Project Schedule - Level IV Schedule
•
3 gefällt mir
•
1,656 views
M
Makrand Kulkarni PMP 2750
Folgen
Melden
Teilen
Melden
Teilen
1 von 7
Jetzt herunterladen
Downloaden Sie, um offline zu lesen
Empfohlen
Epc for module mm1 mm2 baseline schedule level 3
Epc for module mm1 mm2 baseline schedule level 3
robotbietcuoi
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02
Mario Fonseca
WORKFLOW
WORKFLOW
TW Carl
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
PMI Chennai Chapter
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
HIMADRI BANERJI
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Alberto Sanchez
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
DEVELOP
Milestone checklist
Milestone checklist
Stephanus Roux C Eng , IntPE(uk) , FIET
Empfohlen
Epc for module mm1 mm2 baseline schedule level 3
Epc for module mm1 mm2 baseline schedule level 3
robotbietcuoi
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02
Mario Fonseca
WORKFLOW
WORKFLOW
TW Carl
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
PMI Chennai Chapter
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
HIMADRI BANERJI
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Alberto Sanchez
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
DEVELOP
Milestone checklist
Milestone checklist
Stephanus Roux C Eng , IntPE(uk) , FIET
Pid.pdf
Pid.pdf
ssuserfc98db
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
ignitetribes
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
ignitetribes
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Philippe Porta
Epc issues and recommendations
Epc issues and recommendations
ubk1411
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
ignitetribes
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
ignitetribes
Piping Design Course in Hyderabad
Piping Design Course in Hyderabad
Sanjary Edu
Project control plan_draft
Project control plan_draft
ignitetribes
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
MAHESH PANDIT
Project Scheduling & Controls
Project Scheduling & Controls
Procept Associates
Planning For Engineering
Planning For Engineering
Joe Kalchbrenner
Study 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project Definition
Gerard B. Hawkins
EPC Business Model
EPC Business Model
avnishnarula86
Epc presentation robert foxpresentation
Epc presentation robert foxpresentation
raghunathan janarthanan
AWP-Education-Primer.pdf
AWP-Education-Primer.pdf
My own
Basic engineering_Checklist
Basic engineering_Checklist
Stephanus Roux C Eng , IntPE(uk) , FIET
Forensic schedule analysis acesss
Forensic schedule analysis acesss
McLachlan Lister Pty Limited
Piping basics knowledge
Piping basics knowledge
ARINDAM BANERJEE
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
Sistema FIEB
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme - Rev 00
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-
Nixzalis Bourdier
Weitere ähnliche Inhalte
Was ist angesagt?
Pid.pdf
Pid.pdf
ssuserfc98db
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
ignitetribes
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
ignitetribes
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Philippe Porta
Epc issues and recommendations
Epc issues and recommendations
ubk1411
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
ignitetribes
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
ignitetribes
Piping Design Course in Hyderabad
Piping Design Course in Hyderabad
Sanjary Edu
Project control plan_draft
Project control plan_draft
ignitetribes
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
MAHESH PANDIT
Project Scheduling & Controls
Project Scheduling & Controls
Procept Associates
Planning For Engineering
Planning For Engineering
Joe Kalchbrenner
Study 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project Definition
Gerard B. Hawkins
EPC Business Model
EPC Business Model
avnishnarula86
Epc presentation robert foxpresentation
Epc presentation robert foxpresentation
raghunathan janarthanan
AWP-Education-Primer.pdf
AWP-Education-Primer.pdf
My own
Basic engineering_Checklist
Basic engineering_Checklist
Stephanus Roux C Eng , IntPE(uk) , FIET
Forensic schedule analysis acesss
Forensic schedule analysis acesss
McLachlan Lister Pty Limited
Piping basics knowledge
Piping basics knowledge
ARINDAM BANERJEE
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
Sistema FIEB
Was ist angesagt?
(20)
Pid.pdf
Pid.pdf
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Epc issues and recommendations
Epc issues and recommendations
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
Piping Design Course in Hyderabad
Piping Design Course in Hyderabad
Project control plan_draft
Project control plan_draft
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
Project Scheduling & Controls
Project Scheduling & Controls
Planning For Engineering
Planning For Engineering
Study 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project Definition
EPC Business Model
EPC Business Model
Epc presentation robert foxpresentation
Epc presentation robert foxpresentation
AWP-Education-Primer.pdf
AWP-Education-Primer.pdf
Basic engineering_Checklist
Basic engineering_Checklist
Forensic schedule analysis acesss
Forensic schedule analysis acesss
Piping basics knowledge
Piping basics knowledge
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
Ähnlich wie Project Schedule - Level IV Schedule
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme - Rev 00
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-
Nixzalis Bourdier
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activity
Roumik Mukherjee
-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injec...
-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injec...
yang lu
Weekly report no 19
Weekly report no 19
WaqarHussain183
10. Overall Implementation Programme
10. Overall Implementation Programme
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
ADIB Time Schedule V4.0
ADIB Time Schedule V4.0
Ahmed Khaled
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Arun Bharadwaj
ERUP WBS
ERUP WBS
Hani Abolfazli, PMP®, PMI-RMP®, PMI-SP®
Cash Flow Portfolio
Cash Flow Portfolio
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdf
Ahmed Mehrem
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Ahmed Mehrem
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015
William Irving
WORKING PORTFOLIO - 01
WORKING PORTFOLIO - 01
Nattakarn Sooksa-nguan
Equipment Arrival Status.pptx
Equipment Arrival Status.pptx
MehmanNasibov1
Leyet Colleges Schedule
Leyet Colleges Schedule
ALLAN ALMARINES
C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)
Baig Ali
IHH Healthcare Tender Programme.pdf
IHH Healthcare Tender Programme.pdf
SubramanianSaravanan8
SeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule final
Ahmed Mehrem
Ähnlich wie Project Schedule - Level IV Schedule
(20)
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme - Rev 00
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activity
-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injec...
-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injec...
