SlideShare ist ein Scribd-Unternehmen logo
1 von 40
Downloaden Sie, um offline zu lesen
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
01
TPM Introduction
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
02
• Think of a “World Class” sportsperson or team,
either current or past.
• Why are they (or were they) ‘World Class? i.e. What
attributes/characteristics differentiate them from
the rest?
• In other words: What makes (or made) them
‘Special’?
World Class Sports Person or
Team
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
03
• Train and practice a lot before they perform
• Have dedicated “Improvement Time”
• Are obsessive about attention to detail
• Depend on others, not just self
• Have the right equipment, facilities and
environment
• Have a clear vision of what’s possible
• Have a ‘Continuous Improvement’ mentality
• Are totally dedicated
• Maximise their individual and collective potential
• Are well paid when they get there!!
10 x Attributes of “World Class”
Performers
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
04
• 5% of What We Read
• 10% of What We Hear
• 15% of What We See
• 20% of What We See and Hear
• 40% of What We Discuss With Others
• 80% of What We Practice and Experience
• 95% When We Teach Others
Learning, Understanding and
Retention
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
05
Positioning Maintenance
Excellence
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
6
• In any asset based enterprise the effective and
efficient operation of your assets is a critical factor
in the consistent delivery of customer value.
• Therefore we can consider our ability to maintain
and optimise the performance of those assets as
ONE of the critical systems within your business.
• The principles of TPM applied effectively, act as an
effective system to ensure optimal equipment
performance.
Asset Care/TPM
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
7
• As a philosophy TPM is capable of supporting and
encouraging ideal behaviours of those working with
and supporting equipment performance.
• If designed effectively TPM integrates seamlessly
with other critical business systems such as visual
management an system of improvement,enabling
consistent and sustainable business growth.
Asset Care/TPM
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
8
A day in the life
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
9
Average day? Opportunities for
learning?
Good Day No Hassle =	1088	parts
Hassle Day =	1088	parts
Bad Day =	950	parts
Hassle Day =	1088	parts
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
10
• Moving operators to regain productivity = More Cost
• Technical resources = distractedfrom more value adding activity also
More Cost
• Stress = disengagement operator group
• Visual inspection processes rushed?
• Line balance
• WIP rules compromised
• Other lines suffer
• Invisible downtime/issues on equipment
• Supervisor distracted
• Training and learning on back burner etc. etc. etc.
Hassle day
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
11
• List all the improvement/management tools
currently in place within your operational
environment.
• ______________________________
• ______________________________
• ______________________________
• ______________________________
• ______________________________
• ______________________________
Current State process
management
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
12
• What is their purpose?
• Are they effective?
• Are they used on a daily weekly basis?
• Are they truly part of how things are done here?
• Do they work synergistically?
• What would be your answers?
• What do we expect TPM to do and how will it fit into
this picture?
Questions
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
13
TPM as a core business
SYSTEM
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
14
Shingo	Enterprise	Excellence
Overview
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
15
The Shingo Model
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
16
Three Insights of Enterprise Excellence
Insight #1:
Ideal Results Require Ideal Behaviour
Insight #2:
Beliefs and Systems Drive Behaviour
Insight #3:
Principles Inform Ideal
Behaviour
Principles guide us
toward ideal
Behaviour? ][
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
17
What are principles?The	Shingo	Model	&	Guiding	Principles
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
18
© S A Partners
The Application of the
Enterprise Excellence Model
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
19
The Application of the Enterprise
Excellence Model
PeopleProcess
Purpose
Results
Customer
How stakeholder needs
are understood and
converted into strategy
The “WHY”
Improve
How value is created and
realised across the end to
end enterprise
How people potential is
realised
How strategy is
deployed into the
organisation and how
governance is created
How Principles and
values are translated
into Leadership and
Behaviours
How the process is
continually improved
by the people and how
problems are solved
Sustainable Customer
focussed results, from
an integrated
organisation
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
20
© S A Partners
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
21
Enterprise Excellence
Our assessment looks at the purpose of the system and their
effectiveness by examining evidence of its activity and impact on
Ideal Behaviour
Principles
Non negotiable commitments
of business
Systems
The integrated processes which deliver
the results for the organisation
Skills, competencies and confidence
The ability to lead systems, manage processes and
carry out tasks
Know why
Know what
Know how
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
22
What do we mean by Systems?
Business Alignment
Management System
People
Development
Process
Management
(Common Cause
Special Cause)
System of
Engagement
(Hearts and Hands)
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
23
Enterprise Excellence Model
Systems (Examples)
PeopleProcess
Purpose
Results
Customer
Stakeholder Management
Strategy Formation
Organisational design
Improve
Order Creation
Product & Asset Lifecycle Mgt
Order Fulfilment
Supply Chain Integration
Health, Safety &
Environment
Reward and recognition
People Skill & Lifecycle Mgt,
Reward & Recognition
Strategy Deployment
Project Management
