SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – Apr 2016
ISSN: 2395-1303 http://www.ijetjournal.org Page 156
66kV & 220kV Substation Protection From Lightning by Fixed
Angle, Rolling Sphere and Early Streamer Method
Pruthak C. Chauhan.1
, Rinkesh S. Kansara2
, Mukesh P. Patel 3
, Anil L. Parmar 4
, Swati
Pimplekar5
1,2,3,4
Department of Electrical Engineering, Shroff S.R. Rotary Institute of Chemical Technology, Vataria,
5
Department of Electrical Engineering, Takalkar Power Engineers and consultants Pvt. Ltd., Vadodara,
I INTRODUCTION
Direct stroke on the transmission line or the substation
will cause major damage to the substation equipment. The
characteristics of this will be depend on range to region.
According to IEEE the stroke happens in two stages, (i)
return stroke, (ii) ionization of air encompassing the center
and the advancement of stepped leaders. So, to overcome this
cause we have to provide protection. The protection is done
by providing lightning mast at different intervals &
connecting Earth wire tower to tower. The methods which are
explained here are Rolling sphere method by simple rod,
Fixed angle method and Early streamer method.
There are some methods for direct stroke lightning protection
on 66kV and 220kV substation .
1) Empirical design method
This method includes two methods.
i) Empirical curves
ii) fixed angles
Fixed angle method is widely used for 66kV voltage level
substation.
2) The electrogeometrical method (EGM)
This method incudes Rolling sphere method.
Meanwhile, for the EGM, the ‘Protection zone of a lightning
protection system may be defined as the area of space inside
which an termination provides protection against a direct
stroke by attracting the stroke to itself”.[2]
we will also apply Early streamer method.
II ROLLING SPHERE METHOD BY ROD
It is one type of EGM model method. This method
builds on basic principal and theories of Whitehead. An
imaginary sphere of radius S rolls over the surface of
substation which rolls up on the LM, LCLM, earth wire and
shield wire which provides lightning shielding.
Fig-1: protected area of shield wires at equal height
The equipment is below the curved surface of sphere
then said to be protected and the portion which remains
RESEARCH ARTICLE OPEN ACCESS
Abstract:
Lightning strokes are most effective in electrical engineering. Charge formation in cloud produces
the lightning stroke. Substation equipment and auxiliaries also can be get damaged by the lightning
strokes. This paper shows some methods to reduce the effect of lightning stroke on the substation. There
are conventional and non-conventional methods for this. This paper describes some of that methods
briefly.
Keywords –Direct stroke lightning protection, Rolling Sphere Method by simple rod, Fixed angle
method , Early streamer method.
International Journal of Engineering and
ISSN: 2395-1303
unprotected is remains below the curved surface. Twin moose
conductor is used over here.
Now we apply this method on substation having 220kV
voltage, calculation is shown below,
Calculation of one section is shown.
For finding the equivalent radius
Rcx ln{(2 x h )/ Rc} - (Vc / E0 ) = 0
Where,
h = height of tower from GL
Eo= Limiting corona
Vc = Rated lightening impulse withstand voltage
Gradient
By solving this equation
Rc = 0.121 m
In the case of twin conductor the radius is given by,
R0 = (r x l)0.5
So, R0 = 0.0235 m
Now the radius of corona is in case of twin conductor,
R'c = R0 + Rc
So, R'c= 0.145 m
The surge impedance if corona is ,
Zc = 60 x { ln (((2 x h ) / R'c) x ((2 x h ) / r ))}0.5
Where,
r = Radious of conductor (in m)
So, Zc= 238.168 m
Fig-2: principal of rolling sphere [1]
The allowable stroke current is
International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar –
http://www.ijetjournal.org
unprotected is remains below the curved surface. Twin moose
Now we apply this method on substation having 220kV
= Rated lightening impulse withstand voltage
In the case of twin conductor the radius is given by,
conductor,
0.5
Is = (2.2 x BIL )/ Zc
Where,
BIL = Rated lightening impulse withstand
voltage ( For 220kV BIL is 1050 kV/m & For
66kV BIL is 450 kV/m )
Is = 9.699 kA
Now, the allowable strike distance is….
S = 8 x k x Is
Where,
k = Strikes on shield wire (value for mast is 1.2 & for earthig
wire is 1)
S = 29.898 m
H = Height of equipment is
H = 12.495m
A = Height of object to be protected
A = 20.00m
D = Elevation difference between Height of equipment &
Object to be Protected
D = 7.500m
E = Elevation Difference between Origin of the rolling sphere
& equipment
E = 22.398m
L = Horizontal difference between Origin of the rolling sphere
& equipment
L = 19.804m
X = Maximum allowable Horizontal separation of the shield
wires ensuring protection of object at height A