Weekly report no 19
Weekly report no 19
10. Overall Implementation Programme
10. Overall Implementation Programme
ADIB Time Schedule V4.0
ADIB Time Schedule V4.0
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
ERUP WBS
ERUP WBS
Cash Flow Portfolio
Cash Flow Portfolio
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015
WORKING PORTFOLIO - 01
WORKING PORTFOLIO - 01
Equipment Arrival Status.pptx
Equipment Arrival Status.pptx
Leyet Colleges Schedule
Leyet Colleges Schedule
C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)
IHH Healthcare Tender Programme.pdf
IHH Healthcare Tender Programme.pdf
SeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule final
Project Schedule - Level IV Schedule
1.
Activity ID Activity
Name Original Duration Start Finish 14234-3 Eg14234-3 Egbaoma Gas Processing Plant - New 586 05-Aug-14 A 04-Apr-16 14234-3.Co14234-3.Contract About Contract 459 05-Aug-14 A 04-Apr-16 A21270 Kick Off Meeting 0 05-Aug-14 A A21280 Commencement of Project Work 0 05-Aug-14 A A21790 HAZOP 8 17-Dec-14 A 24-Dec-14 A A21800 Engineering Completion 0 21-Sep-15 A21810 Procurement Completion 0 26-Oct-15 A21820 Site Modification, Construction & Erection Works Completion 0 24-Feb-16 A21830 Pre-Commissioning & Commissioning Works Completion 0 29-Feb-16 A21840 First Gas In & Successful Test Run 0 29-Feb-16 A21940 Performance Test 3 29-Feb-16 03-Mar-16 A21950 Reliability Test 30 03-Mar-16 04-Apr-16 A21960 Project Closing 0 04-Apr-16 14234-3.En14234-3.Engineering Engineering 398 18-Aug-14 A 02-Oct-15 14234-3.En14234-3.Engineering.1 Process 341 18-Aug-14 A 19-Apr-15 A A21350 Process Design Completion 0 19-Apr-15 A 14234-3.E14234-3.Engineering.1.1 Documents and Reports 341 18-Aug-14 A 19-Apr-15 A 14234-3.E14234-3.Engineering.1.2 Drawings 326 27-Aug-14 A 25-Mar-15 A 14234-3.En14234-3.Engineering.2 Mechanical Static 377 21-Aug-14 A 15-Apr-15 A A21360 Mechanical Static Design Completion 0 15-Apr-15 A 14234-3.E14234-3.Engineering.2.2 Design Calculation Book 286 17-Sep-14 A 15-Apr-15 A 14234-3.E14234-3.Engineering.2.3 Drawings 367 21-Aug-14 A 09-Apr-15 A 14234-3.E14234-3.Engineering.2.4 Datasheet 295 17-Sep-14 A 09-Apr-15 A 14234-3.E14234-3.Engineering.2.1 Documents 277 11-Sep-14 A 10-Mar-15 A 14234-3.En14234-3.Engineering.4 Piping 366 11-Sep-14 A 04-May-15 A A21380 Piping Design Start 0 11-Sep-14 A A21670 Piping Design Completion 0 30-Mar-15 A 14234-3.E14234-3.Engineering.4.3 Skid General Arrangement Drawing 366 02-Oct-14 A 30-Mar-15 A 14234-3.E14234-3.Engineering.4.1 Documents 81 03-Nov-14 A 04-Feb-15 A 14234-3.E14234-3.Engineering.4.2 General Drawings 292 11-Sep-14 A 04-May-15 A 14234-3.En14234-3.Engineering.3 Mechanical Rotating 177 06-Jan-15 A 19-Apr-15 A A21370 Mechanical Rotating Design Completion 0 19-Apr-15 A 14234-3.E14234-3.Engineering.3.1 Datasheets 177 06-Jan-15 A 19-Apr-15 A 14234-3.En14234-3.Engineering.5 Electrical 202 02-Oct-14 A 02-Oct-15 A A21390 Electrical System Design Completion 0 14-Apr-15 A 14234-3.E14234-3.Engineering.5.2 Documents 194 02-Oct-14 A 02-Oct-15 A 14234-3.E14234-3.Engineering.5.1 Data Sheets 101 07-Jan-15 A 03-Feb-15 A 14234-3.E14234-3.Engineering.5.3 Drawings 103 26-Jan-15 A 14-Apr-15 A 14234-3.En14234-3.Engineering.6 Instrumentation 314 05-Nov-14 A 09-Jul-15 A A21400 Instrumentation System Design Completion 0 15-Apr-15 A 14234-3.E14234-3.Engineering.6.2 Documents 186 05-Nov-14 A 09-Jul-15 A 14234-3.E14234-3.Engineering.6.1 Data Sheets 176 07-Jan-15 A 12-May-15 A 14234-3.E14234-3.Engineering.6.30 Layouts & Drawings 183 25-Feb-15 A 22-Apr-15 A 14234-3.En14234-3.Engineering.7 Civil & Structure 360 21-Aug-14 A 12-Aug-15 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 04-Apr-16, 04-Apr-16, Kick Off Meeting, 05-Aug-14 A Commencement of Project Work, 05-Aug-14 A HAZOP Engineering Completion, Procurement Completion, Site Modification Pre-Commissio First Gas In & Performance T Reliability T Project Clo 02-Oct-15, 14234-3.Engineering 19-Apr-15 A, 14234-3.Engineering.1 Process Process Design Completion, 19-Apr-15 A, 14234-3.Engineering.1.1 Documents a 25-Mar-15 A, 14234-3.Engineering.1.2 Drawings 15-Apr-15 A, 14234-3.Engineering.2 Mechanical Stat Mechanical Static Design Completion, 15-Apr-15 A, 14234-3.Engineering.2.2 Design Calcul 09-Apr-15 A, 14234-3.Engineering.2.3 Drawings 09-Apr-15 A, 14234-3.Engineering.2.4 Datasheet 10-Mar-15 A, 14234-3.Engineering.2.1 Documents 04-May-15 A, 14234-3.Engineering.4 Piping Piping Design Start, 11-Sep-14 A Piping Design Completion, 30-Mar-15 A, 14234-3.Engineering.4.3 Skid General Ar 04-Feb-15 A, 14234-3.Engineering.4.1 Documents 04-May-15 A, 14234-3.Engineering.4.2 General Dr 19-Apr-15 A, 14234-3.Engineering.3 Mechanical Rot Mechanical Rotating Design Completion, 19-Apr-15 A, 14234-3.Engineering.3.1 Datasheets 02-Oct-15 A, 14234-3.Engineerin Electrical System Design Completion, 02-Oct-15 A, 14234-3.Engineerin 03-Feb-15 A, 14234-3.Engineering.5.1 Data Sheets 14-Apr-15 A, 14234-3.Engineering.5.3 Drawings 09-Jul-15 A, 14234-3.Engineering.6 Instrum Instrumentation System Design Completion, 09-Jul-15 A, 14234-3.Engineering.6.2 Docu 12-May-15 A, 14234-3.Engineering.6.1 Data Shee 22-Apr-15 A, 14234-3.Engineering.6.30 Layouts & D 12-Aug-15, 14234-3.Engineering.7 Civ Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 1 of 7 TASK filter: All Activities © Oracle Corporation
2.
