• This presentation provides a ‘mock site induction’ and serves to
help those people in the process of preparing and delivering site
inductions
• Remember -- it is a legal requirement that all personnel receive an
appropriate site induction before they commence work on any site
• The site induction communicates essential information regarding
the site, the working methods and health and safety management
• All attendees of the site induction are required to sign a register to
confirm their attendance and their agreement to abide by the
principal contractor’s policies, procedures and rules and to follow
the agreed method of working
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Site Induction Presentation
ABC
Contracting
Site operating hours are:
Monday--Thursday 8.30am to 5.00pm
Friday 8.30am to 4.00pm
Anyone wishing to work outside these hours must get permission from the
site manager of the principal contractor ABC Construction prior to extended
working.
•All personnel are to sign in and out at the site office everyday -- a swipe
card system is also in operation for signing in and signing out. This is
compulsory
•All site visitors are required to sign in/out using the visitors book in
reception
•Be considerate and co-operative at all times
•This site conforms to the Considerate Contractors Scheme
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Site Induction Presentation
Site Working Hours
ABC
Contracting
The ‘Isaac Newton’ University Building
Address ABC Construction Ltd Site office
City Centre Square
Newtown upon Sea
NE1 2SE
Telephone 0198 201 2345
Fax 0198 201 5432
This is a confined city centre site -- as shown on the
following diagram.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Site Safety Induction
Site Location
ABC
Contracting
(Example) Plan of the Site
1 way
vehicle &
plant route
Storage/ facilities
(Phase 1)
ExistingUniversityBuildings
First Aid
Station
Fire
assembly
point
Offices & canteen
facilities (2 storey)
City Centre Square
Pedestrian
Access only
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Principal Contractor’s Site
Management Team
• Andrew Gregson (Site Manager)
• Eloise Hodder (Site Safety Supervisor)
• First Aiders : Mark Geoffreys; Garrath Matthews;
Muriel Griffiths
• Please refer to the ‘Site Organisation and Emergency
Procedure Chart’ that has been placed upon the site
notice board for further detail
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
ABC
Contracting
Welfare Facilities
The following welfare facilities are provided on site:
• Toilets
• Washing areas (with hot & cold running water)
• A Drying Room
• A Canteen
Please remember when using the canteen facilities to place all
rubbish into the bins provided. This will greatly assist the
cleaner.
Please refer to the site layout chart on the notice board for the
location of these facilities.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Site Rules
• This is a Construction Skills Certification Scheme (CSCS) site. Only
persons holding an appropriate CSCS card will be permitted to work
on this site. CSCS cards must be carried by all personnel at all
times whilst on site.
• All personnel must receive a site induction prior to commencing
work on site. No induction, no work.
• All site personnel must sign in and out of site -- by use of a swipe
card. This should be done individually and never on the behalf of
other persons.
• Appropriate personal protective equipment (PPE) is to be worn by
all persons on site at all times.
• Drugs and alcohol will not be tolerated on his site. Anyone found
under the influence will be disciplined and removed from site
immediately.
• No radios or other such musical equipment are permitted on this
site.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
The following site rules are to be adhered to at all times:
Site Rules (continued)
• All food and drink is to be consumed within the prescribed
welfare facilities compound. Use the rubbish bins provided and
be minded not to leave scraps of food as these could attract
vermin.
• The use of mobile phones is not permitted on this site, except
within the site offices and canteen. Anyone found using a
mobile phone on site will be disciplined and removed from site
immediately.
• Keep all areas of the site tidy and free from discarded
materials. A yellow card/red card scheme is in operation on this
site.
• Ensure mechanical and electrical equipment is stored in the
metal site compound containers at the end of each day.
• Inform site management immediately should you discover any
hazardous materials or activity.
• This is a no smoking site.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
The following site rules are to be adhered to at all times:
Site Rules (continued)
13. Do not interfere with or remove any signage, fencing or dust
screens without expressed permission.