Management Process
Behaviour Deployment
& Coaching
Leader Standard Work
Communications
Organisational Maturity
& Benchmarking
Continuous
Improvement
Performance Mgt
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
24
Types of Asset
environment
People and Assets
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
25
• Number of people approximately equal to the number of
assets
• Machine use may vary based on demand and line balancing
requirements
• Separate maintainer group, separate engineering support
group
• Highly regulated environment?
Types of Asset environments
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
26
• Operator running series of individual assets
• Separate maintainer group
• Separate engineering support group
• Highly regulated environment?
Types of Asset environments
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
27
• Operator running Complex Process
• Separate maintainer group
• Separate engineering support group
• Separate process support group
• High Risk environment?
Types of Asset environments
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
28
• One or two assets per person?
– Cross trained due to demand and line balancing
requirements
• Multiple Assets Per person?
– Flow
– Sub assembly
• Few people complex process
– High Risk?
Types of asset environment
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
29
• Pick an example of asset environment which is
closest to your business.
• Consider, in the ideal state, what would be the
ideal systems, tools and behaviours you need to
ensure ideal sustainable results.
• What Shingo principles would be of particular
relevance to asset optimisation?
In Groups consider the ideal
asset management environment
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
30
How the Best Practice “day job”
culture of Maintenance has evolved
Versatile
People focused
(Today)
Flexible
(00’s)
Single
Skilled
(60’S / 70’S)
Multi
Skilled
(1980’s / 90’s)
Specialist
Craftsmen
Experienced
Proficient
Professional
Adaptable
Responsive
Resourceful
All Purpose
• Told
• Narrow
• Fixed
• Told
• Wider
• Semi Variable
• Explained
• Broad
• Variable
• Delegated
• Team focus
• Greater x’functional
activity
• Participating and
involved with decisions
• Autonomous within
clear boundaries
• Working with
outsourced partners
Capability
Time
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
31
• You cannot achieve excellence without Operational Basics
in place!!
• This means the fundamentals of:-
– Standard (and Safe) Operating Procedures,
– ‘Best Practice’ Work Place Organisation / 5S
– Basic Manufacturing Process Control
– A Disciplined, Self-determined, TPM / Asset Care Regime
– Reliable Data Collection & Interpretation
– Continuous Development and Training of our People
– Clearly defined roles and responsibilities
A Key Message to Remember
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
32
• You transform the culture !!
Achieving Lean will only work, if:
Remember that physical and information
transformation is relatively easy – sustainment
through changing the culture is difficult – and why is
this the case?….
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
33
And The More I Direct My Energy into…
The More I Assume…
The More Suspicious I Become…
The Less I Know About Plans to Change…
The More I Assume…
Poor Communications = Resistance
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
34
• Striving for world class status is revolutionary.
• Culture change is evolutionary, because resistance to
change is both universal and a natural human
characteristic.
• Our philosophy and approach therefore, must centre on
tapping into the potential of our people through
Involvement & Teamwork
• TPM sets out to do precisely this by giving ownership to the
“new ways of working”
Creating the Environment
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
35
Introducing Four Cycle
Eleven Step Model
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
36
• Lean thinking is the speed / pace/velocity with which you
receive a customer’s order and convert it into money in
Company’s bank account by eliminating waste in all that we
do
• 5S & Workplace Organisation is aimed at Creating Flow
• Visual Management indicates the status/quality of that
Flow
• TPM is about Maintaining that flow through our critical
assets
Cutting to the Core
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
37
• TPM is about establishing the correct relationship between
People and their Equipment to create ‘ownership’ and Team
Work
• It’s about unlocking our Installed Productive Capacity by
unlocking the Potential of our People
• Unlocking the discretionary effort and innovative capability
of your team
So what is TPM ?
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
38
Five Principles of TPM
1. Increase the OEE
4. Increase Skills (Hand & Op, T/W’ing & Problem
Solving)
KNOW OF
UNDERSTANDCAN USE
CAN TRAIN
OTHERS
5. Early Involvement in New Equipment Specification
3. Make Routine Front Line Asset Care part of the job
2. Improveexisting Planned MaintenanceSystems
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
39
• Over the last three years S A Partners have worked
with the recognised TPM expert Peter Willmott to
develop his original nine step TPM model.
• Our new four cycle eleven step model takes into
account the critical enabling element
leader/management culture & behaviour.
• This focus defines TPM as a key system within an
asset reliant organisation and allows it to integrate
with true Enterprise Excellence Thinking.
Background and Programme
structure
Total Productive Maintenance
© 2016 The Leadership Network®
© 2016 Jidoka®
40
Four Cycle-11 Step TPM
Review
Performance
Criteria &
History
Measurement
& Opportunity
analysis of
KPIs
(incl. OEE)
Equipment
Criticality
Assessment
Condition
Appraisal &
Restoration
plan
Root cause
Analysis &
Problem
Resolution
Individual
& Team Skill
Development
Leadership
&
Behaviours
Audit & Review
Process
MEASURE
CURRENT STATE
& IDENTIFY
OPPORTUNITY
CONDITION
REVIEW
(INCL. SAFETY
ENERGY, &
ENVIRONMENT)
PROBLEM
PREVENTION &
BEST PRACTICE
ROUTINES
FUTURE STATE
REALISATION
THROUGH A HABIT
OF CONTINUOUS
IMPROVEMENT
Feedback
A
B
C
D
Assess
Hidden
Losses/wastes
& Set
Improvement
priorities
Develop
Future Total
Asset Care
Best Practice &
Standard Work
1 2 3
4 5 6
7 8
9 10 11

