How to build a battery backup
© MathyMpassyIsinki 2016
Mathy is an accomplished off grid energy solutions business and technical sales professional technically competent in the
applications and installation of off grid photovoltaic systems, as well as in hybrid energy solutions combining photovoltaic
and diesel generators.
In addition to providing solutions design, customers development and project management services to the off grid solar
industry, Mathy contributes to better energy solutions through training, with the vision of building a better future for under-
served communities in off grid locations
1Download this document at www.energyoneafrica.com
1. How does a backup works
A power backup is a standby power system which supplies electricity to a load in the event of main
power failure. A battery based power backup system is made of two main components:
 A battery bank storing energy and;
 An inverter converting battery bank DC electricity into AC, inverters used for backup systems
usually have inbuilt battery chargers for charging the battery from the mains power source.
A separate battery charger is required when the inverter does not have one inbuilt. This
guide will focus on backup systems using inverter chargers.
Battery based backup systems are an alternative to generators. Their advantage over generators
are:
 Silent and non polluting operations
 Instantaneous change over when mains power fails or come back
 Low running cost; just limited to the necessary power to charge the batteries.
Their main drawback compared to generator is that they only supply power for a predetermined
amount of time and, the backup time decreases as the load increases. Therefore, the battery bank
should be properly sized to meet the requirements.
In a backup system, energy is stored within a battery bank for use during periods of mains failure.
It is recommended to use deep cycle batteries.Deep cycle batteries have the capacity of being
charged and discharged hundreds of times before they wear out. Lead-acid batteries are the most
used.
Car batteries which are also lead-acid type are not recommended. However, because they are
cheap, they are sometimes used for small backup applications but, their operational life is likely
to be short: their thin plate do not allow them withstanding the deep discharge experienced by
batteries in backup applications.
2Download this document at www.energyoneafrica.com
On the other hand, the inverter must provide enough power to start and run the connected load.
To maintain continuous power supply to the load, backup systems are installed between the mains
AC power supply and the load.
Battery Bank
Inverter
3Download this document at www.energyoneafrica.com
2. Battery bank
Lead acid batteries are made of separate 2-volt compartments known as cells. The cells are filled
with sulfuric acid, serving as electrolyte, and, inside of each cell is a series of thick, parallel lead
plates. Insulators prevent short circuit between the plates and partition walls separate each cell
preventing sulfuric acid to flow from one cell to the next.To build up the voltage, the cells are
wired in series. Electricity can flow out or in the battery through the negative and positive
terminal.
All the cells are encased in a heavy-duty plastic case.
Lead acid batteries can be of two types: flooded or sealed. They work in two directions;
converting electrical energy into chemical energy at the charging and reconverting chemical
energy into electrical energy at the discharge. The discharge, off course corresponds to when
batteries supplies power to the load.
The thickness of plates allows multiple deep discharges of a deep cycle battery. Charging and
discharging being the cycle.
Download this document at www.energyoneafrica.com
Unlike flooded batteries which require to be filled before installing them, sealed batteries are
factory filled; they are delivered ready for use.
Sealed lead acid batteries are also known as maintenance free batteries because fluid level never
need to be checked and they never need to be filled with water.
Large applications use flooded tubular plate lead-acid batteries; sealed lead acid batteries are
used in smaller applications. Their main advantages over flooded batteries are that they don’t
require maintenance, they are less affected by lower temperature, they don’t release gases and
they charge faster. However, they are more expensive, store less electricity and due to their
hermetic design; there is risk of breaking down due to lack of internal heat dissipation.
Two types of sealed lead acid batteries are available: AGM standing for absorbed glass mat and
gel cellbatteries.
Flooded lead acid batteries on the other hand are less expensive, they store more electricity,
and they have longer lifespan and can be rejuvenated after they have been left deep discharged
