Royal Bolton Hospital
Blood Sciences Lean project
Peter Gray
Dave Slater
Bolton Hospitals NHS Trust
Covers a population of 265,000
Employs 3100 staff
Emergency admissions of >38000
Total beds = 779
Pathology total workload >1.4 m
requests 2004/5
Blood Sciences = 50% of above
Pathology lab history
Pathology is split in 2 buildings across the
hospital main corridor
Due to increasing workload, we believed that
the size of the building and staffing needed to
expand (business case showed spend of
ÂŁ650,000 was required)
The laboratory is CPA accredited
Value Stream analysis
Team of various grades from pathology,
pathology users and external staff
worked on value stream analysis over 4
days
Mean of all deliveries
MEAN of all deliveries all routes for all Pathology departments
0
50
100
150
200
250
300
350
400
GPvan Air tube Reception
GP
vans
GP
vans
phlebotomy
Current state
Unnecessary movement
Urgents (Biochemistry)
Sample 75 steps approx 40x daily =3,000
Information 135 steps once a day
GP van (all labs)
Samples 4924 steps per day
Information 135 steps x2 daily
Routine (Microbiology)
Sample 309 steps x7 daily
Information 362 steps x 7 daily
This is the minimum, it could be higher
Future State
Value statement
The delivery of a correct result for a blood
sample, for the correct patient to the
correct clinical team within 1 hour of
receipt unless precluded by current
technology
Staff Communication
After the week, feedback sessions were
held with staff.
One per day for 5 days
Staff were asked for comments to be
written on feedback sheet in Staffroom
Analysis of comments showed 2
categories of concern:
Staff roles
New laboratory design
Week two - 3P planning event
Revisited first Blood Sciences laboratory
design
Reviewed staff comments
Re-calculated waste(s)
Used a lean project management tool to
produce a 1-decision implementation plan
4 phases
Individual task definition and detail
Redesigned the Lean laboratory
Benefits from New Design
Achieves process flow
Reduced Steps
Urgent Blood Samples - reduced from 75 steps to
a maximum of 57 steps
Routine Blood Samples – reduced from 309 steps
to a maximum of 57 steps
GP vans maximum of 57 steps from 2462 steps for
1 run
Strategic grouping of analysers – better
utilisation , require reduced numbers of
analysers
Predicted benefits from new design
New laboratory design accepted by all
staff
Reduced number of staff required
Reduction of floor space (40%)
Reduction of travel distance (80%)
Opportunities to utilise skill mix of staff in
new ways
Current progress
Understand the type of equipment required for
flow processes
Reduction of sample processing time from an
average of 5 hours to approximately 60
minutes. (Routine)
Reduced the turnaround time for some tests
e.g. HbA1c from 30 hours to 3 hours
The design of the lean laboratories will have
flexible benching and analysers will be on
trolleys.
Reduced re-work
Additional benefits for Blood Transfusion
Value stream mapping for Blood Transfusion
Cross Matching
Broken into 28 stages
323 steps
Touch time – 176 secs
Flow time – between 25min – 2hrs 51min
Group & Save
14 Stages
90 – 111 steps
Touch time – 210 sec
Flow time – 70 min
Hand offs – 2 or 3 dependent on staffing levels
Lean Blood Transfusion Lab
Runners
Repeaters
Strangers
Benefits from New Design
Improved flow
Reduced waste
Stocking Blood bank – reduced steps from 160 to 50 steps
(70%)
XM – reduced from 323 to 69 steps (79%)
G&S – reduced from 95 to 7 steps (91%)
Abnormal antibodies – reduced from 111 to 30 steps (73%)
Less re-work
Reduced number of hand offs
Designed area for flow stoppers
Dedicated pod station
6S for Flow
Sort (get rid of what’s not needed)
Straighten (A place for everything..)
Shine (clean and wash)
Safety (checking for hazards and
defects)
Standardise (build into acceptable routines)
Sustain (maintain the standards set by
the 6S event)
6S event for Specimen Reception
Current state
After 6S
Benefits of 6S in Specimen Reception
6S score has improved from 24% on Monday to 87% on Thursday
Staff involvement
As the week progressed staff became more involved and enthusiastic
Visual Management introduced
Labelling
Cupboard fronts removed
Clear boxes introduced
Colour coding
6S board introduced
Working Environment
Cleaner
Brighter
Better organised
“Waste” removed
Is Lean Easy ?
Issues
Extremely complex project
Reconfiguration of services
Project delays due to external suppliers issues
Scanning software for request forms not ready
(external supplier)
Continuing to provide a service 24/365 whilst under
going major change
Plenty of strangers due to configuration issues
IT issues e.g. analyser interfaces
Issues cont’d
Changing the way staff work
Integration of previously discrete departments
HR issues (many to be addressed)
Getting ALL staff to understand lean
Staff on shifts, part time staff, staff using batch techniques
for many years
Some staff are very receptive
Others are less receptive and see it as a means of
reducing staffing levels (particularly in the current NHS
climate)
General lessons
Huge changes in very short time scales have
had (are having) a profound effect on all the
staff.
Some have adapted very quickly, some not at
all yet.
The magnitude of the task of managing the
human issues cannot be over emphasised.
It is a credit to the staff & their managers that
we have progressed so far so quickly.
General lessons
It has been (is still) a roller coaster ride
of emotions & stress & tension usually all
within the same day.
Mutual support especially within the
senior management team has played a
vital role.
Lessons learnt
Don’t leave the staff as they will revert back to
their customary working practices
Must have a team leader responsible for each
area who wears a “lean hat”
Don’t expect the new “flow” to work to the
reduced waste calculated – it will take time
Document the new working practices –
standard work
Is lean easy ?
NO
Changing mindsets
Changing a 24/365 service
But this project has been achieved in 8 months
Previously it would have taken years!!
Pathology and this Trust are at the beginning
of a journey

