LINE SIZING
Liquid Phase Case
Chemical Engineer
Juan Pablo HernĂĄndez Castillo
PROCESS ENGINEERS TASKS
 Process engineers play an important role in the design of plants.
Some of the most common activities process engineers do are relating to:
1. Design of pipelines
2. Design of equipments
3. Design of instruments, such as control and safety relieve valves.
4. P&ID’s construction
5. Design of control strategy of differents parts of the plant.
6. Checking As Built’s
7. Design of the philosophy of operation of a particular section of the plant.
Among others

Today, i would like to share with all of you, the steps taken into account when
designing pipelines.
Currently, one the most known international standard to design pipelines is
provided by the American Petroleum Institute.
API 14E. Recommended Practice for Design and Installation of Offshore
Production Platform Piping Systems.
API 14E design for the following states:
1. Liquid phase
2. Single Phase Gas
3. Gas-Liquid Phase lines.
DESIGN OF PIPELINES
Considerations
 API 14E stablish that in order to have a accurate pipe design, two main
conditions must be met: Velocity and Pressure Drop
 Velocity: In order to avoid
Sedimentation of particles 𝟑
𝐟𝐭
𝐬
Erosion (due to high velocity) 15
𝐟𝐭
𝐬
 Pressure Drop: In order to meet pressure drop conditions.
API stablish 1
𝒑𝒔𝒊
𝟏𝟎𝟎 𝒇𝒕
<
Flow Diagram
Example
 A process engineer is asked to design a pump
which can transport water from one deposit to
another.
PARAMETER SYMBOL VALUE UNIT
TEMPERATURE T 77 °F
VISCOSITY ” 1,85E-05 lb/(ft.s)
DENSITY ρ 1,92 slugs/ft3
SPECIFIC GRAVITY s 1
VOLUMETRIC FLOW RATE 2 ft3/s
30776,9031 barrels/day
PIPE LENGHT L 60 ft
PIPE ROUGHNESS Δ 1,50E-04 ft
PUMP EFICCIENCY %
POTENTIAL HEAD ∆z 50 ft
SPECIFIC WEIGHT Îł 62,2 lb/ft3
Q
INITIAL DATA
Assumptions
 The area in which the system is located : Industry sector
 1 Month= 30 days
 The system works 24h/30 days/1 year
 Average kWh (according to CREG) =$599,722 COP
 Suction and discharge same pipe size
 Comercial Steel Schedule 40 and Schedule 80 design try
 Pipeline lenght of 60 ft
Results
For Schedule 40 Comercial Steel:
For Schedule 80 Comercial Steel:
V(ft/s) Elbows Valves Line
1 231,41 1154,72 6543,42 10836,53 18534,6789 18584,6789 19417 3134,56224 $ 4.901.665 $ 18.136.160.855
2 59,60 63,28 358,57 312,51 734,354596 784,354596 560 132,292212 $ 200.029 $ 740.108.907
3 27,05 12,35 69,99 40,35 122,686563 172,686563 72,29 29,1259687 $ 42.695 $ 157.971.260
4 15,71 3,93 22,29 9,97 36,1998787 86,1998787 17,87 14,5387975 $ 20.832 $ 77.077.751
5 10,00 1,50 8,50 3,15 13,1419988 63,1419988 5,64 10,6497683 $ 15.063 $ 55.733.044
6 6,92 0,67 3,82 1,24 5,7340002 55,7340002 2,22 9,40030725 $ 13.223 $ 48.925.559
8 4,00 0,21 1,19 0,31 1,7113024 51,7113024 0,56 8,72182383 $ 12.229 $ 45.247.677
10 2,54 0,08 0,48 0,10 0,6638566 50,6638566 0,18 8,54515766 $ 11.972 $ 44.295.237
Nominal Diameter(in)
hL(ft)
∑hL(ft) ha(ft) $COP$(USD)PA(kW)∆P(psi)
∆P(psi) PA(kW) $(USD) $COP
Elbows Valves Line
1 278,05 1666,98 9446,25 17548,38 28661,6114 28711,6114 31443,67 4842,60896 $ 7.610.740 $ 28.159.736.856
2 67,73 81,71 463,04 435,91 980,66872 1030,66872 781,08 173,836484 $ 264.039 $ 976.943.993
3 30,28 15,47 87,67 53,97 157,10938 207,10938 96,70 34,9318513 $ 51.469 $ 190.435.597
4 17,40 4,82 27,33 12,95 45,1058345 95,1058345 23,21 16,0409097 $ 23.076 $ 85.381.495
5 10,99 1,81 10,27 4,01 16,0918776 66,0918776 7,18 11,147306 $ 15.800 $ 58.461.385
6 7,67 0,83 4,69 1,61 7,12831215 57,1283121 2,88 9,63547718 $ 13.570 $ 50.208.479
8 4,38 0,25 1,43 0,39 2,07145528 52,0714553 0,70 8,78256857 $ 12.318 $ 45.576.435
10 2,78 0,10 0,58 0,13 0,8053278 50,8053278 0,23 8,56901872 $ 12.006 $ 44.423.454
ha(ft)V(ft/s)Nominal Diameter
hL(ft)
∑hL(ft)
Analysis
 From the previous results, it must be highlighted that the only schedule pipe which met the
velocity-pressure drop requierements was the Schedule 40.
Schedule 40
 Despite the velocity was aceptable from 5 to 8 in nominal diameter. It was noted that the only
diameter which met the requierement of pressure drop(∆P= below 0,6 psi) was the 8 in pipe.
 In the other hand, it was seen that the proper selection of the pipe size does affects the cost of
operation.
 If for example: A process engineer had chosen a 6 inch pipe without taking into account the
requirements, then the cost of operation would have exceed 994 USD per year of operation.
Schedule 40
 Although 5, 6 and 8 inch diameter did meet the velocity requirements, the pressure drop conditions
were not reached.
Bad decisions during the piping design and pump selection can lead to years of unnecessarily high
cost of operation.
Schedule 40- Conditions analysis
Schedule 40- Cost analysis
REFERENCES
[1] R. Mott, MecĂĄnica de fluidos, Dayton: Pearson, 2006.
[2] A. 14E, Recommended Practice for Design and Installation of Offshore Production Platform
Piping Systems., Washington: American Pretroleum Institute, 1991.
[3] C. d. R. d. E. y. G. (CREG), «TARIFAS DE ENERGÍA ELÉCTRICA ($/kWh) REGULADAS POR LA
COMISIÓN DE REGULACIÓN DE ENERGÍAY GAS (CREG) JUNIO DE 2020,» ENEL CODENSA, 2020.
[4] B. d. l. R. d. Colombia, «Tasa Representativa de Mercado (TRM-Peso por dolar),» Banco de la
Republica de Colombia, Colombia, 2020.
ÂĄTHANKS FOR
WATCHING!
 Juan Pablo HernĂĄndez Castillo
Contact:
Email: juanpaheca@outlook.es
Cel: +57 304 395 5569
LinkedIn:
www.linkedin.com/in/juanhdezcastillo