for a long period of time.
Download this document at www.energyoneafrica.com
A system might require more than what a single battery can supply. This might be the
voltage or the amp-hour storage capacity.
Batteries are wired in series to build up the voltage. In a series connection, the positive terminal
of the first battery is connected to the negative of the following battery.
Installers need to connect as many batteries as required to reach the system voltage. System
voltage itself is dictated by the size of the load and its usage time. These two factors determine
the energy consumption;
 Bellow 1kWh, recommended system voltage is of 12Vdc;
 Between 1kWh and 3kWh, recommended system voltage is of 24Vdc;
 Above 3kWh, system voltage should be of 48Vdc
Download this document at www.energyoneafrica.com
The battery bank amps-hour capacity determines the backup time or how long the system would
run with a given load. Amps-hour are build up by connecting batteries in parallel. In a parallel
connection, all the positive terminals are connected together and, the negative, separate from
the positives are also connected together.
In practice, battery banks are often wired in combining series and parallel connections.
Download this document at www.energyoneafrica.com
3. Sizingthebatterybank
The System design is closely linked to the appliances the system will have to supply and how they
are used. A load estimate is necessary before sizing the battery bank.
Load estimate consist in listing the appliances that will be connected to the system and, record
on the load estimate worksheet the quantity of each type of appliances, its wattage and the
hours it will be in case of main power failure. As a result from the load estimate, the power and
energy demand are known.
Watt rating of equipment can be found on its name plate either directly or by multiplying the
volt and amperes rating which are provided when the watts are not.
Watt-hours are obtained by multiplying watt by usage time.
This step of the design process is the occasion for the designer to detect energy waste and
propose energy efficient alternatives. The goal of energy efficiency is to reduce energy
consumption without affecting users comfort. It offers the possibility of reducing the size of the
system and therefore its cost. Lower energy consumption comes with low consumption
equipment or a smarter use.
Battery bank sizing is critical:
 An under sizing the battery bank will reduce the system’s autonomy and;
 An oversized bank dramatically impact on the cost
Download this document at www.energyoneafrica.com
To determine the battery bank amps-hour capacity, you first need to determine the energy
consumption on the batteries by converting the energy needs from watt-hours toamps-hours by
dividing the watt-hours from the load assessment by the system voltage also determined from the
load assessment:
 12V for energy demand bellow 1kWh
 24V between 1kWh and 3kWh
 48V above 3kWh
After converting watt-hours (Wh) into amps-hour (Ah), you will have to de-rate for inverter
efficiency and batteries Depth of Discharge (DOD). Manufacturers DOD vary from 50 to 80% and,
accepted inverters efficiency is of 90%. For de-rating for DOD and inverter efficiency, the math is
to divide the Ah by DOD and efficiency values; in doing so, what you get is the amps-hour capacity
of your battery bank.
The final battery bank configuration will depend on the Ah and voltage of the available batteries.
Here, the number of batteries in series string and the number of parallel string should be
determined. We call string the number of batteries in series:
 The number of batteries in single string is calculated by dividing system voltage by battery
voltage and,
 The number of parallel string is calculated by dividing the battery bank Ah capacity by the
Ah capacity of the available battery.
 The number of batteries forming the bank is calculated by multiplying the number of
batteries in a single string by the number of parallel strings previously calculated.
In summarizing, the battery bank sizing goes through 9 steps:
(a) Determine the share of energy to be supplied by the batteries
(b) Determine the DC system voltage. Typically 24 or48V
(c) Calculate the consumption in amps-hour on the battery bank by dividing the watt-hours
obtained in (a) by the volts obtained in(b)
(d) De-rate the amps-hour obtained in (c) for inverter efficiency. 90% generally accepted
(e) Determine the battery bank’s capacity in amps-hour by de-rating amps-hour obtained in (d)
for battery depth of discharge(DOD)
Download this document at www.energyoneafrica.com
(f) Select the voltage and amps-hour of the single battery which will be used in wiring the
battery bank
(g) Determine the number of batteries in series string by dividing the system voltage