X = 39.609m
Here the value of X has not to be more than the diameter the
imaginary sphere(S).
Same calculations can be done for the remaining sections of
the sub-station.
In this method of protection we have used earth wire
and 3No’s lightning masts. Under green curve the whole
portion is protected by the masts and earth wires.
– Apr 2016
Page 157
BIL = Rated lightening impulse withstand
voltage ( For 220kV BIL is 1050 kV/m & For
strike distance is….
k = Strikes on shield wire (value for mast is 1.2 & for earthig
Height of equipment &
E = Elevation Difference between Origin of the rolling sphere
L = Horizontal difference between Origin of the rolling sphere
ontal separation of the shield
wires ensuring protection of object at height A
Here the value of X has not to be more than the diameter the
Same calculations can be done for the remaining sections of
s method of protection we have used earth wire
and 3No’s lightning masts. Under green curve the whole
portion is protected by the masts and earth wires.
International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – Apr 2016
ISSN: 2395-1303 http://www.ijetjournal.org Page 158
Fig-3: protected layout of 220kV rolling sphere by simple rod
III FIXED ANGLE METHOD
This method comes in the empirical design method.
This method was mainly used by designers as a easy boundary
of protection against stroke.
The fixed-angle design method uses parallel angles
to determine the number, position, and height of shielding
wires or LM. Figure illustrates the method for shielding
wires.[1]
Fig-4: fixed angle method for shielding wire [1]
Area protected by fixed angle method is shown by cross lines.
The layout of 66kv substation is shown here in which
we used 1 Lightning Mast and earth wire tower on pick of
tower.
Fig-5: layout of 66kV substation
Now equations for solving this problem is shown here,
For earth wire , measure the height of tower (in m)
and the height of equipment (in m), then H the difference
between them (in m) is calculated for inner side and outer side
radius of protection is Rx..
To reduce shielding angles designers uses fixed angle
method as the structure height increases to maintain a low
failure rate.
For inner side the degree of protection is 45°(α) and for outer
side 60°(β). The equation is,
tanθ =
Fig-6: fixed angle method for masts [1]
For lightning mast the degree of protection is always 45°.
tan 45 =
So, the solution is above design is calculated and the protected
layout is,
Fig-7: protected layout of 66kV substation
Where the purple line shows the area protected by
this method. But the limitation of this method is that it can be
suitable only for 66kV or below 66kV substation above 66kv
it will not reliable so, by rolling sphere method we have
calculate the 220kv substation layout by rolling sphere method
by simple rod.
IV EARLY STREAMER METHOD
This is not method but it is one type of equipment
which is place over a simple lightning rod which is called as
early streamer emission air terminal (OPR).
The OPR efficiency (ΔT):
Lightning is one of the most spectacular
meteorological phenomena. Generated by the interaction of
clouds elements (water and ice), it can kill, injure and damage.
The unique efficiency of the OPR Early streamer emission is
International Journal of Engineering and
ISSN: 2395-1303
based on the difference (ΔT), measured in a laboratory, in
between the emission time of the OPR and the one from a
simple rod. The OPR ESE air terminal is composed of a
striking point connected to a down conductor to conduct the
lightning to the ground.
Complete autonomy:
During a storm the ambient electric field may rise
from 600 V to 10-20 kV/m. When the electric field reach this
level representing a minimum risk for a lightning, the OPR
begins to get activated and generates high voltage puls
helping to create and propagating an upward leader.
After a strike on the OPR, the lightning current is
driven to ground by the down conductor to the earth
termination system.
Fig 8-without using OPR
Fig-9: using OPR
Radius of protection:
The radius of protection (Rp) of the OPR is
calculated according to the NF C 17‑102 (edition 2011). It
depends on the OPR efficiency (ΔT) expressed in micro
seconds. The maximum value for ΔT is 60 μs. The risk
assessment shall be calculated according to the NF
IEC 62305-2 and will define the protection level (LPL I, II, III
or IV) which will be used in the determination of the OPR
radius of protection.
Now,
Rp(h) : Protection radius at a given height (h)
Rp(h) = √ 2rh - h2 + Δ(2r + Δ) (for h ≥ 5 m) For h < 5 m,
refer to the table below
h : Height of the OPR tip above the surface(s) to be protected
r(m) : Standardized striking distance
International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar –
