Outline of Presentation
• London’s Crossrail scheme – brief description
• The long evolution of Crossrail:
– CLRS and decision not to proceed
– A deviation - Transport and the economy - evidence of transport ‘s
contribution to economic growth
– Crossrail after 2000
• Changes to institutions and economic appraisal methods
• The case for Crossrail strengthened
• Funding and financing
• Governance
• Crossrail 2 - a new proposal for the 2030s
• Conclusions
London
• 1,579km2
• 8.7m residents and growing fast, 10m by
2030?
• 30 million visitors per annum
• 28.4 million journeys per day
• 70 per cent of all UK rail journeys start or
end in London or South East
• I.3 m people commute each day to the
Central Area and Docklands: 90% public
transport, car only 5%
• 32 boroughs, plus ancient City of London
3
4
Route of Crossrail
• Joins Great Western suburban services to Great Eastern
and to South Eastern in Thames Gateway development
area with Heathrow link
• 2x21km new tunnels through Central London – 7 Central
London stations, all with interchange
• 2xnin Thames Gateway development areak shopping
districts (West End), financial districts (City of London,
Canary Wharf) and Heathrow Airport
Key Facts
• First cross-city suburban rail link in London: will increase Central Area
rail capacity by 10%
• 9 stations rebuilt and 28 upgraded
• 24 trains per hour in each direction during peak
• Tunnelling completed 2016: first new trains delivered
• Construction started 2009: open end 2018
• Journey times: Liverpool St - Heathrow 23 mins(55 now),
Paddington - Canary Wharf 14 mins (30 now)
5
Evolution of the Crossrail
scheme – 60 years gestation
1944 Abercrombie Plan
Post war redevelopment of London – two new tube lines proposed –
Victoria line opened 1969
1974 London Rail Study
Government report. Proposed east – west link between Paddington and
Liverpool St stations, noting success of such schemes in Paris and Munich.
Cost £300m – no funding
1980 British Rail Discussion Paper
North-south cross London link for inter-city trains
1987-9 Central London Rail Study
Joint study by Central Government, British Rail and London Regional Transport
Economic Appraisal at the
time of CLRS
• Cost benefit analysis well established in UK as a means of providing transport
decision makers (ministers, parliament and local government) with information to
help prioritise and accept/reject options
• Treasury Green Book supplemented by Transport Department’s COBA
• Mainly use was for highways and some local tram/bus infrastructure: until c2000
rail demand was flat and investment concerned with minimum full life cost
replacement of assets, with enhancements (eg new better rolling stock) being
justified against revenue from selective increases in fares.
• CBA influential in establishing public interest in the case of land purchase for
schemes and value for money to Parliament
• Methods subjected to external expert scrutiny and advice by Standing Advisory
Committee on Trunk Road Assessment (SACTRA)
Central London Rail Study
1989
• The Problem - Overcrowding in Central London and at main
line terminus interchange stations.
• Two broad sets of solutions:
– New deep level limited capacity underground (tube) lines
– Cross London links joining existing suburban lines either side of
London with large diameter tunnels
• Cross London links delivered bigger reduction in crowding
and had higher benefit:cost ratios.
• Best options – East- West Crossrail and a North-South
scheme, linking Euston with Victoria. Chelsea-Hackney, a
north east – south west tube sized route was also short-
listed
Measuring and valuing the
costs and benefits: CLRS
• Transport model: changes in the volume and quality of travel
• LTS and RAILPLAN – Fixed employment, fixed trip totals - route, mode
and destination choice allowed to change. Model estimated changes in
Generalised Costs and contained GC elasticities for response to new
travel cost matrix.
• Valuing of the benefits/costs of an option compared with ‘base case in
terms of;
• Time savings, including rail crowding and road congestion reduction –
mode shift effect
• Other journey quality – stations, interchange
• Additional rail revenues
• Changes in costs, including infrastructure and taxes – transport user,
operators and government
Central London Rail Study
(1989) and E-W Crossrail
• Benefit cost ratio – 1.6:1 – low when compared with inter-
urban roads
• High cost scheme – infrastructure costs of £ 870m 1988
prices (£2.0bn today)
• Government assessment of Study:
– Further needed work on funding - beneficiaries were fare paying
London rail passengers, who should pay
– Contributions should be forthcoming from property owners and
developers
– Possible government subsidy for road congestion relief.
• 1990 recession – decline in commuting – Parliament
rejected the scheme in 1994 - no further work undertaken
Status of the Crossrail
Scheme in the 1990s
• High capital cost – only modest benefits
• No easy resolution of funding problem:
– London had introduced zonal fares in mid 1980s
• No good reason for large public subsidy:
– Main beneficiaries rail passengers in London
– No evidence of benefits to rest of UK
• No scheme ‘champion’
• Many policy ‘diversions’
– Privatisation of British Rail
– Jubilee Line Extension to Docklands under construction
Transport and the Economy
• SACTRA (1999) Report ‘Transport and the Economy’
• Reviewed links between transport investment and the
economy
• Identified inadequacies in conventional CBA:
– Positive externalities from transport – urban agglomeration benefits
- Knowledge transfer and spill-overs
- Sharing – public goods
- Matching - people, jobs, products, firms, goods – more efficient markets
– Changes in the location of economic activity – successful cities
attract innovation, specialisation and skills
• DfT programme of research
Identification and Quantification of Wider
Economic Impacts
• Benefits additional to conventional Transport User Benefits
– Agglomeration effects
• Effective density – accessibility, employment density and
productivity
– Static – increasing accessibility raised productivity
– Dynamic – increasing accessibility leads to change in the
location of activity towards more productive places, further
increasing productivity
– Labour supply effects
• Lower transport costs increases labour market participation
• Move to more productive jobs – creating dynamic agglomeration
Relevance of Wider Benefits
to Transport Policy
• An increase in BCRs of urban schemes relative to highways
– ‘Value for Money’, defined in terms of the BCR, an important
influence on decisions
• Evidence of transport’s role in increasing productivity and
contributing to higher economic growth
– No other Government Department could produce evidence of their
spending having such a direct link to productivity
London 1990-2000 – Governance,
Institutions and Reform
• Between 1986 and 2000 there was no central strategic
planning body for London - Thatcher abolished the GLC
• London Regional Transport (1986-2000) directly controlled
by Central Government
• New governance structure with powers devolved from
Central Government set up in 2000
• Greater London Authority – elected body responsible for
planning and strategy headed by Mayor
• Transport for London reports to the GLA – the 32 boroughs
transport powers limited to local roads
Crossrail – post 2000
• 2000 Government’s Transport Ten Year Plan included
Crossrail
• 2002 CLRL established by SRA and TfL: New business
case
• 2005 Montagu review of Business Case to ensure
deliverability and funding