Weitere ähnliche Inhalte

Was ist angesagt?

010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management trainingDr Fereidoun Dejahang
 
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com GoLeanSixSigma.com
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Association for Manufacturing Excellence
 
Cv faisal issa may 2021
Cv faisal issa may 2021Cv faisal issa may 2021
Cv faisal issa may 2021Faisal Issa
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Timothy Wooi
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production Systemmohammadaarifkhan
 
Vsm template
Vsm  templateVsm  template
Vsm templateAnoirKhalie
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean ManufacturingJohn A. Bailey
 

Was ist angesagt? (20)

010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)
 
Cv faisal issa may 2021
Cv faisal issa may 2021Cv faisal issa may 2021
Cv faisal issa may 2021
 
Lean basics
Lean basicsLean basics
Lean basics
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
SMED
SMEDSMED
SMED
 
zero defect
 zero defect zero defect
zero defect
 
Lean Managment
Lean ManagmentLean Managment
Lean Managment
 
Vsm template
Vsm  templateVsm  template
Vsm template
 
Lean notes
Lean notesLean notes
Lean notes
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Fue hair transplant
Fue hair transplantFue hair transplant
Fue hair transplant
 

Ă„hnlich wie Applying Lean in Pathology

2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigmagueste681ce
 
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNIntroduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNHealth Innovation Wessex
 
Process improvment
Process improvmentProcess improvment
Process improvmentjdyjdo
 
Improvement & Transformation TTO project Final Report Out Jan 16
Improvement & Transformation TTO project Final Report Out Jan 16Improvement & Transformation TTO project Final Report Out Jan 16
Improvement & Transformation TTO project Final Report Out Jan 16Nick Holding
 
Optimizing Sterile Processing Workflow
Optimizing Sterile Processing WorkflowOptimizing Sterile Processing Workflow
Optimizing Sterile Processing Workflowdpjphx
 
Flow queue analysis co4.pptx business process management
Flow  queue analysis co4.pptx business process managementFlow  queue analysis co4.pptx business process management
Flow queue analysis co4.pptx business process management21120061
 
Quality Conference Presentation 9-30-09
Quality Conference Presentation 9-30-09Quality Conference Presentation 9-30-09
Quality Conference Presentation 9-30-09Justin Sherman
 
L03_10_Things_Leaders
L03_10_Things_LeadersL03_10_Things_Leaders
L03_10_Things_LeadersBen Hoffman
 