determined in (b) by the single battery voltage specified in(f)
(h) Determine the number of batteries in parallel by dividing the amps-hours obtained in (e) by
the amps-hour in(f)
(i) To obtain the number of batteries, multiply the number of batteries in series string (g) by the
numbers of batteries in parallel(h)
An example will make it more understandable:
(a) Let’s assume 7kWh to be supplied by a battery bank. 7kWh could be converted in7000Wh
(b) If system voltage is 48V
(c) The consumption on amps-hour on the battery bank will be calculated by dividing
7000Wh (a) by 48V (b) we obtain 7000Wh ÷ 48V = 145.8amps-hour
(d) In de-rating for 90% inverter efficiency, we obtain 145.8Ah ÷ 0.9=162Ah
(e) To determine the battery bank capacity, If DOD is of 80%, for example, we de-rate by
dividing 162Ah (d) by 80% or 0.8; we obtain 162Ah ÷ 0.8 = 202.5 as the battery
bankcapacity
(f) If we decide to use 12V 100Ahbatteries
(g) We get the number of parallel strings by dividing 202.5Ah (e) by 100Ah (6) 202.5Ah ÷
100Ah =2
Download this document at www.energyoneafrica.com
(h) We get the number of batteries in a series stringby dividing 48V (b) by 12V (6) 48V ÷ 12V = 4
(i) By multiplying 2 (7) by 4 (8) we can determine that our battery bank should be of 8
batteries of 12V 100Ah wired in 2 parallel strings of 4batteries.
4. From DC to AC: The inverter
Inverters come in 3 basics output types: square wave; modified square wave and sine
wave. Modified square wave inverters generally have good surge and continuous capability and
are usually cheaper than sine wave types. However, some appliances, such as audio equipment,
television and fans can suffer because of the output wave shape. Sine wave inverters often
provide a better quality power than the grid supply.
The inverter is first selected based on its capacity of supplying enough power to handle the peak
load. Other factors which will influence the specification are:
 System voltage which should correspond to inverter input voltage
 Inverter’s output voltage should correspond to the load nominal voltage. 240Volts in
Europe and Africa and 120V in USA.
 The inverter should maintain a frequency of 50Hz in Africa and Europe and 60Hz in USA
 The inverter should have enough surge capacity to start motors. Most inverters are able to
exceed their rated power for limited period of time. That is necessary to power electric
motors which can, at starting, draw up to five times their rated power.
 In case a generator is present, the inverter’s inbuilt control mechanism should allow
starting and switching of the generator based on predetermined parameters which
generally include battery state of charge, PV array power output presence or absence and
load level.
 The inbuilt battery charger must provide enough current to charge the battery bank within
the specified amount of time; the charging time is determined by dividing the battery bank
Ah capacity by the inbuilt inverter’s charger current.
 In case one single inverter is not sufficient to supply the peak load, check up to how much
stacked inverters could increase the power output and meet the demand.Stacking is an
option of some inverters to be connected together and work as a single unit.
Best practice in charging the inverter requires to de-rate the peak load to account for inverter
efficiency.
Download this document at www.energyoneafrica.com
5. Wiring the system
When wiring the system, you should make sure that the batteries are installed in restricted area;
either a dedicated room or an enclosure depending on the size of your system. The battery area
must be well ventilated and all the wires protected from mechanical damages.
Download this document at www.energyoneafrica.com
If using flooded batteries, provision must be made to contain any spilled electrolyte. Batteries
should not be in contact with the floor.
In preventing spark ignition and minimizing the risk of explosion, all battery interconnect and
terminal must be protected accidental short circuit; all crimps lugs must be fitted using the
appropriate tool.
In preventing excessive current from the batteries, overcurrent protection is to be provided in
each battery output conductor except where one side of the battery bank is earthed, in which
case, only the unearthed conductor requires overcurrent protection.Additionally, a main
protection giving the ability to readily isolate the battery bank must be provided.
The inverter should be mounted outside the battery enclosure and, no exposed live part is
allowed.
All the cables used in the installation should be securely fixed in place to minimize any movement.
Want your own battery backup?
Visit us at www.energyoneafrica.com and share your requirements; we could either review your
design, provide a detailed Bill of Quantity or supply a readymade system.