http://www.ijetjournal.org
based on the difference (ΔT), measured in a laboratory, in
between the emission time of the OPR and the one from a
simple rod. The OPR ESE air terminal is composed of a
striking point connected to a down conductor to conduct the
During a storm the ambient electric field may rise
20 kV/m. When the electric field reach this
level representing a minimum risk for a lightning, the OPR
begins to get activated and generates high voltage pulses,
helping to create and propagating an upward leader.
After a strike on the OPR, the lightning current is
driven to ground by the down conductor to the earth
radius of protection (Rp) of the OPR is
102 (edition 2011). It
depends on the OPR efficiency (ΔT) expressed in micro-
seconds. The maximum value for ΔT is 60 μs. The risk
assessment shall be calculated according to the NF C 17‑102.
2 and will define the protection level (LPL I, II, III
or IV) which will be used in the determination of the OPR
For h < 5 m,
: Height of the OPR tip above the surface(s) to be protected
∆(m) = 106 .ΔT (OPR efficiency)
According to the customers demand this can be
designed but the cost of this equipment is too much high but
the surety of the protection is also too much high as the cost
and the plus point of this is the number of this will be so less
as compared to simple lightning rod.
TABLE -1 OPR radius Protection Table
Protection
level
I(r = 20m)
OPR 30 45
h(m) Radius of Protection Rp (m)
2 19 25
3 29 38
4 38 51
5 48 63
6 48 63
8 49 64
10 49 64
15 50 65
20 50 65
45 43 65
50 40 65
55 36 65
60 30 65
By this table first we have to choose
OPR then height of OPR and according to that we have to
choose OPR which will give the radius of protection by the
OPR over the substation.
Here, we have taken protection level I(r = 20m), OPR 60 and
Height of OPR is 20m.
So the radius of protection will be 80m. This same height can
also be calculated by the equation which is mentioned above.
V CONCLUSION
This paper study the DSLP scheme for 66 & 220 kV
substation.
Form we conclude as follows,
1) Fixed angle method is only suitable
substation; for above 66kV we have to apply EGM
method and early streamer method.
2) By applying advanced method of protection total cost
of substation will become less
ACKNOWLEDGEMENT
We gratefully acknowledge Miss Swati Pimplekar,
Takalkar Power Engineers and Consultants Pvt. Ltd,
Vadodara and Mr. Anil Parmar, assistant professor at SRICT,
– Apr 2016
Page 159
According to the customers demand this can be
pment is too much high but
the surety of the protection is also too much high as the cost
and the plus point of this is the number of this will be so less
1 OPR radius Protection Table
60
Radius of Protection Rp (m)
31
47
63
79
79
79
79
80
80
76
74
72
69
By this table first we have to choose protection level then
OPR then height of OPR and according to that we have to
choose OPR which will give the radius of protection by the
Here, we have taken protection level I(r = 20m), OPR 60 and
ius of protection will be 80m. This same height can
also be calculated by the equation which is mentioned above.
This paper study the DSLP scheme for 66 & 220 kV
Fixed angle method is only suitable for 66kV
substation; for above 66kV we have to apply EGM
method and early streamer method.
By applying advanced method of protection total cost
of substation will become less
We gratefully acknowledge Miss Swati Pimplekar,
Engineers and Consultants Pvt. Ltd,
Vadodara and Mr. Anil Parmar, assistant professor at SRICT,
International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – Apr 2016
ISSN: 2395-1303 http://www.ijetjournal.org Page 160
Ankleshwar for their comments and contribution & many of
which have helped us to improve knowledge and paper.
REFERENCES
[1] IEEE 998-2012 Guide for Direct Lightning
Stroke Shielding of Substations.
[2] Comparative Study on Substation Shielding Due
to Direct Lightning Strokes, By Ab Halim Abu
Bakar Date of publish – December 2013 Email:
a.halim@um.edu.my
[3] Lightning Protection Systems Design for
Substations by Using Masts and Matlab, By Le Viet
Dung and K. Petcharaks.
[4] Understanding direct lightning stroke shielding
of substations, By P. K. Sen.
[5] AIEE Committee Report, “A Method of
Estimating Lightning Performance of Transmission
Lines,” AIEE Transactions, vol. 69, no.2, pp. 1187–
1196, Jan. 1950.
[6] Anderson, J. G., “Monte Carlo Computer
Calculation of Transmission-Line Lightning
Performance,” AIEE Transactions, vol. 80, no. 3,
pp. 414–420, Aug. 1961.
[7] Anderson, R. B., and A. J. Eriksson, “Lightning
Parameters for Engineering Application,” Electra,
no. 69, pp. 65–102, Mar. 1980.
[8] Eriksson, A. J., “The Lightning Round Flash—
an Engineering Study,” PhD thesis, University of
Natal, Pretoria, South Africa, Dec. 1979.

