Weitere ähnliche Inhalte
Ähnlich wie MWV CONTROL VS SPEC (20)
Mehr von Julian Kalac P.Eng (20)
MWV CONTROL VS SPEC
- 1. What is the difference between out of control and
out of specification?
- 3. -6s -5s -4s -3s -2s -1s 0 1s 2s 3s 4s 5s 6s
Process Capability
Control Limits
- 5. Rumble strip Highway
5
DPMO / Control Chart
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
75000
80000
85000
90000
95000
100000
2/5/2
0012/19/20013/5/2
0013/19/20014/2/2
0014/16/20014/30/20015/14/20015/28/20016/11/20016/25/20017/9/2
0017/23/20018/6/2
0018/20/20019/3/2
0019/17/200110/1/2001
10/15
/2001
10/29
/2001
11/12
/2001
11/26
/2001
12/10
/2001
12/24
/2001
DPMO
Baseline
DPMO
UCL
LCL
Mean
Goal
Process
Change
REGIONAL
CONTROL
BEGINS
Control Limits
- 6. 6
Control Limits
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
DPMO / Control Chart
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
75000
80000
85000
90000
95000
100000
2/5/2
0012/19/20013/5/2
0013/19/20014/2/2
0014/16/20014/30/20015/14/20015/28/20016/11/20016/25/20017/9/2
0017/23/20018/6/2
0018/20/20019/3/2
0019/17/200110/1/2001
10/15
/2001
10/29
/2001
11/12
/2001
11/26
/2001
12/10
/2001
12/24
/2001
DPMO
Baseline
DPMO
UCL
LCL
Mean
Goal
Process
Change
REGIONAL
CONTROL
BEGINS