Insulation Continuity and Airtightness in
Construction with Solar Study
Student Name: Jonathan Flanagan
Student Number: G00262330
Date: 21/01/15
Revision: 01
Galway Mayo Institute of technology
2 | P a g e
Table of Contents
Cluain Mhuire Seminary Background .....................................................................................................3
Insulation Continuity...............................................................................................................................4
Airtightness...........................................................................................................................................19
Solar Analysis ........................................................................................................................................25
References ............................................................................................................................................28
Galway Mayo Institute of technology
3 | P a g e
Cluain Mhuire Seminary Background
Fig. 1.1 Cluain Mhuire Seminary
Cluain Mhuire Campus was built in 1920 and is located in Wellpark, on the Monivea
Road approximately one mile from the city centre. Its original function was that of a
Redemptorist Monastery which opened its doors in c.1940 for students that were
undergoing training for the priesthood. The G.M.I.T. campus was later founded in
1998 is currently in operation as the Centre for Creative Arts and Media specialising
in courses in art & design, textiles and film & documentary. The Campus is listed on
the NIAH website as being listed as a protected structure
The chapel sits east of the main four storey monastery building, it features high
ceilings with trussed arches, stained glass windows (some damaged due to
vandalism) and hand cut limestone masonry and externals stone walls with a
thickness of 620mm. The altar is to the South of the building with a number of
confessional boxes featuring arched entrances along each side wall. There is a
narrow stairway to the rear of the building leading up to a gallery overhead. A small
sacristy is located to the South-West of the chapel just off the main alter with its own
entrance door. The site itself is not extremely historic as seen from the old the OSI
maps of Galway. The monastery was built on a blank site. In our Detail & Design
project we are required to provide a new modern extension on the existing site and
also carry out retrofitting and refurbishments on the existing protected structure, this
ties in with our Innovative Architecture module as we are to improve the buildings
energy standards. The fact that it is a protected structure may limit our design
interventions to the buildings envelope. Airtightness and insulation will be looked at
in depth in order for us to achieve the energy standards required for both the existing
buildings and its extension.
Galway Mayo Institute of technology
4 | P a g e
Insulation Continuity
What are U-values?
Put simply, a U-value is a measure of the rate at which a material loses heat built up
inside it. A high U-value in a material demonstrates a poor thermal performance and
a low U-value indicates a good thermal performance. We want good thermal
performance of course.
U-values are one of the most important factors in predicting how a building will
perform in terms of energy efficiency and carbon emissions.
All new building projects and upgrades to existing structures must comply with the
building regulations set out in TGD Part L 2008 for buildings other than dwellings and
TGD Part L 2011 for dwellings. U values are first calculated at the early stages of a
project to meet these requirements.
Fig. 1.2 Table 2 Elemental Heat Loss Method TGD Part L (2008)
This table is extracted from TGD
Part L and shows U-values
required to meet the
requirements set out in the
document at or below these
values at different parts of the
buildings envelope.
It is smart to follow these
regulations especially if you
want to future proof your design,
in this case you will try to
achieve the lowest U value
possible for each element of the
building which will have you
crossing over into the realm of
the passive house standard.
The most important parts of this
table that are relevant to my
project have been highlighted in
red.
Galway Mayo Institute of technology
5 | P a g e
Variety of Insulation:
There is an abundance of Insulations available from many different manufactures at
home here in Ireland and Internationally with some manufacturers providing
environmentally friendly options.
Different thicknesses and material properties will have different U values associated
with them. Natural low density Insulation’s like sheeps wool would require a larger
dimensional thickness than a high denisty Insulation.
This section of the report will highlight the most suitable options that can be used in
the extension and existing structures build up.
Existing Wall
Fig. 1.3 West facade of existing chapel structure
Galway Mayo Institute of technology
6 | P a g e
Below we can see the existing external masonry wall built up inside u-wert.net U-
value calculator, it is currently achieving a U-value of 2.07 W/m2
K which is showing
us that the building is suffering in its thermal efficiency.
Fig. 1.4 U-wert.net U-value calculator
Fig. 1.5 U-wert.net Illustration of the different layers within the wall build up
Galway Mayo Institute of technology
7 | P a g e
For the existing building and new extension I have decided on a choice of three
different Insulations to test and report upon:
Existing Proposal:
Aspen Aerogel Spaceloft
Fig. 1.6 Aspen Aergoel Spaceloft 10mm blanket
Aspen Aerogels' Spaceloft®
is a flexible aerogel composite blanket designed for
insulating buildings. It can be used both externally and internally on existing or new
walls and is screw fixed to surfaces using thermally broken mushroom head fixings
that ensures no cold bridging.
The following is a list of Aerogel spacelofts’s physical characteristics:
 Lambda 14mW/mK to 18mW/mK
 5mm & 10mm blanket thicknesses
 Excellent Vapour permeability (μ = 5), Extremely Hydrophobic – withstand
hydrostatic Head test to 80cm
 Euro Fire class C or A2
 Will not promote mould growth, first class indoor air quality test result
 Good impact sound absorption, up to 20% light transmission
 This product is considered to have a clean environmental profile.
Galway Mayo Institute of technology
8 | P a g e
Proposed Wall Build up with Aerogel Space loft inside U-wert.net calculator:
Fig. 1.7 U-wert.net U-value calculator
As we can see if we use 20mm of Aerogel Space loft within the above wall build up
we shall achieve a U-Value of 0.54 W/m2
K which falls within the TGD Part L (2008)
requirements for our external walls to achieve a U-value under 0.60 W/m2
K for
alterations to existing buildings.
Fig. 1.8 U-wert.net Illustration of the different layers within the wall build up
Galway Mayo Institute of technology
9 | P a g e
Gutex Multitherm
Fig. 1.9 Gutex Multitherm
Gutex Multitherm is a moisture resistant insulation wood fibreboard with single-ply
construction and homogeneous cross section, it is an ideal sarking board for exterior
walls under facade facing.
The following is a list of Gutex Multitherm’s physical characteristics:
 Uniform board dimensions make installation quicker and easier
 Homogeneous, single-ply construction
 Makes structures wind-tight
 Superior moisture resistance due to hydrophobic treatment
 Ideal for upgrading the thermal insulation of existing structures
 Reduces thermal bridging
 Maximum protection against the heat in summer
 Significantly improves soundproofing
 Regulates humidity
 Allows vapour diffusion
 Wood is a sustainable, recyclable natural resource (natureplus® certified)
Galway Mayo Institute of technology
10 | P a g e
Proposed Wall Build up with Gutex Multitherm inside U-wert.net calculator:
Fig. 1.10 U-wert.net U-value calculator
As we can see if we use 40mm of Gutex Multitherm within the above wall build up
we shall achieve a U-Value of 0.55 W/m2
K which falls within the TGD Part L (2008)
requirements for our external walls to achieve a U-value under 0.60 W/m2
K for
alterations to existing buildings.
Fig. 1.11 U-wert.net Illustration of the different layers within the wall build up
Galway Mayo Institute of technology
11 | P a g e
Calsitherm Climate Board
Fig. 1.12 Calsitherm Climate Board
Calsitherm climate board is a very good choice for insulating historic and heritage buildings
with stone masonry walls which require insulation to avoid degradation and damage while at
the same time balancing a strong thermal performance with breathability and protection
against moisture.
Calsitherm is manufactured from calcium silicate which is a micro porous rigid insulating
material which allows an existing stone wall to breathe whilst lowering the buildings energy
consumption. It is installed internally within a building, which fits in with the requirements not
to make alterations to the external façade and is made available in sheet 30mm and 50mm
in thickness. It also inhibits the spread of mould because of its high pH value.
Fig. 1.13 Calsitherm applied around an arched doorway
Galway Mayo Institute of technology