Weitere ähnliche Inhalte

Was ist angesagt?

Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenancevivekmsmech
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...IRJET Journal
 
Principles of Lean Maintenance
Principles of Lean Maintenance Principles of Lean Maintenance
Principles of Lean Maintenance PlantEngineering
 
Lean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introLean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introJaroslaw Gadek, MBA
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceTri Dung Nguyen
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
Management Team Training 4-2-07
Management Team Training 4-2-07Management Team Training 4-2-07
Management Team Training 4-2-07wendyw
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniquesKobi Vider
 

Was ist angesagt? (18)

Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Principles of Lean Maintenance
Principles of Lean Maintenance Principles of Lean Maintenance
Principles of Lean Maintenance
 
Lean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introLean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_intro
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Standard operations preview
Standard operations previewStandard operations preview
Standard operations preview
 
Visual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing ManagementVisual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing Management
 
Tpm
TpmTpm
Tpm
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Management Team Training 4-2-07
Management Team Training 4-2-07Management Team Training 4-2-07
Management Team Training 4-2-07
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Tpm Diagnostic 4
Tpm Diagnostic              4Tpm Diagnostic              4
Tpm Diagnostic 4
 
Autonomous maintenance preview
Autonomous maintenance previewAutonomous maintenance preview
Autonomous maintenance preview
 
Standard work in_services_final
Standard work in_services_finalStandard work in_services_final
Standard work in_services_final
 
Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniques
 

Andere mochten auch

Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011Yves Merel
 
Poka, yoke & jidoka
Poka, yoke & jidokaPoka, yoke & jidoka
Poka, yoke & jidokaAkash Patel
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingTimothy Wooi
 

Andere mochten auch (7)

