SlideShare ist ein Scribd-Unternehmen logo
1 von 39
E-Sis
Company
Project
Management Plan
for
Global Project Management Conference (GPM)
E-Sis
Company
Project Management Plan
(1)
Scope
(2)
Schedule
(3)
Cost
(4)
Quality
(5)
Communications
(6)
Human
Resources
(7)
Risks
(8)
Stakeholders
E-Sis
Company
1) Scope
E-Sis
Company
Project Scope Statement
• Project Scope
• Provide necessary resources and capabilities of Project
Management as a tool to take decisions on critical
businesses in order to conduct Global Project
Management conference.
E-Sis
Company
Project Scope Statement
• Main Objective
• To conduct Global Project Management Conference in
order to emphasize that Project Management is crucial for
mitigating and avoiding risks of critical businesses
including nuclear threats due to natural disasters.
• Deliverables
1) Master Project Plan
2) Global Project Management Conference
3) Summary bulletin
E-Sis
Company
Project Scope Statement
• Constraints
• Budget Constraint
• Government budget is limited. The financial plan has to mention the project costs,
revenues, the conference fee and other financial elements in detail.
• Cost & Profit
• Conference entry fee must be less than 200 US$. Profit ratio should be in the range of 5%
to 10%.
• Time Constraint
• 20th. November, 2014 – 29th May, 2015
• Assumptions
• Participants
• 4000 individuals and two participants from each 60 companies will be participated.
• All participants will be actively participated in avoiding and mitigating nuclear threats
associated with natural disasters.
• Analogue cost estimate method will be succeeded
E-Sis
Company
Proj: Scope Statement
Time Description
Nov. 20 RFP submitting
Nov. 21 – Dec. 5 Master project plan development
Nov. 27 Internal Review
Dec. 4 Internal Review
Dec. 11 Master project plan presentation
Dec. 12 - 19 Primary contractor selection
Dec. 24 Project kickoff
Dec. 25. – Jan. 16 Detail project plan development
Jan. 21 Final project plan review
Feb. 2 – Apr. 27 Fortnightly progress review
May 1 Final progress Review
May 13 -15 Conference
May. 29 Closing review
Milestones
E-Sis
Company
Conference Venue Layout
Main Auditorium Hall
Exhibition Hall
Conference Room(1)
Conference Room(2)
Conference Room(3)
Conference Room(4)
E-Sis
Company
Conference Schedule
Time Day 1 Day 2 Day 3
General Session
Seminar 2 for G1,G2,G3,G4 -
At R1,R2,R3,R4
Introduction on Exhibition
Exhibition Part 2 for
G5,G6,G7,G8
12.00 - 1.00 p.m Break Break Break
Seminar 1 for
G1,G2,G3,G4 -At
R1,R2,R3,R4
Seminar 2 for G5,G6,G7,G8-
At R1,R2,R3,R4
Exhibition Part 1 for
G5,G6,G7,G8
Exhibition Part 2 for
G1,G2,G3,G4
4.00 - 4.30 p.m. Tea Break Tea Break Tea party & Close
Seminar 1 for
G5,G6,G7,G8 - At
R1,R2,R3,R4
Exhibition Part 1 for
G1,G2,G3,G4
Conference Schedule
9.00 a.m - 12.00
1.00 - 4.00 p.m
4.30 - 7.30 p.m.
Feedback, Review Session
Network Meeting - All
Group at Main Auditorium
Panel Discussion- All
Groups at main Auditorium
E-Sis
Company
Work Breakdown Structure
Global Project Management Conference
(GPM)
(D1)
Master Project Plan
Develop Master
Plan
Submit
Proposal
Finale Project
Review
Presentation to
IUJ
(D2)
Conference
General Session
Logistic
Seminars
Logistic
Network
meetings
Logistics
Panel
discussions
Logistics
Exhibitions
Logistics
Feedback
Session
(D3)
Summary Bulletins
Reviewing
Documentation
Submit Bulletin
E-Sis
Company
Work Breakdown Structure
Logistics
Venue
Enquires
Select & Book
Speakers
Invitations
Confirmations
Delegation/
Participants
Invitation Confirmation Public Announce
Press
Conference
Press Release
Advertising
Food &
Accommodation
Enquires
Select & Book
Transportation
Enquires
Bus Timetable
Handouts
Collect Handouts
Printing
E-Sis
Company
2) Schedule
E-Sis
Company
Timeline
Task Name Duration Start Finish
Predece
ssors
Global Conference Project 97 days Wed 12/24/14 Thu 5/7/15
Gloobal Conference Project 97 days Wed 12/24/14 Thu 5/7/15
Project governance 3 days Wed 12/24/14 Fri 12/26/14
kickoff meeting 1 day Wed 12/24/14 Wed 12/24/14
Final Project Plan Review 2 days Thu 12/25/14 Fri 12/26/14
D1) Develop project management plan 94 days Mon 12/29/14 Thu 5/7/15
Define scope & Schedule 9 days Mon 12/29/14 Thu 1/8/15
Review project charter 1 day Mon 12/29/14 Mon 12/29/14
Analyze requirements 4 days Tue 12/30/14 Fri 1/2/158
Document scope statement 2 days Mon 1/5/15 Tue 1/6/159
Crete WBS 1 day Wed 1/7/15 Wed 1/7/1510
Define Schedule 1 day Thu 1/8/15 Thu 1/8/1511
Estimate cost 2 days Fri 1/9/15 Mon 1/12/15
Estimate activity cost 1 day Fri 1/9/15 Fri 1/9/15
Budgeting cost 1 day Mon 1/12/15 Mon 1/12/1514
Communication 1 day Tue 1/13/15 Tue 1/13/15
Define Channels 1 day Tue 1/13/15 Tue 1/13/15
Resource Management Plan 1 day Tue 1/20/15 Tue 1/20/15
Organization Chart & Resource Plan 1 day Tue 1/20/15 Tue 1/20/15
Develop risk management plan 1 day Wed 1/21/15 Wed 1/21/15
Identify risks 1 day Wed 1/21/15 Wed 1/21/15
Plan risk response 1 day Wed 1/21/15 Wed 1/21/1521FF
Submitting & Approving 77 days Wed 1/21/15 Thu 5/7/15
Submit plan 1 day Wed 1/21/15 Wed 1/21/15
Final Project Review 71 days Thu 1/22/15 Thu 4/30/15
Presentation to IUJ 5 days Fri 5/1/15 Thu 5/7/1525
E-Sis
Company
Task Name Duration Start Finish
Predec
essors
D2) Conference Plan 66 days Fri 1/2/15 Fri 4/3/15
General Sessions 22 days Fri 1/2/15 Mon 2/2/15
Venue 18 days Mon 1/5/15 Wed 1/28/15
Enquires 13 days Mon 1/5/15 Wed 1/21/15
Select & Book 3 days Mon 1/26/15 Wed 1/28/1531
Speakers 13 days Fri 1/2/15 Tue 1/20/15
Invitations 10 days Fri 1/2/15 Thu 1/15/15