14. Do not interfere with existing gas, water or electric services
which may become exposed during construction.
15. Do not interfere with any scaffolding or access equipment.
Only suitably qualified persons, with expressed written
permission are permitted to assemble, alter and dissemble
such equipment.
16. All materials brought onto the site are safely handled, stored
and disposed of in compliance with the current Control of
Substances Hazardous to Health Regulations
17.Only suitable trained employees are permitted to use the plant
and equipment on the site. Sub-contractors are to provide their
own plant and equipment at all times.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
The following site rules are to be adhered to at all times:
Site Rules (continued)
18. Operatives who are required to erect, alter or dismantle
scaffold towers must have the appropriate level of training and
those undertaking inspection and signing off as safe must be
formally qualified to do so. Evidence of training certificates
must be retained on site.
19. Misuse of equipment or unsafe practices will not be tolerated.
Anyone found undertaking or permitting this will be subject to
disciplinary action.
20. No work activities will be permitted to commence until a
suitable risk assessment and method statement has been
submitted to (and agreed with) the principal contractor for
inclusion within the H&S plan.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
The following site rules are to be adhered to at all times:
Site Hazards
Significant Hazards
The current significant hazards on this site include:
• Confined spaces in the basement area
• Crane lifts
• The movement of plant
• Temporary barriers
• Working at height
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Site Housekeeping
Always ensure that your work area is tidy and free from any rubbish.
A waste compound is provide on site for the orderly disposal of waste
materials.
A site recycling compound is also provided -- please make full use of
this facility.
This site operates a yellow card/red card scheme -- clean up your work
area. Rubbish is a hazard -- contractors not cleaning up during and after
their work will be issued with warnings. Any cleaning costs incurred by
principal contractors having to tidy up after contractors will be passed
on to the offending contractor.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
First Aid
• The appointed first aiders on this site are Damien Duff , Shay Given
and Graham Souness
• Each of these people are suitably trained and possess a current first
aid certificate
• This site has first aid boxes located in the site office and by the
stairwell on floor level
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Accident Reporting
• All accidents are to be logged in the accident book
• The accident book is located in the site office
• Sub-contractors who posses their own accident book must also
enter all accidents into the site accident book
• Any accidents/incidents that are reportable under RIDDOR are to be
reported immediately to the site safety supervisor, Eloise Hodder
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Fire Safety
Most fires can be prevented with simple precautions.
If a fire does occur:
• Raise the alarm. This site now has a fully automatic alarm
• Locate an escape route. This site has two escape routes which are
the stairwells at either side. These stairwells have fire doors and
emergency lighting. It is vital these routes are kept clear at all times
• Make your way calmly to the designated meeting point, and stay
there. This is very important as a full register will be taken to ensure
everybody is present
This site’s fire marshals are Andrew Gregson and Lucy Thomas.
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Fire Fighting Equipment
In the event that you tackle a small fire -- always position
yourself between the fire and your escape route.
Types of Fire Extinguishers
BS EN 3:1996
The content of an extinguisher are indicated by the colour band
on the body of the extinguisher
Red WATER -- for wood, paper, textile and solid
material fires. Do NOT use on liquid, electrical or metal fires.
Blue POWDER -- for liquid and electric fires. Do NOT use
on metal fires.
Black CARBON DIOXIDE -- for liquid and electrical fires. Do
NOT use on metal fires.
Cream FOAM -- for liquid fires. Do NOT use on electrical or
metal fires
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Remember - the wearing of suitable PPE is
compulsory at all times
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
Thank you
Any questions ?
Please remember to study the notice board. You
must successfully complete the brief induction
assessment and sign the induction attendance
register before commencing work
Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
ABC
Contracting

