case study
Disaster Recovery/Business Continuity: Energy
Technologent helps oil and gas company design
a DR site and provide the documentation and
testing needed for an effective DR plan.
An oil and gas exploration and production company with operations around
the world wished to launch an IT-focused disaster recovery (DR) initiative. Be-
cause the company is publicly traded, it needed to assure shareholders that it
was taking steps to protect vital data and ensure continuity of operations in
the event of a disaster.
Because the customer preferred to maintain its IT infrastructure internally, a
cloud-based Disaster-Recovery-as-a-Service solution was not a consideration.
In addition, the organization had signed a contract with a co-location facility
about 300 miles from its U.S. headquarters, and sought to leverage that
relationship to build out its DR site.
However, the customer needed assistance in establishing recovery time ob-
jectives (RTOs), architecting the DR facility and developing the runbooks re-
quired to execute a formal DR plan.The customer had a lean IT organization
with little experience in the development and execution of a DR program.The
customer was also focused on a number of other business initiatives world-
wide and lacked the resources to dedicate to an initiative of this scope.
The Technologent Solution
Technologent provided two teams — one focused on the data center tech-
nology and the other focused on people, processes, documentation and for-
mal execution of the DR program.The infrastructure team included specialists
in compute, networking, storage, virtualization and data replication, and
focused on designing a secondary data center that would complement the
customer’s production environment.This team inventoried IT assets, including
monitoring and management tools, and gained an understanding of how
the equipment was configured and integrated.The result was a requirements
document that enabled the customer to begin ordering the necessary equip-
ment for the DR site.
In parallel, the infrastructure team assisted the customer with a complete re-
design of its data protection environment and an upgrade of primary storage
supporting all of its production platforms.The customer was also in the pro-
cess of virtualizing additional apps, and Technologent helped consolidate the
compute environment into a denser footprint based upon the Cisco Unified
Computing System (UCS) platform.
The second Technologent team included two certified business continuity
(BC) planners and a project manager.This group conducted an “application
profile” in order to identify mission-critical applications and categorize them
according to 24-, 48- or 72-hour RTOs.The team then wrote runbooks with
shutdown, failover and startup procedures for the 25 apps with 24-hour
RTOs.
The BC team worked with the customer’s application owners to validate
that all the applications functioned properly on the DR site.The team took
the application owners through a tabletop test — a walkthrough of the DR
plan — then ultimately performed failover tests of all the mission-critical ap-
plications.A battery of tests was conducted in an iterative process to help the
customer’s in-house team adopt and successfully execute the DR program.
Deliverables included more than 100 guides, templates and other documents
in accordance with ISO/IEC standards, as well as executive reports detailing
how money was being spent, what progress was made and a road map for
the future. In addition,Technologent is helping the customer correlate the DR
plan with its change management processes to ensure that IT can keep the
documents up-to-date and ready for execution for ongoing cadence testing
and in the event of an actual disaster.
In the next phase,Technologent will repeat the process with the remaining
mission-critical apps.As with the first phase, the Technologent team will train
the customer’s in-house personnel so that they can conduct tests using the
provided documentation and tools.
Solution Summary:
•	 IT inventory and assessment and design of a complementary DR
site
•	 Redesign and upgrade of data protection and storage
environments
•	 Application virtualization, server consolidation and data
replication
•	 Identification of mission-critical apps and development of
documentation to facilitate DR processes
•	 Thorough testing of the DR plan and training of the customer’s IT
staff
•	 Correlation of the DR plan with change management processes to
facilitate ongoing updates
949-716-9500
www.technologent.com

Weitere ähnliche Inhalte

Ähnlich wie Technologent-CS-Disaster_Recovery_Business_Continuity-Energy

JeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeffDavisProjectPortfolio
JeffDavisProjectPortfolio
Jeff Davis
 
Arindam_Kuila_Resume
Arindam_Kuila_ResumeArindam_Kuila_Resume
Arindam_Kuila_Resume
Arindam Kuila
 
Technology assessment case study implementation and adoption of a statistical...
Technology assessment case study implementation and adoption of a statistical...Technology assessment case study implementation and adoption of a statistical...
Technology assessment case study implementation and adoption of a statistical...
D-Wise
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
Jim Sundin
 
Richard Halprin-CV
Richard Halprin-CVRichard Halprin-CV
Richard Halprin-CV
Rich Halprin
 
David Pate _resume_draft_final_1
David Pate _resume_draft_final_1David Pate _resume_draft_final_1
David Pate _resume_draft_final_1
David Pate
 
GouriShankar_Informatica
GouriShankar_InformaticaGouriShankar_Informatica
GouriShankar_Informatica
Gouri Shankar M
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016
Will Loyal
 
Idc paper on disaster recovery
Idc paper on disaster recoveryIdc paper on disaster recovery
Idc paper on disaster recovery
EMC Forum India
 

Ähnlich wie Technologent-CS-Disaster_Recovery_Business_Continuity-Energy (20)

JeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeffDavisProjectPortfolio
JeffDavisProjectPortfolio
 
Arindam_Kuila_Resume
Arindam_Kuila_ResumeArindam_Kuila_Resume
Arindam_Kuila_Resume
 
Whitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsWhitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest Minds
 