Confirmation 3 days Fri 1/16/15 Tue 1/20/1534
Participants 20 days Mon 1/5/15 Fri 1/30/15
Invitations 8 days Mon 1/5/15 Wed 1/14/15
Confirmation 5 days Thu 1/15/15 Wed 1/21/1537
Public Announcement 7 days Thu 1/22/15 Fri 1/30/15
Press Conference 3 days Thu 1/22/15 Mon 1/26/15
Press Release 2 days Mon 1/26/15 Tue 1/27/1540
Advertising 3 days Wed 1/28/15 Fri 1/30/15
Food & Accomodations 15 days Mon 1/5/15 Fri 1/23/15
Enquires 10 days Mon 1/5/15 Fri 1/16/1531SS
Select & Book 5 days Mon 1/19/15 Fri 1/23/1544
Transportation 13 days Mon 1/5/15 Wed 1/21/15
Enquires 10 days Mon 1/5/15 Fri 1/16/1531SS
Bus Timetable 3 days Mon 1/19/15 Wed 1/21/1547
Handouts 8 days Thu 1/22/15 Mon 2/2/15
Collect Handouts 5 days Thu 1/22/15 Wed 1/28/1538
Prinint 3 days Thu 1/29/15 Mon 2/2/1550
Timeline
E-Sis
Company
Task Name Duration Start Finish
Predec
essors
Seminars 24 days Mon 2/2/15 Thu 3/5/15
Venue 18 days Thu 2/5/15 Mon 3/2/15
Enquires 13 days Thu 2/5/15 Mon 2/23/15
Select & Book 3 days Thu 2/26/15 Mon 3/2/1554
Speakers 13 days Mon 2/2/15 Wed 2/18/15
Invitations 10 days Mon 2/2/15 Fri 2/13/15
Confirmation 3 days Mon 2/16/15 Wed 2/18/1557
Participants 19 days Thu 2/5/15 Tue 3/3/15
Invitations 8 days Thu 2/5/15 Mon 2/16/15
Confirmation 5 days Tue 2/17/15 Mon 2/23/1560
Public Announcement 7 days Sun 2/22/15 Tue 3/3/15
Press Conference 3 days Sun 2/22/15 Tue 2/24/15
Press Release 2 days Thu 2/26/15 Fri 2/27/1563
Advertising 3 days Sat 2/28/15 Tue 3/3/15
Food & Accomodations 15 days Thu 2/5/15 Wed 2/25/15
Enquires 10 days Thu 2/5/15 Wed 2/18/1554SS
Select & Book 5 days Thu 2/19/15 Wed 2/25/1567
Transportation 13 days Thu 2/5/15 Mon 2/23/15
Enquires 10 days Thu 2/5/15 Wed 2/18/1554SS
Bus Timetable 3 days Thu 2/19/15 Mon 2/23/1570
Handouts 8 days Tue 2/24/15 Thu 3/5/15
Collect Handouts 5 days Tue 2/24/15 Mon 3/2/1561
Prinint 3 days Tue 3/3/15 Thu 3/5/1573
Timeline
E-Sis
Company
Task Name Duration Start Finish
Predec
essors
Network Meeting & Panel Discussion 21 days Fri 3/6/15 Fri 4/3/15
Venue 16 days Fri 3/6/15 Fri 3/27/15
Enquires 13 days Fri 3/6/15 Tue 3/24/1574
Select & Book 3 days Wed 3/25/15 Fri 3/27/1577
Speakers 13 days Fri 3/6/15 Tue 3/24/15
Invitations 10 days Fri 3/6/15 Thu 3/19/1574
Confirmation 3 days Fri 3/20/15 Tue 3/24/1580
Participants 18 days Fri 3/6/15 Tue 3/31/15
Invitations 8 days Fri 3/6/15 Tue 3/17/1574
Confirmation 5 days Wed 3/18/15 Tue 3/24/1583
Public Announcement 5 days Wed 3/25/15 Tue 3/31/15
Press Conference 3 days Wed 3/25/15 Fri 3/27/1584
Press Release 2 days Mon 3/30/15 Tue 3/31/1586
Advertising 3 days Sat 3/28/15 Tue 3/31/15
Food & Accomodations 15 days Fri 3/6/15 Thu 3/26/15
Enquires 10 days Fri 3/6/15 Thu 3/19/1577SS
Select & Book 5 days Fri 3/20/15 Thu 3/26/1590
Transportation 13 days Fri 3/6/15 Tue 3/24/15
Enquires 10 days Fri 3/6/15 Thu 3/19/1577SS
Bus Timetable 3 days Fri 3/20/15 Tue 3/24/1593
Handouts 8 days Wed 3/25/15 Fri 4/3/15
Collect Handouts 5 days Wed 3/25/15 Tue 3/31/1584
Prinint 3 days Wed 4/1/15 Fri 4/3/1596
Timeline
E-Sis
Company
Task Name Duration Start Finish
Predece
ssors
Exhibation 24 days Fri 3/27/15 Wed 4/29/15
Venue 16 days Mon 4/6/15 Mon 4/27/15
Enquires 13 days Wed 4/1/15 Fri 4/17/1596
Select & Book 3 days Mon 4/20/15 Wed 4/22/15101
Speakers 13 days Wed 4/1/15 Fri 4/17/15
Invitations 10 days Wed 4/1/15 Tue 4/14/1596
Confirmation 3 days Wed 4/15/15 Fri 4/17/15104
Participants 13 days Wed 4/1/15 Fri 4/17/15
Invitations 8 days Wed 4/1/15 Fri 4/10/1596
Confirmation 5 days Mon 4/13/15 Fri 4/17/15107
Public Announcement 21 days Fri 3/27/15 Fri 4/24/15
Press Conference 3 days Mon 4/20/15 Wed 4/22/15108
Press Release 2 days Thu 4/23/15 Fri 4/24/15110
Advertising 3 days Fri 3/27/15 Tue 3/31/15
Food & Accomodations 15 days Wed 4/1/15 Tue 4/21/1596
Enquires 10 days Wed 4/1/15 Tue 4/14/15101SS
Select & Book 5 days Wed 4/15/15 Tue 4/21/15114
Transportation 13 days Wed 4/1/15 Fri 4/17/15
Enquires 10 days Wed 4/1/15 Tue 4/14/15101SS
Bus Timetable 3 days Wed 4/15/15 Fri 4/17/15117
Handouts 8 days Mon 4/20/15 Wed 4/29/15
Collect Handouts 5 days Mon 4/20/15 Fri 4/24/15108
Prinint 3 days Mon 4/27/15 Wed 4/29/15120
Feedback Session 5 days Thu 4/30/15 Wed 5/6/15121
Timeline
E-Sis
Company
Task Name Duration Start Finish
Predec
essors
HELD CONFERENCE 3 days Wed 5/13/15 Fri 5/15/15
General Sessions 1 day Wed 5/13/15 Wed 5/13/15
Seminars 2 days Wed 5/13/15 Thu 5/14/15
Exhibations 2 days Wed 5/13/15 Thu 5/14/15
Pannel Discussions 1 day Thu 5/14/15 Thu 5/14/15
Network Meeting 1 day Fri 5/15/15 Fri 5/15/15
Feedback & seminar review 1 day Fri 5/15/15 Fri 5/15/15
D3) Summary Bulletin 10 days Mon 5/18/15 Fri 5/29/15
Reviewing 3 days Mon 5/18/15 Wed 5/20/15
Documentation 5 days Thu 5/21/15 Wed 5/27/15
Summit Bulletin 1 day Thu 5/28/15 Thu 5/28/15
Closing Project 1 day Fri 5/29/15 Fri 5/29/15
Timeline
E-Sis
Company
3) Cost
Cost estimate based on Analogue Estimating
* Used our previous Experiences of similar projects
E-Sis
Company
Conference Activity Plan
E-Sis
Company
Conference Activity Plan
Total Budget for venue is = $ 2000
E-Sis
Company
Cost Estimate
Expected Revenue
No. of Participants
Individuals 4,000
Company 60* 2 persons 120
Total Participants 4,120
Expected Project Revenue = No. of Expected Participants * fee
per one participant
=4120*US$200
= US$ 824,000
E-Sis
Company
Estimate cost
US$
Total Bugeted Staff Cost 72,975 Annex 1
Deliverable-1
Fees for Hire Expertise of Project Dev Plan -
Deliverable-2
Advertising Fees 1,500
Fees for Venue (May 12 ~15) 500 Per Day 4 Days 2,000