Weitere ähnliche Inhalte

Was ist angesagt?

Earthing Arrangements
Earthing  ArrangementsEarthing  Arrangements
Earthing Arrangements
Paul Holden
 
Guide to Surge Protection Devices
Guide to Surge Protection DevicesGuide to Surge Protection Devices
Guide to Surge Protection Devices
Jason Koffler
 
**Lightning Arrester Presentation**
**Lightning Arrester Presentation****Lightning Arrester Presentation**
**Lightning Arrester Presentation**
SKPAMB
 
Using High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash HazardsUsing High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash Hazards
michaeljmack
 

Was ist angesagt? (20)

Conductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arrestersConductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arresters
 
Earthing Arrangements
Earthing  ArrangementsEarthing  Arrangements
Earthing Arrangements
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
study of lightning arrester
study of lightning arresterstudy of lightning arrester
study of lightning arrester
 
Protection against over voltage
Protection against over voltageProtection against over voltage
Protection against over voltage
 
Bil and insulation coordination ppt
Bil and insulation coordination pptBil and insulation coordination ppt
Bil and insulation coordination ppt
 
Over voltage(Switch Gear and Protection)
Over voltage(Switch Gear and Protection)Over voltage(Switch Gear and Protection)
Over voltage(Switch Gear and Protection)
 
Guide to Surge Protection Devices
Guide to Surge Protection DevicesGuide to Surge Protection Devices
Guide to Surge Protection Devices
 
**Lightning Arrester Presentation**
**Lightning Arrester Presentation****Lightning Arrester Presentation**
**Lightning Arrester Presentation**
 
Surge Arresters construction and working
Surge Arresters construction and workingSurge Arresters construction and working
Surge Arresters construction and working
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
 
Lighting arrester
Lighting arresterLighting arrester
Lighting arrester
 
Using High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash HazardsUsing High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash Hazards
 
surge arrester
surge arrestersurge arrester
surge arrester
 
Insulation co cordination design
Insulation co cordination designInsulation co cordination design
Insulation co cordination design
 
Problems in overhead transmission line
Problems in overhead transmission lineProblems in overhead transmission line
Problems in overhead transmission line
 
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
Wind Farm Earthing, Lightning & Overvoltage Protection - Wind Turbines Earthi...
 
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING
PROTECTION AGAINST OVER VOLTAGE AND GROUNDINGPROTECTION AGAINST OVER VOLTAGE AND GROUNDING
PROTECTION AGAINST OVER VOLTAGE AND GROUNDING
 
Lightning Arrestar
Lightning ArrestarLightning Arrestar
Lightning Arrestar
 
Power surge protection devices
Power surge protection devices Power surge protection devices
Power surge protection devices
 

Andere mochten auch (7)

Cakephp
CakephpCakephp
Cakephp
 
Dr. Lightning's Guide to the Science of Lightning
Dr. Lightning's Guide to the Science of LightningDr. Lightning's Guide to the Science of Lightning
Dr. Lightning's Guide to the Science of Lightning
 
Electrical injuries
Electrical injuriesElectrical injuries
Electrical injuries
 
Energy crisis and conservation
Energy crisis and conservationEnergy crisis and conservation
Energy crisis and conservation
 
Lightning arresters
Lightning arrestersLightning arresters
Lightning arresters
 
Lightning protection
Lightning protectionLightning protection
Lightning protection
 
German CakePHP Meetup #3 - Berlin
German CakePHP Meetup #3 - BerlinGerman CakePHP Meetup #3 - Berlin
German CakePHP Meetup #3 - Berlin
 

Ähnlich wie [IJET V2I2P26] Authors: Pruthak C. Chauhan., Rinkesh S. Kansara, Mukesh P. Patel , Anil L. Parmar , Swati Pimplekar

Dq31551563
Dq31551563Dq31551563
Dq31551563
IJMER
 

Ähnlich wie [IJET V2I2P26] Authors: Pruthak C. Chauhan., Rinkesh S. Kansara, Mukesh P. Patel , Anil L. Parmar , Swati Pimplekar (20)

Ce31533536
Ce31533536Ce31533536
Ce31533536
 
Case Study - Lightning Protection
Case Study - Lightning ProtectionCase Study - Lightning Protection
Case Study - Lightning Protection
 
Arrester
ArresterArrester
Arrester
 
10.1.1.192.9435(1)
10.1.1.192.9435(1)10.1.1.192.9435(1)
10.1.1.192.9435(1)
 
A Study on Protection of Cables by Solkor Differential Protection Relay with ...
A Study on Protection of Cables by Solkor Differential Protection Relay with ...A Study on Protection of Cables by Solkor Differential Protection Relay with ...
A Study on Protection of Cables by Solkor Differential Protection Relay with ...
 
Analysis of MOS Capacitor Loaded Annular Ring MICROSTRIP Antenna
Analysis of MOS Capacitor Loaded Annular Ring MICROSTRIP  AntennaAnalysis of MOS Capacitor Loaded Annular Ring MICROSTRIP  Antenna
Analysis of MOS Capacitor Loaded Annular Ring MICROSTRIP Antenna
 
Hx2615541560
Hx2615541560Hx2615541560
Hx2615541560
 
S ag calc
S ag calcS ag calc
S ag calc
 
Towards An Accurate Modeling of Frequency-dependent Wind Farm Components Unde...
Towards An Accurate Modeling of Frequency-dependent Wind Farm Components Unde...Towards An Accurate Modeling of Frequency-dependent Wind Farm Components Unde...
Towards An Accurate Modeling of Frequency-dependent Wind Farm Components Unde...
 
