SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Downloaden Sie, um offline zu lesen
Working together
for a safer world
Introduction to the Revised UK Offshore Safety Legislation as Impacted
by the EU Offshore Safety Directive
Ian Mackay - Technical Manager, Compliance Operations Aberdeen
How technology and innovation drive optimisation AND safety.
Venue safety information
• Use this slide to give information about safety and emergency evacuation
procedures for the venue you are in.
• Type of warning (siren, announcement, etc.):
• Location of emergency exists:
• Assembly point:
Agenda
• Introduction
• Legislation
• Major Accident Hazards and Major Environmental Incidents
• Major Changes
• Threats & Opportunities
Brief History of Goal Setting Offshore Safety Legislation
• Introduced in UK in 1992 following Lord Cullen’s enquiry into Piper Alpha disaster
• Applied to all oil & gas producing installations on the UKCS through the full
lifecycle
• Replaced previous prescriptive legislation
• Offshore Installations Safety Case Regulations (OSCR) revised in 2005
• EU Directive on safety of offshore oil & gas operations 2013/30/EU
• New Offshore Installations (Offshore Safety Directive) (Safety Case etc.)
Regulations 2015 (SCR) replaced OSCR in UK 19th July 2015
• Methodology increasingly adopted globally, such as Validation requirements in
Australia and voluntary company schemes.
Piper Alpha – before and after
Timescale for New Regulations
Associated UK legislation
HSAW
SCR
PSR DCR MAR PFEER
EU
DIRECTIVE
Goal Setting Offshore Safety Legislation - key features
• Safety case
• Concept of duty holder/ responsible operator/owner
• As low as reasonably practicable (ALARP) principle
• Identification of major accident hazards and major environmental incidents
• Identification of safety & environmental critical elements (SECEs)
• Concept of ‘suitability’
• Setting of performance standards for SECEs
• Verification schemes
• Independent and competent person
• Matching of assurance and verification effort to risk
Prescriptive vs Goal Setting Legislation
• Prescriptive
Industry must comply with regulation
Little alignment between risk and effort to comply
Little flexibility in interpretation and compliance requirements
Can inhibit industry innovation
Responsibility can be seen to sit with the regulator
Can instil a false sense of security
• Goal Setting
Responsibility sits firmly with the owner/operator
Achieves desirable outcomes through thorough risk assessment
Requires reliable management systems
Aligns effort to comply to risk
Key features
Verification Scheme
Performance Standards
Safety & Environmental
Critical Elements
Major Accident Hazards/ Major
Environmental Incidents
VERIFICATION
Gulf of Mexico, April 2015
Pemex, Abkatun A-Permanent platform explosion
At least 4 dead , 16 injured
Pemex
AP
Gulf of Mexico, Bay of Campeche , May 2015
Jack-up rig Troll Solution tilted due to a fault in one of its legs
2 dead, 10 injured
@InforMedia_mx
What are the Major Changes in the UK?
• Formation of a new regulatory Competent Authority (HSE & DECC) known as the
Offshore Safety Directive Regulator (OSDR)
• Requirement for inclusion of major environmental incidents as a result of MAH
• Identification of SECEs
• Additional major hazard indicator reporting requirements under the EU
Implementing Regulation 1112/2014
Major Accident Hazard (MAH) – UK definition
(a) Fire or Explosion
(b) Structural Damage
(c) Diving Life Support System Failure
(d) any other event involving death or serious personal injury to five or more persons
(e) any major environmental incident resulting from any event referred to in
paragraph (a), (b) or (d)
Safety and Environmental Critical Element (SECE)
– UK definition
Such parts of an installation and such of its plant
(including computer programmes), or any part thereof
• the failure of which could cause or contribute substantially to, or
• the purpose of which is to prevent or limit the effect of
a major accident or a major environmental incident
What are the Risks?
• Doing nothing and facing enforcement from the Regulator
• Failing to incorporate environmental protection requirements
• Not taking account of the additional major hazard indicator reporting requirements
of the Implementing Regulations
• Loss of reputation for organisation and the UK O&G industry.
What are the Opportunities to Drive Optimisation & Safety?
• Use the next 5 yearly SC resubmission as a vehicle for change
• Update MAH for your installation in light of production & technology changes
• Ensure that your list of SECEs is up to date and doesn’t include ‘gold plating’
• Review SECE performance standards to ensure that they include the requirements
for environmental incident mitigation
• Refresh your inspection and maintenance strategies to ensure that they align with
the performance requirements and verification schemes
• Balance of assurance to risk mitigation in light of any MAH & SECE changes
Summary
• Legislation
• Major Accident Hazards and Major Environmental Incidents
• Major Changes
• Threats & Opportunities