Performance Improvement Project in OPD.pptx
Performance Improvement Project in OPD.pptxPerformance Improvement Project in OPD.pptx
Performance Improvement Project in OPD.pptxNANCY ALSEBAIY
 
The lean hospital what is mean
The lean hospital what is meanThe lean hospital what is mean
The lean hospital what is meanEmad Kotb
 
1. Should Reagan (or the policies of any past presidents) be credi
1. Should Reagan (or the policies of any past presidents) be credi1. Should Reagan (or the policies of any past presidents) be credi
1. Should Reagan (or the policies of any past presidents) be crediTatianaMajor22
 
Boston Medical Center Presentation
Boston Medical Center PresentationBoston Medical Center Presentation
Boston Medical Center PresentationChristopher Powers
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRahul Singh
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRashil Shah
 
An Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxAn Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxDrmahmoudAhmedabdeen1
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industryArya Wirabhuana
 

Ă„hnlich wie Applying Lean in Pathology (20)

2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma
 
Leanlondon 19sep13
Leanlondon 19sep13Leanlondon 19sep13
Leanlondon 19sep13
 
Leanlondon 19sep13
Leanlondon 19sep13Leanlondon 19sep13
Leanlondon 19sep13
 
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNIntroduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
 
Process improvment
Process improvmentProcess improvment
Process improvment
 
Improvement & Transformation TTO project Final Report Out Jan 16
Improvement & Transformation TTO project Final Report Out Jan 16Improvement & Transformation TTO project Final Report Out Jan 16
Improvement & Transformation TTO project Final Report Out Jan 16
 
Optimizing Sterile Processing Workflow
Optimizing Sterile Processing WorkflowOptimizing Sterile Processing Workflow
Optimizing Sterile Processing Workflow
 
Flow queue analysis co4.pptx business process management
Flow  queue analysis co4.pptx business process managementFlow  queue analysis co4.pptx business process management
Flow queue analysis co4.pptx business process management
 
Quality Conference Presentation 9-30-09
Quality Conference Presentation 9-30-09Quality Conference Presentation 9-30-09
Quality Conference Presentation 9-30-09
 
L03_10_Things_Leaders
L03_10_Things_LeadersL03_10_Things_Leaders
L03_10_Things_Leaders
 
Performance Improvement Project in OPD.pptx
Performance Improvement Project in OPD.pptxPerformance Improvement Project in OPD.pptx
Performance Improvement Project in OPD.pptx
 
The lean hospital what is mean
The lean hospital what is meanThe lean hospital what is mean
The lean hospital what is mean
 
1. Should Reagan (or the policies of any past presidents) be credi
1. Should Reagan (or the policies of any past presidents) be credi1. Should Reagan (or the policies of any past presidents) be credi
1. Should Reagan (or the policies of any past presidents) be credi
 
Boston Medical Center Presentation
Boston Medical Center PresentationBoston Medical Center Presentation
Boston Medical Center Presentation
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
An Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxAn Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptx
 
Lean Hospitals
Lean HospitalsLean Hospitals
Lean Hospitals
 
Lean healthcare barcelos
Lean healthcare barcelosLean healthcare barcelos
Lean healthcare barcelos
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
 

Mehr von Lean Enterprise Academy

Uk lean summit 2015 lean transformation developing the capability to improv...
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...Lean Enterprise Academy
 
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi TanakaThe Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi TanakaLean Enterprise Academy
 
Building a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T JonesBuilding a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T JonesLean Enterprise Academy
 
Toyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerLean Enterprise Academy
 
How to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streamsHow to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streamsLean Enterprise Academy
 
Lean Lessons from Three Healthcare Systems
Lean Lessons from Three Healthcare SystemsLean Lessons from Three Healthcare Systems
Lean Lessons from Three Healthcare SystemsLean Enterprise Academy
 
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisDelivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisLean Enterprise Academy
 
Leading a Lean Turnaround Workshop by Art Byrne
Leading a Lean Turnaround Workshop by Art ByrneLeading a Lean Turnaround Workshop by Art Byrne
Leading a Lean Turnaround Workshop by Art ByrneLean Enterprise Academy
 
Introduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntIntroduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntLean Enterprise Academy
 
Implementing the Lean Turnaround Masterclass by Art Byrne
Implementing the Lean Turnaround Masterclass by Art ByrneImplementing the Lean Turnaround Masterclass by Art Byrne
Implementing the Lean Turnaround Masterclass by Art ByrneLean Enterprise Academy
 
Lean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean Enterprise Academy
 
Leadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter TreadwellLeadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter TreadwellLean Enterprise Academy
 
A3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John KiffA3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John KiffLean Enterprise Academy
 
Lean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN ResearchLean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN ResearchLean Enterprise Academy
 

Mehr von Lean Enterprise Academy (20)

Uk lean summit 2015 lean transformation developing the capability to improv...
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...
 