Weitere ähnliche Inhalte

Was ist angesagt?

Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overviewzz_bedee
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety OrientationBeamer
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safetyPrudhvi raj
 
Basic safety
Basic safetyBasic safety
Basic safetyLalit M
 
training near miss program
training near miss programtraining near miss program
training near miss programoscar anell
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...vigneshm817927
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training Claire
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1debandleigh
 

Was ist angesagt? (20)

Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety Orientation
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
Basic safety
Basic safetyBasic safety
Basic safety
 
training near miss program
training near miss programtraining near miss program
training near miss program
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Behavior Based Safety
Behavior Based Safety Behavior Based Safety
Behavior Based Safety
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 

Ähnlich wie EHS induction Presentation slides

Ähnlich wie EHS induction Presentation slides (20)

Site Induction
Site InductionSite Induction
Site Induction
 
Site Induction
Site InductionSite Induction
Site Induction
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
 
WGM Pipeline Project Orientation
WGM Pipeline Project OrientationWGM Pipeline Project Orientation
WGM Pipeline Project Orientation
 
Hands HQ Example RAMS Document
Hands HQ Example RAMS DocumentHands HQ Example RAMS Document
Hands HQ Example RAMS Document
 
s1
s1s1
s1
 
Construction safety session 1 (new)
Construction safety session 1 (new)Construction safety session 1 (new)
Construction safety session 1 (new)
 
ANNEX0~1.DOC
ANNEX0~1.DOCANNEX0~1.DOC
ANNEX0~1.DOC
 
Think safety - Waitoa
Think safety - WaitoaThink safety - Waitoa
Think safety - Waitoa
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
 
Health & safety part 1
Health & safety part 1Health & safety part 1
Health & safety part 1
 
LSR safety.pdf
LSR safety.pdfLSR safety.pdf
LSR safety.pdf
 
Safety manual
Safety manualSafety manual
Safety manual
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Role Play - Induction process for new employees
Role Play - Induction process for new employeesRole Play - Induction process for new employees
Role Play - Induction process for new employees
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 

Kürzlich hochgeladen

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Kürzlich hochgeladen (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

