INTODUCTION OF QCC
 A quality circle is a volunteer group composed of
workers (or even students), usually under the
leadership of their supervisor (or an elected team
leader), who are trained to identify, analyze and
solve work-related problems and present their
solutions to management in order to improve the
performance of the organization, and motivate
and enrich the work of employees. When matured,
true quality circles become self-managing, having
gained the confidence of management.
Quality circles were first established in Japan
in 1962; Kaoru Ishikawa has been credited with
their creation. The movement in Japan was
coordinated by the Japanese Union of
Scientists and Engineers (JUSE). The first
circles were established at the Nippon Wireless
and Telegraph Company but then spread to
more than 35 other companies in the first year.
By 1978 it was claimed that there were more
than one million quality circles involving some
10 million Japanese workers.
Department: Section:
Circle Name: Date :
DESCRIPTION:
SAFETY
QUALITY
COST
PRODUCTIVITY
OTHERS
1) PROMOTION LEADER ( Head of Department)
2) ADVISOR/COORDINATOR (Director Prod. & Tech.)
3) FACILITATOR
4) CIRCLE/ THEME LEADER
Signature Circle Leader Signature Head of Department
Sr. Sr.
1 6
2 7
3 8
4 9
5 10
THEME REG. NO. _________________________ REG. DATE :_________________________ QCC (T/L) Sign :________________
29.01.2013Zero Break Down
Mr. Nazeer
(Foreman)
(Supervisor)
(Sr. Electrician)
Mr. S. Shahid Ali
Mr. Abdul Raheem
Mr. Hamid Khan.
Mr. Ahsan-ul-Haq
QCC REGISTRATION FORM
QCC Department use only
Theme Name :
Member Name Title Member Name Title
CIRCLE MEMBERS (6~10 Member)
Maintenance I Hamid Khan
Develop key machine list and their system of Preventive Maintenance. (Target Date: 31.03.2013).
(Electrician)
Mr. Ayoub Ahmed
Mr. Ameer Khusroo
Mr. Junaid Zeb Ghouri.
ZERO BREAK DOWN
Approved by Prepared by Date
Sr. #
Will it make the
work easier ?
Can the circle
solve it by
themselves ?
Can they
complete it on
time ?
What will happen
if the problem is
not solved now ?
What will the
benefit for
company ?
Total
1 5 5 4 5 5 24
2 4 4 5 4 4 21
3 3 3 3 3 3 15Hyd. Press of Tool & Die modification.
THEME SELECTION CRITERIA
Proposed Theme
Develop key machines list and their
system of preventive maintenance.
Renovation of Heat Treatment Oven.
Procon Engineering (Pvt.) Ltd.
THEME SELECTION
01 050402 03
Very Low Low Average High Very High
Develop key machines list
and their system of
preventive maintenance.
UP DATED:
15/4/13
S/NO MACHINE NAME CODES DEPARTMENT REMARKS
1 SHEARING MACHINE (MECHANICAL) O25502 DECK ASSEMBLY
2 PIPE BENDING MACHINE O33801 WIRE SHOP
3 PIPE CUTTING (AUTO) O37103 WIRE SHOP
4 ZIG ZAG SPRING MACHINE O33301 WIRE SHOP
5 WIRE CUTTING MACHINE (AUTO) O33101 WIRE SHOP
6 HANGING SPOT WELDING MACHINE O43901 WELDING SHOP
7 HYDRAULIC PRESS 330 TON O50204 SEAT PRESS SHOP
8 SHEARING MACHINE # 02 O55502 SEAT PRESS SHOP
9 STEAM GENERATOR BOILER 104701 CUSHIONING 4 WHEEL
10 OVEN 147801 PAINT SHOP
11 OVEN 147802 PAINT SHOP
12 LAMINATION PLANT (FLAME) 155102 LAMINATION
13 LAMINATION PLANT (GLUE) 155101 LAMINATION
14 SEALING MACHINE 01 KW 191601 CUTTING & STITCHING
15 PNUEMATIC PRESS (MORI) 250 TON 214914 RECLINER