12 | P a g e
The following is a list of Calsitherm’s climate board physical characteristics:
 Reduced heating costs
 Easy to work with and install
 Increased value of the restored building
 Improvement of room climate
 Custom profiles available
 Interior insulation of existing buildings
 Maintain brick-, stucco- and ornamental facades with additional thermal
insulation
 Effective utilization of the heating system when quickly heating interior rooms
in public buildings,meeting rooms and offices
 Humidity control and generation of a healthy room climate in hospitals and
charitable institutions
 Increase in comfort and mould damage prevention
 Dry Bulk Density: 200 - 240 kg/m³
 Thermal Conductivity: 0.066 W/mK
 Measured Thermal Conductivity: 0,059 W/mK
 Water Vapour Transmission Rate: 6
 Porosity: 90%
Proposed Wall Build up with Calsitherm inside U-wert.net calculator:
Fig. 1.14 U-wert.net U-value calculator
As we can see if we use 60mm of Calsitherm within the above wall build up we shall
achieve a U-Value of 0.57 W/m2
K which falls within the TGD Part L (2008)
requirements for our external walls to achieve a U-value under 0.60 W/m2
K for
alterations to existing buildings.
Galway Mayo Institute of technology
13 | P a g e
Fig. 1.15 U-wert.net Illustration of the different layers within the wall build up
Note: Lime plaster layer on the internal envelope to provide airtightness layer and
allow masonry wall to breathe
Extension Proposal:
Gutex Multitherm
Proposed Wall Build up with Gutex Multitherm inside U-wert.net calculator:
Fig. 1.16 U-wert.net U-value calculator
Galway Mayo Institute of technology
14 | P a g e
As we can see if we use 130mm of Gutex Multitherm within the above wall build
up we shall achieve a U-Value of 0.26 W/m2
K which falls within the TGD Part L
(2008) requirements for our external walls to achieve a U-value under 0.27
W/m2
K for new buildings and extensions.
Fig. 1.17 U-wert.net Illustration of the different layers within the wall build up
Aerogel Space Loft
Proposed Wall Build up with Aerogel inside U-wert.net calculator:
Fig. 1.18 U-wert.net U-value calculator
Galway Mayo Institute of technology
15 | P a g e
As we can see if we use 60mm of Aerogel Space Loft within the above floor build up
we shall achieve a U-Value of 0.244 W/m2
K which falls within the TGD Part L (2008)
requirements for our external walls to achieve a U-value under 0.27 W/m2
K for new
buildings and extensions.
Fig. 1.19 U-wert.net Illustration of the different layers within the wall build up
Decided Insulations:
Existing Chapel
For the existing chapel building I have decided to use Calsitherm as the choice of
interior insulation.
Fig. 1.20 Sample of Calsitherm
Reasons for deciding upon this insulation:
 Prevents the spread and growth of mould on walls which the chapel suffers
from
 Enables wall to breathe preventing the build-up of moisture.
Galway Mayo Institute of technology
16 | P a g e
 Achieves a high performance U-value at a mere 80mm in thickness when
applied internally.
 Custom profiles available as there will be a need for this option as the existing
building has many different wall profiles.
 Environmentally friendly.
 Improves quality of air and thermal comfort
For the extension building I have decided to use Gutex Multitherm as the choice of
insulation.
Reasons for deciding upon this:
 Makes structures air-tight.
 Moisture resistant due to its hydrophobic treatment.
 Reduction in thermal bridging.
 Provides protection against heat in summer months.
 Acts as a great soundproofing material as extension is located next to a road.
 Allows walls to breathe.
 Cheaper than Aerogel.
 Improves quality of air and thermal comfort.
Galway Mayo Institute of technology
17 | P a g e
Floor and Roof Choice with calculations:
Proposed Roof Build up with Gutex Thermoflat inside U-wert.net calculator:
Fig. 1.21 U-wert.net U-value calculator
As we can see if we use 160mm of Gutex Thermoflat in our roof build up we shall
achieve a U-Value of 0.22 W/m2
K which falls within the TGD Part L (2008)
requirements for our external walls to achieve a U-value under 0.22 W/m2
K for new
buildings and extensions.
Fig. 1.22 U-wert.net Illustration of the different layers within the roof build up
Galway Mayo Institute of technology
18 | P a g e
Proposed Floor Build up with Gutex ThermoFloor inside U-wert.net calculator:
Fig. 1.23 U-wert.net U-value calculator
As we can see if we use 140mm Gutex Thermofloor within the above floor build up
we shall achieve a U-Value of 0.242 W/m2
K which falls within the TGD Part L (2008)
requirements for our external walls to achieve a U-value under 0.25 W/m2
K for new
buildings and extensions.
Fig. 1.24 U-wert.net Illustration of the different layers within the floor build up
Galway Mayo Institute of technology
19 | P a g e
Airtightness
Airtightness is the resistance to inward or outward flowing air leakage through
unintentional leakage points through gaps and cracks in a buildings envelope. It is
influenced by the air pressure and temperature differences inside and outside of a
building. It can fluctuate accordingly to changes in the weather.
Fig. 1.25 Locations of air leakage in a building
Correct airtightness procedures and installations will remove unwanted draughts in a
building that not only affects human comfort within a building but will also remove
mould growth, condensation, rot and high moisture levels.
There are many reasons and benefits for making your structure airtight. It saves on
energy consumption to heat the building as studies show that air leakage accounts
for 50% total heat loss in leaky buildings. If you then make these buildings airtight
you will see that cost savings on the heating bills alone, this also contributes to
reduced C02 emissions created from heating systems. In a standard medium sized
office complex, the energy savings made each year in an airtight building are 700GJ
which converts to the reduction of 48 tonnes of C02.Other benefits include reduced
need for heating systems resulting in savings in running costs and plant room sizes.
To determine how airtight a building may be, you must carry out an airtightness test
using the blower door system. A door with a variable speed fan and controls is
placed around the jambs of an external open door of a building, all other external
doors and windows are shut and internal doors and windows are left open. The
operator turns it on and forces air into the building at a rate of 50 pascals and
records the current air leakage with a laptop that is connected to the blower door
sensors.
Galway Mayo Institute of technology
20 | P a g e
Fig. 1.26 Blower door test setup on external door of a house
The result should achieve an airtightness of five air changes per hour at fifty pascals
or lower to be certified as being airtight and fall within the requirements of TGD Part
F (2009).
Airtightness Membranes and sealants
There are many different methods you can employ at the detail and specification
stages of your building design to promote airtightness in a building.
There are many different types of elastic and elastomeric gun applied sealants that
can be applied to movement joints in heavy structures, lightweight wall components
and joints between metals and plastics, that allow movement tolerances up to 50%.
The only drawback is that these sealants have an expected life span of 20 years and
need to be reapplied after, these are costly sealants to invest in for making your
building airtight. Service channels and route penetrations passing through floors and
walls must also be detailed to be airtight.
There are also new intelligent membranes arriving on the market with the ever
increasing need for making buildings air tight. One of the company’s that is prevalent
in Ireland promoted by Ecological Building Systems Ireland is Pro Clima which have
a range of membranes, tape seals and gun applied adhesive sealants.
Galway Mayo Institute of technology
21 | P a g e
Pro Clima Intello Plus
Fig. 1.27 Intello Plus Applied tover insulation and Rafters
The most efficient air tightness membrane they have on offer is the Pro Clima Intello
Plus, it acts as both an air tightness and vapour check layer. Offers a greater
protection to all thermal insulation in walls, roofs and floors. Has a high diffusion
airtightness in the winter season and a greater diffusion openness in the summer
season. It allows for rapid drying in summer due to its low diffusion resistance. It is
very durable and is fully recyclable and has a high nail tear resistance due to its
reinforcing layer.
Pro Clima DA Membrane
Fig. 1.28 Pro Clima DA Membrane Overlapped and sealed
Is an airtighness membrane and vapour check layer for installing above roof rafter
insulation and as a general vapor check layer. Provides protection against weather
during the construction phases of a project and is water resistant and water proof.
Galway Mayo Institute of technology
22 | P a g e
There is also a range of gun applied and tape adhesive sealants available on the
market from Pro Clima.
Orcon F
Fig. 1.29 Bead of Orcon F applied at base of Pro Clima membrane
Is a multipurpose flexible joint adhesive for interior and exterior applications, it has a