Weitere Àhnliche Inhalte

Was ist angesagt?

PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONPROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONVijay Sarathy
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Trainingernestvictor
 
PSV Sizing.pdf
PSV Sizing.pdfPSV Sizing.pdf
PSV Sizing.pdfKAhmedRehman
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenationsumit handa
 
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)Vikram Sharma
 
Pressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase FlowPressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase FlowVikram Sharma
 
Overpressure scenarios overview final
Overpressure scenarios overview finalOverpressure scenarios overview final
Overpressure scenarios overview finalRajiv Natkar
 
psv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptpsv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptssuser73bb74
 
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksDesign Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksKushagra Saxena
 
PSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdfPSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdfmitesh979351
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API BasedVijay Sarathy
 
Process Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdfProcess Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdfFaustoMarceloCaibe
 
Basics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizingBasics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizingVikram Sharma
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceAbhishek Srivastav
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_designRahul Tewari
 
Sizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsSizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsAlexis Torreele
 

Was ist angesagt? (20)

Valve sizing
Valve sizingValve sizing
Valve sizing
 
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONPROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
 
PSV Sizing.pdf
PSV Sizing.pdfPSV Sizing.pdf
PSV Sizing.pdf
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenation
 
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
 
Pressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase FlowPressure Relief Valve Sizing for Single Phase Flow
Pressure Relief Valve Sizing for Single Phase Flow
 
Overpressure scenarios overview final
Overpressure scenarios overview finalOverpressure scenarios overview final
Overpressure scenarios overview final
 
psv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptpsv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.ppt
 
Pipe sizing
Pipe sizingPipe sizing
Pipe sizing
 
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksDesign Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
 
PSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdfPSV Calculation and Philosophy.pdf
PSV Calculation and Philosophy.pdf
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API Based
 
Process Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdfProcess Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdf
 
Basics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizingBasics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizing
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - Maintainance
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_design
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
Sizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsSizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluids
 
flare system design.pdf
flare system design.pdfflare system design.pdf
flare system design.pdf
 

Ähnlich wie Line sizing

Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Fiena Azmi
 
Project Management
Project ManagementProject Management
Project ManagementPalash Mahind
 
line sizing-mustang.pdf
line sizing-mustang.pdfline sizing-mustang.pdf
line sizing-mustang.pdfZeeshanAlam90
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptxAbubakar171727
 
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting Karl Kolmetz
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing DesignSteveMillerPE
 
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...ahmedeng10
 
Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)Nikhilesh Mane
 
Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 ITTGRINNELL
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic processsimachem
 
Chemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptxChemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptxKaifyEngineer
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabPiping Technology & Products, Inc.
 