• 2005 Updated business case – WEBs
• 2007 Go ahead in Government’s annual Spending Review
• 2007-10 Supplementary Business Rate
• 2005-8 Crossrail Bill/royal assent
• 2009 Start of works
What had Changed?
• Institutions
– Mayor of London to act as ‘champion’ from 2000 with responsibility fro
Transport for London
– Blair Government ambitions – 10 Year Transport Plan (mostly unrealised)
– New powers enabling Mayor to raise additional tax on property and to
negotiate a levy on developers
– Strategic Rail Authority to provide strategic direction for the now privatised
railway from 1999
• Economic Appraisal
– Implementation of Wider Economic Benefits guidance;
• Increased the BCR to acceptable levels
• Demonstrated link between Crossrail and economic growth – UK
economy gains, not only London rail passengers
• Location of GDP effects mapped to London boroughs to provide
evidence for the business rate (tax) supplement
WEBs and Crossrail
• Conventional BCR 1.9:1
• Static agglomeration benefits raised this to 3.1:1
• Move to More Productive Jobs – dynamic agglomeration
– No LUTI or other model available
– Simple, transparent approach:
• Time series cordon data showed peak period crowding a
constraint on growth and ‘attainable’ levels of crowding
• Analysis of employment densities showed other cities’ CBD more
jobs per km² than London
• Assumption – new capacity would fill up to ‘attainable’ levels over
time with between 26k and 70k workers moving from elsewhere
• BCR increased to 3.5 for low jobs move assumption
Composition of Crossrail
benefits post Wider Impacts
Category of Benefit Benefits £bn 2002 prices
DfT TfL
Public transport users; commuting and
leisure
6.1
Public transport users - business 4.1
Road users; commuting and leisure 1.6
Road users; business 0.6
Indirect tax change -1.4
Total transport user benefits 11.0 15.5
Static Agglomeration 3.1
Move to more productive jobs 2.0
Labour force participation 0.8
Imperfect competition 0.5
Total Wider Impacts 6.4 7.0-18.0
Realising Crossrail’s Wider
Benefits
• Pressure by London businesses from mid-1990s for better
public transport – London First business based lobby group
proposed local funding
• Importance of ‘fairness’ – no special subsidy for London
• Powers delegated to London’s mayor to add a
supplementary charge on the business rate (BRS) of 2% on
the rateable value – broadly a 4% increase in tax paid
• Wider impacts modelling showed where by zone businesses
would benefit from increased access to labour and higher
productivity – most of London gains some benefits
• Special Crossrail BRS imposed from 2010
Crossrail Funding £ billion
• Central Government 4.7
• Business
– Business Rates Supplement 4.1
– Developer Contributions 1.1
• Fare payer 4.9
• Total scheme cost 14.8
• “On time, on budget”, Terry Morgan, Chairman
Crossrail Funding – details of
London’s contribution
• Business Rates Supplement
- Supplement of 2p per £ of rateable value for larger business
premises (occupation tax on commercial property) - approximately a
4% increase in the tax
• Developer contributions – £1.1 billion – from new buildings
- Community Infrastructure Levy (CIL) and
developer contributions £0.6 billion
- City of London / BAA (Heathrow) £0.5 billion
• Plus over station development, say £0.5 billion, treated as reduced costs
Crossrail: Governance for
Delivery
Crossrail Governance – why it
worked
• Joint sponsor board to align the two sponsors’ interests – outputs and constraints
• Sponsors requirements set out in Project Delivery Agreement, which gives
certainty of funding
• CRL – delivery agent – separate from sponsors
• CRL board responsible for overseeing/incentivising delivery, challenges sponsors
wanting change, reports 6 monthly to sponsors
• Private sector tendering/contracting practices used by CRL – experience from
CTRL
• CRL consults industry and works with local stakeholders/interest groups but no
contractual relationship
• Risks of cost overruns – first tranche of any overrun from TfL’s contingency, next
from DfT’s and risk sharing with contractors
Governance: Train and
Infrastructure Operations
• Infrastructure operated and maintained by Transport for
London
• Train service operated by the MTR Corporation under a
£1.4bn 8 year (plus 2 more optional years) management
contract drawn up by TfL through competitive tender
– Transfer to of existing services operated under DfT franchise to TfL
– Services specified by TfL
– Revenue risk with TfL – all revenues paid to TfL
– Performance objectives with penalties and bonuses
• Conventional arrangement for TfL Overground (but
underground operated directly by TfL) – all other GB rail
franchised with revenue risk (usually) taken by operator
Crossrail 2 – North East to
South West
• What?
– 2x38km new tunnels connecting in to
suburban rail from North East to South West
– 10% increase in rail capacity
– High frequency – 30 trains per hour in
Central Area
• Why?
– Supports London’s growth – more CBD jobs
– Addresses capacity constrains in CDB and
on main line suburban routes and stations
– Relief for Waterloo, London’s busiest
station >100,000 passengers morning peak
– Makes land accessible for housing –
200,000 ne w homes
• Cost
– £33.5 bn
Crossrail 2 – From the Incremental to
the Transformational
• Crossrail 1 approach to estimating relocation of jobs ( filling
capacity) not applicable:
– Demand ‘created’ through additional housing
– Intention is to improve service quality – below crush capacity
– Hypothesis that supply creates demand questionable
– Need to show where relocated jobs had come from
– Developments in modelling since 2007
• LONLUTI – transport/land use interaction model for London
with ‘bolt-on’ model to estimate GDP effects of location
change.
Crossrail 2 Appraisal of Wider
Benefits
• LUTI model for London – LONLUTI:
– to estimate responses to changes in accessibility of households, of
firms andof developers of housing land and business floorspace
– Increases in housing and business floorspace constrained by
planning policies, influenced by accessibility
– Regional economic model, to estimate firms’ responses to transport
cost and labour cost changes
• Main use of LUTI model:
– Feedback loop of location change on transport network
– Relocation of firms/jobs to more or less productive places
Conclusions: Success of
Crossrail 1
• Conventional BCR ‘good enough’: still better with Wider Benefits
• Strong political support: national and London policy champions.
• Funding by beneficiaries made possible by:
– New powers for local revenue raising – BRS
– Mapping of benefits using transport model and appraisal
• Evidence from appraisal of GDP effect demonstrated:
– Project contributed to government policy objective – productivity growth
– Benefits for all UK, not only for London
• So investment in London not ‘unfair’ – politically acceptable
• Sound model for governance established
Crossrail 2: Prospects
• More than just a transport scheme – intended to change level and
location of economic activity
• Predicting how Crossrail 2 might transform a place is difficult –
precedent is weak, outcomes depend on many agents and are very
uncertain
• LUTI models can help but:
– Are complex, ‘black box’ models
– Are unvalidated and difficult to challenge
• Governance for Crossrail 2 will be difficult – many agents, need to avoid
strategic game playing
• But Crossrail 2 not alone in its low BCR – costs for all transport schemes
rising faster than benefits
• Politics – Brexit: effect on London employment versus Britain being
‘open for business’