TPM SUMMARY
TPM SUMMARYTPM SUMMARY
TPM SUMMARY
 
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
 
Jidoka Sample
Jidoka SampleJidoka Sample
Jidoka Sample
 
Poka, yoke & jidoka
Poka, yoke & jidokaPoka, yoke & jidoka
Poka, yoke & jidoka
 
Jidoka
JidokaJidoka
Jidoka
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 

Ähnlich wie TPM Intro

Evidence Based Management and Organisational Change
Evidence Based Management and Organisational ChangeEvidence Based Management and Organisational Change
Evidence Based Management and Organisational ChangeSimon Reindl
 
Agile Data Governance Tutorial
Agile Data Governance TutorialAgile Data Governance Tutorial
Agile Data Governance TutorialTami Flowers
 
How to improve your organization's performance with Dawn
How to improve your organization's performance with DawnHow to improve your organization's performance with Dawn
How to improve your organization's performance with DawnInterfacing
 
Agile42 agile for super heroes_june2018
Agile42 agile for super heroes_june2018Agile42 agile for super heroes_june2018
Agile42 agile for super heroes_june2018Richard Dolman
 
Optimizing Product Management and Making Changes That Stick
Optimizing Product Management and Making Changes That StickOptimizing Product Management and Making Changes That Stick
Optimizing Product Management and Making Changes That StickAIPMM Administration
 
Benefits of Moving HR to the Cloud
Benefits of Moving HR to the CloudBenefits of Moving HR to the Cloud
Benefits of Moving HR to the Cloudscoopnewsgroup
 
Lean Strategy Deployment - Quick Overview
Lean Strategy Deployment -  Quick OverviewLean Strategy Deployment -  Quick Overview
Lean Strategy Deployment - Quick OverviewEdgar Cardenas Sanchez
 
The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)Operational Excellence Consulting
 
The seven deadly sins of Scrum
The seven deadly sins of Scrum The seven deadly sins of Scrum
The seven deadly sins of Scrum franohara99
 
Transition to Management: The Other Side of the Desk
Transition to Management: The Other Side of the DeskTransition to Management: The Other Side of the Desk
Transition to Management: The Other Side of the DeskCynthia Clay
 
Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...
Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...
Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...Wolfgang Hilpert
 
Operational Excellence.pptx
Operational Excellence.pptxOperational Excellence.pptx
Operational Excellence.pptxArvindGarg40
 
The Updated Building Blocks of Sales Enablement 11-2019
The Updated Building Blocks of Sales Enablement 11-2019The Updated Building Blocks of Sales Enablement 11-2019
The Updated Building Blocks of Sales Enablement 11-2019Mike Kunkle
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementCynthia Clay
 
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...VMware Tanzu
 

Ähnlich wie TPM Intro (20)

Evidence Based Management and Organisational Change
Evidence Based Management and Organisational ChangeEvidence Based Management and Organisational Change
Evidence Based Management and Organisational Change
 
Agile Data Governance Tutorial
Agile Data Governance TutorialAgile Data Governance Tutorial
Agile Data Governance Tutorial
 
How to improve your organization's performance with Dawn
How to improve your organization's performance with DawnHow to improve your organization's performance with Dawn
How to improve your organization's performance with Dawn
 
Agile42 agile for super heroes_june2018
Agile42 agile for super heroes_june2018Agile42 agile for super heroes_june2018
Agile42 agile for super heroes_june2018
 
Optimizing Product Management and Making Changes That Stick
Optimizing Product Management and Making Changes That StickOptimizing Product Management and Making Changes That Stick
Optimizing Product Management and Making Changes That Stick
 
Benefits of Moving HR to the Cloud
Benefits of Moving HR to the CloudBenefits of Moving HR to the Cloud
Benefits of Moving HR to the Cloud
 
Lean Strategy Deployment - Quick Overview
Lean Strategy Deployment -  Quick OverviewLean Strategy Deployment -  Quick Overview
Lean Strategy Deployment - Quick Overview
 
Introduction to Scrum@Scale
Introduction to Scrum@ScaleIntroduction to Scrum@Scale
Introduction to Scrum@Scale
 
The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)The Shingo Prize for Operational Excellence (The Shingo Model)
The Shingo Prize for Operational Excellence (The Shingo Model)
 
