Julie Lynch MAS2019
1. CITY OF CAMBRIDGE
Municipal Facilities
Improvement Plan
Photovoltaic InstallationsFletcher Maynard Academy 76.6kW
Completed 2018
2. Agenda;
1. Existing conditions analysis
• Daylight
• Comfort
• Ventilation
2. Temporary solutions
3. Strategies
“The goal of the Municipal Facilities Improvement Project
is to use whole building thinking to define a plan for the
City of Cambridge to provide and maintain high-
performance buildings for staff, occupants, the public and
the environment.”
3. Agenda;
1. Existing conditions analysis
• Daylight
• Comfort
• Ventilation
2. Temporary solutions
3. Strategies
The philosophy of looking at a building as a
series of interrelated systems and buildings as
part of an integrated portfolio.
A high performance building is not only low
carbon and energy efficient, but also provides a
comfortable and healthy indoor environment, is
resilient, easily maintained and responds to the
larger community it serves.
WHOLE BUILDING THINKING
4. City of Cambridge Initiative Timeline
• 2012 Municipal Solar Feasibility Study by CDM Smith
• “Rooftop review” identified the top 15 City-owned sites
*See Dept. of Energy Solar Mapping Resources
• 2015 Municipal Facilities Improvement Plan (MFIP)
• 2015 Net Zero Action Plan
• 2015 5% Onsite Renewable Goal by 2020
• 2016 Cambridge Community Shared Solar (CSS) - Additional Site Feasibility
Review by Cadmus
• CDM’s shortlist of 15 City-owned sites starting point.
• Phase 1: First Street Garage - carport CSS project.
• Phase 2: Feasibility of rooftop solar development
• 2016 MFIP projects evaluated solar in existing building portfolio