Weitere ähnliche Inhalte

Was ist angesagt?

Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...WRI Ross Center for Sustainable Cities
 
Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...
Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...
Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...Alejandro Lozano Robledo
 
Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...Atkins
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchSunil Dayma
 
1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf
1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf
1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdfSEANROMMEL
 
comprehensive mobality plan of vellore
comprehensive mobality plan of vellorecomprehensive mobality plan of vellore
comprehensive mobality plan of velloreSatyam Rai
 
Land use transportation relation
Land use  transportation relationLand use  transportation relation
Land use transportation relationSiddhi Vakharia
 
Solving Traffic Congestion Through Transit-Oriented Development: Implementati...
Solving Traffic Congestion Through Transit-Oriented Development: Implementati...Solving Traffic Congestion Through Transit-Oriented Development: Implementati...
Solving Traffic Congestion Through Transit-Oriented Development: Implementati...NathanielNorada
 
Metro & Light Rail Projects in Saudi Arabia
Metro & Light Rail Projects in Saudi ArabiaMetro & Light Rail Projects in Saudi Arabia
Metro & Light Rail Projects in Saudi ArabiaIbrahim Al-Hudhaif
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeTristan Wiggill
 
Concept of Gender-Based Inclusive urban planning for Urban Areas
Concept of Gender-Based Inclusive urban planning for Urban Areas Concept of Gender-Based Inclusive urban planning for Urban Areas
Concept of Gender-Based Inclusive urban planning for Urban Areas SHALINIKESHRI4
 

Was ist angesagt? (20)

Dr. amjad bangash bechtel
Dr. amjad bangash   bechtelDr. amjad bangash   bechtel
Dr. amjad bangash bechtel
 
Walkable city
Walkable cityWalkable city
Walkable city
 
Road Safety and Bus Rapid Transit
Road Safety and Bus Rapid TransitRoad Safety and Bus Rapid Transit
Road Safety and Bus Rapid Transit
 
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
 
Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...
Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...
Masters Thesis Presentation - A proposal for a Cincinnati - Dayton mass trans...
 
Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary research
 
1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf
1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf
1 Urban Planning and Urban Design Urban Planning ( PDFDrive ).pdf
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
comprehensive mobality plan of vellore
comprehensive mobality plan of vellorecomprehensive mobality plan of vellore
comprehensive mobality plan of vellore
 
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
 
Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
 
Land use transportation relation
Land use  transportation relationLand use  transportation relation
Land use transportation relation
 
Linear city
Linear cityLinear city
Linear city
 
Solving Traffic Congestion Through Transit-Oriented Development: Implementati...
Solving Traffic Congestion Through Transit-Oriented Development: Implementati...Solving Traffic Congestion Through Transit-Oriented Development: Implementati...
Solving Traffic Congestion Through Transit-Oriented Development: Implementati...
 
Metro & Light Rail Projects in Saudi Arabia
Metro & Light Rail Projects in Saudi ArabiaMetro & Light Rail Projects in Saudi Arabia
Metro & Light Rail Projects in Saudi Arabia
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
 
Concept of Gender-Based Inclusive urban planning for Urban Areas
Concept of Gender-Based Inclusive urban planning for Urban Areas Concept of Gender-Based Inclusive urban planning for Urban Areas
Concept of Gender-Based Inclusive urban planning for Urban Areas
 
BRTS
BRTSBRTS
BRTS
 

Andere mochten auch

3. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV0110153. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV011015Association for Project Management
 
Crossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United KingdomCrossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United KingdomOECD Governance
 
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015Association for Project Management
 
3. Ross Garland - building governance capability - challenges facing good gov...
3. Ross Garland - building governance capability - challenges facing good gov...3. Ross Garland - building governance capability - challenges facing good gov...
3. Ross Garland - building governance capability - challenges facing good gov...Association for Project Management
 
Project Governance and Failure
Project Governance and FailureProject Governance and Failure
Project Governance and FailureMichael Krigsman
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance StructureSaurabh Sardesai
 

Andere mochten auch (14)

1. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV0110151. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV011015
 
3. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV0110153. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV011015
 
Crossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United KingdomCrossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United Kingdom
 
Risk and assurance on crossrail - rob halstead
Risk and assurance on crossrail - rob halsteadRisk and assurance on crossrail - rob halstead
Risk and assurance on crossrail - rob halstead
 
4. Stuart Collins BBC - strategic governance of p3m GOV011015
4. Stuart Collins BBC - strategic governance of p3m GOV0110154. Stuart Collins BBC - strategic governance of p3m GOV011015
4. Stuart Collins BBC - strategic governance of p3m GOV011015
 
5. Simon Adams - Crossrail governance GOV011015
5. Simon Adams - Crossrail governance GOV0110155. Simon Adams - Crossrail governance GOV011015
5. Simon Adams - Crossrail governance GOV011015
 
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
 
3. Ross Garland - building governance capability - challenges facing good gov...
3. Ross Garland - building governance capability - challenges facing good gov...3. Ross Garland - building governance capability - challenges facing good gov...
3. Ross Garland - building governance capability - challenges facing good gov...
 
1. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV0110151. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV011015
 
4. Ian Triplow - developing good governance... GOV011015
4. Ian Triplow - developing good governance... GOV0110154. Ian Triplow - developing good governance... GOV011015
4. Ian Triplow - developing good governance... GOV011015
 
2. Amerjit Walia - delivering good governance for p3m GOV011015
2. Amerjit Walia - delivering good governance for p3m GOV0110152. Amerjit Walia - delivering good governance for p3m GOV011015
2. Amerjit Walia - delivering good governance for p3m GOV011015
 
Crossrail: lessons in governance
Crossrail: lessons in governanceCrossrail: lessons in governance
Crossrail: lessons in governance
 
Project Governance and Failure
Project Governance and FailureProject Governance and Failure
Project Governance and Failure
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 

Ähnlich wie London's Crossrail Scheme - its evolution, governance, financing and challenges

Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesInstitute for Transport Studies (ITS)
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation Sandra Idio
 
10 Nov Future of Transport
10 Nov Future of Transport10 Nov Future of Transport
10 Nov Future of Transportfutureoflondon
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentationFBE Manchester
 
Doing more with less - LBI
Doing more with less - LBIDoing more with less - LBI
Doing more with less - LBIChristian Bode
 
Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...
Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...
Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...Institute for Transport Studies (ITS)
 
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsIPPAI
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarksCrosstown TO
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of CrossrailEton College
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrailtutor2u
 