Activity ID Activity
Name Original Duration Start Finish A21410 Civil & Structure Design Completion 0 12-Aug-15 14234-3.E14234-3.Engineering.7.2 Drawings 360 21-Aug-14 A 12-Aug-15 14234-3.E14234-3.Engineering.7.1 Document 78 03-Nov-14 A 29-Jan-15 A 14234-3.En14234-3.Engineering.8 HSE 306 20-Aug-14 A 22-Jun-15 A A21420 HSE Documentation Completion 0 22-Jun-15 A 14234-3.E14234-3.Engineering.8.1 Document 306 20-Aug-14 A 22-Jun-15 A 14234-3.En14234-3.Engineering.9 QAQC 147 20-Aug-14 A 10-Mar-15 A A21430 QAQC Documentation Completion 0 10-Mar-15 A 14234-3.E14234-3.Engineering.9.1 Document 59 20-Aug-14 A 10-Mar-15 A 14234-3.En14234-3.Engineering.10 Commissioning 244 05-Nov-14 A 21-Sep-15 A21440 Commissioning Documentation Completion 0 21-Sep-15 14234-3.E14234-3.Engineering.10.1 Documents 244 05-Nov-14 A 21-Sep-15 14234-3.En14234-3.Engineering.11 General 194 15-Sep-14 A 25-Mar-15 A A21450 General Documentation Completion 0 25-Mar-15 A 14234-3.E14234-3.Engineering.11.1 Documents 107 15-Sep-14 A 25-Mar-15 A 14234-3.Pr14234-3.Procourment Procurement 310 19-Oct-14 A 26-Oct-15 A21460 Procurement Completion 0 26-Oct-15 14234-3.Pr14234-3.Procourment.1 Issuance of PO for major buyout Items 216 19-Oct-14 A 22-Jan-15 A A21570 PO Placed for all Major Items 0 22-Jan-15 A 14234-3.P14234-3.Procourment.1.2 Deethanizer OH Condenser E-401 71 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.3 Condensate Stabilization Column C-3001 7 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.6 Gas/Gas Exchanger E-300A 7 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.7 Gas/Gas Exchanger E-300B 7 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.8 Gas/Liquid Exchanger E-302A 54 19-Oct-14 A 08-Dec-14 A 14234-3.P14234-3.Procourment.1.10 Regeneration Gas Cooler E-303 54 19-Oct-14 A 04-Jan-15 A 14234-3.P14234-3.Procourment.1.11 Water Degassing Boot V-3401 7 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.12 CPI Separator V-3402 7 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.13 On Spec Condensate Storage Tank T-3301 7 21-Jan-15 A 22-Jan-15 A 14234-3.P14234-3.Procourment.1.14 Off Spec Condensate Storage Tank T-3302 7 21-Jan-15 A 22-Jan-15 A 14234-3.P14234-3.Procourment.1.15 Bulk Materials 17 08-Dec-14 A 08-Dec-14 A 14234-3.P14234-3.Procourment.1.9 Gas/Liquid Exchanger E-302B 54 19-Oct-14 A 08-Dec-14 A 14234-3.P14234-3.Procourment.1.1 Chiller E-301 46 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.5 Condensate Reboiler E-3001 7 19-Oct-14 A 19-Oct-14 A 14234-3.P14234-3.Procourment.1.4 Propane Receiver V-706 7 19-Oct-14 A 19-Oct-14 A 14234-3.Pr14234-3.Procourment.2 Receipt of Head & Shell Materials at SPEC Facility 253 19-Oct-14 A 22-Feb-15 A A21560 Fabrication Material Received @ SPEC Fabrication Facility 0 22-Feb-15 A 14234-3.P14234-3.Procourment.2.1 Chiller E-301 17 19-Oct-14 A 02-Dec-14 A 14234-3.P14234-3.Procourment.2.2 Deethanizer OH Condenser E-401 17 19-Oct-14 A 02-Dec-14 A 14234-3.P14234-3.Procourment.2.3 Condensate Stabilization Column C-3001 17 19-Oct-14 A 02-Dec-14 A 14234-3.P14234-3.Procourment.2.4 Propane Receiver V-706 17 19-Oct-14 A 02-Dec-14 A 14234-3.P14234-3.Procourment.2.5 Condensate Reboiler E-3001 17 19-Oct-14 A 02-Nov-14 A 14234-3.P14234-3.Procourment.2.6 Gas/Gas Exchanger E-300A 40 19-Oct-14 A 02-Dec-14 A 14234-3.P14234-3.Procourment.2.7 Gas/Gas Exchanger E-300B 40 19-Oct-14 A 02-Dec-14 A 14234-3.P14234-3.Procourment.2.8 Gas/Liquid Exchanger E-302A 47 19-Oct-14 A 30-Dec-14 A 14234-3.P14234-3.Procourment.2.9 Gas/Liquid Exchanger E-302B 47 19-Oct-14 A 30-Dec-14 A 14234-3.P14234-3.Procourment.2.10 Regeneration Gas Cooler E-303 47 19-Oct-14 A 05-Jan-15 A Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 Civil & Structure Design Completion, 12-Aug-15, 14234-3.Engineering.7.2 D 29-Jan-15 A, 14234-3.Engineering.7.1 Document 22-Jun-15 A, 14234-3.Engineering.8 HSE HSE Documentation Completion, 22-Jun-15 A, 14234-3.Engineering.8.1 Docum 