Project Phases (Environment)
By Harush D P
Process Design Engineer
harush.24u@gmail.com
Environment
• Comprises of our surroundings
• Air
• Water
• Soil
• others
Pollution
 Human activities
 Deforestation
 Industrialization
 Uncontrolled Discharges
Water Treatment
 Domestic sewage
 Industrial Effluent
 Drinking water treatment
Type of treatment
 Primary treatment
 Secondary
 Aerobic
 Anaerobic
 Anoxic
 Tertiary
Projects
 Drinking Water Treatment Projects
 Jackwell, pipeline and ESR construction for water supply
 Water supply Networking
 Sewage Treatment Plants
 UGD for cities
 Industrial Effluent Treatment projects
 CETP
 Operation and Maintenance
Tender
 Prepare tender document by reputed consultants
 Government Bodies call for tenders
 Specify Requirements
 Floats tender via various Media
 Calls for bidding
Tender Contents
 Important Dates
 Scope of work
 PRQ
 Pre-bid Details
 Technical Details
 Financial details (project Estimated cost)
 Bidding process
 Cost Breakups
Working
 Process Design (units its sizing and Process flow drawing)
 Civil Estimation ( Quantities)
 Mechanical Estimation ( Equipment's, Pipes, Valves,)
 Instrumentation Estimation ( Scada Design and Estimation)
 Electrical Estimation ( Power Requirement, Costing)
 Operation and Maintenance ( Labor, Chemical, Power Requirement Etc)
 Over all cost calculation
 Cash flow preparation
 Construction schedule preparation.
 E-Portal Submission of Documents and EMD
Notifications
 After successful submission check for regular notification.
 Date of opening of Technical BID.
 Date of opening of Financial BID.
 Lowes BID qualification.
 Award of contract.
Project Phases
 Preparation of Technical Documents
 Getting approval from consultant and client.
 Process Design calculations
 Mass Balance
 Hydraulic Design Calculations
 Drain Calculations
 Plant Water Utility
 Datasheet for mechanical Equipment's
 Structural Design calculations
Drawing Approvals
 PFD
 Layout
 Hydraulic Flow Drawing
 Mass Balance
 P&ID
 Mechanical GA
 Equipment GA
 Civil GA
 Structural Drawing
Mean while at site
 Topographical Survey Completion
 Site Mobilization
 Site Clearing
 Compound Structure
 Drainages
 Excavations
Site Progress
 After approval of drawings construction commences.
 As per Planned Construction Schedule.
 Getting Release of RA Bills as per the progress of work.
 Hydraulic Testing of Structures
 Mechanical Equipment's Installations
 Testing of Equipment's
 Completion of work and trial run
Operation and Maintenance
 Flow measurement
 Inlet Parameter Analysis
 Stabilize the STP
 Culture Development
 Chemical Dosing
 Achievement of said outlet parameter
 Trouble shooting
Design Glimpse
 Analyze the type of effluent to be treated
 Collect population density of area and sources of waste generation
 Collect Flow quantity (hydraulic Loading)
 Collect Effluent Quality parameters (Organic Loading)
 Analyze and plan process design units
 Collect standards required from Standard Manuals (CPHEEO)
 Collects Requirements Specified by Client
 Collect Area Available for construction and inlet point of effluent
Designing
 A sewage Treatment plant will be designed with following flow
 SPS (sewage Pumping Station)
 MPS (Main Pumping Station)
 STP (Sewage Treatment Plant)
 Disposal of Treated Sewage
 Treatment Of Sludge and its Disposal
MPS (Main Pumping Station)
 Why ?
 Units
 Inlet chamber
 Course Screen Channel
 Wetwell
 Pumps and pumping main
STP
 Receives Flow from MPS/ISPS
 Units
 Inlet chamber
 Fine screen Channel
 Grit Chamber
 Flow Measurement
 Secondary Treatment unit (SBR, ASP, MBBR,)(Digester, Trickling Filter etc)
 Clarifier
 Disinfection unit (CCT)
 Disposal or Tertiary treatment
Sludge Treatment
 Sludge Sump
 Gravity Sludge Thickener (GST)
 Sludge Digester/Sludge Holding Tank
 Gas Holder, Power Generation units
 Centrifuge/Belt Filter
 Sludge Cake Disposal
Wet well
construction
Illustrative
photos
Digester lamella clarifier, Biotower
Aeriation Tank
Anaerobic tanks
Complete plant, Digesters and gas holders
Thank you

Weitere ähnliche Inhalte

Was ist angesagt?

summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314Lynn Schroeder P.E.
 