high adhesive strength on substrates, creates airtight outdoor joints for exterior
roofing refurbishments. Provides wind proof bonding of roof under lays. Has a high
resistance to humidity and on site durability as it is a solid acrylic glue.
Tescon No.1
Fig. 1.30 Tescon No.1
Is a flexible multi-purpose adhesive tape for bonding interior and exterior airtightness
overlaps and joints
Galway Mayo Institute of technology
23 | P a g e
It is used to create a airtight permanent seal between overlaps of membranes, roof
underlays and joints between membranes and smooth surface such as OSB, Plaster
boards, window frames and door frames. It also creates a sealant for service
penetrations.
Tescon Profil
Fig. 1.31 Tescon Profil
Tescon Profil is used to seal angled joints and corners which is suitable for sealing
around reveals at windows, doors, planed timber, corners and roof light windows. It
also provides a grat protection against piercing in corners due to its strong adhesive
quality.
Choices of membrane adhesive and tapes:
From my research into airtightness tapes, membranes and adhesive sealants I have
come up with the choices I will be using to make my extension and existing building
airtight.
Here are the following choices with reasons for doing so:
Pro Clima Intello Plus Membrane
Proclima Tescon No.1 Adhesive Tape
Orocon F adhesive Sealant
Will be used in the extension building as it provides high diffusion tightness in winter
and maximum diffusion openness in summer. It offers the solution to structures that
are difficult to protect against condensation e.g. flat roofs, which the extension
contains. It protects against the growth of mould which is prevalent in my existing
structure, which would also be of benefit to the buildings occupants. It also lasts upto
60 years and is fully recyclable.
Tescon No.1 will be used to seal joints between breaking and overlapping Intello
membranes so that there is a continuity of airtightness throughout the building. The
tape also lasts upto 60 years when applied.
Galway Mayo Institute of technology
24 | P a g e
To seal Joints between Airtightness layers and substrates a bead of Orcon F will be
applied to these surfaces to make them airtight with each other.
For the existing building providing an airtightness layer is not an option as the
external walls are made from limestone which is suffering from moisture penetration
from the rain, installing an airtightness membrane would stop the wall from breathing
which it needs to do so to dry out the already penetrating moisture when it can.
It is not viable to make the external wall moisture resistant as this would alter the
external fabric of the building which is not allowed from a protected structures point
of view.Therefore a lime plaster mix installed internally will have to suffice to act as a
airtghtness layer.
Galway Mayo Institute of technology
25 | P a g e
Solar Analysis
Methodology
A solar analysis was carried out using Revits Sun Path and Shadow display and
settings to show how shadows were cast upon the existing structure, proposed
structure and other surrounding buildings.
The solar analysis consisted of setting up these views at different times of the year
as well as at different times of the day as follows:
March 21st @ intervals of 09:00 am - 12:00pm – 03:00pm – 06:00pm
June 21st @ intervals of 09:00 am - 12:00pm – 03:00pm – 06:00pm
December 21st @ intervals of 09:00 am - 12:00pm – 03:00pm – 06:00pm
These dates and times were set in the sun paths settings in revit and the location of
the site was also set in revit to display the most accurate shadows upon the
structures.
Fig. 1.32 Screen shot of sun settings within Revit
The shadows were then enabled in revit and plan views were taken in the 3D model
space to show how these shadows were cast at the different date and time intervals.
Galway Mayo Institute of technology
26 | P a g e
Fig. 1.33 Screenshot of Sun Path and Shadows
Sun Light Analysis / Shadow Study
The full illustrated analysis can be viewed on the Sun Light / Shadow Study Drawing
provided with this report.
On the 21st of March throughout the day starting from 09:00 am the chapel
overshadows the extension and the main building overshadows the chapel up until
03:00pm. It then shifts and the Northwest façade of both the chapel and extension
get the benefit of the sun. By 04:30pm the chapel and extension are still benefitting
from the sun.
On the 21st of June throughout the day starting from 09:00 am the chapel
overshadows the extension and the main building overshadows the chapel up until
03:00pm. It then shifts and the Northwest façade of both the chapel and extension
get the benefit of the sun. By 04:30pm the chapel and extension are still benefitting
from the sun.
On the 21st of December throughout the day starting from 09:00 am throughout the
day starting from 09:00 am the chapel overshadows the extension and the main
building overshadows the chapel. At 03:00pm the chapel and extension are still
overshadowed. By 04:30pm the chapel is benefitting from the sun and the
extensions northwest façade begins to benefit from sunlight.
Galway Mayo Institute of technology
27 | P a g e
Conclusion
To Comply with Part L regulations of the Technical Guidance Documents I would
propose to incorporate Photovoltaic Solar Panels into the extensions West Elevation
Facade, this area of the building would benefit mostly from the sun’s rays and heat
based on my analysis. I could also achieve this with another alternative by placing
Inkjet Printed Solar Cells on to the glazing of that portion of the building which could
also serve as an artistic design for the facade. The building would also benefit from
heat genereated from soalr gain through the glazing and the extensions exterior
fabric.
Galway Mayo Institute of technology
28 | P a g e
References
Photographic
Fig. 1.1 Cluain Mhuire Seminary - Killian Deveraux, Arman Barazenda
Fig. 1.2 Table 2 Elemental Heat Loss Method - TGD Part L (2008)
Fig. 1.3 West facade of existing chapel structure - Killian Deveraux, Arman Barazenda
Fig. 1.4 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.5 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan
Fig. 1.6 Aspen Aergoel Spaceloft 10mm blanket -
http://www.jetsongreen.com/images/old/6a00d8341c67ce53ef01287766b820970c-500wi.jpg
Fig. 1.7 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.8 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan
Fig. 1.9 Gutex Multitherm - http://www.ecologicalbuildingsystems.com/workspace/images/products/Multitherm_160_kl.JPG
Fig. 1.10 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.11 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan
Fig. 1.12 Calsitherm Climate Board - http://www.ecologicalbuildingsystems.com/workspace/images/products/Calsitherm-
Boards.GIF
Fig. 1.13 Calsitherm applied around an arched doorway -
http://www.ecologicalbuildingsystems.com/workspace/images/products/Calsitherm-Installation.GIF
Fig. 1.14 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.15 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan
Fig. 1.16 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.17 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan
Fig. 1.17 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan
Fig. 1.18 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.19 U-wert.net Illustration of the different layers within the wall build up – Jonathan Flanagan
Fig. 1.20 Sample of Calsitherm - http://markstephensarchitectss.files.wordpress.com/2014/06/img_7578.jpg?w=300&h=200
Fig. 1.21 U-wert.net U-value calculator – Jonathan Flanagan
Fig. 1.22 U-wert.net Illustration of the different layers within the roof build up - Jonathan Flanagan
Fig. 1.23 U-wert.net U-value calculator - Jonathan Flanagan
Fig. 1.24 U-wert.net Illustration of the different layers within the floor build up - Jonathan Flanagan
Fig. 1.25 Locations of air leakage in a building - http://www.energyexams.com/images/pie_chart_0000.jpg
Fig. 1.26 Blower door test setup on external door of a house -
http://upload.wikimedia.org/wikipedia/commons/d/d5/BlowerDoor.jpg
Galway Mayo Institute of technology
29 | P a g e
Fig. 1.27 Intello Plus Applied tover insulation and Rafters -
http://de.proclima.com/media/gallery/INTELLO_.jpg.674x252_q95_crop_box-%5B0,%203,%20674,%20257%5D_image_id-
620.jpg
Fig. 1.28 Pro Clima DA Membrane Overlapped and sealed -https://www.isoproc.be/images/uploads/products/pro_clima/DA/pro-
clima-DA-DUPLEX-regendicht-damprem-lcuhtdichting-bebording-renovatie-dak-sarking-etancheite-air-frein-vapeur-resistance-
pluie-voligeage-renovation-toiture.jpg
Fig. 1.29 Bead of Orcon F applied at base of Pro Clima membrane -
https://www.isoproc.be/images/uploads/products/pro_clima/Lijm/pro-clima-ORCON-lijm-luchtdichting-beton-verbinding-vloer-
baan-colle-etancheite-air-sol-membrane-accordement.jpg
Fig. 1.30 Tescon No.1 -
http://buildingindustry.org/bundles/brainforcefrontend/images/uploads/posts/original/images/5I/Innovations/72b375162edf45ef0
86a7357fb3ff204.jpg
Fig. 1.31 Tescon Profil -
http://www.ecologicalbuildingsystems.com/workspace/images/products/p_tescon_profil_02_150x100_cmyk.jpg
Fig. 1.32 Screen shot of sun settings within Revit - Jonathan Flanagan
Fig. 1.33 Screenshot of Sun Path and shadows - Jonathan Flanagan