Richard-Hock
Richard-HockRichard-Hock
Richard-HockRichard Hock
 
Engineering design guideline hx rev 3
Engineering design guideline  hx rev 3Engineering design guideline  hx rev 3
Engineering design guideline hx rev 3huynhthanhtamga
 
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw PumpStudy of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw PumpIJMERJOURNAL
 
Refrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdfRefrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdfssuser642327
 
Mechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube ExchangersMechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube ExchangersGerard B. Hawkins
 

Ähnlich wie Line sizing (20)

Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2
 
Project Management
Project ManagementProject Management
Project Management
 
line sizing-mustang.pdf
line sizing-mustang.pdfline sizing-mustang.pdf
line sizing-mustang.pdf
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx
 
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
 
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
 
Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)
 
Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic process
 
Chemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptxChemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptx
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
 
Richard-Hock
Richard-HockRichard-Hock
Richard-Hock
 
Engineering design guideline hx rev 3
Engineering design guideline  hx rev 3Engineering design guideline  hx rev 3
Engineering design guideline hx rev 3
 
Pipe Support Engineering & Design - June
Pipe Support Engineering & Design - JunePipe Support Engineering & Design - June
Pipe Support Engineering & Design - June
 
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw PumpStudy of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
 
Refrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdfRefrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdf
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
Mechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube ExchangersMechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube Exchangers
 

KĂŒrzlich hochgeladen

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar â‰ŒđŸ” Delhi door step de...
Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar  â‰ŒđŸ” Delhi door step de...Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar  â‰ŒđŸ” Delhi door step de...
Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar â‰ŒđŸ” Delhi door step de...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 

KĂŒrzlich hochgeladen (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar â‰ŒđŸ” Delhi door step de...
Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar  â‰ŒđŸ” Delhi door step de...Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar  â‰ŒđŸ” Delhi door step de...
Call Now ≜ 9953056974 â‰ŒđŸ” Call Girls In New Ashok Nagar â‰ŒđŸ” Delhi door step de...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Line sizing

  • 1. LINE SIZING Liquid Phase Case Chemical Engineer Juan Pablo HernĂĄndez Castillo
  • 2. PROCESS ENGINEERS TASKS  Process engineers play an important role in the design of plants. Some of the most common activities process engineers do are relating to: 1. Design of pipelines 2. Design of equipments 3. Design of instruments, such as control and safety relieve valves. 4. P&ID’s construction 5. Design of control strategy of differents parts of the plant. 6. Checking As Built’s 7. Design of the philosophy of operation of a particular section of the plant. Among others