Gl group profile r5
Gl group profile r5Gl group profile r5
Gl group profile r5Ishu Vohra
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Nicholas Naing
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Nicholas Naing
 
Module 13 plant piping design
Module 13 plant piping designModule 13 plant piping design
Module 13 plant piping designMuhammad Rahman
 
Process And Chemial Industry Soil
Process And Chemial Industry   SoilProcess And Chemial Industry   Soil
Process And Chemial Industry Soiljaapverheul
 
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...ASC-HRSC
 
مهندس ميكانيكا دراسات
مهندس ميكانيكا دراساتمهندس ميكانيكا دراسات
مهندس ميكانيكا دراساتAbd Ellatif Gebril
 
Design Appraisal for offshore structures
Design Appraisal for offshore structuresDesign Appraisal for offshore structures
Design Appraisal for offshore structuresLloyd's Register Energy
 
State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...Alberto Alva-Argaez
 
Benzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeBenzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeProcess Ecology Inc
 
Artificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir ConsiderationsArtificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir ConsiderationsAndres Martingano
 

Was ist angesagt? (18)

summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314
 
Gl group profile r5
Gl group profile r5Gl group profile r5
Gl group profile r5
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
Process Ecology toolbox
Process Ecology toolboxProcess Ecology toolbox
Process Ecology toolbox
 
Module 13 plant piping design
Module 13 plant piping designModule 13 plant piping design
Module 13 plant piping design
 
Process And Chemial Industry Soil
Process And Chemial Industry   SoilProcess And Chemial Industry   Soil
Process And Chemial Industry Soil
 
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
 
Helen Yan - Resume 2016
Helen Yan - Resume 2016Helen Yan - Resume 2016
Helen Yan - Resume 2016
 
مهندس ميكانيكا دراسات
مهندس ميكانيكا دراساتمهندس ميكانيكا دراسات
مهندس ميكانيكا دراسات
 
Vsm
VsmVsm
Vsm
 
Design Appraisal for offshore structures
Design Appraisal for offshore structuresDesign Appraisal for offshore structures
Design Appraisal for offshore structures
 
State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...
 
Benzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeBenzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations Change
 
Artificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir ConsiderationsArtificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir Considerations
 
Plant Performance Monitoring
Plant Performance Monitoring Plant Performance Monitoring
Plant Performance Monitoring
 

Andere mochten auch

Ligonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant PresentationLigonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant Presentationfought70
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarlMKuttler
 
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1Netsol Water Solutions
 
sewage treatment plant
sewage treatment plantsewage treatment plant
sewage treatment plantBhavik Patel
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewageBibhabasu Mohanty
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-pptabhiiii4558
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculationSharifah Ain
 

Andere mochten auch (9)

Ligonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant PresentationLigonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant Presentation
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
 
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
 
sewage treatment plant
sewage treatment plantsewage treatment plant
sewage treatment plant
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Waste Water Treatment
Waste Water TreatmentWaste Water Treatment
Waste Water Treatment
 
Specialized bioreactor
Specialized bioreactor  Specialized bioreactor
Specialized bioreactor
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 

Ähnlich wie Phase of project Environment (Tendering to construction )

2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptxKarenGedalanga
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxssuser0a41e6
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxMathewHany1
 
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeMonitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeCenter for Neighborhood Technology
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stationsebiskis
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Dr Orhan Degermenci
 
Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816William Deskin
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptxAbubakar171727
 
TEKNORGE Oil & Gas Expertise
TEKNORGE  Oil & Gas ExpertiseTEKNORGE  Oil & Gas Expertise
TEKNORGE Oil & Gas ExpertiseTEKNORGE AS
 
EXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGEEXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGETEKNORGE AS
 
TEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas ExpertiseTEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas ExpertiseTEKNORGE AS
 
Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Ashish Verma
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Fiena Azmi
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newlisa zhang
 

Ähnlich wie Phase of project Environment (Tendering to construction ) (20)

2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptx
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptx
 
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeMonitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stations
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 
Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx
 
TEKNORGE Oil & Gas Expertise
TEKNORGE  Oil & Gas ExpertiseTEKNORGE  Oil & Gas Expertise
TEKNORGE Oil & Gas Expertise
 
EXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGEEXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGE
 
TEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas ExpertiseTEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas Expertise
 
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
 
Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
yousef_cv_mk
yousef_cv_mk yousef_cv_mk
yousef_cv_mk
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 