Routes to Clean Air 2016 - Dr Jon Lamonte, Transport for Greater Manchester
Routes to Clean Air 2016  -  Dr Jon Lamonte, Transport for Greater ManchesterRoutes to Clean Air 2016  -  Dr Jon Lamonte, Transport for Greater Manchester
Routes to Clean Air 2016 - Dr Jon Lamonte, Transport for Greater ManchesterIES / IAQM
 
West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017Association for Project Management
 
Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...Association for Project Management
 

Ähnlich wie London's Crossrail Scheme - its evolution, governance, financing and challenges (20)

Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation
 
London residential summit
London residential summitLondon residential summit
London residential summit
 
10 Nov Future of Transport
10 Nov Future of Transport10 Nov Future of Transport
10 Nov Future of Transport
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentation
 
Doing more with less - LBI
Doing more with less - LBIDoing more with less - LBI
Doing more with less - LBI
 
Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...
Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...
Transport Projects Aimed at Fostering Economic Growth – experience in the UK ...
 
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
 
Transport in london
 Transport in london  Transport in london
Transport in london
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarks
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrail
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrail
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Routes to Clean Air 2016 - Dr Jon Lamonte, Transport for Greater Manchester
Routes to Clean Air 2016  -  Dr Jon Lamonte, Transport for Greater ManchesterRoutes to Clean Air 2016  -  Dr Jon Lamonte, Transport for Greater Manchester
Routes to Clean Air 2016 - Dr Jon Lamonte, Transport for Greater Manchester
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...Project and Programme Management, a profession at the heart of the London and...
Project and Programme Management, a profession at the heart of the London and...
 

Mehr von Institute for Transport Studies (ITS)

A clustering method based on repeated trip behaviour to identify road user cl...
A clustering method based on repeated trip behaviour to identify road user cl...A clustering method based on repeated trip behaviour to identify road user cl...
A clustering method based on repeated trip behaviour to identify road user cl...Institute for Transport Studies (ITS)
 
Social networks, activities, and travel - building links to understand behaviour
Social networks, activities, and travel - building links to understand behaviourSocial networks, activities, and travel - building links to understand behaviour
Social networks, activities, and travel - building links to understand behaviourInstitute for Transport Studies (ITS)
 
Agent based car following model for heterogeneities of platoon driving with v...
Agent based car following model for heterogeneities of platoon driving with v...Agent based car following model for heterogeneities of platoon driving with v...
Agent based car following model for heterogeneities of platoon driving with v...Institute for Transport Studies (ITS)
 
Shipping by the crowd - empirical analysis of operations and behavior
Shipping by the crowd - empirical analysis of operations and behaviorShipping by the crowd - empirical analysis of operations and behavior
Shipping by the crowd - empirical analysis of operations and behaviorInstitute for Transport Studies (ITS)
 
Towards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaTowards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaInstitute for Transport Studies (ITS)
 

Mehr von Institute for Transport Studies (ITS) (20)

BA Geography with Transport Studies at the University of Leeds
BA Geography with Transport Studies at the University of LeedsBA Geography with Transport Studies at the University of Leeds
BA Geography with Transport Studies at the University of Leeds
 
Highways Benchmarking - Accelerating Impact
Highways Benchmarking - Accelerating ImpactHighways Benchmarking - Accelerating Impact
Highways Benchmarking - Accelerating Impact
 
Using telematics data to research traffic related air pollution
Using telematics data to research traffic related air pollutionUsing telematics data to research traffic related air pollution
Using telematics data to research traffic related air pollution
 
Masters Dissertation Posters 2017
Masters Dissertation Posters 2017Masters Dissertation Posters 2017
Masters Dissertation Posters 2017
 
Institute for Transport Studies - Masters Open Day 2017
Institute for Transport Studies - Masters Open Day 2017Institute for Transport Studies - Masters Open Day 2017
Institute for Transport Studies - Masters Open Day 2017
 
Secretary of State Visit
Secretary of State VisitSecretary of State Visit
Secretary of State Visit
 
Business model innovation for electrical vehicle futures
Business model innovation for electrical vehicle futuresBusiness model innovation for electrical vehicle futures
Business model innovation for electrical vehicle futures
 
A clustering method based on repeated trip behaviour to identify road user cl...
A clustering method based on repeated trip behaviour to identify road user cl...A clustering method based on repeated trip behaviour to identify road user cl...
A clustering method based on repeated trip behaviour to identify road user cl...
 
Cars cars everywhere
Cars cars everywhereCars cars everywhere
Cars cars everywhere
 
Annual Review 2015-16 - University of leeds
Annual Review 2015-16 - University of leedsAnnual Review 2015-16 - University of leeds
Annual Review 2015-16 - University of leeds
 
Social networks, activities, and travel - building links to understand behaviour
Social networks, activities, and travel - building links to understand behaviourSocial networks, activities, and travel - building links to understand behaviour
Social networks, activities, and travel - building links to understand behaviour
 
Rail freight in Japan - track access
Rail freight in Japan - track accessRail freight in Japan - track access
Rail freight in Japan - track access
 
Real time traffic management - challenges and solutions
Real time traffic management - challenges and solutionsReal time traffic management - challenges and solutions
Real time traffic management - challenges and solutions
 