Mailing Fees to invite delegates 1 Per Mail 4120 Perticipants 4,120
Public Announcement 500
Food & Beverages 4 Days 15 Per Day 4120 Perticipants 247,200
Accomodations 4 Days 15 Per Day 4120 Perticipants 247,200
Printing Handouts 7 booklets 2 Per Booklet 4120 Perticipants 57,680
Resource Person 2 hrs 100 Per Hr 7 Resource Person 1,400
Printing & Submitting Bulletins 7 booklets 2 Per Booklet 4120 Perticipants 57,680
Deliverable-3
Printing Bulletins 1 booklet 3 4120 Perticipants 12,360
Contigency Amout (5% of Budget) 37,007
741,622
Estimate Cost
E-Sis
Company
Total Budgeted Staff Cost
Budget for Project Staffs USD
Appointment
Date
End Date of the
Contact
Work
Duration in
Months
Salary Per
Month
Budget
Project Staff
Project Manager 01.11.2014 30.05.2014 7 1,000 7,000
Project Director 01.11.2014 30.05.2014 7 950 6,650
Project Execurive 15.11.2014 30.05.2014 6.5 900 5,850
Project Staff 1 15.11.2014 30.05.2014 6.5 700 4,550
Project Staff 2 15.11.2014 30.05.2014 6.5 700 4,550
Accountant 15.11.2014 30.05.2014 6.5 900 5,850
Supporting Staff 1 15.11.2014 30.05.2014 6.5 750 4,875
Supporting Staff 2 15.11.2014 30.05.2014 6.5 750 4,875
Project Marketing Executive 01.12.2014 30.05.2014 6 900 5,400
Supoting Staff 1 01.12.2014 30.05.2014 6 700 4,200
Project HR Executive 15.11.2014 30.05.2014 6.5 800 5,200
Suporting Staff 1 15.11.2014 30.05.2014 6.5 700 4,550
Logistic Officer 15.11.2014 30.05.2014 6.5 750 4,875
Suprting Staff 1 15.11.2014 30.05.2014 6.5 700 4,550
Total Bugeted Staff Cost 72,975
E-Sis
Company
4) Quality
E-Sis
Company
Quality
Project Quality Plan
USD
Conference entry fee 4120 200 824,000
Estimated Total project cost 746,497
Estimated Project Profit 77,503
Cost Benefit Ratio = Estimated Project Profit = 10.38223
Estimated Total project cost
Estimated Profit as a percentge of entry fee = Estimated Project Profit = 9.405704
Conference entry fee
Cost per person = Estimated Project cost = 746,497
No of Participates 4120
= 181
E-Sis
Company
5) Communication
E-Sis
Company
Stakeholders
• International University of Japan (IUJ)
• Project contractor
• Executive Director(Yuichi Naito)
• Projective Executive (Jey Rajasekera)
• Niigata Prefectural office
• Ministry of Economy, Trade and Industry(METI)
• Japan International Cooperation Agency (JICA)
• Project Management Association of Japan (PMAJ)
• Public Companies
• General Participants
E-Sis
Company
No of Channels = N(N-1)/2
• Stakeholders = 9
• Required potential communication
cannels = 36
E-Sis
Company
Project Team
Communication Plan
Audience Information Method Frequency Who is
Responsible
Owner and
Cosponsor
Project
announcement
E-Mai l,
Fax
Weekly Team Leads
Project teams Team Meeting Meeting Daily Team Leads
Project Teams
Owner and
Cosponsor
Team Meeting ,
Meeting Minute
E mail, Fax Weekly Team leads
Participants Meeting Agenda Email , Fax 2 Weeks
before
Conference
Project
manager
E-Sis
Company
Project Team Communication
Plan (cont. )
Audience Information Method Frequency Who is
Responsible
Owner and
Cosponsor
Project
Implementation
Network
Meeting, Video
Conferencing
One Month Project
Manager
Project
Manager
Feedback from
Stakeholder
E mail, Fax,
Video
conferencing,
cell phone
One Month Owner,
Cosponsor
E-Sis
Company
Output from Com: Plan
• Outputs
• Document Update
• Meeting Minutes
• Change Request
E-Sis
Company
6) Human Resource
E-Sis
Company
Human Resource
(Organization Chart)
Project Manager
Project
Executive
Logistic Officer
IT Staff
General logistic
Staff
Staff 1 Staff 2
Project
Marketing
Executive
Staff 1
Staff 2
Project
Accounting
Executive
Staff 1
Project Human
Resources
Executive
Staff 1
Project Director
E-Sis
Company
7) Risks
E-Sis
CompanyRisk
Nr.
Risk Description Possibility
Impact/
Severity
Risk Management Plan/ Mitigation Strategy
1
Over costing more than the budget
allocated
Medium High
The budget is limited. Thus, Marketing team should define
advertising strategy to guarantee that at least the pre-
registration of 4000 fees. Part of money collected would
help in preparation of the conference.
2 Lack of funding High High Ask for JICA and METI financial support
3 Delay on schedule Medium Medium
Organize meeting with facility staff members before the
conference
4 Guest Speakers cancelations Low High
Ask to the guest speaker confirmation and update speaker as
cancellation occur
5
Lack of audience/ reduced
number of participants
Medium High
- Advertising
- Create a Website for a conference
- -Online Registration
- Inviting famous Guest Speakers
(Specialists in Project Management)
- High participation of Project Management Association of
Japan
6 Natural Disaster (Eg. Earthquake) Low High
Prepare an emergency plan for quickly evacuation in case of
natural disaster
7
Delay on logistics (Catering,
accommodation and
transportation)
Medium High
Update to Catering Service about the final number of
participants, according to pre-registration. Logistics Officer
must in permanent contact with the Hotels contracted.
8
Equipment problems (Computer
and
High Medium Allocate an IT staff
9
Equipment problems (Computer,
projectors and printers)
High Medium Allocate an IT staff
E-Sis
Company
8) Stakeholders
E-Sis
Company
Stakeholders
Stakeholders
IUJ Project Team
(Project Owner)
Project Director
(Yuichi Naito)
Project Executive
(Jey Rajasekera)
Primary Contractor
Cosponsor
Niigata Prefecture
Government
Ministry of Economy,
Trade and Industry
(METI)
Japan International
Corporation (JICA)
Project Management
Association of Japan
Public Companies General participants
E-Sis
Company
Thank You!