16 HUDRAULIC RIVETING MACHINE 224002 CHASSIS ASSEMBLY
17 PLASMA CUTTING MACHINE 224801 CHASSIS ASSEMBLY
18 LONG MEMBER PRESS 3600 TON 220201 CHASSIS ASSEMBLY
19 FIRE PUMP DIESEL 176601 GENERAL
20 FIRE PUMP ELECTRIC 176602 GENERAL
21 COOLING TOWER 173605 HEAVY PRESS SHOP
22 HOIST (LIFT) 178205 COIL CUTTING AREA
KEY MACHINE LIST FOR MAINTENANCE
2
0
1
0
0
1
2
3
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
Series2 2 0 1 0
SHEARING MACHINE
# 025502 (DECK
ASSEMBLY)
2
1.5
0 0
0
0.5
1
1.5
2
2.5
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES2 2 1.5 0 0
PIPE BENDING #
033801 (WIRE SHOP)
0 0 0 0
0
0.2
0.4
0.6
0.8
1
Hours
Jan-13
Feb-
13
Mar-
13
Apr-
13
SERIES3 0 0 0 0
PIPE CUTTING (AUTO)
# 037103 (WIRE SHOP)
0 0 0 0
0
0.5
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES4 0 0 0 0
ZIG ZAG SPRING
MACHINE # 033301
(WIRE SHOP)
1
0 0 0
0
0.5
1
1.5
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES5 1 0 0 0
WIRE CUTTING
MACHINE # 033101
(WIRE SHOP)
0 0 0 0
0
0.5
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES6 0 0 0 0
HANGING SPOT
WELDING MACHINE
# 043901 (WELD
SHOP)
1.5
0 0
1
0
1
2
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES7 1.5 0 0 1
HYD. PRESS 330 TON
# 050204 (SEAT PRESS
SHOP)
0
1
0 0
0
0.5
1
1.5
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES8 0 1 0 0
SHEARING MACHINE
# 055502 (SEAT PRESS
SHOP)
0 0 0 0
0
0.5
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES9 0 0 0 0
STEAM GENERATOR
BOILER # 104701
(CUSHION 4 WHEEL)
1
4.5
0 0
0
1
2
3
4
5
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES10 1 4.5 0 0
OVEN # 147801 (PAINT
SHOP)
0 0 0 0
0
0.2
0.4
0.6
0.8
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES11 0 0 0 0
OVEN # 147802
(PAINT SHOP)
1.5
4.5
2.5
0
0
2
4
6
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES12 1.5 4.5 2.5 0
GLUE LAMINATION #
155101 (LAMINATION
)
1
1.5
1
0
0
1
2
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES13 1 1.5 1 0
FLAME LAMINATION
# 155102
(LAMINATION)
1
0 0 0
0
1
2
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES14 1 0 0 0
SEALING MACHINE 1
KW # 191601
(STITCHING &
CUTTING)
0 0
165
0
0
100
200
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES15 0 0 165 0
PNEUMATIC PRESS
(MORI) 250 TON #
214914 (RA
RECLINER)
0
2.5
1
0
0
1
2
3
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES16 0 2.5 1 0
HYD. RIVITING
MACHINE # 224002
(CHASSIS ASSEMBLY)
0.5
0 0 0
0
0.2
0.4
0.6
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES17 0.5 0 0 0
PLASMA CUTTING
MACHINE# 224801
(CHASSIS ASSEMBLY)
0 0 0 0
0
0.5
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES18 0 0 0 0
LONG MEMBER
PRESS 3600 TON #
220201 (CHASSIS
ASEMBLY)
0 0 0 0
0
0.2
0.4
0.6
0.8
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES19 0 0 0 0
FIRE PUMP DIESEL #
176601 (GENERAL)
0 0 0 0
0
0.5
1
Hours Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES2
0
0 0 0 0
FIRE PUMP
ELECTRIC # 176602
(GENERAL)
0 0 0 0
0
0.5
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES21 0 0 0 0
COOLING TOWER #
173605 [HEAVY PRESS
SHOP (GENERAL)]
0 0 0 0
0
0.5
1
Hours
Jan-
13
Feb-
13
Mar-
13
Apr-
13
SERIES22 0 0 0 0
HOIST (LIFT) # 178205
[COIL CUTTING
AREA (GENERAL)]