Weitere ähnliche Inhalte

Was ist angesagt?

Prospects of Expanded Polystyrene Sheet as Green Building Material
Prospects of Expanded Polystyrene Sheet as Green Building MaterialProspects of Expanded Polystyrene Sheet as Green Building Material
Prospects of Expanded Polystyrene Sheet as Green Building MaterialMD ASIF AKBARI
 
EPS (thermocoal ) in construction
EPS (thermocoal ) in construction EPS (thermocoal ) in construction
EPS (thermocoal ) in construction Hafis Puzhakkal
 
Material science technology plastics
Material science technology   plasticsMaterial science technology   plastics
Material science technology plasticsHayati Haji Rithuwan
 
RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2
RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2
RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2Abimbola Ogundiran
 
Ethylene tetrafluoroethylene
Ethylene tetrafluoroethyleneEthylene tetrafluoroethylene
Ethylene tetrafluoroethyleneAMIT ANAND
 
IRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building ConstructionIRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building ConstructionIRJET Journal
 
Eps geofoam applications & technical data
Eps geofoam applications & technical dataEps geofoam applications & technical data
Eps geofoam applications & technical dataerickson valera garcia
 
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestWalls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestRDH Building Science
 
2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwestAmber Joan Wood
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concreteSIVA Aruna
 
Andreas Kiesewetter - External Thermal Insulation Composite Systems ETICS
Andreas Kiesewetter - External Thermal Insulation Composite Systems ETICSAndreas Kiesewetter - External Thermal Insulation Composite Systems ETICS
Andreas Kiesewetter - External Thermal Insulation Composite Systems ETICSkuwaitinsulation
 
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.Mr. Lucky
 
Cool Roofing and Building enveloping
Cool Roofing and Building envelopingCool Roofing and Building enveloping
Cool Roofing and Building envelopingArnav Mathur
 
Etalbond: Aluminum Composite Panels, A2 fire resistant
Etalbond: Aluminum Composite Panels, A2 fire resistantEtalbond: Aluminum Composite Panels, A2 fire resistant
Etalbond: Aluminum Composite Panels, A2 fire resistantAndreas Laspadakis
 
Kā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijai
Kā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijaiKā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijai
Kā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijaiEkonomikas ministrija/ Dzīvo siltāk
 
Super Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific NorthwestSuper Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific NorthwestGraham Finch
 
CMS Danskin Product Guide
CMS Danskin Product GuideCMS Danskin Product Guide
CMS Danskin Product GuideAshlie Carty
 
Window Standards Compared: NFRC, ISO and Passive House Ratings
Window Standards Compared: NFRC, ISO and Passive House RatingsWindow Standards Compared: NFRC, ISO and Passive House Ratings
Window Standards Compared: NFRC, ISO and Passive House RatingsRDH Building Science
 

Was ist angesagt? (20)

Prospects of Expanded Polystyrene Sheet as Green Building Material
Prospects of Expanded Polystyrene Sheet as Green Building MaterialProspects of Expanded Polystyrene Sheet as Green Building Material
Prospects of Expanded Polystyrene Sheet as Green Building Material
 
EPS (thermocoal ) in construction
EPS (thermocoal ) in construction EPS (thermocoal ) in construction
EPS (thermocoal ) in construction
 
Material science technology plastics
Material science technology   plasticsMaterial science technology   plastics
Material science technology plastics
 
RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2
RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2
RESEARCH WORK ON EXPANDED POLYSTYRENE vol-3 iss-2
 
Ethylene tetrafluoroethylene
Ethylene tetrafluoroethyleneEthylene tetrafluoroethylene
Ethylene tetrafluoroethylene
 
IRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building ConstructionIRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building Construction
 
Eps geofoam applications & technical data
Eps geofoam applications & technical dataEps geofoam applications & technical data
Eps geofoam applications & technical data
 
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific NorthwestWalls and Windows for Highly Insulated Buildings in the Pacific Northwest
Walls and Windows for Highly Insulated Buildings in the Pacific Northwest
 
2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concrete
 
Andreas Kiesewetter - External Thermal Insulation Composite Systems ETICS
Andreas Kiesewetter - External Thermal Insulation Composite Systems ETICSAndreas Kiesewetter - External Thermal Insulation Composite Systems ETICS
Andreas Kiesewetter - External Thermal Insulation Composite Systems ETICS
 
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
 
Aerocon bricks
Aerocon bricksAerocon bricks
Aerocon bricks
 
CalStar Article
CalStar ArticleCalStar Article
CalStar Article
 
Cool Roofing and Building enveloping
Cool Roofing and Building envelopingCool Roofing and Building enveloping
Cool Roofing and Building enveloping
 
Etalbond: Aluminum Composite Panels, A2 fire resistant
Etalbond: Aluminum Composite Panels, A2 fire resistantEtalbond: Aluminum Composite Panels, A2 fire resistant
Etalbond: Aluminum Composite Panels, A2 fire resistant
 
Kā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijai
Kā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijaiKā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijai
Kā ietaupīt enerģiju, izmantojot jumtus – ieteikumi jumtu renovācijai
 
Super Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific NorthwestSuper Insulated Buildings Enclosures in the Pacific Northwest
Super Insulated Buildings Enclosures in the Pacific Northwest
 
CMS Danskin Product Guide
CMS Danskin Product GuideCMS Danskin Product Guide
CMS Danskin Product Guide
 
Window Standards Compared: NFRC, ISO and Passive House Ratings
Window Standards Compared: NFRC, ISO and Passive House RatingsWindow Standards Compared: NFRC, ISO and Passive House Ratings
Window Standards Compared: NFRC, ISO and Passive House Ratings
 

Andere mochten auch

Newmarket holidays - Cruises aboard warm and welcoming MS Olympia
Newmarket holidays - Cruises aboard warm and welcoming MS OlympiaNewmarket holidays - Cruises aboard warm and welcoming MS Olympia
Newmarket holidays - Cruises aboard warm and welcoming MS OlympiaNewmarket Holidays
 
Gfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 okt
Gfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 oktGfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 okt
Gfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 oktlikewildfire
 
Primer Borrador Estructura Fundacion
Primer Borrador Estructura FundacionPrimer Borrador Estructura Fundacion
Primer Borrador Estructura Fundaciononiloiram
 
Startup News Asia: June 2016
Startup News Asia: June 2016Startup News Asia: June 2016
Startup News Asia: June 2016Wade Wright
 
Tetuán 30 Días sept-12
Tetuán 30 Días sept-12Tetuán 30 Días sept-12
Tetuán 30 Días sept-12Tetuan30Dias
 
Cosas que deberíamos aprender de nuestras mascotas
Cosas que deberíamos aprender de nuestras mascotasCosas que deberíamos aprender de nuestras mascotas
Cosas que deberíamos aprender de nuestras mascotasThe Yellow Pet
 
#Marketingartes14 Pepe Zapata, Teknecultura
#Marketingartes14 Pepe Zapata, Teknecultura#Marketingartes14 Pepe Zapata, Teknecultura
#Marketingartes14 Pepe Zapata, TekneculturaPepe Zapata
 
Health Plan Week 10-27-14
Health Plan Week 10-27-14Health Plan Week 10-27-14
Health Plan Week 10-27-14Daniel Tedesco
 
Los secretos del agua de mar.
Los secretos del agua de mar.Los secretos del agua de mar.
Los secretos del agua de mar.Juan Gomez
 
Emma; Un dibujo en el mundo real
Emma; Un dibujo en el mundo realEmma; Un dibujo en el mundo real
Emma; Un dibujo en el mundo reallapeca
 
jule : initiative junge Leser
jule : initiative junge Leserjule : initiative junge Leser
jule : initiative junge LeserThomas Bertz
 