What have we learnt about Lean?
What have we learnt about Lean?What have we learnt about Lean?
What have we learnt about Lean?
 
Lean green stream in surgery
Lean green stream in surgery  Lean green stream in surgery
Lean green stream in surgery
 
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi TanakaThe Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
 
Building a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T JonesBuilding a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T Jones
 
Toyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon Tanner
 
How to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streamsHow to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streams
 
Rethinking IT service delivery
Rethinking IT service deliveryRethinking IT service delivery
Rethinking IT service delivery
 
Lean Lessons from Three Healthcare Systems
Lean Lessons from Three Healthcare SystemsLean Lessons from Three Healthcare Systems
Lean Lessons from Three Healthcare Systems
 
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisDelivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
 
Leading a Lean Turnaround Workshop by Art Byrne
Leading a Lean Turnaround Workshop by Art ByrneLeading a Lean Turnaround Workshop by Art Byrne
Leading a Lean Turnaround Workshop by Art Byrne
 
Introduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntIntroduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David Brunt
 
Implementing the Lean Turnaround Masterclass by Art Byrne
Implementing the Lean Turnaround Masterclass by Art ByrneImplementing the Lean Turnaround Masterclass by Art Byrne
Implementing the Lean Turnaround Masterclass by Art Byrne
 
Lean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean in new Product Development by Jim Morgan
Lean in new Product Development by Jim Morgan
 
Leadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter TreadwellLeadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter Treadwell
 
A3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John KiffA3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John Kiff
 
Policy Deployment
Policy DeploymentPolicy Deployment
Policy Deployment
 
Lean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN ResearchLean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN Research
 
Why Responsiveness Matters
Why Responsiveness Matters   Why Responsiveness Matters
Why Responsiveness Matters
 
The Beginners Guide to Lean
The Beginners Guide to LeanThe Beginners Guide to Lean
The Beginners Guide to Lean
 

KĂĽrzlich hochgeladen

Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

KĂĽrzlich hochgeladen (20)

Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 

Applying Lean in Pathology

  • 1. Royal Bolton Hospital Blood Sciences Lean project Peter Gray Dave Slater
  • 2. Bolton Hospitals NHS Trust Covers a population of 265,000 Employs 3100 staff Emergency admissions of >38000 Total beds = 779 Pathology total workload >1.4 m requests 2004/5 Blood Sciences = 50% of above
  • 3. Pathology lab history Pathology is split in 2 buildings across the hospital main corridor Due to increasing workload, we believed that the size of the building and staffing needed to expand (business case showed spend of ÂŁ650,000 was required) The laboratory is CPA accredited
  • 4. Value Stream analysis Team of various grades from pathology, pathology users and external staff worked on value stream analysis over 4 days
  • 5. Mean of all deliveries MEAN of all deliveries all routes for all Pathology departments 0 50 100 150 200 250 300 350 400 GPvan Air tube Reception GP vans GP vans phlebotomy
  • 7. Unnecessary movement Urgents (Biochemistry) Sample 75 steps approx 40x daily =3,000 Information 135 steps once a day GP van (all labs) Samples 4924 steps per day Information 135 steps x2 daily Routine (Microbiology) Sample 309 steps x7 daily Information 362 steps x 7 daily This is the minimum, it could be higher
  • 9. Value statement The delivery of a correct result for a blood sample, for the correct patient to the correct clinical team within 1 hour of receipt unless precluded by current technology
  • 10. Staff Communication After the week, feedback sessions were held with staff. One per day for 5 days Staff were asked for comments to be written on feedback sheet in Staffroom Analysis of comments showed 2 categories of concern: Staff roles New laboratory design
  • 11. Week two - 3P planning event Revisited first Blood Sciences laboratory design Reviewed staff comments Re-calculated waste(s) Used a lean project management tool to produce a 1-decision implementation plan 4 phases Individual task definition and detail
  • 12. Redesigned the Lean laboratory
  • 13.
  • 14. Benefits from New Design Achieves process flow Reduced Steps Urgent Blood Samples - reduced from 75 steps to a maximum of 57 steps Routine Blood Samples – reduced from 309 steps to a maximum of 57 steps GP vans maximum of 57 steps from 2462 steps for 1 run Strategic grouping of analysers – better utilisation , require reduced numbers of analysers
  • 15. Predicted benefits from new design New laboratory design accepted by all staff Reduced number of staff required Reduction of floor space (40%) Reduction of travel distance (80%) Opportunities to utilise skill mix of staff in new ways
  • 16. Current progress Understand the type of equipment required for flow processes Reduction of sample processing time from an average of 5 hours to approximately 60 minutes. (Routine) Reduced the turnaround time for some tests e.g. HbA1c from 30 hours to 3 hours The design of the lean laboratories will have flexible benching and analysers will be on trolleys. Reduced re-work
  • 17. Additional benefits for Blood Transfusion
  • 18. Value stream mapping for Blood Transfusion Cross Matching Broken into 28 stages 323 steps Touch time – 176 secs Flow time – between 25min – 2hrs 51min Group & Save 14 Stages 90 – 111 steps Touch time – 210 sec Flow time – 70 min Hand offs – 2 or 3 dependent on staffing levels
  • 19. Lean Blood Transfusion Lab Runners Repeaters Strangers
  • 20. Benefits from New Design Improved flow Reduced waste Stocking Blood bank – reduced steps from 160 to 50 steps (70%) XM – reduced from 323 to 69 steps (79%) G&S – reduced from 95 to 7 steps (91%) Abnormal antibodies – reduced from 111 to 30 steps (73%) Less re-work Reduced number of hand offs Designed area for flow stoppers Dedicated pod station
  • 21. 6S for Flow Sort (get rid of what’s not needed) Straighten (A place for everything..) Shine (clean and wash) Safety (checking for hazards and defects) Standardise (build into acceptable routines) Sustain (maintain the standards set by the 6S event)
  • 22. 6S event for Specimen Reception
  • 25.
  • 26. Benefits of 6S in Specimen Reception 6S score has improved from 24% on Monday to 87% on Thursday Staff involvement As the week progressed staff became more involved and enthusiastic Visual Management introduced Labelling Cupboard fronts removed Clear boxes introduced Colour coding 6S board introduced Working Environment Cleaner Brighter Better organised “Waste” removed
  • 28. Issues Extremely complex project Reconfiguration of services Project delays due to external suppliers issues Scanning software for request forms not ready (external supplier) Continuing to provide a service 24/365 whilst under going major change Plenty of strangers due to configuration issues IT issues e.g. analyser interfaces
  • 29. Issues cont’d Changing the way staff work Integration of previously discrete departments HR issues (many to be addressed) Getting ALL staff to understand lean Staff on shifts, part time staff, staff using batch techniques for many years Some staff are very receptive Others are less receptive and see it as a means of reducing staffing levels (particularly in the current NHS climate)
  • 30. General lessons Huge changes in very short time scales have had (are having) a profound effect on all the staff. Some have adapted very quickly, some not at all yet. The magnitude of the task of managing the human issues cannot be over emphasised. It is a credit to the staff & their managers that we have progressed so far so quickly.
  • 31. General lessons It has been (is still) a roller coaster ride of emotions & stress & tension usually all within the same day. Mutual support especially within the senior management team has played a vital role.
  • 32. Lessons learnt Don’t leave the staff as they will revert back to their customary working practices Must have a team leader responsible for each area who wears a “lean hat” Don’t expect the new “flow” to work to the reduced waste calculated – it will take time Document the new working practices – standard work
  • 33. Is lean easy ? NO Changing mindsets Changing a 24/365 service But this project has been achieved in 8 months Previously it would have taken years!! Pathology and this Trust are at the beginning of a journey