Schneider electric : Neutral Earthing
Schneider electric : Neutral EarthingSchneider electric : Neutral Earthing
Schneider electric : Neutral Earthing
 
Calculation and comparison of circuit breaker parameters in Power World Simul...
Calculation and comparison of circuit breaker parameters in Power World Simul...Calculation and comparison of circuit breaker parameters in Power World Simul...
Calculation and comparison of circuit breaker parameters in Power World Simul...
 
Calculation and comparison of circuit breaker parameters in Power World Simul...
Calculation and comparison of circuit breaker parameters in Power World Simul...Calculation and comparison of circuit breaker parameters in Power World Simul...
Calculation and comparison of circuit breaker parameters in Power World Simul...
 
Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.
 
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated SubstationModeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
 
Dq31551563
Dq31551563Dq31551563
Dq31551563
 
How to conduct the lightning impulse withstand test on 550kv GIS?
How to conduct the lightning impulse withstand test on 550kv GIS?How to conduct the lightning impulse withstand test on 550kv GIS?
How to conduct the lightning impulse withstand test on 550kv GIS?
 
IRJET- Design of Microstrip Patch Antenna for Smart Antenna Applications
IRJET-  	  Design of Microstrip Patch Antenna for Smart Antenna ApplicationsIRJET-  	  Design of Microstrip Patch Antenna for Smart Antenna Applications
IRJET- Design of Microstrip Patch Antenna for Smart Antenna Applications
 
1 txh000247c0202 opr_lightning_protection_systems
1 txh000247c0202 opr_lightning_protection_systems1 txh000247c0202 opr_lightning_protection_systems
1 txh000247c0202 opr_lightning_protection_systems
 
Microstrip_patch_antenna_design.ppt
Microstrip_patch_antenna_design.pptMicrostrip_patch_antenna_design.ppt
Microstrip_patch_antenna_design.ppt
 
H010526975
H010526975H010526975
H010526975
 

Mehr von IJET - International Journal of Engineering and Techniques

healthcare supervising system to monitor heart rate to diagonize and alert he...
healthcare supervising system to monitor heart rate to diagonize and alert he...healthcare supervising system to monitor heart rate to diagonize and alert he...
healthcare supervising system to monitor heart rate to diagonize and alert he...
IJET - International Journal of Engineering and Techniques
 
IJET-V3I2P23
IJET-V3I2P23IJET-V3I2P23
IJET-V3I2P21
IJET-V3I2P21IJET-V3I2P21

Mehr von IJET - International Journal of Engineering and Techniques (20)

healthcare supervising system to monitor heart rate to diagonize and alert he...
healthcare supervising system to monitor heart rate to diagonize and alert he...healthcare supervising system to monitor heart rate to diagonize and alert he...
healthcare supervising system to monitor heart rate to diagonize and alert he...
 
verifiable and multi-keyword searchable attribute-based encryption scheme for...
verifiable and multi-keyword searchable attribute-based encryption scheme for...verifiable and multi-keyword searchable attribute-based encryption scheme for...
verifiable and multi-keyword searchable attribute-based encryption scheme for...
 