The seven deadly sins of Scrum
The seven deadly sins of Scrum The seven deadly sins of Scrum
The seven deadly sins of Scrum
 
Transition to Management: The Other Side of the Desk
Transition to Management: The Other Side of the DeskTransition to Management: The Other Side of the Desk
Transition to Management: The Other Side of the Desk
 
Yellow belt.pps
Yellow belt.ppsYellow belt.pps
Yellow belt.pps
 
Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...
Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...
Scrum Deutschland 2018 - Wolfgang Hilpert - Are you agile enough to succeed w...
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Balancedscorecard
BalancedscorecardBalancedscorecard
Balancedscorecard
 
Operational Excellence.pptx
Operational Excellence.pptxOperational Excellence.pptx
Operational Excellence.pptx
 
TPM Self-Assessment Guide
TPM Self-Assessment GuideTPM Self-Assessment Guide
TPM Self-Assessment Guide
 
The Updated Building Blocks of Sales Enablement 11-2019
The Updated Building Blocks of Sales Enablement 11-2019The Updated Building Blocks of Sales Enablement 11-2019
The Updated Building Blocks of Sales Enablement 11-2019
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline Management
 
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
 

Mehr von Max Lyons

Mehr von Max Lyons (12)

Lecture 7b
Lecture 7bLecture 7b
Lecture 7b
 
Lecture 7a
Lecture 7aLecture 7a
Lecture 7a
 
Lecture 6a
Lecture 6aLecture 6a
Lecture 6a
 
Lecture 5a
Lecture 5aLecture 5a
Lecture 5a
 
Lecture 4b
Lecture 4bLecture 4b
Lecture 4b
 
Lecture 4a
Lecture 4aLecture 4a
Lecture 4a
 
Lecture 3b
Lecture 3bLecture 3b
Lecture 3b
 
Lecture 3a
Lecture 3aLecture 3a
Lecture 3a
 
Lecture 3a edits
Lecture 3a editsLecture 3a edits
Lecture 3a edits
 
Lecture 2a
Lecture 2aLecture 2a
Lecture 2a
 
Lecture 1b
Lecture 1bLecture 1b
Lecture 1b
 
Lecture 1a
Lecture 1aLecture 1a
Lecture 1a
 

Kürzlich hochgeladen

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Kürzlich hochgeladen (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