Weitere ähnliche Inhalte

Was ist angesagt?

Quality control circle presentation
Quality control circle presentationQuality control circle presentation
Quality control circle presentationGanesh Murugan
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleFrank-G. Adler
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving ProcessAnand Subramaniam
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 
Quality Control Circle Action plan : A brief format
Quality Control Circle Action plan : A brief formatQuality Control Circle Action plan : A brief format
Quality Control Circle Action plan : A brief formatEngr. Abdun Noor
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group ActivitiesDEEPAK SAHOO
 
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)KetanKumar43
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m changeDeepak Sharma
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan Jitesh Gaurav
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson5S BALAMURUGAN
 
QCC Implementation.pptx
QCC Implementation.pptxQCC Implementation.pptx
QCC Implementation.pptxHasanWaqar3
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m changeHardil Shah
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009ExerciseLeanLLC
 

Was ist angesagt? (20)

Quality control circle presentation
Quality control circle presentationQuality control circle presentation
Quality control circle presentation
 
QC Circle
QC CircleQC Circle
QC Circle
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Quality Control Circle Action plan : A brief format
Quality Control Circle Action plan : A brief formatQuality Control Circle Action plan : A brief format
Quality Control Circle Action plan : A brief format
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group Activities
 
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
5 why analysis
5 why analysis5 why analysis
5 why analysis
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 
QCC Implementation.pptx
QCC Implementation.pptxQCC Implementation.pptx
QCC Implementation.pptx
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m change
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 

Andere mochten auch

Contoh QCC Presentation
Contoh QCC PresentationContoh QCC Presentation
Contoh QCC PresentationAdhi Hermawan
 
QCC (Quality Control Circle)
QCC (Quality Control Circle)QCC (Quality Control Circle)
QCC (Quality Control Circle)Sri Sulastri
 
20111104 qcc-daredevil-(reduce wrinkle 2b)-report
20111104 qcc-daredevil-(reduce wrinkle 2b)-report20111104 qcc-daredevil-(reduce wrinkle 2b)-report
20111104 qcc-daredevil-(reduce wrinkle 2b)-reportTaufik Azzikra
 
Quality Control Circle
Quality Control CircleQuality Control Circle
Quality Control CircleNeha Shukla
 
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...Duraisamy R
 
GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle)
GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle) GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle)
GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle) Astrid Jein Astrini
 
Presentasi QCC PowerVision
Presentasi QCC PowerVisionPresentasi QCC PowerVision
Presentasi QCC PowerVisionArief M Ridwan
 
Implementasi QCC
Implementasi QCCImplementasi QCC
Implementasi QCCmaya.gita
 
Teknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo PrimanandaTeknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo PrimanandaDivo Primananda
 
Qcc distance learning ged
Qcc distance learning gedQcc distance learning ged
Qcc distance learning gedCatherama
 
How to Determine the Root Cause Analysis Techniques in a Management System?
How to Determine the Root Cause Analysis Techniques in a Management System?How to Determine the Root Cause Analysis Techniques in a Management System?
How to Determine the Root Cause Analysis Techniques in a Management System?PECB
 

Andere mochten auch (20)

Contoh QCC Presentation
Contoh QCC PresentationContoh QCC Presentation
Contoh QCC Presentation
 