10-Mar-15 A, 14234-3.Engineering.9 QAQC QAQC Documentation Completion, 10-Mar-15 A, 14234-3.Engineering.9.1 Document 21-Sep-15, 14234-3.Engineering.1 Commissioning Documentation Co 21-Sep-15, 14234-3.Engineering.1 25-Mar-15 A, 14234-3.Engineering.11 General General Documentation Completion, 25-Mar-15 A, 14234-3.Engineering.11.1 Documents 26-Oct-15, 14234-3.Procourm Procurement Completion, 22-Jan-15 A, 14234-3.Procourment.1 Issuance of PO for majo PO Placed for all Major Items, 19-Oct-14 A, 14234-3.Procourment.1.2 Deethanizer OH Condenser E-40 19-Oct-14 A, 14234-3.Procourment.1.3 Condensate Stabilization Column 19-Oct-14 A, 14234-3.Procourment.1.6 Gas/Gas Exchanger E-300A 19-Oct-14 A, 14234-3.Procourment.1.7 Gas/Gas Exchanger E-300B 08-Dec-14 A, 14234-3.Procourment.1.8 Gas/Liquid Exchanger E-30 04-Jan-15 A, 14234-3.Procourment.1.10 Regeneration Gas Coo 19-Oct-14 A, 14234-3.Procourment.1.11 Water Degassing Boot V-3401 19-Oct-14 A, 14234-3.Procourment.1.12 CPI Separator V-3402 22-Jan-15 A, 14234-3.Procourment.1.13 On Spec Condensate 22-Jan-15 A, 14234-3.Procourment.1.14 Off Spec Condensate 08-Dec-14 A, 14234-3.Procourment.1.15 Bulk Materials 08-Dec-14 A, 14234-3.Procourment.1.9 Gas/Liquid Exchanger E-30 19-Oct-14 A, 14234-3.Procourment.1.1 Chiller E-301 19-Oct-14 A, 14234-3.Procourment.1.5 Condensate Reboiler E-3001 19-Oct-14 A, 14234-3.Procourment.1.4 Propane Receiver V-706 22-Feb-15 A, 14234-3.Procourment.2 Receipt of Head & S Fabrication Material Received @ SPEC Fabrication Facility, 02-Dec-14 A, 14234-3.Procourment.2.1 Chiller E-301 02-Dec-14 A, 14234-3.Procourment.2.2 Deethanizer OH Condenser 02-Dec-14 A, 14234-3.Procourment.2.3 Condensate Stabilization Co 02-Dec-14 A, 14234-3.Procourment.2.4 Propane Receiver V-706 02-Nov-14 A, 14234-3.Procourment.2.5 Condensate Reboiler E-3001 02-Dec-14 A, 14234-3.Procourment.2.6 Gas/Gas Exchanger E-300A 02-Dec-14 A, 14234-3.Procourment.2.7 Gas/Gas Exchanger E-300B 30-Dec-14 A, 14234-3.Procourment.2.8 Gas/Liquid Exchanger E 30-Dec-14 A, 14234-3.Procourment.2.9 Gas/Liquid Exchanger E 05-Jan-15 A, 14234-3.Procourment.2.10 Regeneration Gas Coo Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 2 of 7 TASK filter: All Activities © Oracle Corporation
3.
Activity ID Activity
Name Original Duration Start Finish 14234-3.P14234-3.Procourment.2.11 Water Degassing Boot V-3401 21 19-Oct-14 A 07-Dec-14 A 14234-3.P14234-3.Procourment.2.12 CPI Separator V-3402 21 19-Oct-14 A 07-Dec-14 A 14234-3.P14234-3.Procourment.2.13 On Spec Condensate Storage Tank T-3301 49 22-Jan-15 A 22-Feb-15 A 14234-3.P14234-3.Procourment.2.14 Off Spec Condensate Storage Tank T-3302 49 22-Jan-15 A 22-Feb-15 A 14234-3.P14234-3.Procourment.2.15 Bulk Materials 21 08-Dec-14 A 30-Dec-14 A 14234-3.Pr14234-3.Procourment.3 Successful Vessel Hydro Test 22 02-Apr-15 A 16-Aug-15 A21550 Hydrotesting of Vessels Completion 0 16-Aug-15 14234-3.P14234-3.Procourment.3.1 Chiller E-301 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.2 Deethanizer OH Condenser E-401 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.3 Condensate Stabilization Column C-3001 1 03-Apr-15 A 03-Apr-15 A 14234-3.P14234-3.Procourment.3.4 Propane Receiver V-706 1 03-Apr-15 A 03-Apr-15 A 14234-3.P14234-3.Procourment.3.5 Condensate Reboiler E-3001 1 03-Apr-15 A 03-Apr-15 A 14234-3.P14234-3.Procourment.3.6 Gas/Gas Exchanger E-300A 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.7 Gas/Gas Exchanger E-300B 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.8 Gas/Liquid Exchanger E-302A 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.9 Gas/Liquid Exchanger E-302B 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.10 Regeneration Gas Cooler E-303 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.3.11 Water Degassing Boot V-3401 1 02-Apr-15 A 02-Apr-15 A 14234-3.P14234-3.Procourment.3.12 CPI Separator V-3402 1 02-Apr-15 A 02-Apr-15 A 14234-3.Pr14234-3.Procourment.4 