Weitere ähnliche Inhalte

Was ist angesagt?

Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management Workshop
Nadun De Silva
 
Organization Chart Roles & Responsibilities Matrix
Organization Chart Roles & Responsibilities MatrixOrganization Chart Roles & Responsibilities Matrix
Organization Chart Roles & Responsibilities Matrix
Chris Garbett
 

Was ist angesagt? (20)

Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management Workshop
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-schedule
 
Project management
Project managementProject management
Project management
 
Project Management Plan - Group Presentation
Project Management Plan - Group PresentationProject Management Plan - Group Presentation
Project Management Plan - Group Presentation
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
 
Project Management
Project ManagementProject Management
Project Management
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
PM 01 - Introduction to Project Management
PM 01 - Introduction to Project ManagementPM 01 - Introduction to Project Management
PM 01 - Introduction to Project Management
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Organization Chart Roles & Responsibilities Matrix
Organization Chart Roles & Responsibilities MatrixOrganization Chart Roles & Responsibilities Matrix
Organization Chart Roles & Responsibilities Matrix
 
Challenges Of Project Management
Challenges Of Project ManagementChallenges Of Project Management
Challenges Of Project Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
AXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - FoundationAXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - Foundation
 
Planning phase of project
Planning phase of projectPlanning phase of project
Planning phase of project
 
Project Status Report Presentation Visuals
Project Status Report Presentation VisualsProject Status Report Presentation Visuals
Project Status Report Presentation Visuals
 

Ähnlich wie Project management plan for Global Project Management Conference (GPM)

Engineering Design Center Project Schedule
Engineering Design Center Project ScheduleEngineering Design Center Project Schedule
Engineering Design Center Project Schedule
Virginia Kam
 
Quazar 2 Presentation - Delta Project
Quazar 2 Presentation - Delta ProjectQuazar 2 Presentation - Delta Project
Quazar 2 Presentation - Delta Project
Clint Monroe
 
Shneha single page
Shneha single pageShneha single page
Shneha single page
shneha patel
 
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docxID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
wilcockiris
 

Ähnlich wie Project management plan for Global Project Management Conference (GPM) (20)

WBS
WBSWBS
WBS
 
Formatos para lineas de tiempo
Formatos para lineas de tiempoFormatos para lineas de tiempo
Formatos para lineas de tiempo
 
Engineering Design Center Project Schedule
Engineering Design Center Project ScheduleEngineering Design Center Project Schedule
Engineering Design Center Project Schedule
 
Time optimization of B-School Event
Time optimization of B-School EventTime optimization of B-School Event
Time optimization of B-School Event
 
Quazar 2 Presentation - Delta Project
Quazar 2 Presentation - Delta ProjectQuazar 2 Presentation - Delta Project
Quazar 2 Presentation - Delta Project
 
Newsletter.4
Newsletter.4Newsletter.4
Newsletter.4
 
Hotel opening checklist
Hotel opening checklistHotel opening checklist
Hotel opening checklist
 
Attachment 3
Attachment 3Attachment 3
Attachment 3
 
Executive British MBA in Tbilisi, at ISB
Executive British MBA in Tbilisi,  at ISBExecutive British MBA in Tbilisi,  at ISB
Executive British MBA in Tbilisi, at ISB
 
Rehoboth Beach City Hall Construction Schedule
Rehoboth Beach City Hall Construction ScheduleRehoboth Beach City Hall Construction Schedule
Rehoboth Beach City Hall Construction Schedule
 
Standard Competition 12 Months
Standard Competition 12 MonthsStandard Competition 12 Months
Standard Competition 12 Months
 
Shneha single page
Shneha single pageShneha single page
Shneha single page
 
Project master schedule daughter station cng mini plant
Project master schedule daughter station cng mini plantProject master schedule daughter station cng mini plant
Project master schedule daughter station cng mini plant
 
eco space 2015 internship details "project management" all right received to ...
eco space 2015 internship details "project management" all right received to ...eco space 2015 internship details "project management" all right received to ...
eco space 2015 internship details "project management" all right received to ...
 
