SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
TIME From To
1
2
Green Orange Red
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
2.1
2.2
2.3
2.4
2.5
2.6
Emergency preparedness management
Individual OSH performance measurements
Record keeping
Page 1 of 5
Consistent disciplinary procedure for OSH violators
Commitment and follow-up actions
1.0 TOP MANAGEMENT PHILOSOPHY AND COMMITMENT
Two-way communications between top management
and employee
DATE
NAME OF AUDITORS
Response to citation
Recognition system for outstanding section and/or
individual (if any)
General OSH awareness
OSH organizational structure
2.0 ORGANIZATIONAL STRUCTURE AND RESOURCES
Budget for OSH activities
Training need analysis and training plan
Specific and clear OSH responsibilities and
accountability for all levels of management
Motivated management and employees
Company OSH policies
Company OSH goals and measurements
Comment
SIGNATURE
Audited items ( verification of documentation, interviews, plant
tour )
COMPANY &
ADDRESS
AUDIT CHECKLIST
Understanding and compliance of legislation
TOTAL SCORE
SAFETY & HEALTH
MANAGEMENT PLAN
NAGANO BUILDER PROJECT SAFETY PLAN
Green Orange Red
3.1
3.2
3.3
4.1
4.2
4.3
4.3
4.4
5.1
5.2
5.3
5.4
5.5
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
TOTAL SCORE
Regular inspections
Adequate machine guarding for all equipment and
machines
Audited items ( verification of documentation, interviews, plant
tour )
Adequate disciplinary action for violators
Adequate training for all employees
Validation of site permit
Update and availability of applicable legislation, codes
of practice (CP) and relevant Malaysia Standards
AUDIT CHECKLIST
Adequate control for contractors working on electrical
supplies
Validation of applicable electrical licenses and permits
Adequate warning signs for high and low tension power
supplies
Adequate identification for authorized electricians or
contractors
Applicable permit for corrosive, poisonous storage tanks
/ vessels
Adequate warning signs
Adequate fall protection
Restricted area control
Secondary containment for such tanks/vessels
Adequate walkway, passage-way
Safe construction of handrails
Conditions for mobile and fixed ladders
Slip, over-head, fall and/or trip hazards
Safe and sound materials storage/stacking
6.0 PROVISION FOR A SAFE WORKPLACE
4.0 MACHINE GUARDING COMPLIANCE
Page 2 of 5
Regular inspections
Restricted area control
Appropriate OSH training for new and existing
employees
Comment
3.0 UPDATE OF APPLICABLE PERMITS & LEGISLATION
5.0 ELECTRICAL SAFETY COMPLIANCE
OSH inspections and records
NAGANO BUILDER PROJECT SAFETY PLAN
Easy access to applicable permits and legislation
SAFETY & HEALTH
MANAGEMENT PLAN
Green Orange Red
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
8.1
8.2
8.3
8.4
8.5
8.6
8.7.
8.8
9.1
9.2
9.3
9.4
9.5
9.6
9.7
Audited items ( verification of documentation, interviews, plant
tour )
TOTAL SCORE
Permit-to-work system
Authorized entrants, standby attendants and site
supervisor
Comment
Restricted area control
Adequate written procedure and its enforcement
Confined space training for authorized employees and
or contractors
Personal protective equipment
Site supervision and air monitoring records
Disciplinary procedure for violators
Adequate warning signs
7.0 WORK IN CONFINED SPACE
Fire fighting and protection equipment, such as
sprinklers, fire extinguishers, hose-reels, etc.
Flammable substances control & storage
Means of escape (free from obstructions)
8.0 FIRE PREVENTION
Adequate signs for exits and fire fighting equipment
Housekeeping
Inspections, testing and drill records
Written emergency evacuation plan
Adequate training for all employees
Register for hoists, lift, lifting gears and appliances
9.0 LIFTING EQUIPMENT
Permits for these equipment
Stencils for safe working load limit
Restricted area control
Preventive maintenance, testing, inspection records
Written operating procedures
Adequate training for all employees
Page 3 of 5
AUDIT CHECKLIST
SAFETY & HEALTH
MANAGEMENT PLAN
NAGANO BUILDER PROJECT SAFETY PLAN
Green Orange Red
10.1
10.2
10.3
10.4
11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
1.10
11.1
11.1
12.1
12.2
12.3
12.4
12.5
Communication channels
Audited items ( verification of documentation, interviews, plant
tour )
AUDIT CHECKLIST
Register of PPE recipients
Hazard assessment
10.0 PERSONAL PROTECTIVE EQUIPMENT (PPE)
Written purchasing and operating procedures
Adequate training for all employees
Written operating and emergency procedures
Disciplinary procedure for violators
11.0 CHEMICAL SAFETY DATA SHEET
Ventilation
Personal protective equipment
Restricted area control
Medical surveillance
Applicable permit for corrosive, poisonous storage
Notification to authorities
Preventive maintenance and inspection records
Availability of specific permit/license
Investigation and follow-up actions
12.0 REPORTING OF ACCIDENTS
Written procedure
Risk/hazard assessment and records
TOTAL SCORE
Page 4 of 5
Adequate training for all employees
Comment
Access to CSDS
Warning signs
SAFETY & HEALTH
MANAGEMENT PLAN
NAGANO BUILDER PROJECT SAFETY PLAN
Green Orange Red
13.1
13.2
13.4
13.5
13.6
13.7
13.8
13.9
13.10
13.11
13.12
13.13
13.14
SCORE
5
3
0
A
B
C
D
E
Air, water, soil monitoring and testing
Restricted area control
Warning signs
TOTAL SCORE
Ventilation
Drainage
Medical surveillance
Lighting
Overcrowding
Sanitary
Noise and vibration
Written procedure
GENERAL COMMENT
The contractor has shown full compliance and commitment towards safety and health issues at
site. They should maintain and improve further on certain aspects as shown in the "Orange"
column.
AUDIT RATING
COLOR
Cleanliness
GOOD
SATISFACTORY
AUDIT OVERALL SCORE
VERY GOOD
AUDIT GRADING
GREEN
ORANGE
EXCELLENT
AUDITED ELEMENTS DO NOT FULLY COMPLY WITH IN-HOUSE OSHMS
AUDITED ELEMENTS DO NOT COMPLY WITH IN-HOUSE OSHMS
AUDIT GRADING
OVERALL SCORE
RED
First aid facilities
Page 5 of 5
13.0 OCCUPATIONAL HEALTH AND WELFARE
UNSATISFACTORY
>90%
75% - 90%
50% - 75%
35% - 50%
< 35%
AUDITED ELEMENTS COMPLY WITH IN-HOUSE OSHMS
LEVEL OF SAFETY ACHIEVED
Audited items ( verification of documentation, interviews, plant
tour )
Comment
AUDIT CHECKLIST
SAFETY & HEALTH
MANAGEMENT PLAN
NAGANO BUILDER PROJECT SAFETY PLAN