TPM Intro

  • 1. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 01 TPM Introduction
  • 2. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 02 • Think of a “World Class” sportsperson or team, either current or past. • Why are they (or were they) ‘World Class? i.e. What attributes/characteristics differentiate them from the rest? • In other words: What makes (or made) them ‘Special’? World Class Sports Person or Team
  • 3. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 03 • Train and practice a lot before they perform • Have dedicated “Improvement Time” • Are obsessive about attention to detail • Depend on others, not just self • Have the right equipment, facilities and environment • Have a clear vision of what’s possible • Have a ‘Continuous Improvement’ mentality • Are totally dedicated • Maximise their individual and collective potential • Are well paid when they get there!! 10 x Attributes of “World Class” Performers
  • 4. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 04 • 5% of What We Read • 10% of What We Hear • 15% of What We See • 20% of What We See and Hear • 40% of What We Discuss With Others • 80% of What We Practice and Experience • 95% When We Teach Others Learning, Understanding and Retention
  • 5. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 05 Positioning Maintenance Excellence
  • 6. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 6 • In any asset based enterprise the effective and efficient operation of your assets is a critical factor in the consistent delivery of customer value. • Therefore we can consider our ability to maintain and optimise the performance of those assets as ONE of the critical systems within your business. • The principles of TPM applied effectively, act as an effective system to ensure optimal equipment performance. Asset Care/TPM
  • 7. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 7 • As a philosophy TPM is capable of supporting and encouraging ideal behaviours of those working with and supporting equipment performance. • If designed effectively TPM integrates seamlessly with other critical business systems such as visual management an system of improvement,enabling consistent and sustainable business growth. Asset Care/TPM
  • 8. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 8 A day in the life
  • 9. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 9 Average day? Opportunities for learning? Good Day No Hassle = 1088 parts Hassle Day = 1088 parts Bad Day = 950 parts Hassle Day = 1088 parts
  • 10. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 10 • Moving operators to regain productivity = More Cost • Technical resources = distractedfrom more value adding activity also More Cost • Stress = disengagement operator group • Visual inspection processes rushed? • Line balance • WIP rules compromised • Other lines suffer • Invisible downtime/issues on equipment • Supervisor distracted • Training and learning on back burner etc. etc. etc. Hassle day
  • 11. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 11 • List all the improvement/management tools currently in place within your operational environment. • ______________________________ • ______________________________ • ______________________________ • ______________________________ • ______________________________ • ______________________________ Current State process management
  • 12. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 12 • What is their purpose? • Are they effective? • Are they used on a daily weekly basis? • Are they truly part of how things are done here? • Do they work synergistically? • What would be your answers? • What do we expect TPM to do and how will it fit into this picture? Questions
  • 13. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 13 TPM as a core business SYSTEM
  • 14. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 14 Shingo Enterprise Excellence Overview
  • 15. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 15 The Shingo Model
  • 16. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 16 Three Insights of Enterprise Excellence Insight #1: Ideal Results Require Ideal Behaviour Insight #2: Beliefs and Systems Drive Behaviour Insight #3: Principles Inform Ideal Behaviour Principles guide us toward ideal Behaviour? ][
  • 17. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 17 What are principles?The Shingo Model & Guiding Principles
  • 18. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 18 © S A Partners The Application of the Enterprise Excellence Model
  • 19. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 19 The Application of the Enterprise Excellence Model PeopleProcess Purpose Results Customer How stakeholder needs are understood and converted into strategy The “WHY” Improve How value is created and realised across the end to end enterprise How people potential is realised How strategy is deployed into the organisation and how governance is created How Principles and values are translated into Leadership and Behaviours How the process is continually improved by the people and how problems are solved Sustainable Customer focussed results, from an integrated organisation
  • 20. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 20 © S A Partners
  • 21. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 21 Enterprise Excellence Our assessment looks at the purpose of the system and their effectiveness by examining evidence of its activity and impact on Ideal Behaviour Principles Non negotiable commitments of business Systems The integrated processes which deliver the results for the organisation Skills, competencies and confidence The ability to lead systems, manage processes and carry out tasks Know why Know what Know how
  • 22. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 22 What do we mean by Systems? Business Alignment Management System People Development Process Management (Common Cause Special Cause) System of Engagement (Hearts and Hands)
  • 23. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 23 Enterprise Excellence Model Systems (Examples) PeopleProcess Purpose Results Customer Stakeholder Management Strategy Formation Organisational design Improve Order Creation Product & Asset Lifecycle Mgt Order Fulfilment Supply Chain Integration Health, Safety & Environment Reward and recognition People Skill & Lifecycle Mgt, Reward & Recognition Strategy Deployment Project Management Management Process Behaviour Deployment & Coaching Leader Standard Work Communications Organisational Maturity & Benchmarking Continuous Improvement Performance Mgt