Ijet v5 i6p18
Ijet v5 i6p18Ijet v5 i6p18
Ijet v5 i6p18
 
Ijet v5 i6p17
Ijet v5 i6p17Ijet v5 i6p17
Ijet v5 i6p17
 
Ijet v5 i6p16
Ijet v5 i6p16Ijet v5 i6p16
Ijet v5 i6p16
 
Ijet v5 i6p15
Ijet v5 i6p15Ijet v5 i6p15
Ijet v5 i6p15
 
Ijet v5 i6p14
Ijet v5 i6p14Ijet v5 i6p14
Ijet v5 i6p14
 
Ijet v5 i6p13
Ijet v5 i6p13Ijet v5 i6p13
Ijet v5 i6p13
 
Ijet v5 i6p12
Ijet v5 i6p12Ijet v5 i6p12
Ijet v5 i6p12
 
Ijet v5 i6p11
Ijet v5 i6p11Ijet v5 i6p11
Ijet v5 i6p11
 
Ijet v5 i6p10
Ijet v5 i6p10Ijet v5 i6p10
Ijet v5 i6p10
 
Ijet v5 i6p2
Ijet v5 i6p2Ijet v5 i6p2
Ijet v5 i6p2
 
IJET-V3I2P24
IJET-V3I2P24IJET-V3I2P24
IJET-V3I2P24
 
IJET-V3I2P23
IJET-V3I2P23IJET-V3I2P23
IJET-V3I2P23
 
IJET-V3I2P22
IJET-V3I2P22IJET-V3I2P22
IJET-V3I2P22
 
IJET-V3I2P21
IJET-V3I2P21IJET-V3I2P21
IJET-V3I2P21
 
IJET-V3I2P20
IJET-V3I2P20IJET-V3I2P20
IJET-V3I2P20
 
IJET-V3I2P19
IJET-V3I2P19IJET-V3I2P19
IJET-V3I2P19
 
IJET-V3I2P18
IJET-V3I2P18IJET-V3I2P18
IJET-V3I2P18
 
IJET-V3I2P17
IJET-V3I2P17IJET-V3I2P17
IJET-V3I2P17
 

Kürzlich hochgeladen

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Kürzlich hochgeladen (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 

[IJET V2I2P26] Authors: Pruthak C. Chauhan., Rinkesh S. Kansara, Mukesh P. Patel , Anil L. Parmar , Swati Pimplekar