Weitere ähnliche Inhalte

Was ist angesagt?

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)Yash Menghani
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
ISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDFISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDFmohammad riyaz
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptxMoolRaj3
 
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC Rev 2.docx
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC  Rev 2.docxAUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC  Rev 2.docx
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC Rev 2.docxDwarika Bhushan Sharma
 
7 point security inspection guide
7 point security inspection guide7 point security inspection guide
7 point security inspection guidehuynhloan
 
Brian Maynard Presentation Comedy Safety Unsafe Acts
Brian Maynard Presentation Comedy Safety Unsafe ActsBrian Maynard Presentation Comedy Safety Unsafe Acts
Brian Maynard Presentation Comedy Safety Unsafe Actsgitjiggy
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all ANUPAM RAY
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safetyPrudhvi raj
 

Was ist angesagt? (20)

Powered Pallet Jack Safety Poster
Powered Pallet Jack Safety PosterPowered Pallet Jack Safety Poster
Powered Pallet Jack Safety Poster
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
 
Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)Corrective & Preventive actions (CAPA)
Corrective & Preventive actions (CAPA)
 
Scaffold
ScaffoldScaffold
Scaffold
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Root Cause Analysis ( RCA )
Root Cause Analysis ( RCA )Root Cause Analysis ( RCA )
Root Cause Analysis ( RCA )
 
ISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDFISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDF
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
 
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC Rev 2.docx
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC  Rev 2.docxAUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC  Rev 2.docx
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC Rev 2.docx
 
7 point security inspection guide
7 point security inspection guide7 point security inspection guide
7 point security inspection guide
 
Brian Maynard Presentation Comedy Safety Unsafe Acts
Brian Maynard Presentation Comedy Safety Unsafe ActsBrian Maynard Presentation Comedy Safety Unsafe Acts
Brian Maynard Presentation Comedy Safety Unsafe Acts
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Root cause analysis 1
Root cause analysis 1Root cause analysis 1
Root cause analysis 1
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Safety rules for injection molding
Safety rules for injection moldingSafety rules for injection molding
Safety rules for injection molding
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
Ftt machine safety
Ftt machine safetyFtt machine safety
Ftt machine safety
 

Ähnlich wie APPENDIX D - AUDIT CHECKLIST.pdf

OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulationssanjeev saraf
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 finalSamarth Mewada
 