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docxID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
 
bb.pdf
bb.pdfbb.pdf
bb.pdf
 
Project update and plan Year 2, by Cecile Hoareau-McGrath
Project update and plan Year 2, by Cecile Hoareau-McGrath Project update and plan Year 2, by Cecile Hoareau-McGrath
Project update and plan Year 2, by Cecile Hoareau-McGrath
 
Order to Cash (Time To Invoice) Libya
Order to Cash (Time To Invoice) LibyaOrder to Cash (Time To Invoice) Libya
Order to Cash (Time To Invoice) Libya
 
Who says release planning is not agile - Vered Yeret at Agile Israel 2015
Who says release planning is not agile - Vered Yeret at Agile Israel 2015Who says release planning is not agile - Vered Yeret at Agile Israel 2015
Who says release planning is not agile - Vered Yeret at Agile Israel 2015
 
UMBC IFSM438 Project Management Group Presentation
UMBC IFSM438 Project Management Group PresentationUMBC IFSM438 Project Management Group Presentation
UMBC IFSM438 Project Management Group Presentation
 

Mehr von Lúcia Dénis

Starbucks Cofee Company: Transformational and Renewal
Starbucks Cofee Company: Transformational and RenewalStarbucks Cofee Company: Transformational and Renewal
Starbucks Cofee Company: Transformational and Renewal
Lúcia Dénis
 

Mehr von Lúcia Dénis (12)

Dell ad Google Case Study
Dell ad Google Case StudyDell ad Google Case Study
Dell ad Google Case Study
 
Kraft Foods: The Cofee Pod launch
Kraft Foods: The Cofee Pod launchKraft Foods: The Cofee Pod launch
Kraft Foods: The Cofee Pod launch
 
Marketing plan - Shrimp Exportation (from Mozambique to Japan)
Marketing plan - Shrimp Exportation (from Mozambique to Japan)Marketing plan - Shrimp Exportation (from Mozambique to Japan)
Marketing plan - Shrimp Exportation (from Mozambique to Japan)
 
Samsung growth strategy
Samsung growth strategySamsung growth strategy
Samsung growth strategy
 
Crocs Case study
Crocs Case studyCrocs Case study
Crocs Case study
 
Supply Chain Network of Fast Retailing Co.(UNIQLO)
Supply Chain Network of Fast Retailing Co.(UNIQLO)Supply Chain Network of Fast Retailing Co.(UNIQLO)
Supply Chain Network of Fast Retailing Co.(UNIQLO)
 
Trincomalle Wind Power Project
Trincomalle Wind Power Project Trincomalle Wind Power Project
Trincomalle Wind Power Project
 
Harrah's Entertainment Inc. rewarding our People
Harrah's Entertainment Inc. rewarding our PeopleHarrah's Entertainment Inc. rewarding our People
Harrah's Entertainment Inc. rewarding our People
 
Four Seasons goes to Paris
Four Seasons goes to ParisFour Seasons goes to Paris
Four Seasons goes to Paris
 
Starbucks Cofee Company: Transformational and Renewal
Starbucks Cofee Company: Transformational and RenewalStarbucks Cofee Company: Transformational and Renewal
Starbucks Cofee Company: Transformational and Renewal
 
The Ritz-carlton: Using information systems to better serve the costumer
The Ritz-carlton: Using information systems to better serve the costumerThe Ritz-carlton: Using information systems to better serve the costumer
The Ritz-carlton: Using information systems to better serve the costumer
 
Socialmediacampaignstrategy lucia-finalversion
Socialmediacampaignstrategy lucia-finalversionSocialmediacampaignstrategy lucia-finalversion
Socialmediacampaignstrategy lucia-finalversion
 

Kürzlich hochgeladen

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Kürzlich hochgeladen (20)

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 

Project management plan for Global Project Management Conference (GPM)