  • 3. Today, i would like to share with all of you, the steps taken into account when designing pipelines. Currently, one the most known international standard to design pipelines is provided by the American Petroleum Institute. API 14E. Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems. API 14E design for the following states: 1. Liquid phase 2. Single Phase Gas 3. Gas-Liquid Phase lines. DESIGN OF PIPELINES
  • 4. Considerations  API 14E stablish that in order to have a accurate pipe design, two main conditions must be met: Velocity and Pressure Drop  Velocity: In order to avoid Sedimentation of particles 𝟑 𝐟𝐭 𝐬 Erosion (due to high velocity) 15 𝐟𝐭 𝐬  Pressure Drop: In order to meet pressure drop conditions. API stablish 1 𝒑𝒔𝒊 𝟏𝟎𝟎 𝒇𝒕 <
  • 6. Example  A process engineer is asked to design a pump which can transport water from one deposit to another. PARAMETER SYMBOL VALUE UNIT TEMPERATURE T 77 °F VISCOSITY ” 1,85E-05 lb/(ft.s) DENSITY ρ 1,92 slugs/ft3 SPECIFIC GRAVITY s 1 VOLUMETRIC FLOW RATE 2 ft3/s 30776,9031 barrels/day PIPE LENGHT L 60 ft PIPE ROUGHNESS Δ 1,50E-04 ft PUMP EFICCIENCY % POTENTIAL HEAD ∆z 50 ft SPECIFIC WEIGHT Îł 62,2 lb/ft3 Q INITIAL DATA
  • 7. Assumptions  The area in which the system is located : Industry sector  1 Month= 30 days  The system works 24h/30 days/1 year  Average kWh (according to CREG) =$599,722 COP  Suction and discharge same pipe size  Comercial Steel Schedule 40 and Schedule 80 design try  Pipeline lenght of 60 ft
  • 8. Results For Schedule 40 Comercial Steel: For Schedule 80 Comercial Steel: V(ft/s) Elbows Valves Line 1 231,41 1154,72 6543,42 10836,53 18534,6789 18584,6789 19417 3134,56224 $ 4.901.665 $ 18.136.160.855 2 59,60 63,28 358,57 312,51 734,354596 784,354596 560 132,292212 $ 200.029 $ 740.108.907 3 27,05 12,35 69,99 40,35 122,686563 172,686563 72,29 29,1259687 $ 42.695 $ 157.971.260 4 15,71 3,93 22,29 9,97 36,1998787 86,1998787 17,87 14,5387975 $ 20.832 $ 77.077.751 5 10,00 1,50 8,50 3,15 13,1419988 63,1419988 5,64 10,6497683 $ 15.063 $ 55.733.044 6 6,92 0,67 3,82 1,24 5,7340002 55,7340002 2,22 9,40030725 $ 13.223 $ 48.925.559 8 4,00 0,21 1,19 0,31 1,7113024 51,7113024 0,56 8,72182383 $ 12.229 $ 45.247.677 10 2,54 0,08 0,48 0,10 0,6638566 50,6638566 0,18 8,54515766 $ 11.972 $ 44.295.237 Nominal Diameter(in) hL(ft) ∑hL(ft) ha(ft) $COP$(USD)PA(kW)∆P(psi) ∆P(psi) PA(kW) $(USD) $COP Elbows Valves Line 1 278,05 1666,98 9446,25 17548,38 28661,6114 28711,6114 31443,67 4842,60896 $ 7.610.740 $ 28.159.736.856 2 67,73 81,71 463,04 435,91 980,66872 1030,66872 781,08 173,836484 $ 264.039 $ 976.943.993 3 30,28 15,47 87,67 53,97 157,10938 207,10938 96,70 34,9318513 $ 51.469 $ 190.435.597 4 17,40 4,82 27,33 12,95 45,1058345 95,1058345 23,21 16,0409097 $ 23.076 $ 85.381.495 5 10,99 1,81 10,27 4,01 16,0918776 66,0918776 7,18 11,147306 $ 15.800 $ 58.461.385 6 7,67 0,83 4,69 1,61 7,12831215 57,1283121 2,88 9,63547718 $ 13.570 $ 50.208.479 8 4,38 0,25 1,43 0,39 2,07145528 52,0714553 0,70 8,78256857 $ 12.318 $ 45.576.435 10 2,78 0,10 0,58 0,13 0,8053278 50,8053278 0,23 8,56901872 $ 12.006 $ 44.423.454 ha(ft)V(ft/s)Nominal Diameter hL(ft) ∑hL(ft)
  • 9. Analysis  From the previous results, it must be highlighted that the only schedule pipe which met the velocity-pressure drop requierements was the Schedule 40. Schedule 40  Despite the velocity was aceptable from 5 to 8 in nominal diameter. It was noted that the only diameter which met the requierement of pressure drop(∆P= below 0,6 psi) was the 8 in pipe.  In the other hand, it was seen that the proper selection of the pipe size does affects the cost of operation.  If for example: A process engineer had chosen a 6 inch pipe without taking into account the requirements, then the cost of operation would have exceed 994 USD per year of operation. Schedule 40  Although 5, 6 and 8 inch diameter did meet the velocity requirements, the pressure drop conditions were not reached. Bad decisions during the piping design and pump selection can lead to years of unnecessarily high cost of operation.
  • 11. Schedule 40- Cost analysis
  • 12. REFERENCES [1] R. Mott, MecĂĄnica de fluidos, Dayton: Pearson, 2006. [2] A. 14E, Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems., Washington: American Pretroleum Institute, 1991. [3] C. d. R. d. E. y. G. (CREG), «TARIFAS DE ENERGÍA ELÉCTRICA ($/kWh) REGULADAS POR LA COMISIÓN DE REGULACIÓN DE ENERGÍAY GAS (CREG) JUNIO DE 2020,» ENEL CODENSA, 2020. [4] B. d. l. R. d. Colombia, «Tasa Representativa de Mercado (TRM-Peso por dolar),» Banco de la Republica de Colombia, Colombia, 2020.
  • 13. ÂĄTHANKS FOR WATCHING!  Juan Pablo HernĂĄndez Castillo Contact: Email: juanpaheca@outlook.es Cel: +57 304 395 5569 LinkedIn: www.linkedin.com/in/juanhdezcastillo