Equipment FAT at SPEC Facility 41 16-Aug-15 25-Oct-15 A21540 Equipment FAT Completion 0 25-Oct-15 14234-3.P14234-3.Procourment.4.1 Gas/Gas Exchanger (E-300A/B) Skid 1 10-Sep-15 13-Sep-15 14234-3.P14234-3.Procourment.4.2 Gas Liquid Exchanger (E-302A/B) Skid 1 27-Aug-15 30-Aug-15 14234-3.P14234-3.Procourment.4.3 Regeneration Gas Cooler (E-303) Skid 1 10-Sep-15 13-Sep-15 14234-3.P14234-3.Procourment.4.4 Gas Metering Package 1 25-Oct-15 25-Oct-15 14234-3.P14234-3.Procourment.4.5 NGL Stabilization Package 1 25-Oct-15 25-Oct-15 14234-3.P14234-3.Procourment.4.6 NGL Loading Pump Package 1 30-Aug-15 30-Aug-15 14234-3.P14234-3.Procourment.4.7 Water Degassing Boot & CPI Separator Package 1 16-Aug-15 16-Aug-15 14234-3.P14234-3.Procourment.4.8 ESD/FGS Panel 2 27-Sep-15 28-Sep-15 14234-3.Pr14234-3.Procourment.5 Shipping Readiness of Materials from SPEC Facility 41 17-Aug-15 26-Oct-15 A21530 Shipping Readiness of Materials @ SPEC Facility 0 26-Oct-15 14234-3.P14234-3.Procourment.5.1 Gas/Gas & Gas/Liquid Exchangers Package 2 13-Sep-15 16-Sep-15 14234-3.P14234-3.Procourment.5.2 Gas Metering Package 1 26-Oct-15 26-Oct-15 14234-3.P14234-3.Procourment.5.3 Condensate Stabilization Package 1 26-Oct-15 26-Oct-15 14234-3.P14234-3.Procourment.5.4 Condensate Loading Pump Package 1 31-Aug-15 31-Aug-15 14234-3.P14234-3.Procourment.5.5 Water Degassing Boot & CPI Separator Package 1 17-Aug-15 17-Aug-15 14234-3.P14234-3.Procourment.5.6 ESD/FGS Panel 1 29-Sep-15 29-Sep-15 14234-3.Pr14234-3.Project Constraints Project Constraints 137 09-Jul-15 27-Nov-15 A23989 Project Activities Resumed 0 09-Jul-15 A23990 First Shipment Despatch from HFZ 5 15-Aug-15* 20-Aug-15 A24000 First Shipment Receiving on Site 65 20-Aug-15 27-Oct-15 A24040 Overhaul of Compressors & Generators 80 15-Aug-15* 06-Nov-15 A24050 Procurement of MCC Enclosure & Component 5 15-Jul-15* 20-Jul-15 A24060 Material Deliveries, Assembly, & FAT 65 20-Jul-15 25-Sep-15 A24080 Procurement of Synchornization Controller + Delivery to HFZ 25 15-Aug-15* 10-Sep-15 A24100 Pumps Receiving in HFZ 45 09-Jul-15 24-Aug-15 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 07-Dec-14 A, 14234-3.Procourment.2.11 Water Degassing Boot V-3 07-Dec-14 A, 14234-3.Procourment.2.12 CPI Separator V-3402 22-Feb-15 A, 14234-3.Procourment.2.13 On Spec Conden 22-Feb-15 A, 14234-3.Procourment.2.14 Off Spec Conden 30-Dec-14 A, 14234-3.Procourment.2.15 Bulk Materials 16-Aug-15, 14234-3.Procourment.3 S Hydrotesting of Vessels Completion, 16-Aug-15, 14234-3.Procourment.3.1 16-Aug-15, 14234-3.Procourment.3.2 03-Apr-15 A, 14234-3.Procourment.3.3 Condensate S 03-Apr-15 A, 14234-3.Procourment.3.4 Propane Rece 03-Apr-15 A, 14234-3.Procourment.3.5 Condensate R 16-Aug-15, 14234-3.Procourment.3.6 16-Aug-15, 14234-3.Procourment.3.7 16-Aug-15, 14234-3.Procourment.3.8 16-Aug-15, 14234-3.Procourment.3.9 16-Aug-15, 14234-3.Procourment.3.10 02-Apr-15 A, 14234-3.Procourment.3.11 Water Degas 02-Apr-15 A, 14234-3.Procourment.3.12 CPI Separato 25-Oct-15, 14234-3.Procourm Equipment FAT Completion, 13-Sep-15, 14234-3.Procourment.4 30-Aug-15, 14234-3.Procourment.4.2 13-Sep-15, 14234-3.Procourment.4 25-Oct-15, 14234-3.Procourm 25-Oct-15, 14234-3.Procourm 30-Aug-15, 14234-3.Procourment.4.6 16-Aug-15, 14234-3.Procourment.4.7 28-Sep-15, 14234-3.Procourmen 26-Oct-15, 14234-3.Procourm Shipping Readiness of Materia 16-Sep-15, 14234-3.Procourment. 26-Oct-15, 14234-3.Procourm 26-Oct-15, 14234-3.Procourm 31-Aug-15, 14234-3.Procourment.5. 17-Aug-15, 14234-3.Procourment.5.5 29-Sep-15, 14234-3.Procourmen 27-Nov-15, 14234-3.Proje Project Activities Resumed, 09-Jul-15 First Shipment Despatch from HFZ First Shipment Receiving on S Overhaul of Compressors & Procurement of MCC Enclosure & Compo Material Deliveries, Assembly, & F Procurement of Synchornization Co Pumps Receiving in HFZ Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 3 of 7 TASK filter: All Activities © Oracle Corporation
4.