(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...
(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...
(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...Ryan Buchanan (@eROI)
 
Gainers&loosers
Gainers&loosersGainers&loosers
Gainers&loosersVnktp1
 

Andere mochten auch (20)

Myspace
MyspaceMyspace
Myspace
 
Newmarket holidays - Cruises aboard warm and welcoming MS Olympia
Newmarket holidays - Cruises aboard warm and welcoming MS OlympiaNewmarket holidays - Cruises aboard warm and welcoming MS Olympia
Newmarket holidays - Cruises aboard warm and welcoming MS Olympia
 
Gfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 okt
Gfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 oktGfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 okt
Gfhe 111021 presentation-sw-sabine wildevuur and jacco van uden-17 okt
 
(2015-4-28)razonamiento clinico(ppt)
(2015-4-28)razonamiento clinico(ppt)(2015-4-28)razonamiento clinico(ppt)
(2015-4-28)razonamiento clinico(ppt)
 
Instrumento evaluacion (Prueba de inglés)
Instrumento evaluacion (Prueba de inglés)Instrumento evaluacion (Prueba de inglés)
Instrumento evaluacion (Prueba de inglés)
 
26. sánchez m. ulises
26. sánchez m. ulises26. sánchez m. ulises
26. sánchez m. ulises
 
Primer Borrador Estructura Fundacion
Primer Borrador Estructura FundacionPrimer Borrador Estructura Fundacion
Primer Borrador Estructura Fundacion
 
Startup News Asia: June 2016
Startup News Asia: June 2016Startup News Asia: June 2016
Startup News Asia: June 2016
 
Dinse Automation
Dinse AutomationDinse Automation
Dinse Automation
 
Tetuán 30 Días sept-12
Tetuán 30 Días sept-12Tetuán 30 Días sept-12
Tetuán 30 Días sept-12
 
Book
BookBook
Book
 
Acebuche
AcebucheAcebuche
Acebuche
 
Cosas que deberíamos aprender de nuestras mascotas
Cosas que deberíamos aprender de nuestras mascotasCosas que deberíamos aprender de nuestras mascotas
Cosas que deberíamos aprender de nuestras mascotas
 
#Marketingartes14 Pepe Zapata, Teknecultura
#Marketingartes14 Pepe Zapata, Teknecultura#Marketingartes14 Pepe Zapata, Teknecultura
#Marketingartes14 Pepe Zapata, Teknecultura
 
Health Plan Week 10-27-14
Health Plan Week 10-27-14Health Plan Week 10-27-14
Health Plan Week 10-27-14
 
Los secretos del agua de mar.
Los secretos del agua de mar.Los secretos del agua de mar.
Los secretos del agua de mar.
 
Emma; Un dibujo en el mundo real
Emma; Un dibujo en el mundo realEmma; Un dibujo en el mundo real
Emma; Un dibujo en el mundo real
 
jule : initiative junge Leser
jule : initiative junge Leserjule : initiative junge Leser
jule : initiative junge Leser
 
(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...
(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...
(Long Version) 2020 eROI Vision: driving innovation through email, web, + soc...
 
Gainers&loosers
Gainers&loosersGainers&loosers
Gainers&loosers
 

Ähnlich wie Insulation & Airtightness Continuity Report with Shadow Study

Energy saving in green building
Energy saving in green buildingEnergy saving in green building
Energy saving in green buildingakshaykathalkar
 
Energy saving in green building
Energy saving in green buildingEnergy saving in green building
Energy saving in green buildingakshaykathalkar
 
Introduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdfIntroduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdfbkbk37
 
Quantity Surveying Practice.docx
Quantity Surveying Practice.docxQuantity Surveying Practice.docx
Quantity Surveying Practice.docxwrite5
 
Dow Corning & Wintech Riverlight Case Study
Dow Corning & Wintech Riverlight Case StudyDow Corning & Wintech Riverlight Case Study
Dow Corning & Wintech Riverlight Case StudyWintech
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Unit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction workUnit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction workgsr101
 
Lightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefitsLightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefitsjohndorian555
 
Technical details of Energy Efficient HVAC System
Technical details of  Energy Efficient HVAC SystemTechnical details of  Energy Efficient HVAC System
Technical details of Energy Efficient HVAC Systemjayeshmahajan24
 
Biobased EPDM Pipes & K-Box
Biobased EPDM Pipes  & K-BoxBiobased EPDM Pipes  & K-Box
Biobased EPDM Pipes & K-BoxRINNO
 
drainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assembliesdrainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assembliesAmiran Bokhua
 
Owens corning enduragold duct system fiberglass insulation
Owens corning enduragold duct system fiberglass insulationOwens corning enduragold duct system fiberglass insulation
Owens corning enduragold duct system fiberglass insulationAkshay Naik
 
Introducing AKKO Sept 2011
Introducing AKKO Sept 2011Introducing AKKO Sept 2011
Introducing AKKO Sept 2011AKKO2010
 

Ähnlich wie Insulation & Airtightness Continuity Report with Shadow Study (20)

Energy saving in green building
Energy saving in green buildingEnergy saving in green building
Energy saving in green building
 
Energy saving in green building
Energy saving in green buildingEnergy saving in green building
Energy saving in green building
 
ICANZ Insulation installation handbook P:2 V:5
ICANZ Insulation installation handbook P:2 V:5 ICANZ Insulation installation handbook P:2 V:5
ICANZ Insulation installation handbook P:2 V:5
 
Introduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdfIntroduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdf
 
Presentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall SystemPresentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall System
 
Quantity Surveying Practice.docx
Quantity Surveying Practice.docxQuantity Surveying Practice.docx
Quantity Surveying Practice.docx
 
Dow Corning & Wintech Riverlight Case Study
Dow Corning & Wintech Riverlight Case StudyDow Corning & Wintech Riverlight Case Study
Dow Corning & Wintech Riverlight Case Study
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Unit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction workUnit 301: Principles of organising, planning and pricing construction work
Unit 301: Principles of organising, planning and pricing construction work
 
Lightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefitsLightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefits
 
hb_insulation
hb_insulationhb_insulation
hb_insulation
 
Technical details of Energy Efficient HVAC System
Technical details of  Energy Efficient HVAC SystemTechnical details of  Energy Efficient HVAC System
Technical details of Energy Efficient HVAC System
 
Feasibility Analysis of Applying Thermal Insulation Composite Wall in Residen...
Feasibility Analysis of Applying Thermal Insulation Composite Wall in Residen...Feasibility Analysis of Applying Thermal Insulation Composite Wall in Residen...
Feasibility Analysis of Applying Thermal Insulation Composite Wall in Residen...
 
Biobased EPDM Pipes & K-Box
Biobased EPDM Pipes  & K-BoxBiobased EPDM Pipes  & K-Box
Biobased EPDM Pipes & K-Box
 
HollowVictory_ci I5v4
HollowVictory_ci I5v4HollowVictory_ci I5v4
HollowVictory_ci I5v4
 
drainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assembliesdrainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assemblies
 
Smart High Performanc Facades
Smart High Performanc FacadesSmart High Performanc Facades
Smart High Performanc Facades
 
Owens corning enduragold duct system fiberglass insulation
Owens corning enduragold duct system fiberglass insulationOwens corning enduragold duct system fiberglass insulation
Owens corning enduragold duct system fiberglass insulation
 
Introducing AKKO Sept 2011
Introducing AKKO Sept 2011Introducing AKKO Sept 2011
Introducing AKKO Sept 2011
 
Better Builder Issue 7
Better Builder Issue 7Better Builder Issue 7
Better Builder Issue 7
 

Mehr von Jonathan Flanagan

Airtightness and insulation with solar study
Airtightness and insulation with solar studyAirtightness and insulation with solar study
Airtightness and insulation with solar studyJonathan Flanagan
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsJonathan Flanagan
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module Jonathan Flanagan
 
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterCentre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterJonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsJonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report Jonathan Flanagan
 

Mehr von Jonathan Flanagan (15)

Technical Report
Technical ReportTechnical Report
Technical Report
 
Cover letter
Cover letterCover letter
Cover letter
 
Jonathan Flanagan CV
Jonathan Flanagan CVJonathan Flanagan CV
Jonathan Flanagan CV
 