EHS induction Presentation slides

  • 1. • This presentation provides a ‘mock site induction’ and serves to help those people in the process of preparing and delivering site inductions • Remember -- it is a legal requirement that all personnel receive an appropriate site induction before they commence work on any site • The site induction communicates essential information regarding the site, the working methods and health and safety management • All attendees of the site induction are required to sign a register to confirm their attendance and their agreement to abide by the principal contractor’s policies, procedures and rules and to follow the agreed method of working Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson Site Induction Presentation ABC Contracting
  • 2. Site operating hours are: Monday--Thursday 8.30am to 5.00pm Friday 8.30am to 4.00pm Anyone wishing to work outside these hours must get permission from the site manager of the principal contractor ABC Construction prior to extended working. •All personnel are to sign in and out at the site office everyday -- a swipe card system is also in operation for signing in and signing out. This is compulsory •All site visitors are required to sign in/out using the visitors book in reception •Be considerate and co-operative at all times •This site conforms to the Considerate Contractors Scheme Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson Site Induction Presentation Site Working Hours ABC Contracting
  • 3. The ‘Isaac Newton’ University Building Address ABC Construction Ltd Site office City Centre Square Newtown upon Sea NE1 2SE Telephone 0198 201 2345 Fax 0198 201 5432 This is a confined city centre site -- as shown on the following diagram. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson Site Safety Induction Site Location ABC Contracting
  • 4. (Example) Plan of the Site 1 way vehicle & plant route Storage/ facilities (Phase 1) ExistingUniversityBuildings First Aid Station Fire assembly point Offices & canteen facilities (2 storey) City Centre Square Pedestrian Access only Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 5. Principal Contractor’s Site Management Team • Andrew Gregson (Site Manager) • Eloise Hodder (Site Safety Supervisor) • First Aiders : Mark Geoffreys; Garrath Matthews; Muriel Griffiths • Please refer to the ‘Site Organisation and Emergency Procedure Chart’ that has been placed upon the site notice board for further detail Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson ABC Contracting
  • 6. Welfare Facilities The following welfare facilities are provided on site: • Toilets • Washing areas (with hot & cold running water) • A Drying Room • A Canteen Please remember when using the canteen facilities to place all rubbish into the bins provided. This will greatly assist the cleaner. Please refer to the site layout chart on the notice board for the location of these facilities. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 7. Site Rules • This is a Construction Skills Certification Scheme (CSCS) site. Only persons holding an appropriate CSCS card will be permitted to work on this site. CSCS cards must be carried by all personnel at all times whilst on site. • All personnel must receive a site induction prior to commencing work on site. No induction, no work. • All site personnel must sign in and out of site -- by use of a swipe card. This should be done individually and never on the behalf of other persons. • Appropriate personal protective equipment (PPE) is to be worn by all persons on site at all times. • Drugs and alcohol will not be tolerated on his site. Anyone found under the influence will be disciplined and removed from site immediately. • No radios or other such musical equipment are permitted on this site. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson The following site rules are to be adhered to at all times:
  • 8. Site Rules (continued) • All food and drink is to be consumed within the prescribed welfare facilities compound. Use the rubbish bins provided and be minded not to leave scraps of food as these could attract vermin. • The use of mobile phones is not permitted on this site, except within the site offices and canteen. Anyone found using a mobile phone on site will be disciplined and removed from site immediately. • Keep all areas of the site tidy and free from discarded materials. A yellow card/red card scheme is in operation on this site. • Ensure mechanical and electrical equipment is stored in the metal site compound containers at the end of each day. • Inform site management immediately should you discover any hazardous materials or activity. • This is a no smoking site. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson The following site rules are to be adhered to at all times:
  • 9. Site Rules (continued) 13. Do not interfere with or remove any signage, fencing or dust screens without expressed permission. 14. Do not interfere with existing gas, water or electric services which may become exposed during construction. 15. Do not interfere with any scaffolding or access equipment. Only suitably qualified persons, with expressed written permission are permitted to assemble, alter and dissemble such equipment. 16. All materials brought onto the site are safely handled, stored and disposed of in compliance with the current Control of Substances Hazardous to Health Regulations 17.Only suitable trained employees are permitted to use the plant and equipment on the site. Sub-contractors are to provide their own plant and equipment at all times. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson The following site rules are to be adhered to at all times:
  • 10. Site Rules (continued) 18. Operatives who are required to erect, alter or dismantle scaffold towers must have the appropriate level of training and those undertaking inspection and signing off as safe must be formally qualified to do so. Evidence of training certificates must be retained on site. 19. Misuse of equipment or unsafe practices will not be tolerated. Anyone found undertaking or permitting this will be subject to disciplinary action. 20. No work activities will be permitted to commence until a suitable risk assessment and method statement has been submitted to (and agreed with) the principal contractor for inclusion within the H&S plan. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson The following site rules are to be adhered to at all times:
  • 11. Site Hazards Significant Hazards The current significant hazards on this site include: • Confined spaces in the basement area • Crane lifts • The movement of plant • Temporary barriers • Working at height Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 12. Site Housekeeping Always ensure that your work area is tidy and free from any rubbish. A waste compound is provide on site for the orderly disposal of waste materials. A site recycling compound is also provided -- please make full use of this facility. This site operates a yellow card/red card scheme -- clean up your work area. Rubbish is a hazard -- contractors not cleaning up during and after their work will be issued with warnings. Any cleaning costs incurred by principal contractors having to tidy up after contractors will be passed on to the offending contractor. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 13. First Aid • The appointed first aiders on this site are Damien Duff , Shay Given and Graham Souness • Each of these people are suitably trained and possess a current first aid certificate • This site has first aid boxes located in the site office and by the stairwell on floor level Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 14. Accident Reporting • All accidents are to be logged in the accident book • The accident book is located in the site office • Sub-contractors who posses their own accident book must also enter all accidents into the site accident book • Any accidents/incidents that are reportable under RIDDOR are to be reported immediately to the site safety supervisor, Eloise Hodder Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 15. Fire Safety Most fires can be prevented with simple precautions. If a fire does occur: • Raise the alarm. This site now has a fully automatic alarm • Locate an escape route. This site has two escape routes which are the stairwells at either side. These stairwells have fire doors and emergency lighting. It is vital these routes are kept clear at all times • Make your way calmly to the designated meeting point, and stay there. This is very important as a full register will be taken to ensure everybody is present This site’s fire marshals are Andrew Gregson and Lucy Thomas. Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 16. Fire Fighting Equipment In the event that you tackle a small fire -- always position yourself between the fire and your escape route. Types of Fire Extinguishers BS EN 3:1996 The content of an extinguisher are indicated by the colour band on the body of the extinguisher Red WATER -- for wood, paper, textile and solid material fires. Do NOT use on liquid, electrical or metal fires. Blue POWDER -- for liquid and electric fires. Do NOT use on metal fires. Black CARBON DIOXIDE -- for liquid and electrical fires. Do NOT use on metal fires. Cream FOAM -- for liquid fires. Do NOT use on electrical or metal fires Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 17. Remember - the wearing of suitable PPE is compulsory at all times Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson
  • 18. Thank you Any questions ? Please remember to study the notice board. You must successfully complete the brief induction assessment and sign the induction attendance register before commencing work Howarth and Watson, Construction Safety Management. © 2009 by Tim Howarth and Paul Watson ABC Contracting