Activity ID Activity
Name Original Duration Start Finish A24101 Procurement of Commissioning Spare 5 01-Sep-15* 05-Sep-15 A24102 Commissioning Spares Receiving In HFZ 25 05-Sep-15 01-Oct-15 A24150 Procurement of Electrical & Instrumentation Cables 5 30-Jul-15* 04-Aug-15 A24160 Electrical & Instrumentation Cables Ex. Works Readiness & Receiving on Site 92 04-Aug-15 07-Nov-15 A24161 DPR Visit - Hydro for 2nd Lot of Vessels and FAT for 1st lot Skid Packages 14 25-Aug-15* 08-Sep-15 A24162 Punch List Close Out + Shipping Readiness 3 08-Sep-15 11-Sep-15 A24170 2nd Shipment Dispatch from UAE 5 11-Sep-15 16-Sep-15 A24180 2nd Shipment Receiving on Site 50 16-Sep-15 06-Nov-15 A24181 DPR Visit - FAT for 2nd Lot of Skid Packages 13 15-Sep-15* 28-Sep-15 A24182 Punch List Close Out + Shipping Readiness 3 28-Sep-15 01-Oct-15 A24190 3rd Shipment Dispatch from UAE 5 01-Oct-15 07-Oct-15 A24200 3rd Shipment Receiving on Site 50 07-Oct-15 27-Nov-15 14234-3.Co14234-3.Construction Site Modification, Construction & Erection W 222 21-Jan-15 A 24-Feb-16 A21880 Site Modification, Construction & Erection Completion 0 24-Feb-16 14234-3.C14234-3.Construction.2 Site Construction & Erection Works 222 21-Jan-15 A 24-Feb-16 A21510 Site Construction & Erection Works Completion 0 24-Feb-16 14234-3.C14234-3.Construction.2.1 Foundation for Gas Metering Package 56 12-Aug-15 09-Oct-15 14234-3.C14234-3.Construction.2.2 Foundation for Water Degassing Boot & CPI Separator Sk 56 12-Aug-15 09-Oct-15 14234-3.C14234-3.Construction.2.3 Foundation for NGL Storage Tank T-3101 56 21-Jan-15 A 05-Sep-15 14234-3.C14234-3.Construction.2.4 Foundation for Condensate Stabilization Skid 56 12-Aug-15 09-Oct-15 14234-3.C14234-3.Construction.2.5 Foundation for Condensate Transfer Pump Skid 56 12-Aug-15 09-Oct-15 14234-3.C14234-3.Construction.2.6 Foundation for Gas/Gas Exchanger (E-300A/B) Skid 42 21-Sep-15 03-Nov-15 14234-3.C14234-3.Construction.2.7 Foundation for Gas Liquid Exchanger (E-302(A/B Skid 56 12-Aug-15 09-Oct-15 14234-3.C14234-3.Construction.2.8 Foundation for Regeneration Gas Cooler (E-303) Skid 42 21-Sep-15 04-Nov-15 14234-3.C14234-3.Construction.2.9 Foundation for Lighting Poles 56 12-Aug-15 09-Oct-15 14234-3.C14234-3.Construction.2.26 Erection of Gas Metering Skid 5 14-Nov-15 20-Nov-15 14234-3.C14234-3.Construction.2.10 Foundation for NGL Storage Tank T-3102 56 09-Jul-15 05-Sep-15 14234-3.C14234-3.Construction.2.28 Erection of NGL Storage Tank T-3101 126 09-Jul-15 16-Nov-15 14234-3.C14234-3.Construction.2.27 Erection of NGL Storage Tank T-3102 126 09-Jul-15 16-Nov-15 14234-3.C14234-3.Construction.2.11 Erection of Water Degassing Boot & CPI Separator Skid 7 14-Nov-15 23-Nov-15 14234-3.C14234-3.Construction.2.12 Erection of Condensate Stabilization Skid 14 27-Nov-15 11-Dec-15 14234-3.C14234-3.Construction.2.13 Erection of NGL Transfer Pump Skid 7 27-Nov-15 04-Dec-15 14234-3.C14234-3.Construction.2.14 Erection of Gas/Gas Exchanger (E-300A/B) Skid 7 09-Dec-15 17-Dec-15 14234-3.C14234-3.Construction.2.15 Erection of Gas Liquid Exchanger (E-302(A/B Skid 7 27-Nov-15 04-Dec-15 14234-3.C14234-3.Construction.2.16 Erection of Regeneration Gas Cooler (E-303) Skid 7 10-Dec-15 17-Dec-15 14234-3.C14234-3.Construction.2.17 Erection of Lighting Poles 7 14-Nov-15 23-Nov-15 14234-3.C14234-3.Construction.2.18 Cable Pulling - Instrument Cables 21 07-Nov-15 28-Nov-15 14234-3.C14234-3.Construction.2.19 Cable Pulling - Electrical Cables 21 07-Nov-15 28-Nov-15 14234-3.C14234-3.Construction.2.20 Electrical Cables Termination in MCC 14 19-Jan-16 02-Feb-16 14234-3.C14234-3.Construction.2.21 Erection of ESD/FGS Panel 7 27-Nov-15 04-Dec-15 14234-3.C14234-3.Construction.2.22 Instruments Cable Termination in DCS Panel 14 04-Dec-15 19-Dec-15 14234-3.C14234-3.Construction.2.23 Instruments Cable Termination in ESD/FGS Panel 14 07-Nov-15 21-Nov-15 14234-3.C14234-3.Construction.2.24 Interconnecting Cables - DCS to ESD/FGS Panel 14 19-Dec-15 02-Jan-16 14234-3.C14234-3.Construction.2.25 Interconnecting Piping Works 64 19-Dec-15 24-Feb-16 14234-3.C14234-3.Construction.1 Site Modification Works 103 04-Sep-15 19-Dec-15 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 Procurement of Commissioning Spa Commissioning Spares Receiving Procurement of Electrical & Instrumenta Electrical & Instrumentation C DPR Visit - Hydro for 2nd Lot of Ves Punch List Close Out + Shipping Re 2nd Shipment Dispatch from UAE 2nd Shipment Receiving on S DPR Visit - FAT for 2nd Lot of Ski Punch List Close Out + Shipping 3rd Shipment Dispatch from UAE 3rd Shipment Receiving on 24-Feb-16, 142 Site Modification 24-Feb-16, 142 Site Constructio 09-Oct-15, 14234-3.Constructio 09-Oct-15, 14234-3.Constructio 05-Sep-15, 14234-3.Construction.2 09-Oct-15, 14234-3.Constructio 09-Oct-15, 14234-3.Constructio 03-Nov-15, 14234-3.Constru 09-Oct-15, 14234-3.Constructio 04-Nov-15, 14234-3.Constru 09-Oct-15, 14234-3.Constructio 20-Nov-15, 14234-3.Const 05-Sep-15, 14234-3.Construction.2 16-Nov-15, 14234-3.Constr 16-Nov-15, 14234-3.Constr 23-Nov-15, 14234-3.Cons 11-Dec-15, 14234-3.Con 04-Dec-15, 14234-3.Con 17-Dec-15, 14234-3.Co 04-Dec-15, 14234-3.Con 17-Dec-15, 14234-3.Co 23-Nov-15, 14234-3.Cons 28-Nov-15, 14234-3.Cons 28-Nov-15, 14234-3.Cons 02-Feb-16, 14234 04-Dec-15, 14234-3.Con 19-Dec-15, 14234-3.Co 21-Nov-15, 14234-3.Const 02-Jan-16, 14234-3.C 24-Feb-16, 142 19-Dec-15, 14234-3.Co Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 4 of 7 TASK filter: All Activities © Oracle Corporation
5.