Weitere ähnliche Inhalte

Was ist angesagt?

Linked List Implementation of Deque in C
Linked List Implementation of Deque in CLinked List Implementation of Deque in C
Linked List Implementation of Deque in C
Kasun Ranga Wijeweera
 
Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...
Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...
Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...
Databricks
 

Was ist angesagt? (20)

Basic Elasticity
Basic ElasticityBasic Elasticity
Basic Elasticity
 
Finite Element Analysis of the Aeroelasticity Plates Under Thermal and Aerody...
Finite Element Analysis of the Aeroelasticity Plates Under Thermal and Aerody...Finite Element Analysis of the Aeroelasticity Plates Under Thermal and Aerody...
Finite Element Analysis of the Aeroelasticity Plates Under Thermal and Aerody...
 
REVIEW OF DRIVERS FOR TRANSMISSION INVESTMENT DECISIONS
REVIEW OF DRIVERS FOR TRANSMISSION INVESTMENT DECISIONSREVIEW OF DRIVERS FOR TRANSMISSION INVESTMENT DECISIONS
REVIEW OF DRIVERS FOR TRANSMISSION INVESTMENT DECISIONS
 
Benefits of PD diagnosis on GIS condition assessment
Benefits of PD diagnosis on GIS condition assessmentBenefits of PD diagnosis on GIS condition assessment
Benefits of PD diagnosis on GIS condition assessment
 
Structural Design and Analysis of Offshore Wind Turbines from a System Point ...
Structural Design and Analysis of Offshore Wind Turbines from a System Point ...Structural Design and Analysis of Offshore Wind Turbines from a System Point ...
Structural Design and Analysis of Offshore Wind Turbines from a System Point ...
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)
 
OVF, OVA, ovftool
OVF, OVA, ovftoolOVF, OVA, ovftool
OVF, OVA, ovftool
 
3 torsion- Mechanics of Materials - 4th - Beer
3 torsion- Mechanics of Materials - 4th - Beer3 torsion- Mechanics of Materials - 4th - Beer
3 torsion- Mechanics of Materials - 4th - Beer
 
Endevor api an introduction to the endevor application programming interface
Endevor api   an introduction to the endevor application programming interface Endevor api   an introduction to the endevor application programming interface
Endevor api an introduction to the endevor application programming interface
 
Unit 6- Plate Bending Theory.pdf
Unit 6- Plate Bending Theory.pdfUnit 6- Plate Bending Theory.pdf
Unit 6- Plate Bending Theory.pdf
 
FEA Analysis - Thin Plate
FEA Analysis - Thin PlateFEA Analysis - Thin Plate
FEA Analysis - Thin Plate
 
Design and Analysis of Helical Compression Spring for Shock Absorber
Design and Analysis of Helical Compression Spring for Shock AbsorberDesign and Analysis of Helical Compression Spring for Shock Absorber
Design and Analysis of Helical Compression Spring for Shock Absorber
 
Linked List Implementation of Deque in C
Linked List Implementation of Deque in CLinked List Implementation of Deque in C
Linked List Implementation of Deque in C
 
Screw jack project
Screw jack projectScrew jack project
Screw jack project
 
Lec9 finite element_beam_structures 1
Lec9 finite element_beam_structures 1Lec9 finite element_beam_structures 1
Lec9 finite element_beam_structures 1
 
Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...
Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...
Operationalizing Edge Machine Learning with Apache Spark with Nisha Talagala ...
 