A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements360factors
 
HVAC & Water in Pharmaceutical Mnaufacturing; From Theory to Application
HVAC & Water in Pharmaceutical Mnaufacturing; From Theory to ApplicationHVAC & Water in Pharmaceutical Mnaufacturing; From Theory to Application
HVAC & Water in Pharmaceutical Mnaufacturing; From Theory to ApplicationObaid Ali / Roohi B. Obaid
 
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSEGLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSESigma-HSE (UK) Ltd
 
Untitled.fr10
Untitled.fr10Untitled.fr10
Untitled.fr10ECRD IN
 
Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018JAHANGIR MIAN
 
ADEPP &amp; Configuration Management
ADEPP &amp; Configuration ManagementADEPP &amp; Configuration Management
ADEPP &amp; Configuration ManagementFabienne Salimi
 
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreoMejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreogafch
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANDwarika Bhushan Sharma
 
SGS - Development of UAV Operations Manuals
SGS - Development of UAV Operations ManualsSGS - Development of UAV Operations Manuals
SGS - Development of UAV Operations ManualsSGS
 
Navigating Pharmacovigilance
Navigating PharmacovigilanceNavigating Pharmacovigilance
Navigating PharmacovigilanceLauren Carr
 

Ähnlich wie APPENDIX D - AUDIT CHECKLIST.pdf (20)

Process-flow CHART.
Process-flow CHART.Process-flow CHART.
Process-flow CHART.
 
OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulations
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 final
 
A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements
 
HVAC & Water in Pharmaceutical Mnaufacturing; From Theory to Application
HVAC & Water in Pharmaceutical Mnaufacturing; From Theory to ApplicationHVAC & Water in Pharmaceutical Mnaufacturing; From Theory to Application
HVAC & Water in Pharmaceutical Mnaufacturing; From Theory to Application
 
john corr cv feb 2016
john corr cv feb 2016john corr cv feb 2016
john corr cv feb 2016
 
john corr cv feb 2016
john corr cv feb 2016john corr cv feb 2016
john corr cv feb 2016
 
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSEGLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
 
Safety cv(1)
Safety cv(1)Safety cv(1)
Safety cv(1)
 
Untitled.fr10
Untitled.fr10Untitled.fr10
Untitled.fr10
 
Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018
 
ADEPP &amp; Configuration Management
ADEPP &amp; Configuration ManagementADEPP &amp; Configuration Management
ADEPP &amp; Configuration Management
 
Design qualification
Design qualificationDesign qualification
Design qualification
 
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreoMejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
 
ABHI REPORT
ABHI REPORTABHI REPORT
ABHI REPORT
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
 
SGS - Development of UAV Operations Manuals
SGS - Development of UAV Operations ManualsSGS - Development of UAV Operations Manuals
SGS - Development of UAV Operations Manuals
 
Navigating Pharmacovigilance
Navigating PharmacovigilanceNavigating Pharmacovigilance
Navigating Pharmacovigilance
 

Kürzlich hochgeladen

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Kürzlich hochgeladen (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