Activity ID Activity
Name Original Duration Start Finish A21520 Site Modification Works Completion 0 19-Dec-15 14234-3.C14234-3.Construction.1.1 Three Phase Separator Package 18 27-Nov-15 16-Dec-15 14234-3.C14234-3.Construction.1.14 Heat Medium Expansion Tank/Pumps Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.19 LPG Bullets Control Station Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.26 LPG Loading Arm Skid 18 27-Nov-15 16-Dec-15 14234-3.C14234-3.Construction.1.27 Distributed Control System (DCS) 35 27-Oct-15 02-Dec-15 14234-3.C14234-3.Construction.1.28 Power Generators 19 06-Nov-15 25-Nov-15 14234-3.C14234-3.Construction.1.29 LV Switchgear & MCC 15 27-Nov-15 12-Dec-15 14234-3.C14234-3.Construction.1.23 Heat Medium Heater Skid 12Mmbtu 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.24 Flare KO Drum Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.25 Propane Loading Arm Skid 18 27-Nov-15 16-Dec-15 14234-3.C14234-3.Construction.1.15 Fuel Gas Conditioning Skid 25 27-Oct-15 21-Nov-15 14234-3.C14234-3.Construction.1.16 Instrument Air Package 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.17 Depropanizer Reboiler Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.18 Debutanizer Reboiler Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.30 Synchronization Panel 15 07-Nov-15 23-Nov-15 14234-3.C14234-3.Construction.1.13 Deethanizer Reboiler Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.3 Inlet Compressor Package - A 26 06-Nov-15 03-Dec-15 14234-3.C14234-3.Construction.1.5 Inlet Compressor Package - C 26 06-Nov-15 03-Dec-15 14234-3.C14234-3.Construction.1.7 Regeneration Heater Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.8 Deethanizer Reflux Accumulator Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.9 Depropanizer Reflux Accumulator Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.10 Debutanizer Reflux Accumulator Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.11 Condensate Flash Tank Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.12 Cold & LP Separator Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.20 Propane Bullets Control Staion Skid 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.21 LPG Loading Pumps Skid 18 27-Nov-15 16-Dec-15 14234-3.C14234-3.Construction.1.22 Heat Medium Heater Skid 6Mmbtu 26 27-Oct-15 23-Nov-15 14234-3.C14234-3.Construction.1.4 Inlet Compressor Package - B 26 06-Nov-15 03-Dec-15 14234-3.C14234-3.Construction.1.6 Molecular Sieve Filters Package 26 20-Oct-15 16-Nov-15 14234-3.C14234-3.Construction.1.2 Booster Compressor Package 42 06-Nov-15 19-Dec-15 14234-3.C14234-3.Construction.1.31 UPS System 67 04-Sep-15 12-Nov-15 14234-3.Co14234-3.Commissioning Precommissioning & Commissioning Wo 105 12-Nov-15 29-Feb-16 A21480 Precommissioning & Commissioning Completion 0 29-Feb-16 14234-3.C14234-3.Commissioning.1 Pre-Commissioning Works 57 12-Nov-15 09-Jan-16 A21500 Pre-Commissioning Completion 0 09-Jan-16 14234-3.C14234-3.Commissioning.1.1 Three Phase Separator Package 7 11-Dec-15 18-Dec-15 14234-3.C14234-3.Commissioning.1.2 Booster Compressor Package 7 19-Dec-15 26-Dec-15 14234-3.C14234-3.Commissioning.1.3 Inlet Compressor Package - A 7 03-Dec-15 10-Dec-15 14234-3.C14234-3.Commissioning.1.4 Inlet Compressor Package - B 7 03-Dec-15 10-Dec-15 14234-3.C14234-3.Commissioning.1.5 Inlet Compressor Package - C 7 03-Dec-15 10-Dec-15 14234-3.C14234-3.Commissioning.1.6 Molecular Sieve Filters Package 7 19-Dec-15 26-Dec-15 14234-3.C14234-3.Commissioning.1.7 Regeneration Heater Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.8 Deethanizer Reflux Accumulator Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.9 Depropanizer Reflux Accumulator Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.10 Debutanizer Reflux Accumulator Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.11 Condensate Flash Tank Skid 7 02-Jan-16 09-Jan-16 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 Site Modification Works 16-Dec-15, 14234-3.Co 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 16-Dec-15, 14234-3.Co 02-Dec-15, 14234-3.Cons 25-Nov-15, 14234-3.Cons 12-Dec-15, 14234-3.Con 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 16-Dec-15, 14234-3.Co 21-Nov-15, 14234-3.Const 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 03-Dec-15, 14234-3.Cons 03-Dec-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 23-Nov-15, 14234-3.Cons 16-Dec-15, 14234-3.Co 23-Nov-15, 14234-3.Cons 03-Dec-15, 14234-3.Cons 16-Nov-15, 14234-3.Constr 19-Dec-15, 14234-3.Co 12-Nov-15, 14234-3.Constr 29-Feb-16, 142 Precommission 09-Jan-16, 14234-3.C Pre-Commissioning C 18-Dec-15, 14234-3.Co 26-Dec-15, 14234-3.C 10-Dec-15, 14234-3.Com 10-Dec-15, 14234-3.Com 10-Dec-15, 14234-3.Com 26-Dec-15, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 5 of 7 TASK filter: All Activities © Oracle Corporation
6.