  • 4. E-Sis Company Project Scope Statement • Project Scope • Provide necessary resources and capabilities of Project Management as a tool to take decisions on critical businesses in order to conduct Global Project Management conference.
  • 5. E-Sis Company Project Scope Statement • Main Objective • To conduct Global Project Management Conference in order to emphasize that Project Management is crucial for mitigating and avoiding risks of critical businesses including nuclear threats due to natural disasters. • Deliverables 1) Master Project Plan 2) Global Project Management Conference 3) Summary bulletin
  • 6. E-Sis Company Project Scope Statement • Constraints • Budget Constraint • Government budget is limited. The financial plan has to mention the project costs, revenues, the conference fee and other financial elements in detail. • Cost & Profit • Conference entry fee must be less than 200 US$. Profit ratio should be in the range of 5% to 10%. • Time Constraint • 20th. November, 2014 – 29th May, 2015 • Assumptions • Participants • 4000 individuals and two participants from each 60 companies will be participated. • All participants will be actively participated in avoiding and mitigating nuclear threats associated with natural disasters. • Analogue cost estimate method will be succeeded
  • 7. E-Sis Company Proj: Scope Statement Time Description Nov. 20 RFP submitting Nov. 21 – Dec. 5 Master project plan development Nov. 27 Internal Review Dec. 4 Internal Review Dec. 11 Master project plan presentation Dec. 12 - 19 Primary contractor selection Dec. 24 Project kickoff Dec. 25. – Jan. 16 Detail project plan development Jan. 21 Final project plan review Feb. 2 – Apr. 27 Fortnightly progress review May 1 Final progress Review May 13 -15 Conference May. 29 Closing review Milestones
  • 8. E-Sis Company Conference Venue Layout Main Auditorium Hall Exhibition Hall Conference Room(1) Conference Room(2) Conference Room(3) Conference Room(4)
  • 9. E-Sis Company Conference Schedule Time Day 1 Day 2 Day 3 General Session Seminar 2 for G1,G2,G3,G4 - At R1,R2,R3,R4 Introduction on Exhibition Exhibition Part 2 for G5,G6,G7,G8 12.00 - 1.00 p.m Break Break Break Seminar 1 for G1,G2,G3,G4 -At R1,R2,R3,R4 Seminar 2 for G5,G6,G7,G8- At R1,R2,R3,R4 Exhibition Part 1 for G5,G6,G7,G8 Exhibition Part 2 for G1,G2,G3,G4 4.00 - 4.30 p.m. Tea Break Tea Break Tea party & Close Seminar 1 for G5,G6,G7,G8 - At R1,R2,R3,R4 Exhibition Part 1 for G1,G2,G3,G4 Conference Schedule 9.00 a.m - 12.00 1.00 - 4.00 p.m 4.30 - 7.30 p.m. Feedback, Review Session Network Meeting - All Group at Main Auditorium Panel Discussion- All Groups at main Auditorium
  • 10. E-Sis Company Work Breakdown Structure Global Project Management Conference (GPM) (D1) Master Project Plan Develop Master Plan Submit Proposal Finale Project Review Presentation to IUJ (D2) Conference General Session Logistic Seminars Logistic Network meetings Logistics Panel discussions Logistics Exhibitions Logistics Feedback Session (D3) Summary Bulletins Reviewing Documentation Submit Bulletin
  • 11. E-Sis Company Work Breakdown Structure Logistics Venue Enquires Select & Book Speakers Invitations Confirmations Delegation/ Participants Invitation Confirmation Public Announce Press Conference Press Release Advertising Food & Accommodation Enquires Select & Book Transportation Enquires Bus Timetable Handouts Collect Handouts Printing
  • 13. E-Sis Company Timeline Task Name Duration Start Finish Predece ssors Global Conference Project 97 days Wed 12/24/14 Thu 5/7/15 Gloobal Conference Project 97 days Wed 12/24/14 Thu 5/7/15 Project governance 3 days Wed 12/24/14 Fri 12/26/14 kickoff meeting 1 day Wed 12/24/14 Wed 12/24/14 Final Project Plan Review 2 days Thu 12/25/14 Fri 12/26/14 D1) Develop project management plan 94 days Mon 12/29/14 Thu 5/7/15 Define scope & Schedule 9 days Mon 12/29/14 Thu 1/8/15 Review project charter 1 day Mon 12/29/14 Mon 12/29/14 Analyze requirements 4 days Tue 12/30/14 Fri 1/2/158 Document scope statement 2 days Mon 1/5/15 Tue 1/6/159 Crete WBS 1 day Wed 1/7/15 Wed 1/7/1510 Define Schedule 1 day Thu 1/8/15 Thu 1/8/1511 Estimate cost 2 days Fri 1/9/15 Mon 1/12/15 Estimate activity cost 1 day Fri 1/9/15 Fri 1/9/15 Budgeting cost 1 day Mon 1/12/15 Mon 1/12/1514 Communication 1 day Tue 1/13/15 Tue 1/13/15 Define Channels 1 day Tue 1/13/15 Tue 1/13/15 Resource Management Plan 1 day Tue 1/20/15 Tue 1/20/15 Organization Chart & Resource Plan 1 day Tue 1/20/15 Tue 1/20/15 Develop risk management plan 1 day Wed 1/21/15 Wed 1/21/15 Identify risks 1 day Wed 1/21/15 Wed 1/21/15 Plan risk response 1 day Wed 1/21/15 Wed 1/21/1521FF Submitting & Approving 77 days Wed 1/21/15 Thu 5/7/15 Submit plan 1 day Wed 1/21/15 Wed 1/21/15 Final Project Review 71 days Thu 1/22/15 Thu 4/30/15 Presentation to IUJ 5 days Fri 5/1/15 Thu 5/7/1525