Airtightness and insulation with solar study
Airtightness and insulation with solar studyAirtightness and insulation with solar study
Airtightness and insulation with solar study
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment Drawings
 
Revit poster (actual print)
Revit poster (actual print)Revit poster (actual print)
Revit poster (actual print)
 
Conservation report
Conservation reportConservation report
Conservation report
 
Cluain mhuire research
Cluain mhuire researchCluain mhuire research
Cluain mhuire research
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module
 
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterCentre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
 
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
 

Kürzlich hochgeladen

Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...Call Girls in Nagpur High Profile
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 

Kürzlich hochgeladen (20)

Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 

Insulation & Airtightness Continuity Report with Shadow Study

  • 1. Insulation Continuity and Airtightness in Construction with Solar Study Student Name: Jonathan Flanagan Student Number: G00262330 Date: 21/01/15 Revision: 01
  • 2. Galway Mayo Institute of technology 2 | P a g e Table of Contents Cluain Mhuire Seminary Background .....................................................................................................3 Insulation Continuity...............................................................................................................................4 Airtightness...........................................................................................................................................19 Solar Analysis ........................................................................................................................................25 References ............................................................................................................................................28
  • 3. Galway Mayo Institute of technology 3 | P a g e Cluain Mhuire Seminary Background Fig. 1.1 Cluain Mhuire Seminary Cluain Mhuire Campus was built in 1920 and is located in Wellpark, on the Monivea Road approximately one mile from the city centre. Its original function was that of a Redemptorist Monastery which opened its doors in c.1940 for students that were undergoing training for the priesthood. The G.M.I.T. campus was later founded in 1998 is currently in operation as the Centre for Creative Arts and Media specialising in courses in art & design, textiles and film & documentary. The Campus is listed on the NIAH website as being listed as a protected structure The chapel sits east of the main four storey monastery building, it features high ceilings with trussed arches, stained glass windows (some damaged due to vandalism) and hand cut limestone masonry and externals stone walls with a thickness of 620mm. The altar is to the South of the building with a number of confessional boxes featuring arched entrances along each side wall. There is a narrow stairway to the rear of the building leading up to a gallery overhead. A small sacristy is located to the South-West of the chapel just off the main alter with its own entrance door. The site itself is not extremely historic as seen from the old the OSI maps of Galway. The monastery was built on a blank site. In our Detail & Design project we are required to provide a new modern extension on the existing site and also carry out retrofitting and refurbishments on the existing protected structure, this ties in with our Innovative Architecture module as we are to improve the buildings energy standards. The fact that it is a protected structure may limit our design interventions to the buildings envelope. Airtightness and insulation will be looked at in depth in order for us to achieve the energy standards required for both the existing buildings and its extension.
  • 4. Galway Mayo Institute of technology 4 | P a g e Insulation Continuity What are U-values? Put simply, a U-value is a measure of the rate at which a material loses heat built up inside it. A high U-value in a material demonstrates a poor thermal performance and a low U-value indicates a good thermal performance. We want good thermal performance of course. U-values are one of the most important factors in predicting how a building will perform in terms of energy efficiency and carbon emissions. All new building projects and upgrades to existing structures must comply with the building regulations set out in TGD Part L 2008 for buildings other than dwellings and TGD Part L 2011 for dwellings. U values are first calculated at the early stages of a project to meet these requirements. Fig. 1.2 Table 2 Elemental Heat Loss Method TGD Part L (2008) This table is extracted from TGD Part L and shows U-values required to meet the requirements set out in the document at or below these values at different parts of the buildings envelope. It is smart to follow these regulations especially if you want to future proof your design, in this case you will try to achieve the lowest U value possible for each element of the building which will have you crossing over into the realm of the passive house standard. The most important parts of this table that are relevant to my project have been highlighted in red.
  • 5. Galway Mayo Institute of technology 5 | P a g e Variety of Insulation: There is an abundance of Insulations available from many different manufactures at home here in Ireland and Internationally with some manufacturers providing environmentally friendly options. Different thicknesses and material properties will have different U values associated with them. Natural low density Insulation’s like sheeps wool would require a larger dimensional thickness than a high denisty Insulation. This section of the report will highlight the most suitable options that can be used in the extension and existing structures build up. Existing Wall Fig. 1.3 West facade of existing chapel structure
  • 6. Galway Mayo Institute of technology 6 | P a g e Below we can see the existing external masonry wall built up inside u-wert.net U- value calculator, it is currently achieving a U-value of 2.07 W/m2 K which is showing us that the building is suffering in its thermal efficiency. Fig. 1.4 U-wert.net U-value calculator Fig. 1.5 U-wert.net Illustration of the different layers within the wall build up
  • 7. Galway Mayo Institute of technology 7 | P a g e For the existing building and new extension I have decided on a choice of three different Insulations to test and report upon: Existing Proposal: Aspen Aerogel Spaceloft Fig. 1.6 Aspen Aergoel Spaceloft 10mm blanket Aspen Aerogels' Spaceloft® is a flexible aerogel composite blanket designed for insulating buildings. It can be used both externally and internally on existing or new walls and is screw fixed to surfaces using thermally broken mushroom head fixings that ensures no cold bridging. The following is a list of Aerogel spacelofts’s physical characteristics:  Lambda 14mW/mK to 18mW/mK  5mm & 10mm blanket thicknesses  Excellent Vapour permeability (μ = 5), Extremely Hydrophobic – withstand hydrostatic Head test to 80cm  Euro Fire class C or A2  Will not promote mould growth, first class indoor air quality test result  Good impact sound absorption, up to 20% light transmission  This product is considered to have a clean environmental profile.
  • 8. Galway Mayo Institute of technology 8 | P a g e Proposed Wall Build up with Aerogel Space loft inside U-wert.net calculator: Fig. 1.7 U-wert.net U-value calculator As we can see if we use 20mm of Aerogel Space loft within the above wall build up we shall achieve a U-Value of 0.54 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.60 W/m2 K for alterations to existing buildings. Fig. 1.8 U-wert.net Illustration of the different layers within the wall build up
  • 9. Galway Mayo Institute of technology 9 | P a g e Gutex Multitherm Fig. 1.9 Gutex Multitherm Gutex Multitherm is a moisture resistant insulation wood fibreboard with single-ply construction and homogeneous cross section, it is an ideal sarking board for exterior walls under facade facing. The following is a list of Gutex Multitherm’s physical characteristics:  Uniform board dimensions make installation quicker and easier  Homogeneous, single-ply construction  Makes structures wind-tight  Superior moisture resistance due to hydrophobic treatment  Ideal for upgrading the thermal insulation of existing structures  Reduces thermal bridging  Maximum protection against the heat in summer  Significantly improves soundproofing  Regulates humidity  Allows vapour diffusion  Wood is a sustainable, recyclable natural resource (natureplus® certified)
  • 10. Galway Mayo Institute of technology 10 | P a g e Proposed Wall Build up with Gutex Multitherm inside U-wert.net calculator: Fig. 1.10 U-wert.net U-value calculator As we can see if we use 40mm of Gutex Multitherm within the above wall build up we shall achieve a U-Value of 0.55 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.60 W/m2 K for alterations to existing buildings. Fig. 1.11 U-wert.net Illustration of the different layers within the wall build up