Weitere ähnliche Inhalte

Was ist angesagt?

Electrical bill & audit
Electrical bill & auditElectrical bill & audit
Electrical bill & auditvigyanashram
 
Designing an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyDesigning an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyLeonardo ENERGY
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plantra m
 
Energy storage systems
Energy storage systemsEnergy storage systems
Energy storage systemsGagandeep Kaur
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantDr. Ramesh B
 
Automatic meter reading
Automatic meter readingAutomatic meter reading
Automatic meter readingSajan Sahu
 
UPS Working, UPS Types
UPS Working, UPS TypesUPS Working, UPS Types
UPS Working, UPS TypesBhim Avarade
 
Presentation on battery
Presentation on batteryPresentation on battery
Presentation on batterySheikh Aves
 
solar photovoltaic system
solar photovoltaic systemsolar photovoltaic system
solar photovoltaic systemPrachet Sokhiya
 
Battery Types and Battery technology
Battery Types and Battery technologyBattery Types and Battery technology
Battery Types and Battery technologySRM UNIVERSITY
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application pptswati malla
 
Become a Battery Sizing Guru
Become a Battery Sizing GuruBecome a Battery Sizing Guru
Become a Battery Sizing GuruSure Power, Inc.
 
Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - mme
 

Was ist angesagt? (20)

Uninterruptible power supply
Uninterruptible power supply Uninterruptible power supply
Uninterruptible power supply
 
Electrical bill & audit
Electrical bill & auditElectrical bill & audit
Electrical bill & audit
 
Designing an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyDesigning an Uninterruptible Power Supply
Designing an Uninterruptible Power Supply
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Ups
UpsUps
Ups
 
About Solar Inverter
About Solar Inverter About Solar Inverter
About Solar Inverter
 
Energy storage systems
Energy storage systemsEnergy storage systems
Energy storage systems
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Battery Concept
Battery ConceptBattery Concept
Battery Concept
 
Supercapacitors
SupercapacitorsSupercapacitors
Supercapacitors
 
Automatic meter reading
Automatic meter readingAutomatic meter reading
Automatic meter reading
 
UPS Working, UPS Types
UPS Working, UPS TypesUPS Working, UPS Types
UPS Working, UPS Types
 
Presentation on battery
Presentation on batteryPresentation on battery
Presentation on battery
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
solar photovoltaic system
solar photovoltaic systemsolar photovoltaic system
solar photovoltaic system
 
Battery Types and Battery technology
Battery Types and Battery technologyBattery Types and Battery technology
Battery Types and Battery technology
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application ppt
 
Become a Battery Sizing Guru
Become a Battery Sizing GuruBecome a Battery Sizing Guru
Become a Battery Sizing Guru
 
Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system -
 
Solar PV System
Solar PV SystemSolar PV System
Solar PV System
 

Andere mochten auch

Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...
Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...
Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...Konstantin Yamnitskiy
 
Ashish ranjan( chemistry project[ acid rain] )
Ashish ranjan( chemistry project[ acid rain] )Ashish ranjan( chemistry project[ acid rain] )
Ashish ranjan( chemistry project[ acid rain] )Ashish Ranjan
 
CIGS Solar Cells: How and Why is their Cost Falling?
CIGS Solar Cells: How and Why is their Cost Falling?CIGS Solar Cells: How and Why is their Cost Falling?
CIGS Solar Cells: How and Why is their Cost Falling?Jeffrey Funk
 
Phosphoric acid process comparison, paper
Phosphoric acid process comparison, paperPhosphoric acid process comparison, paper
Phosphoric acid process comparison, paperDonal_Tunks
 
Introduction to thin film growth and molecular beam epitaxy
Introduction to thin film growth and molecular beam epitaxyIntroduction to thin film growth and molecular beam epitaxy
Introduction to thin film growth and molecular beam epitaxyOleg Maksimov
 
Wearable Energy Sources
Wearable Energy SourcesWearable Energy Sources
Wearable Energy SourcesDawson Hun
 
Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...
Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...
Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...thinfilmsworkshop
 
liquid crystal display
liquid crystal displayliquid crystal display
liquid crystal displayDinesh Pasi
 
fast disintegrating oral thin films
fast disintegrating oral thin filmsfast disintegrating oral thin films
fast disintegrating oral thin filmssahithi9reddy
 
Artificial retina using thin filim Transistor
Artificial retina using thin filim TransistorArtificial retina using thin filim Transistor
Artificial retina using thin filim Transistorbrijithpushkaran
 
Part 6 thin film depositoin
Part 6  thin film depositoinPart 6  thin film depositoin
Part 6 thin film depositoinMaheen Iqbal
 
Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?
Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?
Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?Tuong Do
 
Artificial retina using thin film transistor report
Artificial retina  using thin film transistor reportArtificial retina  using thin film transistor report
Artificial retina using thin film transistor reportRam B
 

Andere mochten auch (20)

Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...
Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...
Semiconducting SWCNT’s as nano-pillars for improved efficiency in organic pho...
 
Ashish ranjan( chemistry project[ acid rain] )
Ashish ranjan( chemistry project[ acid rain] )Ashish ranjan( chemistry project[ acid rain] )
Ashish ranjan( chemistry project[ acid rain] )
 
CIGS Solar Cells: How and Why is their Cost Falling?
CIGS Solar Cells: How and Why is their Cost Falling?CIGS Solar Cells: How and Why is their Cost Falling?
CIGS Solar Cells: How and Why is their Cost Falling?
 
HiPIMS: technology, physics and thin film applications.
HiPIMS: technology, physics and thin film applications.HiPIMS: technology, physics and thin film applications.
HiPIMS: technology, physics and thin film applications.
 