  • 14. E-Sis Company Task Name Duration Start Finish Predec essors D2) Conference Plan 66 days Fri 1/2/15 Fri 4/3/15 General Sessions 22 days Fri 1/2/15 Mon 2/2/15 Venue 18 days Mon 1/5/15 Wed 1/28/15 Enquires 13 days Mon 1/5/15 Wed 1/21/15 Select & Book 3 days Mon 1/26/15 Wed 1/28/1531 Speakers 13 days Fri 1/2/15 Tue 1/20/15 Invitations 10 days Fri 1/2/15 Thu 1/15/15 Confirmation 3 days Fri 1/16/15 Tue 1/20/1534 Participants 20 days Mon 1/5/15 Fri 1/30/15 Invitations 8 days Mon 1/5/15 Wed 1/14/15 Confirmation 5 days Thu 1/15/15 Wed 1/21/1537 Public Announcement 7 days Thu 1/22/15 Fri 1/30/15 Press Conference 3 days Thu 1/22/15 Mon 1/26/15 Press Release 2 days Mon 1/26/15 Tue 1/27/1540 Advertising 3 days Wed 1/28/15 Fri 1/30/15 Food & Accomodations 15 days Mon 1/5/15 Fri 1/23/15 Enquires 10 days Mon 1/5/15 Fri 1/16/1531SS Select & Book 5 days Mon 1/19/15 Fri 1/23/1544 Transportation 13 days Mon 1/5/15 Wed 1/21/15 Enquires 10 days Mon 1/5/15 Fri 1/16/1531SS Bus Timetable 3 days Mon 1/19/15 Wed 1/21/1547 Handouts 8 days Thu 1/22/15 Mon 2/2/15 Collect Handouts 5 days Thu 1/22/15 Wed 1/28/1538 Prinint 3 days Thu 1/29/15 Mon 2/2/1550 Timeline
  • 15. E-Sis Company Task Name Duration Start Finish Predec essors Seminars 24 days Mon 2/2/15 Thu 3/5/15 Venue 18 days Thu 2/5/15 Mon 3/2/15 Enquires 13 days Thu 2/5/15 Mon 2/23/15 Select & Book 3 days Thu 2/26/15 Mon 3/2/1554 Speakers 13 days Mon 2/2/15 Wed 2/18/15 Invitations 10 days Mon 2/2/15 Fri 2/13/15 Confirmation 3 days Mon 2/16/15 Wed 2/18/1557 Participants 19 days Thu 2/5/15 Tue 3/3/15 Invitations 8 days Thu 2/5/15 Mon 2/16/15 Confirmation 5 days Tue 2/17/15 Mon 2/23/1560 Public Announcement 7 days Sun 2/22/15 Tue 3/3/15 Press Conference 3 days Sun 2/22/15 Tue 2/24/15 Press Release 2 days Thu 2/26/15 Fri 2/27/1563 Advertising 3 days Sat 2/28/15 Tue 3/3/15 Food & Accomodations 15 days Thu 2/5/15 Wed 2/25/15 Enquires 10 days Thu 2/5/15 Wed 2/18/1554SS Select & Book 5 days Thu 2/19/15 Wed 2/25/1567 Transportation 13 days Thu 2/5/15 Mon 2/23/15 Enquires 10 days Thu 2/5/15 Wed 2/18/1554SS Bus Timetable 3 days Thu 2/19/15 Mon 2/23/1570 Handouts 8 days Tue 2/24/15 Thu 3/5/15 Collect Handouts 5 days Tue 2/24/15 Mon 3/2/1561 Prinint 3 days Tue 3/3/15 Thu 3/5/1573 Timeline
  • 16. E-Sis Company Task Name Duration Start Finish Predec essors Network Meeting & Panel Discussion 21 days Fri 3/6/15 Fri 4/3/15 Venue 16 days Fri 3/6/15 Fri 3/27/15 Enquires 13 days Fri 3/6/15 Tue 3/24/1574 Select & Book 3 days Wed 3/25/15 Fri 3/27/1577 Speakers 13 days Fri 3/6/15 Tue 3/24/15 Invitations 10 days Fri 3/6/15 Thu 3/19/1574 Confirmation 3 days Fri 3/20/15 Tue 3/24/1580 Participants 18 days Fri 3/6/15 Tue 3/31/15 Invitations 8 days Fri 3/6/15 Tue 3/17/1574 Confirmation 5 days Wed 3/18/15 Tue 3/24/1583 Public Announcement 5 days Wed 3/25/15 Tue 3/31/15 Press Conference 3 days Wed 3/25/15 Fri 3/27/1584 Press Release 2 days Mon 3/30/15 Tue 3/31/1586 Advertising 3 days Sat 3/28/15 Tue 3/31/15 Food & Accomodations 15 days Fri 3/6/15 Thu 3/26/15 Enquires 10 days Fri 3/6/15 Thu 3/19/1577SS Select & Book 5 days Fri 3/20/15 Thu 3/26/1590 Transportation 13 days Fri 3/6/15 Tue 3/24/15 Enquires 10 days Fri 3/6/15 Thu 3/19/1577SS Bus Timetable 3 days Fri 3/20/15 Tue 3/24/1593 Handouts 8 days Wed 3/25/15 Fri 4/3/15 Collect Handouts 5 days Wed 3/25/15 Tue 3/31/1584 Prinint 3 days Wed 4/1/15 Fri 4/3/1596 Timeline
  • 17. E-Sis Company Task Name Duration Start Finish Predece ssors Exhibation 24 days Fri 3/27/15 Wed 4/29/15 Venue 16 days Mon 4/6/15 Mon 4/27/15 Enquires 13 days Wed 4/1/15 Fri 4/17/1596 Select & Book 3 days Mon 4/20/15 Wed 4/22/15101 Speakers 13 days Wed 4/1/15 Fri 4/17/15 Invitations 10 days Wed 4/1/15 Tue 4/14/1596 Confirmation 3 days Wed 4/15/15 Fri 4/17/15104 Participants 13 days Wed 4/1/15 Fri 4/17/15 Invitations 8 days Wed 4/1/15 Fri 4/10/1596 Confirmation 5 days Mon 4/13/15 Fri 4/17/15107 Public Announcement 21 days Fri 3/27/15 Fri 4/24/15 Press Conference 3 days Mon 4/20/15 Wed 4/22/15108 Press Release 2 days Thu 4/23/15 Fri 4/24/15110 Advertising 3 days Fri 3/27/15 Tue 3/31/15 Food & Accomodations 15 days Wed 4/1/15 Tue 4/21/1596 Enquires 10 days Wed 4/1/15 Tue 4/14/15101SS Select & Book 5 days Wed 4/15/15 Tue 4/21/15114 Transportation 13 days Wed 4/1/15 Fri 4/17/15 Enquires 10 days Wed 4/1/15 Tue 4/14/15101SS Bus Timetable 3 days Wed 4/15/15 Fri 4/17/15117 Handouts 8 days Mon 4/20/15 Wed 4/29/15 Collect Handouts 5 days Mon 4/20/15 Fri 4/24/15108 Prinint 3 days Mon 4/27/15 Wed 4/29/15120 Feedback Session 5 days Thu 4/30/15 Wed 5/6/15121 Timeline
  • 18. E-Sis Company Task Name Duration Start Finish Predec essors HELD CONFERENCE 3 days Wed 5/13/15 Fri 5/15/15 General Sessions 1 day Wed 5/13/15 Wed 5/13/15 Seminars 2 days Wed 5/13/15 Thu 5/14/15 Exhibations 2 days Wed 5/13/15 Thu 5/14/15 Pannel Discussions 1 day Thu 5/14/15 Thu 5/14/15 Network Meeting 1 day Fri 5/15/15 Fri 5/15/15 Feedback & seminar review 1 day Fri 5/15/15 Fri 5/15/15 D3) Summary Bulletin 10 days Mon 5/18/15 Fri 5/29/15 Reviewing 3 days Mon 5/18/15 Wed 5/20/15 Documentation 5 days Thu 5/21/15 Wed 5/27/15 Summit Bulletin 1 day Thu 5/28/15 Thu 5/28/15 Closing Project 1 day Fri 5/29/15 Fri 5/29/15 Timeline
  • 19. E-Sis Company 3) Cost Cost estimate based on Analogue Estimating * Used our previous Experiences of similar projects
  • 21. E-Sis Company Conference Activity Plan Total Budget for venue is = $ 2000
  • 22. E-Sis Company Cost Estimate Expected Revenue No. of Participants Individuals 4,000 Company 60* 2 persons 120 Total Participants 4,120 Expected Project Revenue = No. of Expected Participants * fee per one participant =4120*US$200 = US$ 824,000