  • 11. Galway Mayo Institute of technology 11 | P a g e Calsitherm Climate Board Fig. 1.12 Calsitherm Climate Board Calsitherm climate board is a very good choice for insulating historic and heritage buildings with stone masonry walls which require insulation to avoid degradation and damage while at the same time balancing a strong thermal performance with breathability and protection against moisture. Calsitherm is manufactured from calcium silicate which is a micro porous rigid insulating material which allows an existing stone wall to breathe whilst lowering the buildings energy consumption. It is installed internally within a building, which fits in with the requirements not to make alterations to the external façade and is made available in sheet 30mm and 50mm in thickness. It also inhibits the spread of mould because of its high pH value. Fig. 1.13 Calsitherm applied around an arched doorway
  • 12. Galway Mayo Institute of technology 12 | P a g e The following is a list of Calsitherm’s climate board physical characteristics:  Reduced heating costs  Easy to work with and install  Increased value of the restored building  Improvement of room climate  Custom profiles available  Interior insulation of existing buildings  Maintain brick-, stucco- and ornamental facades with additional thermal insulation  Effective utilization of the heating system when quickly heating interior rooms in public buildings,meeting rooms and offices  Humidity control and generation of a healthy room climate in hospitals and charitable institutions  Increase in comfort and mould damage prevention  Dry Bulk Density: 200 - 240 kg/m³  Thermal Conductivity: 0.066 W/mK  Measured Thermal Conductivity: 0,059 W/mK  Water Vapour Transmission Rate: 6  Porosity: 90% Proposed Wall Build up with Calsitherm inside U-wert.net calculator: Fig. 1.14 U-wert.net U-value calculator As we can see if we use 60mm of Calsitherm within the above wall build up we shall achieve a U-Value of 0.57 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.60 W/m2 K for alterations to existing buildings.
  • 13. Galway Mayo Institute of technology 13 | P a g e Fig. 1.15 U-wert.net Illustration of the different layers within the wall build up Note: Lime plaster layer on the internal envelope to provide airtightness layer and allow masonry wall to breathe Extension Proposal: Gutex Multitherm Proposed Wall Build up with Gutex Multitherm inside U-wert.net calculator: Fig. 1.16 U-wert.net U-value calculator
  • 14. Galway Mayo Institute of technology 14 | P a g e As we can see if we use 130mm of Gutex Multitherm within the above wall build up we shall achieve a U-Value of 0.26 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.27 W/m2 K for new buildings and extensions. Fig. 1.17 U-wert.net Illustration of the different layers within the wall build up Aerogel Space Loft Proposed Wall Build up with Aerogel inside U-wert.net calculator: Fig. 1.18 U-wert.net U-value calculator
  • 15. Galway Mayo Institute of technology 15 | P a g e As we can see if we use 60mm of Aerogel Space Loft within the above floor build up we shall achieve a U-Value of 0.244 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.27 W/m2 K for new buildings and extensions. Fig. 1.19 U-wert.net Illustration of the different layers within the wall build up Decided Insulations: Existing Chapel For the existing chapel building I have decided to use Calsitherm as the choice of interior insulation. Fig. 1.20 Sample of Calsitherm Reasons for deciding upon this insulation:  Prevents the spread and growth of mould on walls which the chapel suffers from  Enables wall to breathe preventing the build-up of moisture.
  • 16. Galway Mayo Institute of technology 16 | P a g e  Achieves a high performance U-value at a mere 80mm in thickness when applied internally.  Custom profiles available as there will be a need for this option as the existing building has many different wall profiles.  Environmentally friendly.  Improves quality of air and thermal comfort For the extension building I have decided to use Gutex Multitherm as the choice of insulation. Reasons for deciding upon this:  Makes structures air-tight.  Moisture resistant due to its hydrophobic treatment.  Reduction in thermal bridging.  Provides protection against heat in summer months.  Acts as a great soundproofing material as extension is located next to a road.  Allows walls to breathe.  Cheaper than Aerogel.  Improves quality of air and thermal comfort.
  • 17. Galway Mayo Institute of technology 17 | P a g e Floor and Roof Choice with calculations: Proposed Roof Build up with Gutex Thermoflat inside U-wert.net calculator: Fig. 1.21 U-wert.net U-value calculator As we can see if we use 160mm of Gutex Thermoflat in our roof build up we shall achieve a U-Value of 0.22 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.22 W/m2 K for new buildings and extensions. Fig. 1.22 U-wert.net Illustration of the different layers within the roof build up
  • 18. Galway Mayo Institute of technology 18 | P a g e Proposed Floor Build up with Gutex ThermoFloor inside U-wert.net calculator: Fig. 1.23 U-wert.net U-value calculator As we can see if we use 140mm Gutex Thermofloor within the above floor build up we shall achieve a U-Value of 0.242 W/m2 K which falls within the TGD Part L (2008) requirements for our external walls to achieve a U-value under 0.25 W/m2 K for new buildings and extensions. Fig. 1.24 U-wert.net Illustration of the different layers within the floor build up
  • 19. Galway Mayo Institute of technology 19 | P a g e Airtightness Airtightness is the resistance to inward or outward flowing air leakage through unintentional leakage points through gaps and cracks in a buildings envelope. It is influenced by the air pressure and temperature differences inside and outside of a building. It can fluctuate accordingly to changes in the weather. Fig. 1.25 Locations of air leakage in a building Correct airtightness procedures and installations will remove unwanted draughts in a building that not only affects human comfort within a building but will also remove mould growth, condensation, rot and high moisture levels. There are many reasons and benefits for making your structure airtight. It saves on energy consumption to heat the building as studies show that air leakage accounts for 50% total heat loss in leaky buildings. If you then make these buildings airtight you will see that cost savings on the heating bills alone, this also contributes to reduced C02 emissions created from heating systems. In a standard medium sized office complex, the energy savings made each year in an airtight building are 700GJ which converts to the reduction of 48 tonnes of C02.Other benefits include reduced need for heating systems resulting in savings in running costs and plant room sizes. To determine how airtight a building may be, you must carry out an airtightness test using the blower door system. A door with a variable speed fan and controls is placed around the jambs of an external open door of a building, all other external doors and windows are shut and internal doors and windows are left open. The operator turns it on and forces air into the building at a rate of 50 pascals and records the current air leakage with a laptop that is connected to the blower door sensors.
  • 20. Galway Mayo Institute of technology 20 | P a g e Fig. 1.26 Blower door test setup on external door of a house The result should achieve an airtightness of five air changes per hour at fifty pascals or lower to be certified as being airtight and fall within the requirements of TGD Part F (2009). Airtightness Membranes and sealants There are many different methods you can employ at the detail and specification stages of your building design to promote airtightness in a building. There are many different types of elastic and elastomeric gun applied sealants that can be applied to movement joints in heavy structures, lightweight wall components and joints between metals and plastics, that allow movement tolerances up to 50%. The only drawback is that these sealants have an expected life span of 20 years and need to be reapplied after, these are costly sealants to invest in for making your building airtight. Service channels and route penetrations passing through floors and walls must also be detailed to be airtight. There are also new intelligent membranes arriving on the market with the ever increasing need for making buildings air tight. One of the company’s that is prevalent in Ireland promoted by Ecological Building Systems Ireland is Pro Clima which have a range of membranes, tape seals and gun applied adhesive sealants.
  • 21. Galway Mayo Institute of technology 21 | P a g e Pro Clima Intello Plus Fig. 1.27 Intello Plus Applied tover insulation and Rafters The most efficient air tightness membrane they have on offer is the Pro Clima Intello Plus, it acts as both an air tightness and vapour check layer. Offers a greater protection to all thermal insulation in walls, roofs and floors. Has a high diffusion airtightness in the winter season and a greater diffusion openness in the summer season. It allows for rapid drying in summer due to its low diffusion resistance. It is very durable and is fully recyclable and has a high nail tear resistance due to its reinforcing layer. Pro Clima DA Membrane Fig. 1.28 Pro Clima DA Membrane Overlapped and sealed Is an airtighness membrane and vapour check layer for installing above roof rafter insulation and as a general vapor check layer. Provides protection against weather during the construction phases of a project and is water resistant and water proof.