Proportionally fair scheduling for traffic light networks
Proportionally fair scheduling for traffic light networksProportionally fair scheduling for traffic light networks
Proportionally fair scheduling for traffic light networks
 
Capacity maximising traffic signal control policies
Capacity maximising traffic signal control policiesCapacity maximising traffic signal control policies
Capacity maximising traffic signal control policies
 
Bayesian risk assessment of autonomous vehicles
Bayesian risk assessment of autonomous vehiclesBayesian risk assessment of autonomous vehicles
Bayesian risk assessment of autonomous vehicles
 
Agent based car following model for heterogeneities of platoon driving with v...
Agent based car following model for heterogeneities of platoon driving with v...Agent based car following model for heterogeneities of platoon driving with v...
Agent based car following model for heterogeneities of platoon driving with v...
 
A new theory of lane selection on highways
A new theory of lane selection on highwaysA new theory of lane selection on highways
A new theory of lane selection on highways
 
Shipping by the crowd - empirical analysis of operations and behavior
Shipping by the crowd - empirical analysis of operations and behaviorShipping by the crowd - empirical analysis of operations and behavior
Shipping by the crowd - empirical analysis of operations and behavior
 
Towards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaTowards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in Ghana
 

Kürzlich hochgeladen

Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiMonica Sydney
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlMonica Sydney
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServicePriya Reddy
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...kumargunjan9515
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...Sareena Khatun
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxarnab132
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...robinsonayot
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...Sareena Khatun
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...kumargunjan9515
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...kumargunjan9515
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 

Kürzlich hochgeladen (20)

Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 

London's Crossrail Scheme - its evolution, governance, financing and challenges

  • 1. Institute for Transport Studies FACULTY OF ENVIRONMENT London’s Crossrail Scheme- its evolution, governance, financing and challenges Workshop on transport investment – London, Paris and New York 22nd March 2017 Tom Worsley Visiting Fellow
  • 2. Outline of Presentation • London’s Crossrail scheme – brief description • The long evolution of Crossrail: – CLRS and decision not to proceed – A deviation - Transport and the economy - evidence of transport ‘s contribution to economic growth – Crossrail after 2000 • Changes to institutions and economic appraisal methods • The case for Crossrail strengthened • Funding and financing • Governance • Crossrail 2 - a new proposal for the 2030s • Conclusions
  • 3. London • 1,579km2 • 8.7m residents and growing fast, 10m by 2030? • 30 million visitors per annum • 28.4 million journeys per day • 70 per cent of all UK rail journeys start or end in London or South East • I.3 m people commute each day to the Central Area and Docklands: 90% public transport, car only 5% • 32 boroughs, plus ancient City of London 3
  • 4. 4 Route of Crossrail • Joins Great Western suburban services to Great Eastern and to South Eastern in Thames Gateway development area with Heathrow link • 2x21km new tunnels through Central London – 7 Central London stations, all with interchange • 2xnin Thames Gateway development areak shopping districts (West End), financial districts (City of London, Canary Wharf) and Heathrow Airport
  • 5. Key Facts • First cross-city suburban rail link in London: will increase Central Area rail capacity by 10% • 9 stations rebuilt and 28 upgraded • 24 trains per hour in each direction during peak • Tunnelling completed 2016: first new trains delivered • Construction started 2009: open end 2018 • Journey times: Liverpool St - Heathrow 23 mins(55 now), Paddington - Canary Wharf 14 mins (30 now) 5
  • 6. Evolution of the Crossrail scheme – 60 years gestation 1944 Abercrombie Plan Post war redevelopment of London – two new tube lines proposed – Victoria line opened 1969 1974 London Rail Study Government report. Proposed east – west link between Paddington and Liverpool St stations, noting success of such schemes in Paris and Munich. Cost £300m – no funding 1980 British Rail Discussion Paper North-south cross London link for inter-city trains 1987-9 Central London Rail Study Joint study by Central Government, British Rail and London Regional Transport
  • 7. Economic Appraisal at the time of CLRS • Cost benefit analysis well established in UK as a means of providing transport decision makers (ministers, parliament and local government) with information to help prioritise and accept/reject options • Treasury Green Book supplemented by Transport Department’s COBA • Mainly use was for highways and some local tram/bus infrastructure: until c2000 rail demand was flat and investment concerned with minimum full life cost replacement of assets, with enhancements (eg new better rolling stock) being justified against revenue from selective increases in fares. • CBA influential in establishing public interest in the case of land purchase for schemes and value for money to Parliament • Methods subjected to external expert scrutiny and advice by Standing Advisory Committee on Trunk Road Assessment (SACTRA)
  • 8. Central London Rail Study 1989 • The Problem - Overcrowding in Central London and at main line terminus interchange stations. • Two broad sets of solutions: – New deep level limited capacity underground (tube) lines – Cross London links joining existing suburban lines either side of London with large diameter tunnels • Cross London links delivered bigger reduction in crowding and had higher benefit:cost ratios. • Best options – East- West Crossrail and a North-South scheme, linking Euston with Victoria. Chelsea-Hackney, a north east – south west tube sized route was also short- listed
  • 9. Measuring and valuing the costs and benefits: CLRS • Transport model: changes in the volume and quality of travel • LTS and RAILPLAN – Fixed employment, fixed trip totals - route, mode and destination choice allowed to change. Model estimated changes in Generalised Costs and contained GC elasticities for response to new travel cost matrix. • Valuing of the benefits/costs of an option compared with ‘base case in terms of; • Time savings, including rail crowding and road congestion reduction – mode shift effect • Other journey quality – stations, interchange • Additional rail revenues • Changes in costs, including infrastructure and taxes – transport user, operators and government
  • 10. Central London Rail Study (1989) and E-W Crossrail • Benefit cost ratio – 1.6:1 – low when compared with inter- urban roads • High cost scheme – infrastructure costs of £ 870m 1988 prices (£2.0bn today) • Government assessment of Study: – Further needed work on funding - beneficiaries were fare paying London rail passengers, who should pay – Contributions should be forthcoming from property owners and developers – Possible government subsidy for road congestion relief. • 1990 recession – decline in commuting – Parliament rejected the scheme in 1994 - no further work undertaken
  • 11. Status of the Crossrail Scheme in the 1990s • High capital cost – only modest benefits • No easy resolution of funding problem: – London had introduced zonal fares in mid 1980s • No good reason for large public subsidy: – Main beneficiaries rail passengers in London – No evidence of benefits to rest of UK • No scheme ‘champion’ • Many policy ‘diversions’ – Privatisation of British Rail – Jubilee Line Extension to Docklands under construction
  • 12. Transport and the Economy • SACTRA (1999) Report ‘Transport and the Economy’ • Reviewed links between transport investment and the economy • Identified inadequacies in conventional CBA: – Positive externalities from transport – urban agglomeration benefits - Knowledge transfer and spill-overs - Sharing – public goods - Matching - people, jobs, products, firms, goods – more efficient markets – Changes in the location of economic activity – successful cities attract innovation, specialisation and skills • DfT programme of research
  • 13. Identification and Quantification of Wider Economic Impacts • Benefits additional to conventional Transport User Benefits – Agglomeration effects • Effective density – accessibility, employment density and productivity – Static – increasing accessibility raised productivity – Dynamic – increasing accessibility leads to change in the location of activity towards more productive places, further increasing productivity – Labour supply effects • Lower transport costs increases labour market participation • Move to more productive jobs – creating dynamic agglomeration
  • 14. Relevance of Wider Benefits to Transport Policy • An increase in BCRs of urban schemes relative to highways – ‘Value for Money’, defined in terms of the BCR, an important influence on decisions • Evidence of transport’s role in increasing productivity and contributing to higher economic growth – No other Government Department could produce evidence of their spending having such a direct link to productivity
  • 15. London 1990-2000 – Governance, Institutions and Reform • Between 1986 and 2000 there was no central strategic planning body for London - Thatcher abolished the GLC • London Regional Transport (1986-2000) directly controlled by Central Government • New governance structure with powers devolved from Central Government set up in 2000 • Greater London Authority – elected body responsible for planning and strategy headed by Mayor • Transport for London reports to the GLA – the 32 boroughs transport powers limited to local roads