QCC (Quality Control Circle)
QCC (Quality Control Circle)QCC (Quality Control Circle)
QCC (Quality Control Circle)
 
20111104 qcc-daredevil-(reduce wrinkle 2b)-report
20111104 qcc-daredevil-(reduce wrinkle 2b)-report20111104 qcc-daredevil-(reduce wrinkle 2b)-report
20111104 qcc-daredevil-(reduce wrinkle 2b)-report
 
Quality Control Circle
Quality Control CircleQuality Control Circle
Quality Control Circle
 
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
 
Handbook for-tqm-qcc-1
Handbook for-tqm-qcc-1Handbook for-tqm-qcc-1
Handbook for-tqm-qcc-1
 
GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle)
GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle) GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle)
GKM (Gugus Kendali Mutu)/ QCC (Quality Control Circle)
 
2014 03-18 qcc pif grant
2014 03-18 qcc pif grant2014 03-18 qcc pif grant
2014 03-18 qcc pif grant
 
Qual-IT-yes2012
Qual-IT-yes2012Qual-IT-yes2012
Qual-IT-yes2012
 
Konsep QCC
Konsep QCCKonsep QCC
Konsep QCC
 
2nd winner ss 2010
2nd winner ss 20102nd winner ss 2010
2nd winner ss 2010
 
Presentasi QCC PowerVision
Presentasi QCC PowerVisionPresentasi QCC PowerVision
Presentasi QCC PowerVision
 
Implementasi QCC
Implementasi QCCImplementasi QCC
Implementasi QCC
 
Teknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo PrimanandaTeknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo Primananda
 
Quality circle
Quality circle Quality circle
Quality circle
 
Ip 1
Ip 1Ip 1
Ip 1
 
Qcc distance learning ged
Qcc distance learning gedQcc distance learning ged
Qcc distance learning ged
 
Build your career
Build your careerBuild your career
Build your career
 
Quality Introduction
Quality IntroductionQuality Introduction
Quality Introduction
 
How to Determine the Root Cause Analysis Techniques in a Management System?
How to Determine the Root Cause Analysis Techniques in a Management System?How to Determine the Root Cause Analysis Techniques in a Management System?
How to Determine the Root Cause Analysis Techniques in a Management System?
 

Ähnlich wie QCC Presentation

Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice Tech Co.,Ltd.
 
final year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanicalfinal year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanicalTariqJamil19
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIRJET Journal
 
Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...
Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...
Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...IJMER
 
Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentationNishant Pathak
 
industrial training internship report
industrial training internship reportindustrial training internship report
industrial training internship reportTariqJamil19
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualudjjfkkskemm
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualeudskkejedmm
 
Hyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualHyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualfjskekfsmem
 
Hyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualHyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualeudskkejedmm
 
Hyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualHyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualudjjfkkskemm
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualfjskekfsmem
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship reportMohammad Younus
 
Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...eSAT Journals
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualiekkdmmem
 

Ähnlich wie QCC Presentation (18)

Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1
 
final year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanicalfinal year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanical
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
 
Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...
Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...
Productivity Improvement by Designing Storage Systems in a Manufacturing Indu...
 
Industrial Training Report
Industrial Training ReportIndustrial Training Report
Industrial Training Report
 
Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentation
 
industrial training internship report
industrial training internship reportindustrial training internship report
industrial training internship report
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manual
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manual
 
Hyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualHyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manual
 
Hyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualHyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manual
 
Hyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manualHyundai hb90 backhoe loader service repair manual
Hyundai hb90 backhoe loader service repair manual
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manual
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship report
 
Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...
 
Hyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manualHyundai hb100 backhoe loader service repair manual
Hyundai hb100 backhoe loader service repair manual
 
Theory Of Constraints.
Theory Of Constraints.Theory Of Constraints.
Theory Of Constraints.
 