Activity ID Activity
Name Original Duration Start Finish 14234-3.C14234-3.Commissioning.1.12 Cold & LP Separator Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.13 Deethanizer Reboiler Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.14 Heat Medium Expansion Tank/Pumps Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.15 Fuel Gas Conditioning Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.16 Instrument Air Package 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.17 Depropanizer Reboiler Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.18 Debutanizer Reboiler Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.19 LPG Bullets Control Station Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.20 Propane Bullets Control Staion Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.21 LPG Loading Pumps Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.22 Heat Medium Heater Skid 6Mmbtu 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.23 Heat Medium Heater Skid 12Mmbtu 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.24 Flare KO Drum Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.25 Propane Loading Arm Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.26 LPG Loading Arm Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.27 Gas Metering Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.28 Water Degassing Boot & CPI Separator Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.29 Condensate Stabilization Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.30 Condensate Transfer Pump Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.31 Gas/Gas Exchanger (E-300A/B) Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.36 Distributed Control System (DCS) 7 19-Dec-15 26-Dec-15 14234-3.C14234-3.Commissioning.1.37 Synchronization Panel 7 23-Nov-15 30-Nov-15 14234-3.C14234-3.Commissioning.1.32 Gas Liquid Exchanger (E-302(A/B Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.33 Regeneration Gas Cooler (E-303) Skid 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.34 F&G System 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.35 ESD/FGS System 7 02-Jan-16 09-Jan-16 14234-3.C14234-3.Commissioning.1.38 LV Switchgear & MCC 7 12-Dec-15 21-Dec-15 14234-3.C14234-3.Commissioning.1.39 UPS System 7 12-Nov-15 19-Nov-15 14234-3.C14234-3.Commissioning.1.40 Power Generators 7 26-Nov-15 03-Dec-15 14234-3.C14234-3.Commissioning.2 Commissioning Works 48 09-Jan-16 29-Feb-16 A21490 Commissioning Completion 0 29-Feb-16 14234-3.C14234-3.Commissioning.2.1 Three Phase Separator Package 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.2 Booster Compressor Package 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.3 Inlet Compressor Package - A 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.4 Inlet Compressor Package - B 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.5 Inlet Compressor Package - C 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.6 Molecular Sieve Filters Package 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.7 Regeneration Heater Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.8 Deethanizer Reflux Accumulator Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.9 Depropanizer Reflux Accumulator Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.10 Debutanizer Reflux Accumulator Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.11 Condensate Flash Tank Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.12 Cold & LP Separator Skid 5 09-Jan-16 15-Jan-16 14234-3.C14234-3.Commissioning.2.13 Deethanizer Reboiler Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.14 Heat Medium Expansion Tank/Pumps Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.15 Fuel Gas Conditioning Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.16 Instrument Air Package 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.17 Depropanizer Reboiler Skid 5 24-Feb-16 29-Feb-16 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 26-Dec-15, 14234-3.C 30-Nov-15, 14234-3.Com 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 09-Jan-16, 14234-3.C 21-Dec-15, 14234-3.Co 19-Nov-15, 14234-3.Comm 03-Dec-15, 14234-3.Com 29-Feb-16, 142 Commissioning 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 15-Jan-16, 14234-3 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 6 of 7 TASK filter: All Activities © Oracle Corporation
7.
Activity ID Activity
Name Original Duration Start Finish 14234-3.C14234-3.Commissioning.2.18 Debutanizer Reboiler Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.19 LPG Bullets Control Station Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.20 Propane Bullets Control Staion Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.21 LPG Loading Pumps Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.22 Heat Medium Heater Skid 6Mmbtu 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.23 Heat Medium Heater Skid 12Mmbtu 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.24 Flare KO Drum Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.25 Propane Loading Arm Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.26 LPG Loading Arm Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.27 Gas Metering Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.28 Water Degassing Boot & CPI Separator Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.29 Condensate Stabilization Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.30 Condensate Transfer Pump Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.31 Gas/Gas Exchanger (E-300A/B) Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.32 Gas Liquid Exchanger (E-302(A/B Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.33 Regeneration Gas Cooler (E-303) Skid 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.34 F&G System 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.35 ESD/FGS System 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.36 Distributed Control System (DCS) 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.37 Synchronization Panel 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.38 LV Switchgear & MCC 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.39 Power Generators 5 24-Feb-16 29-Feb-16 14234-3.C14234-3.Commissioning.2.40 UPS System 5 24-Feb-16 29-Feb-16 14234-3.Pe14234-3.Perf & Rel Test Performance and Reliability Test 33 29-Feb-16 04-Apr-16 14234-3.Pe14234-3.Perf & Rel Test.Perf Test Performance Test 3 29-Feb-16 03-Mar-16 A24210 Performance Test 3 29-Feb-16 03-Mar-16 14234-3.Pe14234-3.Perf & Rel Test.Rel. Test Reliability Test 30 03-Mar-16 04-Apr-16 A24220 Reliability Test 30 03-Mar-16 04-Apr-16 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 29-Feb-16, 142 04-Apr-16, 03-Mar-16, 142 Performance T 04-Apr-16, Reliability T Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 7 of 7 TASK filter: All Activities © Oracle Corporation