Kürzlich hochgeladen

Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programsitadmin50
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 

Kürzlich hochgeladen (20)

Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Deforestation
DeforestationDeforestation
Deforestation
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 

Phase of project Environment (Tendering to construction )

  • 1. Project Phases (Environment) By Harush D P Process Design Engineer harush.24u@gmail.com
  • 2. Environment • Comprises of our surroundings • Air • Water • Soil • others
  • 3. Pollution  Human activities  Deforestation  Industrialization  Uncontrolled Discharges
  • 4. Water Treatment  Domestic sewage  Industrial Effluent  Drinking water treatment
  • 5. Type of treatment  Primary treatment  Secondary  Aerobic  Anaerobic  Anoxic  Tertiary
  • 6. Projects  Drinking Water Treatment Projects  Jackwell, pipeline and ESR construction for water supply  Water supply Networking  Sewage Treatment Plants  UGD for cities  Industrial Effluent Treatment projects  CETP  Operation and Maintenance
  • 7. Tender  Prepare tender document by reputed consultants  Government Bodies call for tenders  Specify Requirements  Floats tender via various Media  Calls for bidding
  • 8.
  • 9. Tender Contents  Important Dates  Scope of work  PRQ  Pre-bid Details  Technical Details  Financial details (project Estimated cost)  Bidding process  Cost Breakups
  • 10.
  • 11.
  • 12.
  • 13. Working  Process Design (units its sizing and Process flow drawing)  Civil Estimation ( Quantities)  Mechanical Estimation ( Equipment's, Pipes, Valves,)  Instrumentation Estimation ( Scada Design and Estimation)  Electrical Estimation ( Power Requirement, Costing)  Operation and Maintenance ( Labor, Chemical, Power Requirement Etc)  Over all cost calculation  Cash flow preparation  Construction schedule preparation.  E-Portal Submission of Documents and EMD
  • 14. Notifications  After successful submission check for regular notification.  Date of opening of Technical BID.  Date of opening of Financial BID.  Lowes BID qualification.  Award of contract.
  • 15. Project Phases  Preparation of Technical Documents  Getting approval from consultant and client.  Process Design calculations  Mass Balance  Hydraulic Design Calculations  Drain Calculations  Plant Water Utility  Datasheet for mechanical Equipment's  Structural Design calculations
  • 16. Drawing Approvals  PFD  Layout  Hydraulic Flow Drawing  Mass Balance  P&ID  Mechanical GA  Equipment GA  Civil GA  Structural Drawing
  • 17. Mean while at site  Topographical Survey Completion  Site Mobilization  Site Clearing  Compound Structure  Drainages  Excavations
  • 18. Site Progress  After approval of drawings construction commences.  As per Planned Construction Schedule.  Getting Release of RA Bills as per the progress of work.  Hydraulic Testing of Structures  Mechanical Equipment's Installations  Testing of Equipment's  Completion of work and trial run
  • 19. Operation and Maintenance  Flow measurement  Inlet Parameter Analysis  Stabilize the STP  Culture Development  Chemical Dosing  Achievement of said outlet parameter  Trouble shooting
  • 20. Design Glimpse  Analyze the type of effluent to be treated  Collect population density of area and sources of waste generation  Collect Flow quantity (hydraulic Loading)  Collect Effluent Quality parameters (Organic Loading)  Analyze and plan process design units  Collect standards required from Standard Manuals (CPHEEO)  Collects Requirements Specified by Client  Collect Area Available for construction and inlet point of effluent
  • 21. Designing  A sewage Treatment plant will be designed with following flow  SPS (sewage Pumping Station)  MPS (Main Pumping Station)  STP (Sewage Treatment Plant)  Disposal of Treated Sewage  Treatment Of Sludge and its Disposal
  • 22. MPS (Main Pumping Station)  Why ?  Units  Inlet chamber  Course Screen Channel  Wetwell  Pumps and pumping main
  • 23. STP  Receives Flow from MPS/ISPS  Units  Inlet chamber  Fine screen Channel  Grit Chamber  Flow Measurement  Secondary Treatment unit (SBR, ASP, MBBR,)(Digester, Trickling Filter etc)  Clarifier  Disinfection unit (CCT)  Disposal or Tertiary treatment
  • 24. Sludge Treatment  Sludge Sump  Gravity Sludge Thickener (GST)  Sludge Digester/Sludge Holding Tank  Gas Holder, Power Generation units  Centrifuge/Belt Filter  Sludge Cake Disposal
  • 29. Complete plant, Digesters and gas holders