C-- Sample Programs and Screenshots
C-- Sample Programs and ScreenshotsC-- Sample Programs and Screenshots
C-- Sample Programs and Screenshots
 
Mechanics of Materials: Question Bank from old VTU Question papers
Mechanics of Materials: Question Bank from old VTU Question papersMechanics of Materials: Question Bank from old VTU Question papers
Mechanics of Materials: Question Bank from old VTU Question papers
 
Solution manual for introduction to finite element analysis and design nam ...
Solution manual for introduction to finite element analysis and design   nam ...Solution manual for introduction to finite element analysis and design   nam ...
Solution manual for introduction to finite element analysis and design nam ...
 
C program to check leap year
C program to check leap year C program to check leap year
C program to check leap year
 

Ähnlich wie Introduction to the Revised UK Offshore Safety Legislation as Impacted by the EU Offshore Safety Directive

EV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATION
EV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATIONEV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATION
EV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATION
iQHub
 
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape
 
CV - David Kime - January 16_1
CV - David Kime - January 16_1CV - David Kime - January 16_1
CV - David Kime - January 16_1
David Kime
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Mike Poland, CMRP
 
Pp 1 insulation installation training program final
Pp 1 insulation installation training program finalPp 1 insulation installation training program final
Pp 1 insulation installation training program final
ScottDickenson2
 
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Lloyd's Register Renewables
 

Ähnlich wie Introduction to the Revised UK Offshore Safety Legislation as Impacted by the EU Offshore Safety Directive (20)

1 3 amec
1 3 amec1 3 amec
1 3 amec
 
Asset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyAsset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process Safety
 
EV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATION
EV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATIONEV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATION
EV CHARGING CABLE – STANDARDS, TESTING, AND CERTIFICATION
 
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
CV - David Kime - January 16_1
CV - David Kime - January 16_1CV - David Kime - January 16_1
CV - David Kime - January 16_1
 
Technical Assumptions Used in PV Financial Models: Review of Current Practice...
Technical Assumptions Used in PV Financial Models: Review of Current Practice...Technical Assumptions Used in PV Financial Models: Review of Current Practice...
Technical Assumptions Used in PV Financial Models: Review of Current Practice...
 
Meec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copyMeec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copy
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
 
Pp 1 insulation installation training program final
Pp 1 insulation installation training program finalPp 1 insulation installation training program final
Pp 1 insulation installation training program final
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
The Leak Management Opportunity
The Leak Management OpportunityThe Leak Management Opportunity
The Leak Management Opportunity
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
 
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
 
Shanahan Engineering Presentation
Shanahan Engineering PresentationShanahan Engineering Presentation
Shanahan Engineering Presentation
 
Engage with...NPL
Engage with...NPLEngage with...NPL
Engage with...NPL
 

Mehr von Lloyd's Register Energy

Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy
 

Mehr von Lloyd's Register Energy (20)

What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
Maximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environmentMaximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environment
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performance
 
RBI Embedded within Maximo
RBI Embedded within MaximoRBI Embedded within Maximo
RBI Embedded within Maximo
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Bop reliability
Bop reliabilityBop reliability
Bop reliability
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throw
 

Kürzlich hochgeladen

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Kürzlich hochgeladen (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Introduction to the Revised UK Offshore Safety Legislation as Impacted by the EU Offshore Safety Directive