SULFONATION OF BY SO3
SULFONATION OF BY SO3SULFONATION OF BY SO3
SULFONATION OF BY SO3
 
Phosphoric acid process comparison, paper
Phosphoric acid process comparison, paperPhosphoric acid process comparison, paper
Phosphoric acid process comparison, paper
 
Introduction to thin film growth and molecular beam epitaxy
Introduction to thin film growth and molecular beam epitaxyIntroduction to thin film growth and molecular beam epitaxy
Introduction to thin film growth and molecular beam epitaxy
 
Wearable Energy Sources
Wearable Energy SourcesWearable Energy Sources
Wearable Energy Sources
 
Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...
Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...
Sebastiani - Nano-mechanical and microstructural characterization of MS-PVD N...
 
liquid crystal display
liquid crystal displayliquid crystal display
liquid crystal display
 
fast disintegrating oral thin films
fast disintegrating oral thin filmsfast disintegrating oral thin films
fast disintegrating oral thin films
 
Artificial retina using thin filim Transistor
Artificial retina using thin filim TransistorArtificial retina using thin filim Transistor
Artificial retina using thin filim Transistor
 
Solar cell
Solar cellSolar cell
Solar cell
 
Air Pollution
Air PollutionAir Pollution
Air Pollution
 
Part 6 thin film depositoin
Part 6  thin film depositoinPart 6  thin film depositoin
Part 6 thin film depositoin
 
Planar Chromatography
Planar ChromatographyPlanar Chromatography
Planar Chromatography
 
Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?
Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?
Solar Cells Lecture 4: What is Different about Thin-Film Solar Cells?
 
Thin films
Thin filmsThin films
Thin films
 
Vijay and ravi
Vijay  and raviVijay  and ravi
Vijay and ravi
 
Artificial retina using thin film transistor report
Artificial retina  using thin film transistor reportArtificial retina  using thin film transistor report
Artificial retina using thin film transistor report
 

Ähnlich wie How to build a battery backup

A quick guide to off grid solar power systems design
A quick guide to off grid solar power systems designA quick guide to off grid solar power systems design
A quick guide to off grid solar power systems designMathy Mpassy Isinki
 
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System ecij
 
Storing Solar Power: An Insight into Batteries
Storing Solar Power: An  Insight into BatteriesStoring Solar Power: An  Insight into Batteries
Storing Solar Power: An Insight into BatteriesArpit Kurel
 
Vector White paper - Understanding the difference between energy and power b...
Vector  White paper - Understanding the difference between energy and power b...Vector  White paper - Understanding the difference between energy and power b...
Vector White paper - Understanding the difference between energy and power b...Peter Tait
 
Ac coupling wht_paper
Ac coupling wht_paperAc coupling wht_paper
Ac coupling wht_paperfarazahmad759
 
17 mse017 battery and battery management system
17 mse017 battery and battery management system17 mse017 battery and battery management system
17 mse017 battery and battery management systempaneliya sagar
 
Components of solar systems
Components of solar systemsComponents of solar systems
Components of solar systemsJay Ranvir
 
A report on Solar Load Calculation
A report on Solar Load CalculationA report on Solar Load Calculation
A report on Solar Load CalculationMilan Ghimire
 
Energy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehiclesEnergy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehiclesS.K. Biradar
 
Energy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehiclesEnergy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehiclesCollege Of Engineering Pune
 
Energy Storage System in Microgrids.pptx
Energy Storage System in Microgrids.pptxEnergy Storage System in Microgrids.pptx
Energy Storage System in Microgrids.pptxdebidasimohanty1
 
IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...
IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...
IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...IRJET Journal
 
Low Power Energy Harvesting & Supercapacitor Storage
Low Power Energy Harvesting & Supercapacitor StorageLow Power Energy Harvesting & Supercapacitor Storage
Low Power Energy Harvesting & Supercapacitor StorageIOSR Journals
 
Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2Surojit Mukerji
 
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...
APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...MATHEW JOSEPH
 

Ähnlich wie How to build a battery backup (20)

A quick guide to off grid solar power systems design
A quick guide to off grid solar power systems designA quick guide to off grid solar power systems design
A quick guide to off grid solar power systems design
 
9. PPT.pptx
9. PPT.pptx9. PPT.pptx
9. PPT.pptx
 
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
 
Storing Solar Power: An Insight into Batteries
Storing Solar Power: An  Insight into BatteriesStoring Solar Power: An  Insight into Batteries
Storing Solar Power: An Insight into Batteries
 
Vector White paper - Understanding the difference between energy and power b...
Vector  White paper - Understanding the difference between energy and power b...Vector  White paper - Understanding the difference between energy and power b...
Vector White paper - Understanding the difference between energy and power b...
 