Amitabha Cv 15022010
Amitabha Cv 15022010Amitabha Cv 15022010
Amitabha Cv 15022010
 
20160624 Mgr Resume
20160624 Mgr Resume20160624 Mgr Resume
20160624 Mgr Resume
 
Leveraging Cloud for Non-Production Environments
Leveraging Cloud for Non-Production EnvironmentsLeveraging Cloud for Non-Production Environments
Leveraging Cloud for Non-Production Environments
 
Pankaj Singh_CV
Pankaj Singh_CVPankaj Singh_CV
Pankaj Singh_CV
 
nitesh_rajpurkar_2016
nitesh_rajpurkar_2016nitesh_rajpurkar_2016
nitesh_rajpurkar_2016
 
Technology assessment case study implementation and adoption of a statistical...
Technology assessment case study implementation and adoption of a statistical...Technology assessment case study implementation and adoption of a statistical...
Technology assessment case study implementation and adoption of a statistical...
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
 
Tablet Based Time Management System
Tablet Based Time Management SystemTablet Based Time Management System
Tablet Based Time Management System
 
Richard Halprin-CV
Richard Halprin-CVRichard Halprin-CV
Richard Halprin-CV
 
David Pate _resume_draft_final_1
David Pate _resume_draft_final_1David Pate _resume_draft_final_1
David Pate _resume_draft_final_1
 
Sheldon cousino resume
Sheldon cousino resumeSheldon cousino resume
Sheldon cousino resume
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Final Project
Final ProjectFinal Project
Final Project
 
GouriShankar_Informatica
GouriShankar_InformaticaGouriShankar_Informatica
GouriShankar_Informatica
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016
 
Idc paper on disaster recovery
Idc paper on disaster recoveryIdc paper on disaster recovery
Idc paper on disaster recovery
 

Technologent-CS-Disaster_Recovery_Business_Continuity-Energy

  • 1. case study Disaster Recovery/Business Continuity: Energy Technologent helps oil and gas company design a DR site and provide the documentation and testing needed for an effective DR plan. An oil and gas exploration and production company with operations around the world wished to launch an IT-focused disaster recovery (DR) initiative. Be- cause the company is publicly traded, it needed to assure shareholders that it was taking steps to protect vital data and ensure continuity of operations in the event of a disaster. Because the customer preferred to maintain its IT infrastructure internally, a cloud-based Disaster-Recovery-as-a-Service solution was not a consideration. In addition, the organization had signed a contract with a co-location facility about 300 miles from its U.S. headquarters, and sought to leverage that relationship to build out its DR site. However, the customer needed assistance in establishing recovery time ob- jectives (RTOs), architecting the DR facility and developing the runbooks re- quired to execute a formal DR plan.The customer had a lean IT organization with little experience in the development and execution of a DR program.The customer was also focused on a number of other business initiatives world- wide and lacked the resources to dedicate to an initiative of this scope. The Technologent Solution Technologent provided two teams — one focused on the data center tech- nology and the other focused on people, processes, documentation and for- mal execution of the DR program.The infrastructure team included specialists in compute, networking, storage, virtualization and data replication, and focused on designing a secondary data center that would complement the customer’s production environment.This team inventoried IT assets, including monitoring and management tools, and gained an understanding of how the equipment was configured and integrated.The result was a requirements document that enabled the customer to begin ordering the necessary equip- ment for the DR site. In parallel, the infrastructure team assisted the customer with a complete re- design of its data protection environment and an upgrade of primary storage supporting all of its production platforms.The customer was also in the pro- cess of virtualizing additional apps, and Technologent helped consolidate the compute environment into a denser footprint based upon the Cisco Unified Computing System (UCS) platform. The second Technologent team included two certified business continuity (BC) planners and a project manager.This group conducted an “application profile” in order to identify mission-critical applications and categorize them according to 24-, 48- or 72-hour RTOs.The team then wrote runbooks with shutdown, failover and startup procedures for the 25 apps with 24-hour RTOs. The BC team worked with the customer’s application owners to validate that all the applications functioned properly on the DR site.The team took the application owners through a tabletop test — a walkthrough of the DR plan — then ultimately performed failover tests of all the mission-critical ap- plications.A battery of tests was conducted in an iterative process to help the customer’s in-house team adopt and successfully execute the DR program. Deliverables included more than 100 guides, templates and other documents in accordance with ISO/IEC standards, as well as executive reports detailing how money was being spent, what progress was made and a road map for the future. In addition,Technologent is helping the customer correlate the DR plan with its change management processes to ensure that IT can keep the documents up-to-date and ready for execution for ongoing cadence testing and in the event of an actual disaster. In the next phase,Technologent will repeat the process with the remaining mission-critical apps.As with the first phase, the Technologent team will train the customer’s in-house personnel so that they can conduct tests using the provided documentation and tools. Solution Summary: • IT inventory and assessment and design of a complementary DR site • Redesign and upgrade of data protection and storage environments • Application virtualization, server consolidation and data replication • Identification of mission-critical apps and development of documentation to facilitate DR processes • Thorough testing of the DR plan and training of the customer’s IT staff • Correlation of the DR plan with change management processes to facilitate ongoing updates 949-716-9500 www.technologent.com