  • 1. Working together for a safer world Introduction to the Revised UK Offshore Safety Legislation as Impacted by the EU Offshore Safety Directive Ian Mackay - Technical Manager, Compliance Operations Aberdeen How technology and innovation drive optimisation AND safety.
  • 2. Venue safety information • Use this slide to give information about safety and emergency evacuation procedures for the venue you are in. • Type of warning (siren, announcement, etc.): • Location of emergency exists: • Assembly point:
  • 3. Agenda • Introduction • Legislation • Major Accident Hazards and Major Environmental Incidents • Major Changes • Threats & Opportunities
  • 4. Brief History of Goal Setting Offshore Safety Legislation • Introduced in UK in 1992 following Lord Cullen’s enquiry into Piper Alpha disaster • Applied to all oil & gas producing installations on the UKCS through the full lifecycle • Replaced previous prescriptive legislation • Offshore Installations Safety Case Regulations (OSCR) revised in 2005 • EU Directive on safety of offshore oil & gas operations 2013/30/EU • New Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015 (SCR) replaced OSCR in UK 19th July 2015 • Methodology increasingly adopted globally, such as Validation requirements in Australia and voluntary company schemes.
  • 5. Piper Alpha – before and after
  • 6. Timescale for New Regulations
  • 7. Associated UK legislation HSAW SCR PSR DCR MAR PFEER EU DIRECTIVE
  • 8. Goal Setting Offshore Safety Legislation - key features • Safety case • Concept of duty holder/ responsible operator/owner • As low as reasonably practicable (ALARP) principle • Identification of major accident hazards and major environmental incidents • Identification of safety & environmental critical elements (SECEs) • Concept of ‘suitability’ • Setting of performance standards for SECEs • Verification schemes • Independent and competent person • Matching of assurance and verification effort to risk
  • 9. Prescriptive vs Goal Setting Legislation • Prescriptive Industry must comply with regulation Little alignment between risk and effort to comply Little flexibility in interpretation and compliance requirements Can inhibit industry innovation Responsibility can be seen to sit with the regulator Can instil a false sense of security • Goal Setting Responsibility sits firmly with the owner/operator Achieves desirable outcomes through thorough risk assessment Requires reliable management systems Aligns effort to comply to risk
  • 10. Key features Verification Scheme Performance Standards Safety & Environmental Critical Elements Major Accident Hazards/ Major Environmental Incidents VERIFICATION
  • 11. Gulf of Mexico, April 2015 Pemex, Abkatun A-Permanent platform explosion At least 4 dead , 16 injured Pemex AP
  • 12. Gulf of Mexico, Bay of Campeche , May 2015 Jack-up rig Troll Solution tilted due to a fault in one of its legs 2 dead, 10 injured @InforMedia_mx
  • 13. What are the Major Changes in the UK? • Formation of a new regulatory Competent Authority (HSE & DECC) known as the Offshore Safety Directive Regulator (OSDR) • Requirement for inclusion of major environmental incidents as a result of MAH • Identification of SECEs • Additional major hazard indicator reporting requirements under the EU Implementing Regulation 1112/2014
  • 14. Major Accident Hazard (MAH) – UK definition (a) Fire or Explosion (b) Structural Damage (c) Diving Life Support System Failure (d) any other event involving death or serious personal injury to five or more persons (e) any major environmental incident resulting from any event referred to in paragraph (a), (b) or (d)
  • 15. Safety and Environmental Critical Element (SECE) – UK definition Such parts of an installation and such of its plant (including computer programmes), or any part thereof • the failure of which could cause or contribute substantially to, or • the purpose of which is to prevent or limit the effect of a major accident or a major environmental incident
  • 16. What are the Risks? • Doing nothing and facing enforcement from the Regulator • Failing to incorporate environmental protection requirements • Not taking account of the additional major hazard indicator reporting requirements of the Implementing Regulations • Loss of reputation for organisation and the UK O&G industry.
  • 17. What are the Opportunities to Drive Optimisation & Safety? • Use the next 5 yearly SC resubmission as a vehicle for change • Update MAH for your installation in light of production & technology changes • Ensure that your list of SECEs is up to date and doesn’t include ‘gold plating’ • Review SECE performance standards to ensure that they include the requirements for environmental incident mitigation • Refresh your inspection and maintenance strategies to ensure that they align with the performance requirements and verification schemes • Balance of assurance to risk mitigation in light of any MAH & SECE changes
  • 18. Summary • Legislation • Major Accident Hazards and Major Environmental Incidents • Major Changes • Threats & Opportunities