APPENDIX D - AUDIT CHECKLIST.pdf

  • 1. TIME From To 1 2 Green Orange Red 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 2.1 2.2 2.3 2.4 2.5 2.6 Emergency preparedness management Individual OSH performance measurements Record keeping Page 1 of 5 Consistent disciplinary procedure for OSH violators Commitment and follow-up actions 1.0 TOP MANAGEMENT PHILOSOPHY AND COMMITMENT Two-way communications between top management and employee DATE NAME OF AUDITORS Response to citation Recognition system for outstanding section and/or individual (if any) General OSH awareness OSH organizational structure 2.0 ORGANIZATIONAL STRUCTURE AND RESOURCES Budget for OSH activities Training need analysis and training plan Specific and clear OSH responsibilities and accountability for all levels of management Motivated management and employees Company OSH policies Company OSH goals and measurements Comment SIGNATURE Audited items ( verification of documentation, interviews, plant tour ) COMPANY & ADDRESS AUDIT CHECKLIST Understanding and compliance of legislation TOTAL SCORE SAFETY & HEALTH MANAGEMENT PLAN NAGANO BUILDER PROJECT SAFETY PLAN
  • 2. Green Orange Red 3.1 3.2 3.3 4.1 4.2 4.3 4.3 4.4 5.1 5.2 5.3 5.4 5.5 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 TOTAL SCORE Regular inspections Adequate machine guarding for all equipment and machines Audited items ( verification of documentation, interviews, plant tour ) Adequate disciplinary action for violators Adequate training for all employees Validation of site permit Update and availability of applicable legislation, codes of practice (CP) and relevant Malaysia Standards AUDIT CHECKLIST Adequate control for contractors working on electrical supplies Validation of applicable electrical licenses and permits Adequate warning signs for high and low tension power supplies Adequate identification for authorized electricians or contractors Applicable permit for corrosive, poisonous storage tanks / vessels Adequate warning signs Adequate fall protection Restricted area control Secondary containment for such tanks/vessels Adequate walkway, passage-way Safe construction of handrails Conditions for mobile and fixed ladders Slip, over-head, fall and/or trip hazards Safe and sound materials storage/stacking 6.0 PROVISION FOR A SAFE WORKPLACE 4.0 MACHINE GUARDING COMPLIANCE Page 2 of 5 Regular inspections Restricted area control Appropriate OSH training for new and existing employees Comment 3.0 UPDATE OF APPLICABLE PERMITS & LEGISLATION 5.0 ELECTRICAL SAFETY COMPLIANCE OSH inspections and records NAGANO BUILDER PROJECT SAFETY PLAN Easy access to applicable permits and legislation SAFETY & HEALTH MANAGEMENT PLAN
  • 3. Green Orange Red 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.1 8.2 8.3 8.4 8.5 8.6 8.7. 8.8 9.1 9.2 9.3 9.4 9.5 9.6 9.7 Audited items ( verification of documentation, interviews, plant tour ) TOTAL SCORE Permit-to-work system Authorized entrants, standby attendants and site supervisor Comment Restricted area control Adequate written procedure and its enforcement Confined space training for authorized employees and or contractors Personal protective equipment Site supervision and air monitoring records Disciplinary procedure for violators Adequate warning signs 7.0 WORK IN CONFINED SPACE Fire fighting and protection equipment, such as sprinklers, fire extinguishers, hose-reels, etc. Flammable substances control & storage Means of escape (free from obstructions) 8.0 FIRE PREVENTION Adequate signs for exits and fire fighting equipment Housekeeping Inspections, testing and drill records Written emergency evacuation plan Adequate training for all employees Register for hoists, lift, lifting gears and appliances 9.0 LIFTING EQUIPMENT Permits for these equipment Stencils for safe working load limit Restricted area control Preventive maintenance, testing, inspection records Written operating procedures Adequate training for all employees Page 3 of 5 AUDIT CHECKLIST SAFETY & HEALTH MANAGEMENT PLAN NAGANO BUILDER PROJECT SAFETY PLAN
  • 4. Green Orange Red 10.1 10.2 10.3 10.4 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 1.10 11.1 11.1 12.1 12.2 12.3 12.4 12.5 Communication channels Audited items ( verification of documentation, interviews, plant tour ) AUDIT CHECKLIST Register of PPE recipients Hazard assessment 10.0 PERSONAL PROTECTIVE EQUIPMENT (PPE) Written purchasing and operating procedures Adequate training for all employees Written operating and emergency procedures Disciplinary procedure for violators 11.0 CHEMICAL SAFETY DATA SHEET Ventilation Personal protective equipment Restricted area control Medical surveillance Applicable permit for corrosive, poisonous storage Notification to authorities Preventive maintenance and inspection records Availability of specific permit/license Investigation and follow-up actions 12.0 REPORTING OF ACCIDENTS Written procedure Risk/hazard assessment and records TOTAL SCORE Page 4 of 5 Adequate training for all employees Comment Access to CSDS Warning signs SAFETY & HEALTH MANAGEMENT PLAN NAGANO BUILDER PROJECT SAFETY PLAN
  • 5. Green Orange Red 13.1 13.2 13.4 13.5 13.6 13.7 13.8 13.9 13.10 13.11 13.12 13.13 13.14 SCORE 5 3 0 A B C D E Air, water, soil monitoring and testing Restricted area control Warning signs TOTAL SCORE Ventilation Drainage Medical surveillance Lighting Overcrowding Sanitary Noise and vibration Written procedure GENERAL COMMENT The contractor has shown full compliance and commitment towards safety and health issues at site. They should maintain and improve further on certain aspects as shown in the "Orange" column. AUDIT RATING COLOR Cleanliness GOOD SATISFACTORY AUDIT OVERALL SCORE VERY GOOD AUDIT GRADING GREEN ORANGE EXCELLENT AUDITED ELEMENTS DO NOT FULLY COMPLY WITH IN-HOUSE OSHMS AUDITED ELEMENTS DO NOT COMPLY WITH IN-HOUSE OSHMS AUDIT GRADING OVERALL SCORE RED First aid facilities Page 5 of 5 13.0 OCCUPATIONAL HEALTH AND WELFARE UNSATISFACTORY >90% 75% - 90% 50% - 75% 35% - 50% < 35% AUDITED ELEMENTS COMPLY WITH IN-HOUSE OSHMS LEVEL OF SAFETY ACHIEVED Audited items ( verification of documentation, interviews, plant tour ) Comment AUDIT CHECKLIST SAFETY & HEALTH MANAGEMENT PLAN NAGANO BUILDER PROJECT SAFETY PLAN