Industrial attachment
Industrial attachmentIndustrial attachment
Industrial attachment
 

QCC Presentation

  • 1.
  • 2. INTODUCTION OF QCC  A quality circle is a volunteer group composed of workers (or even students), usually under the leadership of their supervisor (or an elected team leader), who are trained to identify, analyze and solve work-related problems and present their solutions to management in order to improve the performance of the organization, and motivate and enrich the work of employees. When matured, true quality circles become self-managing, having gained the confidence of management.
  • 3. Quality circles were first established in Japan in 1962; Kaoru Ishikawa has been credited with their creation. The movement in Japan was coordinated by the Japanese Union of Scientists and Engineers (JUSE). The first circles were established at the Nippon Wireless and Telegraph Company but then spread to more than 35 other companies in the first year. By 1978 it was claimed that there were more than one million quality circles involving some 10 million Japanese workers.
  • 4. Department: Section: Circle Name: Date : DESCRIPTION: SAFETY QUALITY COST PRODUCTIVITY OTHERS 1) PROMOTION LEADER ( Head of Department) 2) ADVISOR/COORDINATOR (Director Prod. & Tech.) 3) FACILITATOR 4) CIRCLE/ THEME LEADER Signature Circle Leader Signature Head of Department Sr. Sr. 1 6 2 7 3 8 4 9 5 10 THEME REG. NO. _________________________ REG. DATE :_________________________ QCC (T/L) Sign :________________ 29.01.2013Zero Break Down Mr. Nazeer (Foreman) (Supervisor) (Sr. Electrician) Mr. S. Shahid Ali Mr. Abdul Raheem Mr. Hamid Khan. Mr. Ahsan-ul-Haq QCC REGISTRATION FORM QCC Department use only Theme Name : Member Name Title Member Name Title CIRCLE MEMBERS (6~10 Member) Maintenance I Hamid Khan Develop key machine list and their system of Preventive Maintenance. (Target Date: 31.03.2013). (Electrician) Mr. Ayoub Ahmed Mr. Ameer Khusroo Mr. Junaid Zeb Ghouri.
  • 6. Approved by Prepared by Date Sr. # Will it make the work easier ? Can the circle solve it by themselves ? Can they complete it on time ? What will happen if the problem is not solved now ? What will the benefit for company ? Total 1 5 5 4 5 5 24 2 4 4 5 4 4 21 3 3 3 3 3 3 15Hyd. Press of Tool & Die modification. THEME SELECTION CRITERIA Proposed Theme Develop key machines list and their system of preventive maintenance. Renovation of Heat Treatment Oven. Procon Engineering (Pvt.) Ltd. THEME SELECTION 01 050402 03 Very Low Low Average High Very High
  • 7. Develop key machines list and their system of preventive maintenance.
  • 8. UP DATED: 15/4/13 S/NO MACHINE NAME CODES DEPARTMENT REMARKS 1 SHEARING MACHINE (MECHANICAL) O25502 DECK ASSEMBLY 2 PIPE BENDING MACHINE O33801 WIRE SHOP 3 PIPE CUTTING (AUTO) O37103 WIRE SHOP 4 ZIG ZAG SPRING MACHINE O33301 WIRE SHOP 5 WIRE CUTTING MACHINE (AUTO) O33101 WIRE SHOP 6 HANGING SPOT WELDING MACHINE O43901 WELDING SHOP 7 HYDRAULIC PRESS 330 TON O50204 SEAT PRESS SHOP 8 SHEARING MACHINE # 02 O55502 SEAT PRESS SHOP 9 STEAM GENERATOR BOILER 104701 CUSHIONING 4 