  • 1. International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – Apr 2016 ISSN: 2395-1303 http://www.ijetjournal.org Page 156 66kV & 220kV Substation Protection From Lightning by Fixed Angle, Rolling Sphere and Early Streamer Method Pruthak C. Chauhan.1 , Rinkesh S. Kansara2 , Mukesh P. Patel 3 , Anil L. Parmar 4 , Swati Pimplekar5 1,2,3,4 Department of Electrical Engineering, Shroff S.R. Rotary Institute of Chemical Technology, Vataria, 5 Department of Electrical Engineering, Takalkar Power Engineers and consultants Pvt. Ltd., Vadodara, I INTRODUCTION Direct stroke on the transmission line or the substation will cause major damage to the substation equipment. The characteristics of this will be depend on range to region. According to IEEE the stroke happens in two stages, (i) return stroke, (ii) ionization of air encompassing the center and the advancement of stepped leaders. So, to overcome this cause we have to provide protection. The protection is done by providing lightning mast at different intervals & connecting Earth wire tower to tower. The methods which are explained here are Rolling sphere method by simple rod, Fixed angle method and Early streamer method. There are some methods for direct stroke lightning protection on 66kV and 220kV substation . 1) Empirical design method This method includes two methods. i) Empirical curves ii) fixed angles Fixed angle method is widely used for 66kV voltage level substation. 2) The electrogeometrical method (EGM) This method incudes Rolling sphere method. Meanwhile, for the EGM, the ‘Protection zone of a lightning protection system may be defined as the area of space inside which an termination provides protection against a direct stroke by attracting the stroke to itself”.[2] we will also apply Early streamer method. II ROLLING SPHERE METHOD BY ROD It is one type of EGM model method. This method builds on basic principal and theories of Whitehead. An imaginary sphere of radius S rolls over the surface of substation which rolls up on the LM, LCLM, earth wire and shield wire which provides lightning shielding. Fig-1: protected area of shield wires at equal height The equipment is below the curved surface of sphere then said to be protected and the portion which remains RESEARCH ARTICLE OPEN ACCESS Abstract: Lightning strokes are most effective in electrical engineering. Charge formation in cloud produces the lightning stroke. Substation equipment and auxiliaries also can be get damaged by the lightning strokes. This paper shows some methods to reduce the effect of lightning stroke on the substation. There are conventional and non-conventional methods for this. This paper describes some of that methods briefly. Keywords –Direct stroke lightning protection, Rolling Sphere Method by simple rod, Fixed angle method , Early streamer method.
  • 2. International Journal of Engineering and ISSN: 2395-1303 unprotected is remains below the curved surface. Twin moose conductor is used over here. Now we apply this method on substation having 220kV voltage, calculation is shown below, Calculation of one section is shown. For finding the equivalent radius Rcx ln{(2 x h )/ Rc} - (Vc / E0 ) = 0 Where, h = height of tower from GL Eo= Limiting corona Vc = Rated lightening impulse withstand voltage Gradient By solving this equation Rc = 0.121 m In the case of twin conductor the radius is given by, R0 = (r x l)0.5 So, R0 = 0.0235 m Now the radius of corona is in case of twin conductor, R'c = R0 + Rc So, R'c= 0.145 m The surge impedance if corona is , Zc = 60 x { ln (((2 x h ) / R'c) x ((2 x h ) / r ))}0.5 Where, r = Radious of conductor (in m) So, Zc= 238.168 m Fig-2: principal of rolling sphere [1] The allowable stroke current is International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – http://www.ijetjournal.org unprotected is remains below the curved surface. Twin moose Now we apply this method on substation having 220kV = Rated lightening impulse withstand voltage In the case of twin conductor the radius is given by, conductor, 0.5 Is = (2.2 x BIL )/ Zc Where, BIL = Rated lightening impulse withstand voltage ( For 220kV BIL is 1050 kV/m & For 66kV BIL is 450 kV/m ) Is = 9.699 kA Now, the allowable strike distance is…. S = 8 x k x Is Where, k = Strikes on shield wire (value for mast is 1.2 & for earthig wire is 1) S = 29.898 m H = Height of equipment is H = 12.495m A = Height of object to be protected A = 20.00m D = Elevation difference between Height of equipment & Object to be Protected D = 7.500m E = Elevation Difference between Origin of the rolling sphere & equipment E = 22.398m L = Horizontal difference between Origin of the rolling sphere & equipment L = 19.804m X = Maximum allowable Horizontal separation of the shield wires ensuring protection of object at height A X = 39.609m Here the value of X has not to be more than the diameter the imaginary sphere(S). Same calculations can be done for the remaining sections of the sub-station. In this method of protection we have used earth wire and 3No’s lightning masts. Under green curve the whole portion is protected by the masts and earth wires. – Apr 2016 Page 157 BIL = Rated lightening impulse withstand voltage ( For 220kV BIL is 1050 kV/m & For strike distance is…. k = Strikes on shield wire (value for mast is 1.2 & for earthig Height of equipment & E = Elevation Difference between Origin of the rolling sphere L = Horizontal difference between Origin of the rolling sphere ontal separation of the shield wires ensuring protection of object at height A Here the value of X has not to be more than the diameter the Same calculations can be done for the remaining sections of s method of protection we have used earth wire and 3No’s lightning masts. Under green curve the whole portion is protected by the masts and earth wires.
  • 3. International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – Apr 2016 ISSN: 2395-1303 http://www.ijetjournal.org Page 158 Fig-3: protected layout of 220kV rolling sphere by simple rod III FIXED ANGLE METHOD This method comes in the empirical design method. This method was mainly used by designers as a easy boundary of protection against stroke. The fixed-angle design method uses parallel angles to determine the number, position, and height of shielding wires or LM. Figure illustrates the method for shielding wires.[1] Fig-4: fixed angle method for shielding wire [1] Area protected by fixed angle method is shown by cross lines. The layout of 66kv substation is shown here in which we used 1 Lightning Mast and earth wire tower on pick of tower. Fig-5: layout of 66kV substation Now equations for solving this problem is shown here, For earth wire , measure the height of tower (in m) and the height of equipment (in m), then H the difference between them (in m) is calculated for inner side and outer side radius of protection is Rx.. To reduce shielding angles designers uses fixed angle method as the structure height increases to maintain a low failure rate. For inner side the degree of protection is 45°(α) and for outer side 60°(β). The equation is, tanθ = Fig-6: fixed angle method for masts [1] For lightning mast the degree of protection is always 45°. tan 45 = So, the solution is above design is calculated and the protected layout is, Fig-7: protected layout of 66kV substation Where the purple line shows the area protected by this method. But the limitation of this method is that it can be suitable only for 66kV or below 66kV substation above 66kv it will not reliable so, by rolling sphere method we have calculate the 220kv substation layout by rolling sphere method by simple rod. IV EARLY STREAMER METHOD This is not method but it is one type of equipment which is place over a simple lightning rod which is called as early streamer emission air terminal (OPR). The OPR efficiency (ΔT): Lightning is one of the most spectacular meteorological phenomena. Generated by the interaction of clouds elements (water and ice), it can kill, injure and damage. The unique efficiency of the OPR Early streamer emission is