  • 24. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 24 Types of Asset environment People and Assets
  • 25. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 25 • Number of people approximately equal to the number of assets • Machine use may vary based on demand and line balancing requirements • Separate maintainer group, separate engineering support group • Highly regulated environment? Types of Asset environments
  • 26. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 26 • Operator running series of individual assets • Separate maintainer group • Separate engineering support group • Highly regulated environment? Types of Asset environments
  • 27. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 27 • Operator running Complex Process • Separate maintainer group • Separate engineering support group • Separate process support group • High Risk environment? Types of Asset environments
  • 28. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 28 • One or two assets per person? – Cross trained due to demand and line balancing requirements • Multiple Assets Per person? – Flow – Sub assembly • Few people complex process – High Risk? Types of asset environment
  • 29. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 29 • Pick an example of asset environment which is closest to your business. • Consider, in the ideal state, what would be the ideal systems, tools and behaviours you need to ensure ideal sustainable results. • What Shingo principles would be of particular relevance to asset optimisation? In Groups consider the ideal asset management environment
  • 30. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 30 How the Best Practice “day job” culture of Maintenance has evolved Versatile People focused (Today) Flexible (00’s) Single Skilled (60’S / 70’S) Multi Skilled (1980’s / 90’s) Specialist Craftsmen Experienced Proficient Professional Adaptable Responsive Resourceful All Purpose • Told • Narrow • Fixed • Told • Wider • Semi Variable • Explained • Broad • Variable • Delegated • Team focus • Greater x’functional activity • Participating and involved with decisions • Autonomous within clear boundaries • Working with outsourced partners Capability Time
  • 31. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 31 • You cannot achieve excellence without Operational Basics in place!! • This means the fundamentals of:- – Standard (and Safe) Operating Procedures, – ‘Best Practice’ Work Place Organisation / 5S – Basic Manufacturing Process Control – A Disciplined, Self-determined, TPM / Asset Care Regime – Reliable Data Collection & Interpretation – Continuous Development and Training of our People – Clearly defined roles and responsibilities A Key Message to Remember
  • 32. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 32 • You transform the culture !! Achieving Lean will only work, if: Remember that physical and information transformation is relatively easy – sustainment through changing the culture is difficult – and why is this the case?….
  • 33. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 33 And The More I Direct My Energy into… The More I Assume… The More Suspicious I Become… The Less I Know About Plans to Change… The More I Assume… Poor Communications = Resistance
  • 34. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 34 • Striving for world class status is revolutionary. • Culture change is evolutionary, because resistance to change is both universal and a natural human characteristic. • Our philosophy and approach therefore, must centre on tapping into the potential of our people through Involvement & Teamwork • TPM sets out to do precisely this by giving ownership to the “new ways of working” Creating the Environment
  • 35. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 35 Introducing Four Cycle Eleven Step Model
  • 36. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 36 • Lean thinking is the speed / pace/velocity with which you receive a customer’s order and convert it into money in Company’s bank account by eliminating waste in all that we do • 5S & Workplace Organisation is aimed at Creating Flow • Visual Management indicates the status/quality of that Flow • TPM is about Maintaining that flow through our critical assets Cutting to the Core
  • 37. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 37 • TPM is about establishing the correct relationship between People and their Equipment to create ‘ownership’ and Team Work • It’s about unlocking our Installed Productive Capacity by unlocking the Potential of our People • Unlocking the discretionary effort and innovative capability of your team So what is TPM ?
  • 38. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 38 Five Principles of TPM 1. Increase the OEE 4. Increase Skills (Hand & Op, T/W’ing & Problem Solving) KNOW OF UNDERSTANDCAN USE CAN TRAIN OTHERS 5. Early Involvement in New Equipment Specification 3. Make Routine Front Line Asset Care part of the job 2. Improveexisting Planned MaintenanceSystems
  • 39. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 39 • Over the last three years S A Partners have worked with the recognised TPM expert Peter Willmott to develop his original nine step TPM model. • Our new four cycle eleven step model takes into account the critical enabling element leader/management culture & behaviour. • This focus defines TPM as a key system within an asset reliant organisation and allows it to integrate with true Enterprise Excellence Thinking. Background and Programme structure
  • 40. Total Productive Maintenance © 2016 The Leadership Network® © 2016 Jidoka® 40 Four Cycle-11 Step TPM Review Performance Criteria & History Measurement & Opportunity analysis of KPIs (incl. OEE) Equipment Criticality Assessment Condition Appraisal & Restoration plan Root cause Analysis & Problem Resolution Individual & Team Skill Development Leadership & Behaviours Audit & Review Process MEASURE CURRENT STATE & IDENTIFY OPPORTUNITY CONDITION REVIEW (INCL. SAFETY ENERGY, & ENVIRONMENT) PROBLEM PREVENTION & BEST PRACTICE ROUTINES FUTURE STATE REALISATION THROUGH A HABIT OF CONTINUOUS IMPROVEMENT Feedback A B C D Assess Hidden Losses/wastes & Set Improvement priorities Develop Future Total Asset Care Best Practice & Standard Work 1 2 3 4 5 6 7 8 9 10 11