1. Clean Expo
28th
Jan. 2015, Surrey,
British Columbia, Canada
• Supernova Waste to Energy Inc.
• Presented by :
• Jacqueline Young
• Director
2. Supernova Waste to Energy Inc.
Partnership with
•EAWC Technologies (Switzerland)
•Since 2013
•Provide One-stop Waste to
•Energy solutions
3. Plasma Gastification Technology
Benefits
• Process any wastes to zero wastes
• Generate energy in the process
• Zero Co2 emission
• Odourless
• Qualifies for Carbon Tax Credit
• Economical- less capital & operational costs.
• 12-18 months : set up – operation time
• Profitable By-products – clean synthetic gas,
clean water, silicates & metal
4. State of the art Solution for
Waste to Energy
• Eliminates & replaces
• Landfills
• Hydro-electric dams
• Nuclear & coal power plants
• Reduce pollution caused by industrial
plants & mining ponds.
• Cleaner environments
5. Return on Investments
• 3 Mw/h WtE power plant = US$ 5 m capital investment
• Process 3 ton MSW or 30,000 litres liquid waste per hr.
• Or 100 tons MSW or 600,000 litres liquid waste per day
• Income per day:
• Syngas : ROI in 118 days
• Electricity 3 Mw/h, $ 0.10/kw/h = $ 7,200/ day
• ROI in 23 months
• Combined Syngas & Electricity , ROI = 256 days
• I
6. Introduction – EAWC Technologies
• Patented technologies
• Pilot plant in Switzerland
• Approved supplier to United Nations
• Complied with EPA standards (Environmental Protection
Agency)
• Commercial project in progress in Mexico City
• Publicly listed on OTC Exchange, USA
• Head Quarter – Switzerland
• Offices in Miami, USA; Mexico City, Cancun
• 34 representatives worldwide
7. Market Size
• EAWC Current Project :
• JV with Mexico City govt. (Green Party) - 1,000 tons MSW
(Municipal Solid Waste) per day to 200 MW electricity.
• Estimated completion date – end of 2015.
• Supernova targeted market:
• British Columbia – municipal councils, (Metro Vancouver City, BC
Hydro, Whistler City)
• Domestic wastes, Mining wastes, industrial wastes, food wastes.
• Projects in progress (International): Thai Energy Commission,
Africa.
8. Plasma Gastification Technology
PCS (Plasma Converter System)
• PCS process is not a burning process – not an incinerator
• What is Plasma ?
• Plasma is simply a gas our PCS ionizes to become an effective
electrical conductor, produces a lightning-like arc of electricity.
• Source of intense energy ( 3,000+ degree Centigrade)
• Breaks down molecular bonds of solid, liquid & gaseous
compounds of hazardous & nonhazardous wastes, organic &
inorganic into atoms.
• then reformed into recoverable non-hazardous commodity products
for commercial use (syn gas, clean water, silicates, metal).
• .
9. Plasma Technology rules Supreme
• Plasma gastification compared against :
• Pyrolysis
• Pyrolysis/ gastification
• Conventional gastification
• Mass burn (incineration)
• Concluded by:
• Dr Gary C. Young is an expert in industrial processes
and the author of recently published book ‘Municipal
Solid Waste To Energy Conversion Processes;
Economic, Technical and Renewable Comparisons’
e-mail: gycoinc@aol.com
•
10. Advantages & Benefits
• Economical – Less costly than conventional WtE
options.
• e.g. Site C Peace River Dam can be replaced with our
technology at CDN 1.2 billion instead of CDN 8 billion.
Completed within 2 years instead of 8 years.
• Short term ROI – profitable Return on Investment
• (Income from sales of energy, syn gas, clean water)
• Financial support from international Swiss bank & USA
financial institutions. Not approach local banks yet.
• Not tax payers.
11. Social & Economic Benefits
• No need to truck wastes to landfills
• Reduce transportation costs & tipping fees
• Provide training and employment to locals to operate
WtE facilities
• Provide partnership opportunities to local entrepreneurs.
• Attractive return on investment.
• Sales of by-products provide loyalty or fee-sharing
opportunities to local municipal councils to offset
reduced tipping fees at landfills.
12. Advantages
• Compact in size - PCS is size of a basketball court
(up to 50MW) or a football field (200MW)
• Modular system, scalable easily
• Prefabricated in Europe, shipped on trailer to any
location of country of destination.
• Quick to set up - From feasibility study, to
installation & commissioning – 12 to 18 months.