  • 4. International Journal of Engineering and ISSN: 2395-1303 based on the difference (ΔT), measured in a laboratory, in between the emission time of the OPR and the one from a simple rod. The OPR ESE air terminal is composed of a striking point connected to a down conductor to conduct the lightning to the ground. Complete autonomy: During a storm the ambient electric field may rise from 600 V to 10-20 kV/m. When the electric field reach this level representing a minimum risk for a lightning, the OPR begins to get activated and generates high voltage puls helping to create and propagating an upward leader. After a strike on the OPR, the lightning current is driven to ground by the down conductor to the earth termination system. Fig 8-without using OPR Fig-9: using OPR Radius of protection: The radius of protection (Rp) of the OPR is calculated according to the NF C 17‑102 (edition 2011). It depends on the OPR efficiency (ΔT) expressed in micro seconds. The maximum value for ΔT is 60 μs. The risk assessment shall be calculated according to the NF IEC 62305-2 and will define the protection level (LPL I, II, III or IV) which will be used in the determination of the OPR radius of protection. Now, Rp(h) : Protection radius at a given height (h) Rp(h) = √ 2rh - h2 + Δ(2r + Δ) (for h ≥ 5 m) For h < 5 m, refer to the table below h : Height of the OPR tip above the surface(s) to be protected r(m) : Standardized striking distance International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – http://www.ijetjournal.org based on the difference (ΔT), measured in a laboratory, in between the emission time of the OPR and the one from a simple rod. The OPR ESE air terminal is composed of a striking point connected to a down conductor to conduct the During a storm the ambient electric field may rise 20 kV/m. When the electric field reach this level representing a minimum risk for a lightning, the OPR begins to get activated and generates high voltage pulses, helping to create and propagating an upward leader. After a strike on the OPR, the lightning current is driven to ground by the down conductor to the earth radius of protection (Rp) of the OPR is 102 (edition 2011). It depends on the OPR efficiency (ΔT) expressed in micro- seconds. The maximum value for ΔT is 60 μs. The risk assessment shall be calculated according to the NF C 17‑102. 2 and will define the protection level (LPL I, II, III or IV) which will be used in the determination of the OPR For h < 5 m, : Height of the OPR tip above the surface(s) to be protected ∆(m) = 106 .ΔT (OPR efficiency) According to the customers demand this can be designed but the cost of this equipment is too much high but the surety of the protection is also too much high as the cost and the plus point of this is the number of this will be so less as compared to simple lightning rod. TABLE -1 OPR radius Protection Table Protection level I(r = 20m) OPR 30 45 h(m) Radius of Protection Rp (m) 2 19 25 3 29 38 4 38 51 5 48 63 6 48 63 8 49 64 10 49 64 15 50 65 20 50 65 45 43 65 50 40 65 55 36 65 60 30 65 By this table first we have to choose OPR then height of OPR and according to that we have to choose OPR which will give the radius of protection by the OPR over the substation. Here, we have taken protection level I(r = 20m), OPR 60 and Height of OPR is 20m. So the radius of protection will be 80m. This same height can also be calculated by the equation which is mentioned above. V CONCLUSION This paper study the DSLP scheme for 66 & 220 kV substation. Form we conclude as follows, 1) Fixed angle method is only suitable substation; for above 66kV we have to apply EGM method and early streamer method. 2) By applying advanced method of protection total cost of substation will become less ACKNOWLEDGEMENT We gratefully acknowledge Miss Swati Pimplekar, Takalkar Power Engineers and Consultants Pvt. Ltd, Vadodara and Mr. Anil Parmar, assistant professor at SRICT, – Apr 2016 Page 159 According to the customers demand this can be pment is too much high but the surety of the protection is also too much high as the cost and the plus point of this is the number of this will be so less 1 OPR radius Protection Table 60 Radius of Protection Rp (m) 31 47 63 79 79 79 79 80 80 76 74 72 69 By this table first we have to choose protection level then OPR then height of OPR and according to that we have to choose OPR which will give the radius of protection by the Here, we have taken protection level I(r = 20m), OPR 60 and ius of protection will be 80m. This same height can also be calculated by the equation which is mentioned above. This paper study the DSLP scheme for 66 & 220 kV Fixed angle method is only suitable for 66kV substation; for above 66kV we have to apply EGM method and early streamer method. By applying advanced method of protection total cost of substation will become less We gratefully acknowledge Miss Swati Pimplekar, Engineers and Consultants Pvt. Ltd, Vadodara and Mr. Anil Parmar, assistant professor at SRICT,
  • 5. International Journal of Engineering and Techniques - Volume 2 Issue 2, Mar – Apr 2016 ISSN: 2395-1303 http://www.ijetjournal.org Page 160 Ankleshwar for their comments and contribution & many of which have helped us to improve knowledge and paper. REFERENCES [1] IEEE 998-2012 Guide for Direct Lightning Stroke Shielding of Substations. [2] Comparative Study on Substation Shielding Due to Direct Lightning Strokes, By Ab Halim Abu Bakar Date of publish – December 2013 Email: a.halim@um.edu.my [3] Lightning Protection Systems Design for Substations by Using Masts and Matlab, By Le Viet Dung and K. Petcharaks. [4] Understanding direct lightning stroke shielding of substations, By P. K. Sen. [5] AIEE Committee Report, “A Method of Estimating Lightning Performance of Transmission Lines,” AIEE Transactions, vol. 69, no.2, pp. 1187– 1196, Jan. 1950. [6] Anderson, J. G., “Monte Carlo Computer Calculation of Transmission-Line Lightning Performance,” AIEE Transactions, vol. 80, no. 3, pp. 414–420, Aug. 1961. [7] Anderson, R. B., and A. J. Eriksson, “Lightning Parameters for Engineering Application,” Electra, no. 69, pp. 65–102, Mar. 1980. [8] Eriksson, A. J., “The Lightning Round Flash— an Engineering Study,” PhD thesis, University of Natal, Pretoria, South Africa, Dec. 1979.