  • 22. Galway Mayo Institute of technology 22 | P a g e There is also a range of gun applied and tape adhesive sealants available on the market from Pro Clima. Orcon F Fig. 1.29 Bead of Orcon F applied at base of Pro Clima membrane Is a multipurpose flexible joint adhesive for interior and exterior applications, it has a high adhesive strength on substrates, creates airtight outdoor joints for exterior roofing refurbishments. Provides wind proof bonding of roof under lays. Has a high resistance to humidity and on site durability as it is a solid acrylic glue. Tescon No.1 Fig. 1.30 Tescon No.1 Is a flexible multi-purpose adhesive tape for bonding interior and exterior airtightness overlaps and joints
  • 23. Galway Mayo Institute of technology 23 | P a g e It is used to create a airtight permanent seal between overlaps of membranes, roof underlays and joints between membranes and smooth surface such as OSB, Plaster boards, window frames and door frames. It also creates a sealant for service penetrations. Tescon Profil Fig. 1.31 Tescon Profil Tescon Profil is used to seal angled joints and corners which is suitable for sealing around reveals at windows, doors, planed timber, corners and roof light windows. It also provides a grat protection against piercing in corners due to its strong adhesive quality. Choices of membrane adhesive and tapes: From my research into airtightness tapes, membranes and adhesive sealants I have come up with the choices I will be using to make my extension and existing building airtight. Here are the following choices with reasons for doing so: Pro Clima Intello Plus Membrane Proclima Tescon No.1 Adhesive Tape Orocon F adhesive Sealant Will be used in the extension building as it provides high diffusion tightness in winter and maximum diffusion openness in summer. It offers the solution to structures that are difficult to protect against condensation e.g. flat roofs, which the extension contains. It protects against the growth of mould which is prevalent in my existing structure, which would also be of benefit to the buildings occupants. It also lasts upto 60 years and is fully recyclable. Tescon No.1 will be used to seal joints between breaking and overlapping Intello membranes so that there is a continuity of airtightness throughout the building. The tape also lasts upto 60 years when applied.
  • 24. Galway Mayo Institute of technology 24 | P a g e To seal Joints between Airtightness layers and substrates a bead of Orcon F will be applied to these surfaces to make them airtight with each other. For the existing building providing an airtightness layer is not an option as the external walls are made from limestone which is suffering from moisture penetration from the rain, installing an airtightness membrane would stop the wall from breathing which it needs to do so to dry out the already penetrating moisture when it can. It is not viable to make the external wall moisture resistant as this would alter the external fabric of the building which is not allowed from a protected structures point of view.Therefore a lime plaster mix installed internally will have to suffice to act as a airtghtness layer.
  • 25. Galway Mayo Institute of technology 25 | P a g e Solar Analysis Methodology A solar analysis was carried out using Revits Sun Path and Shadow display and settings to show how shadows were cast upon the existing structure, proposed structure and other surrounding buildings. The solar analysis consisted of setting up these views at different times of the year as well as at different times of the day as follows: March 21st @ intervals of 09:00 am - 12:00pm – 03:00pm – 06:00pm June 21st @ intervals of 09:00 am - 12:00pm – 03:00pm – 06:00pm December 21st @ intervals of 09:00 am - 12:00pm – 03:00pm – 06:00pm These dates and times were set in the sun paths settings in revit and the location of the site was also set in revit to display the most accurate shadows upon the structures. Fig. 1.32 Screen shot of sun settings within Revit The shadows were then enabled in revit and plan views were taken in the 3D model space to show how these shadows were cast at the different date and time intervals.
  • 26. Galway Mayo Institute of technology 26 | P a g e Fig. 1.33 Screenshot of Sun Path and Shadows Sun Light Analysis / Shadow Study The full illustrated analysis can be viewed on the Sun Light / Shadow Study Drawing provided with this report. On the 21st of March throughout the day starting from 09:00 am the chapel overshadows the extension and the main building overshadows the chapel up until 03:00pm. It then shifts and the Northwest façade of both the chapel and extension get the benefit of the sun. By 04:30pm the chapel and extension are still benefitting from the sun. On the 21st of June throughout the day starting from 09:00 am the chapel overshadows the extension and the main building overshadows the chapel up until 03:00pm. It then shifts and the Northwest façade of both the chapel and extension get the benefit of the sun. By 04:30pm the chapel and extension are still benefitting from the sun. On the 21st of December throughout the day starting from 09:00 am throughout the day starting from 09:00 am the chapel overshadows the extension and the main building overshadows the chapel. At 03:00pm the chapel and extension are still overshadowed. By 04:30pm the chapel is benefitting from the sun and the extensions northwest façade begins to benefit from sunlight.
  • 27. Galway Mayo Institute of technology 27 | P a g e Conclusion To Comply with Part L regulations of the Technical Guidance Documents I would propose to incorporate Photovoltaic Solar Panels into the extensions West Elevation Facade, this area of the building would benefit mostly from the sun’s rays and heat based on my analysis. I could also achieve this with another alternative by placing Inkjet Printed Solar Cells on to the glazing of that portion of the building which could also serve as an artistic design for the facade. The building would also benefit from heat genereated from soalr gain through the glazing and the extensions exterior fabric.
  • 28. Galway Mayo Institute of technology 28 | P a g e References Photographic Fig. 1.1 Cluain Mhuire Seminary - Killian Deveraux, Arman Barazenda Fig. 1.2 Table 2 Elemental Heat Loss Method - TGD Part L (2008) Fig. 1.3 West facade of existing chapel structure - Killian Deveraux, Arman Barazenda Fig. 1.4 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.5 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan Fig. 1.6 Aspen Aergoel Spaceloft 10mm blanket - http://www.jetsongreen.com/images/old/6a00d8341c67ce53ef01287766b820970c-500wi.jpg Fig. 1.7 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.8 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan Fig. 1.9 Gutex Multitherm - http://www.ecologicalbuildingsystems.com/workspace/images/products/Multitherm_160_kl.JPG Fig. 1.10 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.11 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan Fig. 1.12 Calsitherm Climate Board - http://www.ecologicalbuildingsystems.com/workspace/images/products/Calsitherm- Boards.GIF Fig. 1.13 Calsitherm applied around an arched doorway - http://www.ecologicalbuildingsystems.com/workspace/images/products/Calsitherm-Installation.GIF Fig. 1.14 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.15 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan Fig. 1.16 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.17 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan Fig. 1.17 U-wert.net Illustration of the different layers within the wall build up - Jonathan Flanagan Fig. 1.18 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.19 U-wert.net Illustration of the different layers within the wall build up – Jonathan Flanagan Fig. 1.20 Sample of Calsitherm - http://markstephensarchitectss.files.wordpress.com/2014/06/img_7578.jpg?w=300&h=200 Fig. 1.21 U-wert.net U-value calculator – Jonathan Flanagan Fig. 1.22 U-wert.net Illustration of the different layers within the roof build up - Jonathan Flanagan Fig. 1.23 U-wert.net U-value calculator - Jonathan Flanagan Fig. 1.24 U-wert.net Illustration of the different layers within the floor build up - Jonathan Flanagan Fig. 1.25 Locations of air leakage in a building - http://www.energyexams.com/images/pie_chart_0000.jpg Fig. 1.26 Blower door test setup on external door of a house - http://upload.wikimedia.org/wikipedia/commons/d/d5/BlowerDoor.jpg
  • 29. Galway Mayo Institute of technology 29 | P a g e Fig. 1.27 Intello Plus Applied tover insulation and Rafters - http://de.proclima.com/media/gallery/INTELLO_.jpg.674x252_q95_crop_box-%5B0,%203,%20674,%20257%5D_image_id- 620.jpg Fig. 1.28 Pro Clima DA Membrane Overlapped and sealed -https://www.isoproc.be/images/uploads/products/pro_clima/DA/pro- clima-DA-DUPLEX-regendicht-damprem-lcuhtdichting-bebording-renovatie-dak-sarking-etancheite-air-frein-vapeur-resistance- pluie-voligeage-renovation-toiture.jpg Fig. 1.29 Bead of Orcon F applied at base of Pro Clima membrane - https://www.isoproc.be/images/uploads/products/pro_clima/Lijm/pro-clima-ORCON-lijm-luchtdichting-beton-verbinding-vloer- baan-colle-etancheite-air-sol-membrane-accordement.jpg Fig. 1.30 Tescon No.1 - http://buildingindustry.org/bundles/brainforcefrontend/images/uploads/posts/original/images/5I/Innovations/72b375162edf45ef0 86a7357fb3ff204.jpg Fig. 1.31 Tescon Profil - http://www.ecologicalbuildingsystems.com/workspace/images/products/p_tescon_profil_02_150x100_cmyk.jpg Fig. 1.32 Screen shot of sun settings within Revit - Jonathan Flanagan Fig. 1.33 Screenshot of Sun Path and shadows - Jonathan Flanagan