Ac coupling wht_paper
Ac coupling wht_paperAc coupling wht_paper
Ac coupling wht_paper
 
Inverters Catalogue
Inverters CatalogueInverters Catalogue
Inverters Catalogue
 
17 mse017 battery and battery management system
17 mse017 battery and battery management system17 mse017 battery and battery management system
17 mse017 battery and battery management system
 
Components of solar systems
Components of solar systemsComponents of solar systems
Components of solar systems
 
A report on Solar Load Calculation
A report on Solar Load CalculationA report on Solar Load Calculation
A report on Solar Load Calculation
 
Module 7
Module 7Module 7
Module 7
 
Energy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehiclesEnergy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehicles
 
Energy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehiclesEnergy storage systems for electric & hybrid vehicles
Energy storage systems for electric & hybrid vehicles
 
Energy Storage System in Microgrids.pptx
Energy Storage System in Microgrids.pptxEnergy Storage System in Microgrids.pptx
Energy Storage System in Microgrids.pptx
 
Design methodology for pv
Design methodology for pvDesign methodology for pv
Design methodology for pv
 
IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...
IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...
IRJET- Improving Braking Energy Recovery Efficiency of Electric Vehicle Equip...
 
Hybrid inverter project report
Hybrid inverter project reportHybrid inverter project report
Hybrid inverter project report
 
Low Power Energy Harvesting & Supercapacitor Storage
Low Power Energy Harvesting & Supercapacitor StorageLow Power Energy Harvesting & Supercapacitor Storage
Low Power Energy Harvesting & Supercapacitor Storage
 
Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2
 
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...
APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...
 