WHEEL 10 OVEN 147801 PAINT SHOP 11 OVEN 147802 PAINT SHOP 12 LAMINATION PLANT (FLAME) 155102 LAMINATION 13 LAMINATION PLANT (GLUE) 155101 LAMINATION 14 SEALING MACHINE 01 KW 191601 CUTTING & STITCHING 15 PNUEMATIC PRESS (MORI) 250 TON 214914 RECLINER 16 HUDRAULIC RIVETING MACHINE 224002 CHASSIS ASSEMBLY 17 PLASMA CUTTING MACHINE 224801 CHASSIS ASSEMBLY 18 LONG MEMBER PRESS 3600 TON 220201 CHASSIS ASSEMBLY 19 FIRE PUMP DIESEL 176601 GENERAL 20 FIRE PUMP ELECTRIC 176602 GENERAL 21 COOLING TOWER 173605 HEAVY PRESS SHOP 22 HOIST (LIFT) 178205 COIL CUTTING AREA KEY MACHINE LIST FOR MAINTENANCE
  • 9. 2 0 1 0 0 1 2 3 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 Series2 2 0 1 0 SHEARING MACHINE # 025502 (DECK ASSEMBLY)
  • 11. 0 0 0 0 0 0.2 0.4 0.6 0.8 1 Hours Jan-13 Feb- 13 Mar- 13 Apr- 13 SERIES3 0 0 0 0 PIPE CUTTING (AUTO) # 037103 (WIRE SHOP)
  • 12. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES4 0 0 0 0 ZIG ZAG SPRING MACHINE # 033301 (WIRE SHOP)
  • 13. 1 0 0 0 0 0.5 1 1.5 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES5 1 0 0 0 WIRE CUTTING MACHINE # 033101 (WIRE SHOP)
  • 14. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES6 0 0 0 0 HANGING SPOT WELDING MACHINE # 043901 (WELD SHOP)
  • 15. 1.5 0 0 1 0 1 2 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES7 1.5 0 0 1 HYD. PRESS 330 TON # 050204 (SEAT PRESS SHOP)
  • 16. 0 1 0 0 0 0.5 1 1.5 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES8 0 1 0 0 SHEARING MACHINE # 055502 (SEAT PRESS SHOP)
  • 17. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES9 0 0 0 0 STEAM GENERATOR BOILER # 104701 (CUSHION 4 WHEEL)
  • 19. 0 0 0 0 0 0.2 0.4 0.6 0.8 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES11 0 0 0 0 OVEN # 147802 (PAINT SHOP)
  • 21. 1 1.5 1 0 0 1 2 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES13 1 1.5 1 0 FLAME LAMINATION # 155102 (LAMINATION)
  • 22. 1 0 0 0 0 1 2 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES14 1 0 0 0 SEALING MACHINE 1 KW # 191601 (STITCHING & CUTTING)
  • 23. 0 0 165 0 0 100 200 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES15 0 0 165 0 PNEUMATIC PRESS (MORI) 250 TON # 214914 (RA RECLINER)
  • 24. 0 2.5 1 0 0 1 2 3 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES16 0 2.5 1 0 HYD. RIVITING MACHINE # 224002 (CHASSIS ASSEMBLY)
  • 25. 0.5 0 0 0 0 0.2 0.4 0.6 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES17 0.5 0 0 0 PLASMA CUTTING MACHINE# 224801 (CHASSIS ASSEMBLY)
  • 26. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES18 0 0 0 0 LONG MEMBER PRESS 3600 TON # 220201 (CHASSIS ASEMBLY)
  • 27. 0 0 0 0 0 0.2 0.4 0.6 0.8 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES19 0 0 0 0 FIRE PUMP DIESEL # 176601 (GENERAL)
  • 28. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES2 0 0 0 0 0 FIRE PUMP ELECTRIC # 176602 (GENERAL)
  • 29. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES21 0 0 0 0 COOLING TOWER # 173605 [HEAVY PRESS SHOP (GENERAL)]
  • 30. 0 0 0 0 0 0.5 1 Hours Jan- 13 Feb- 13 Mar- 13 Apr- 13 SERIES22 0 0 0 0 HOIST (LIFT) # 178205 [COIL CUTTING AREA (GENERAL)]