  • 16. Crossrail – post 2000 • 2000 Government’s Transport Ten Year Plan included Crossrail • 2002 CLRL established by SRA and TfL: New business case • 2005 Montagu review of Business Case to ensure deliverability and funding • 2005 Updated business case – WEBs • 2007 Go ahead in Government’s annual Spending Review • 2007-10 Supplementary Business Rate • 2005-8 Crossrail Bill/royal assent • 2009 Start of works
  • 17. What had Changed? • Institutions – Mayor of London to act as ‘champion’ from 2000 with responsibility fro Transport for London – Blair Government ambitions – 10 Year Transport Plan (mostly unrealised) – New powers enabling Mayor to raise additional tax on property and to negotiate a levy on developers – Strategic Rail Authority to provide strategic direction for the now privatised railway from 1999 • Economic Appraisal – Implementation of Wider Economic Benefits guidance; • Increased the BCR to acceptable levels • Demonstrated link between Crossrail and economic growth – UK economy gains, not only London rail passengers • Location of GDP effects mapped to London boroughs to provide evidence for the business rate (tax) supplement
  • 18. WEBs and Crossrail • Conventional BCR 1.9:1 • Static agglomeration benefits raised this to 3.1:1 • Move to More Productive Jobs – dynamic agglomeration – No LUTI or other model available – Simple, transparent approach: • Time series cordon data showed peak period crowding a constraint on growth and ‘attainable’ levels of crowding • Analysis of employment densities showed other cities’ CBD more jobs per km² than London • Assumption – new capacity would fill up to ‘attainable’ levels over time with between 26k and 70k workers moving from elsewhere • BCR increased to 3.5 for low jobs move assumption
  • 19. Composition of Crossrail benefits post Wider Impacts Category of Benefit Benefits £bn 2002 prices DfT TfL Public transport users; commuting and leisure 6.1 Public transport users - business 4.1 Road users; commuting and leisure 1.6 Road users; business 0.6 Indirect tax change -1.4 Total transport user benefits 11.0 15.5 Static Agglomeration 3.1 Move to more productive jobs 2.0 Labour force participation 0.8 Imperfect competition 0.5 Total Wider Impacts 6.4 7.0-18.0
  • 20. Realising Crossrail’s Wider Benefits • Pressure by London businesses from mid-1990s for better public transport – London First business based lobby group proposed local funding • Importance of ‘fairness’ – no special subsidy for London • Powers delegated to London’s mayor to add a supplementary charge on the business rate (BRS) of 2% on the rateable value – broadly a 4% increase in tax paid • Wider impacts modelling showed where by zone businesses would benefit from increased access to labour and higher productivity – most of London gains some benefits • Special Crossrail BRS imposed from 2010
  • 21. Crossrail Funding £ billion • Central Government 4.7 • Business – Business Rates Supplement 4.1 – Developer Contributions 1.1 • Fare payer 4.9 • Total scheme cost 14.8 • “On time, on budget”, Terry Morgan, Chairman
  • 22. Crossrail Funding – details of London’s contribution • Business Rates Supplement - Supplement of 2p per £ of rateable value for larger business premises (occupation tax on commercial property) - approximately a 4% increase in the tax • Developer contributions – £1.1 billion – from new buildings - Community Infrastructure Levy (CIL) and developer contributions £0.6 billion - City of London / BAA (Heathrow) £0.5 billion • Plus over station development, say £0.5 billion, treated as reduced costs
  • 24. Crossrail Governance – why it worked • Joint sponsor board to align the two sponsors’ interests – outputs and constraints • Sponsors requirements set out in Project Delivery Agreement, which gives certainty of funding • CRL – delivery agent – separate from sponsors • CRL board responsible for overseeing/incentivising delivery, challenges sponsors wanting change, reports 6 monthly to sponsors • Private sector tendering/contracting practices used by CRL – experience from CTRL • CRL consults industry and works with local stakeholders/interest groups but no contractual relationship • Risks of cost overruns – first tranche of any overrun from TfL’s contingency, next from DfT’s and risk sharing with contractors
  • 25. Governance: Train and Infrastructure Operations • Infrastructure operated and maintained by Transport for London • Train service operated by the MTR Corporation under a £1.4bn 8 year (plus 2 more optional years) management contract drawn up by TfL through competitive tender – Transfer to of existing services operated under DfT franchise to TfL – Services specified by TfL – Revenue risk with TfL – all revenues paid to TfL – Performance objectives with penalties and bonuses • Conventional arrangement for TfL Overground (but underground operated directly by TfL) – all other GB rail franchised with revenue risk (usually) taken by operator
  • 26. Crossrail 2 – North East to South West • What? – 2x38km new tunnels connecting in to suburban rail from North East to South West – 10% increase in rail capacity – High frequency – 30 trains per hour in Central Area • Why? – Supports London’s growth – more CBD jobs – Addresses capacity constrains in CDB and on main line suburban routes and stations – Relief for Waterloo, London’s busiest station >100,000 passengers morning peak – Makes land accessible for housing – 200,000 ne w homes • Cost – £33.5 bn
  • 27. Crossrail 2 – From the Incremental to the Transformational • Crossrail 1 approach to estimating relocation of jobs ( filling capacity) not applicable: – Demand ‘created’ through additional housing – Intention is to improve service quality – below crush capacity – Hypothesis that supply creates demand questionable – Need to show where relocated jobs had come from – Developments in modelling since 2007 • LONLUTI – transport/land use interaction model for London with ‘bolt-on’ model to estimate GDP effects of location change.
  • 28. Crossrail 2 Appraisal of Wider Benefits • LUTI model for London – LONLUTI: – to estimate responses to changes in accessibility of households, of firms andof developers of housing land and business floorspace – Increases in housing and business floorspace constrained by planning policies, influenced by accessibility – Regional economic model, to estimate firms’ responses to transport cost and labour cost changes • Main use of LUTI model: – Feedback loop of location change on transport network – Relocation of firms/jobs to more or less productive places
  • 29. Conclusions: Success of Crossrail 1 • Conventional BCR ‘good enough’: still better with Wider Benefits • Strong political support: national and London policy champions. • Funding by beneficiaries made possible by: – New powers for local revenue raising – BRS – Mapping of benefits using transport model and appraisal • Evidence from appraisal of GDP effect demonstrated: – Project contributed to government policy objective – productivity growth – Benefits for all UK, not only for London • So investment in London not ‘unfair’ – politically acceptable • Sound model for governance established
  • 30. Crossrail 2: Prospects • More than just a transport scheme – intended to change level and location of economic activity • Predicting how Crossrail 2 might transform a place is difficult – precedent is weak, outcomes depend on many agents and are very uncertain • LUTI models can help but: – Are complex, ‘black box’ models – Are unvalidated and difficult to challenge • Governance for Crossrail 2 will be difficult – many agents, need to avoid strategic game playing • But Crossrail 2 not alone in its low BCR – costs for all transport schemes rising faster than benefits • Politics – Brexit: effect on London employment versus Britain being ‘open for business’