Kürzlich hochgeladen

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

How to build a battery backup

  • 1.
  • 2. How to build a battery backup © MathyMpassyIsinki 2016 Mathy is an accomplished off grid energy solutions business and technical sales professional technically competent in the applications and installation of off grid photovoltaic systems, as well as in hybrid energy solutions combining photovoltaic and diesel generators. In addition to providing solutions design, customers development and project management services to the off grid solar industry, Mathy contributes to better energy solutions through training, with the vision of building a better future for under- served communities in off grid locations
  • 3. 1Download this document at www.energyoneafrica.com 1. How does a backup works A power backup is a standby power system which supplies electricity to a load in the event of main power failure. A battery based power backup system is made of two main components:  A battery bank storing energy and;  An inverter converting battery bank DC electricity into AC, inverters used for backup systems usually have inbuilt battery chargers for charging the battery from the mains power source. A separate battery charger is required when the inverter does not have one inbuilt. This guide will focus on backup systems using inverter chargers. Battery based backup systems are an alternative to generators. Their advantage over generators are:  Silent and non polluting operations  Instantaneous change over when mains power fails or come back  Low running cost; just limited to the necessary power to charge the batteries. Their main drawback compared to generator is that they only supply power for a predetermined amount of time and, the backup time decreases as the load increases. Therefore, the battery bank should be properly sized to meet the requirements. In a backup system, energy is stored within a battery bank for use during periods of mains failure. It is recommended to use deep cycle batteries.Deep cycle batteries have the capacity of being charged and discharged hundreds of times before they wear out. Lead-acid batteries are the most used. Car batteries which are also lead-acid type are not recommended. However, because they are cheap, they are sometimes used for small backup applications but, their operational life is likely to be short: their thin plate do not allow them withstanding the deep discharge experienced by batteries in backup applications.
  • 4. 2Download this document at www.energyoneafrica.com On the other hand, the inverter must provide enough power to start and run the connected load. To maintain continuous power supply to the load, backup systems are installed between the mains AC power supply and the load. Battery Bank Inverter
  • 5. 3Download this document at www.energyoneafrica.com 2. Battery bank Lead acid batteries are made of separate 2-volt compartments known as cells. The cells are filled with sulfuric acid, serving as electrolyte, and, inside of each cell is a series of thick, parallel lead plates. Insulators prevent short circuit between the plates and partition walls separate each cell preventing sulfuric acid to flow from one cell to the next.To build up the voltage, the cells are wired in series. Electricity can flow out or in the battery through the negative and positive terminal. All the cells are encased in a heavy-duty plastic case. Lead acid batteries can be of two types: flooded or sealed. They work in two directions; converting electrical energy into chemical energy at the charging and reconverting chemical energy into electrical energy at the discharge. The discharge, off course corresponds to when batteries supplies power to the load. The thickness of plates allows multiple deep discharges of a deep cycle battery. Charging and discharging being the cycle.
  • 6. Download this document at www.energyoneafrica.com Unlike flooded batteries which require to be filled before installing them, sealed batteries are factory filled; they are delivered ready for use. Sealed lead acid batteries are also known as maintenance free batteries because fluid level never need to be checked and they never need to be filled with water. Large applications use flooded tubular plate lead-acid batteries; sealed lead acid batteries are used in smaller applications. Their main advantages over flooded batteries are that they don’t require maintenance, they are less affected by lower temperature, they don’t release gases and they charge faster. However, they are more expensive, store less electricity and due to their hermetic design; there is risk of breaking down due to lack of internal heat dissipation. Two types of sealed lead acid batteries are available: AGM standing for absorbed glass mat and gel cellbatteries. Flooded lead acid batteries on the other hand are less expensive, they store more electricity, and they have longer lifespan and can be rejuvenated after they have been left deep discharged for a long period of time.
  • 7. Download this document at www.energyoneafrica.com A system might require more than what a single battery can supply. This might be the voltage or the amp-hour storage capacity. Batteries are wired in series to build up the voltage. In a series connection, the positive terminal of the first battery is connected to the negative of the following battery. Installers need to connect as many batteries as required to reach the system voltage. System voltage itself is dictated by the size of the load and its usage time. These two factors determine the energy consumption;  Bellow 1kWh, recommended system voltage is of 12Vdc;  Between 1kWh and 3kWh, recommended system voltage is of 24Vdc;  Above 3kWh, system voltage should be of 48Vdc
  • 8. Download this document at www.energyoneafrica.com The battery bank amps-hour capacity determines the backup time or how long the system would run with a given load. Amps-hour are build up by connecting batteries in parallel. In a parallel connection, all the positive terminals are connected together and, the negative, separate from the positives are also connected together. In practice, battery banks are often wired in combining series and parallel connections.
  • 9. Download this document at www.energyoneafrica.com 3. Sizingthebatterybank The System design is closely linked to the appliances the system will have to supply and how they are used. A load estimate is necessary before sizing the battery bank. Load estimate consist in listing the appliances that will be connected to the system and, record on the load estimate worksheet the quantity of each type of appliances, its wattage and the hours it will be in case of main power failure. As a result from the load estimate, the power and energy demand are known. Watt rating of equipment can be found on its name plate either directly or by multiplying the volt and amperes rating which are provided when the watts are not. Watt-hours are obtained by multiplying watt by usage time. This step of the design process is the occasion for the designer to detect energy waste and propose energy efficient alternatives. The goal of energy efficiency is to reduce energy consumption without affecting users comfort. It offers the possibility of reducing the size of the system and therefore its cost. Lower energy consumption comes with low consumption equipment or a smarter use. Battery bank sizing is critical:  An under sizing the battery bank will reduce the system’s autonomy and;  An oversized bank dramatically impact on the cost
