to any task and represents the amount of what ever has to be achieved. QUALITY Quality is defined as the standard that has to be met and can be either objective or subjective RESOURCES Resources are defined as the materials, information, people, money, accountabilities and authorities allocated to the individual to effectively complete the task. TIME Time is the deadline or time available for completion of the task.
  • 30. Dimension 2 - The Lynas Way Work Allocation - CPQQRT 30 BIS Sensitivity • Context ,Purpose, Quality, Quantity, Resources and Timing (CPQQRT) • Reduces Anxiety for BIS ensures that all information and resources for task completion are described on task initiation.
  • 31. Dimension 3 - Lynas Way – Values and Behaviours 31 Values provide a framework that • provide a sense of certainty in times of rapid discontinuous change • provide a reference for when the systems, process and procedures that are either immature-under developed or not in place – a typical start up . Care RelationshipRespect Integrity Courage
  • 32. The Lynas Way – Values and Behaviours 32 BIS Sensitivity • Provides a Frame to fills gaps in Policy, Procedure and System and where people need something to connect with. BAS - Sensitivity • Explicitly States Organisational Acceptance for Breakthrough Thinking and Risk Taking • Encourage organisational time and space for people to try something new
  • 33. Dimension 4 – The Lynas Way People and Relationships 33 • Toolsets beyond the Mechanistic • Cultural Memes, Spiral Dynamics • Developing the Corporate Heart as well as Minds in Corporate Conversations and when problem solving • Formalised Training in 21st Century leadership Topics, modelled in project teams and change efforts • Thinking beyond socialised norms to challenge the role that corporations play in “Shared Value” • Application of “breakthrough thinking” techniques to creating shared value • Visioning – “Remember the Future” – pre meditative states to allow access to subconcious problem solving and goal setting • Shared Value Conversations at the heart of corporate
  • 34. Dimension 4 – The Lynas Way People and Relationships 34 BAS - Sensitivity • Encouraging “Entrepreneurial” and “breakthrough Thinking Approaches” – Higher Levels of Thinking; Spiral Dynamics; Deep Change • Feeds Novelty Seeking, Encouraging Attainment of Goals not yet realisable BIS Sensitivity • Emotional Safety Creation through Values Based Discussions and EQ toolsets • Heart as well as Mind Applied to Problem Solving and People Decisions mitigating anxiety potential negative outcomes.
  • 35. Impact of the Lynas Way on Retention. 35 Lynas Labour Turn Over Rates are Respective Industry Benchmarks (2011-Q1 2013) 23.50 18.9 12.2 14.2 0 5 10 15 20 25 Labour Turn Over WA Labour Turn Over MY Benchmark Lynas http://www.amma.org.au/assets/Policy/Papers/20130227AMMA%20Research%20Paper%20-%20Labour%20Turnover.pdf Hayes Industry Data – Gebeng Industrial Park – Pahang, Malaysia.
  • 36. The Lynas Way – An Integrated HR Framework for a “Developing Company Culture” 36