  • 23. E-Sis Company Estimate cost US$ Total Bugeted Staff Cost 72,975 Annex 1 Deliverable-1 Fees for Hire Expertise of Project Dev Plan - Deliverable-2 Advertising Fees 1,500 Fees for Venue (May 12 ~15) 500 Per Day 4 Days 2,000 Mailing Fees to invite delegates 1 Per Mail 4120 Perticipants 4,120 Public Announcement 500 Food & Beverages 4 Days 15 Per Day 4120 Perticipants 247,200 Accomodations 4 Days 15 Per Day 4120 Perticipants 247,200 Printing Handouts 7 booklets 2 Per Booklet 4120 Perticipants 57,680 Resource Person 2 hrs 100 Per Hr 7 Resource Person 1,400 Printing & Submitting Bulletins 7 booklets 2 Per Booklet 4120 Perticipants 57,680 Deliverable-3 Printing Bulletins 1 booklet 3 4120 Perticipants 12,360 Contigency Amout (5% of Budget) 37,007 741,622 Estimate Cost
  • 24. E-Sis Company Total Budgeted Staff Cost Budget for Project Staffs USD Appointment Date End Date of the Contact Work Duration in Months Salary Per Month Budget Project Staff Project Manager 01.11.2014 30.05.2014 7 1,000 7,000 Project Director 01.11.2014 30.05.2014 7 950 6,650 Project Execurive 15.11.2014 30.05.2014 6.5 900 5,850 Project Staff 1 15.11.2014 30.05.2014 6.5 700 4,550 Project Staff 2 15.11.2014 30.05.2014 6.5 700 4,550 Accountant 15.11.2014 30.05.2014 6.5 900 5,850 Supporting Staff 1 15.11.2014 30.05.2014 6.5 750 4,875 Supporting Staff 2 15.11.2014 30.05.2014 6.5 750 4,875 Project Marketing Executive 01.12.2014 30.05.2014 6 900 5,400 Supoting Staff 1 01.12.2014 30.05.2014 6 700 4,200 Project HR Executive 15.11.2014 30.05.2014 6.5 800 5,200 Suporting Staff 1 15.11.2014 30.05.2014 6.5 700 4,550 Logistic Officer 15.11.2014 30.05.2014 6.5 750 4,875 Suprting Staff 1 15.11.2014 30.05.2014 6.5 700 4,550 Total Bugeted Staff Cost 72,975
  • 26. E-Sis Company Quality Project Quality Plan USD Conference entry fee 4120 200 824,000 Estimated Total project cost 746,497 Estimated Project Profit 77,503 Cost Benefit Ratio = Estimated Project Profit = 10.38223 Estimated Total project cost Estimated Profit as a percentge of entry fee = Estimated Project Profit = 9.405704 Conference entry fee Cost per person = Estimated Project cost = 746,497 No of Participates 4120 = 181
  • 28. E-Sis Company Stakeholders • International University of Japan (IUJ) • Project contractor • Executive Director(Yuichi Naito) • Projective Executive (Jey Rajasekera) • Niigata Prefectural office • Ministry of Economy, Trade and Industry(METI) • Japan International Cooperation Agency (JICA) • Project Management Association of Japan (PMAJ) • Public Companies • General Participants
  • 29. E-Sis Company No of Channels = N(N-1)/2 • Stakeholders = 9 • Required potential communication cannels = 36
  • 30. E-Sis Company Project Team Communication Plan Audience Information Method Frequency Who is Responsible Owner and Cosponsor Project announcement E-Mai l, Fax Weekly Team Leads Project teams Team Meeting Meeting Daily Team Leads Project Teams Owner and Cosponsor Team Meeting , Meeting Minute E mail, Fax Weekly Team leads Participants Meeting Agenda Email , Fax 2 Weeks before Conference Project manager
  • 31. E-Sis Company Project Team Communication Plan (cont. ) Audience Information Method Frequency Who is Responsible Owner and Cosponsor Project Implementation Network Meeting, Video Conferencing One Month Project Manager Project Manager Feedback from Stakeholder E mail, Fax, Video conferencing, cell phone One Month Owner, Cosponsor
  • 32. E-Sis Company Output from Com: Plan • Outputs • Document Update • Meeting Minutes • Change Request
  • 34. E-Sis Company Human Resource (Organization Chart) Project Manager Project Executive Logistic Officer IT Staff General logistic Staff Staff 1 Staff 2 Project Marketing Executive Staff 1 Staff 2 Project Accounting Executive Staff 1 Project Human Resources Executive Staff 1 Project Director
  • 36. E-Sis CompanyRisk Nr. Risk Description Possibility Impact/ Severity Risk Management Plan/ Mitigation Strategy 1 Over costing more than the budget allocated Medium High The budget is limited. Thus, Marketing team should define advertising strategy to guarantee that at least the pre- registration of 4000 fees. Part of money collected would help in preparation of the conference. 2 Lack of funding High High Ask for JICA and METI financial support 3 Delay on schedule Medium Medium Organize meeting with facility staff members before the conference 4 Guest Speakers cancelations Low High Ask to the guest speaker confirmation and update speaker as cancellation occur 5 Lack of audience/ reduced number of participants Medium High - Advertising - Create a Website for a conference - -Online Registration - Inviting famous Guest Speakers (Specialists in Project Management) - High participation of Project Management Association of Japan 6 Natural Disaster (Eg. Earthquake) Low High Prepare an emergency plan for quickly evacuation in case of natural disaster 7 Delay on logistics (Catering, accommodation and transportation) Medium High Update to Catering Service about the final number of participants, according to pre-registration. Logistics Officer must in permanent contact with the Hotels contracted. 8 Equipment problems (Computer and High Medium Allocate an IT staff 9 Equipment problems (Computer, projectors and printers) High Medium Allocate an IT staff
  • 38. E-Sis Company Stakeholders Stakeholders IUJ Project Team (Project Owner) Project Director (Yuichi Naito) Project Executive (Jey Rajasekera) Primary Contractor Cosponsor Niigata Prefecture Government Ministry of Economy, Trade and Industry (METI) Japan International Corporation (JICA) Project Management Association of Japan Public Companies General participants