  • 10. Download this document at www.energyoneafrica.com To determine the battery bank amps-hour capacity, you first need to determine the energy consumption on the batteries by converting the energy needs from watt-hours toamps-hours by dividing the watt-hours from the load assessment by the system voltage also determined from the load assessment:  12V for energy demand bellow 1kWh  24V between 1kWh and 3kWh  48V above 3kWh After converting watt-hours (Wh) into amps-hour (Ah), you will have to de-rate for inverter efficiency and batteries Depth of Discharge (DOD). Manufacturers DOD vary from 50 to 80% and, accepted inverters efficiency is of 90%. For de-rating for DOD and inverter efficiency, the math is to divide the Ah by DOD and efficiency values; in doing so, what you get is the amps-hour capacity of your battery bank. The final battery bank configuration will depend on the Ah and voltage of the available batteries. Here, the number of batteries in series string and the number of parallel string should be determined. We call string the number of batteries in series:  The number of batteries in single string is calculated by dividing system voltage by battery voltage and,  The number of parallel string is calculated by dividing the battery bank Ah capacity by the Ah capacity of the available battery.  The number of batteries forming the bank is calculated by multiplying the number of batteries in a single string by the number of parallel strings previously calculated. In summarizing, the battery bank sizing goes through 9 steps: (a) Determine the share of energy to be supplied by the batteries (b) Determine the DC system voltage. Typically 24 or48V (c) Calculate the consumption in amps-hour on the battery bank by dividing the watt-hours obtained in (a) by the volts obtained in(b) (d) De-rate the amps-hour obtained in (c) for inverter efficiency. 90% generally accepted (e) Determine the battery bank’s capacity in amps-hour by de-rating amps-hour obtained in (d) for battery depth of discharge(DOD)
  • 11. Download this document at www.energyoneafrica.com (f) Select the voltage and amps-hour of the single battery which will be used in wiring the battery bank (g) Determine the number of batteries in series string by dividing the system voltage determined in (b) by the single battery voltage specified in(f) (h) Determine the number of batteries in parallel by dividing the amps-hours obtained in (e) by the amps-hour in(f) (i) To obtain the number of batteries, multiply the number of batteries in series string (g) by the numbers of batteries in parallel(h) An example will make it more understandable: (a) Let’s assume 7kWh to be supplied by a battery bank. 7kWh could be converted in7000Wh (b) If system voltage is 48V (c) The consumption on amps-hour on the battery bank will be calculated by dividing 7000Wh (a) by 48V (b) we obtain 7000Wh ÷ 48V = 145.8amps-hour (d) In de-rating for 90% inverter efficiency, we obtain 145.8Ah ÷ 0.9=162Ah (e) To determine the battery bank capacity, If DOD is of 80%, for example, we de-rate by dividing 162Ah (d) by 80% or 0.8; we obtain 162Ah ÷ 0.8 = 202.5 as the battery bankcapacity (f) If we decide to use 12V 100Ahbatteries (g) We get the number of parallel strings by dividing 202.5Ah (e) by 100Ah (6) 202.5Ah ÷ 100Ah =2
  • 12. Download this document at www.energyoneafrica.com (h) We get the number of batteries in a series stringby dividing 48V (b) by 12V (6) 48V ÷ 12V = 4 (i) By multiplying 2 (7) by 4 (8) we can determine that our battery bank should be of 8 batteries of 12V 100Ah wired in 2 parallel strings of 4batteries. 4. From DC to AC: The inverter Inverters come in 3 basics output types: square wave; modified square wave and sine wave. Modified square wave inverters generally have good surge and continuous capability and are usually cheaper than sine wave types. However, some appliances, such as audio equipment, television and fans can suffer because of the output wave shape. Sine wave inverters often provide a better quality power than the grid supply. The inverter is first selected based on its capacity of supplying enough power to handle the peak load. Other factors which will influence the specification are:  System voltage which should correspond to inverter input voltage  Inverter’s output voltage should correspond to the load nominal voltage. 240Volts in Europe and Africa and 120V in USA.  The inverter should maintain a frequency of 50Hz in Africa and Europe and 60Hz in USA  The inverter should have enough surge capacity to start motors. Most inverters are able to exceed their rated power for limited period of time. That is necessary to power electric motors which can, at starting, draw up to five times their rated power.  In case a generator is present, the inverter’s inbuilt control mechanism should allow starting and switching of the generator based on predetermined parameters which generally include battery state of charge, PV array power output presence or absence and load level.  The inbuilt battery charger must provide enough current to charge the battery bank within the specified amount of time; the charging time is determined by dividing the battery bank Ah capacity by the inbuilt inverter’s charger current.  In case one single inverter is not sufficient to supply the peak load, check up to how much stacked inverters could increase the power output and meet the demand.Stacking is an option of some inverters to be connected together and work as a single unit. Best practice in charging the inverter requires to de-rate the peak load to account for inverter efficiency.
  • 13. Download this document at www.energyoneafrica.com 5. Wiring the system When wiring the system, you should make sure that the batteries are installed in restricted area; either a dedicated room or an enclosure depending on the size of your system. The battery area must be well ventilated and all the wires protected from mechanical damages.
  • 14. Download this document at www.energyoneafrica.com If using flooded batteries, provision must be made to contain any spilled electrolyte. Batteries should not be in contact with the floor. In preventing spark ignition and minimizing the risk of explosion, all battery interconnect and terminal must be protected accidental short circuit; all crimps lugs must be fitted using the appropriate tool. In preventing excessive current from the batteries, overcurrent protection is to be provided in each battery output conductor except where one side of the battery bank is earthed, in which case, only the unearthed conductor requires overcurrent protection.Additionally, a main protection giving the ability to readily isolate the battery bank must be provided. The inverter should be mounted outside the battery enclosure and, no exposed live part is allowed. All the cables used in the installation should be securely fixed in place to minimize any movement. Want your own battery backup? Visit us at www.energyoneafrica.com and share your requirements; we could either review your design, provide a detailed Bill of Quantity or supply a readymade system.