In Environmental Stress Screening
(ESS), When To Do Vibration
Environmental stress screening of a product is a process which involves the application of one
or more specific types of environmental stresses for the purpose of precipitating to hard failure,
latent, intermittent, or incipient defects or flaws which would cause product failure in the use
environment. The stress may be applied in combination or in sequence on an accelerated basis
but within product design capabilities.
Our requirements to improve the operational performance of End-Units while reducing their
operating and support costs can be met only by improving their quality and reliability. ESS has
been shown to be a significant aid towards meeting these objectives.
ESS is a cost-effective means of improving quality and reliability of electrical, electronic,
electro-optical, electromechanical assemblies and systems at a time when defect removal is
relatively inexpensive. Random Vibration and Temperature Cycling have proven to be the most
successful forms of ESS in terms of flaw precipitation.
ESS is a process rather than a test in the normal accept/reject sense. Those participating in the
effort, including the contractor, should never be led to believe that a “failure” is bad and would
be held against them. ESS is intended to stimulate defects, not to simulate the operating
environment, and therefore, factory “failures” are encouraged. The root causes of ESS failures
need to be found and corrected before there is a complete process.
Today, true random and quasi-random vibration are used almost exclusively for ESS. True
random vibration, which is well known in the ESS community, applies all frequencies in a
certain bandwidth (usually 20 to 2000 HZ) and is neither cyclic nor repetitive. Quasi-random
vibration, on the other hand, is a relatively new technology using pneumatically driven vibrators
which generate repetitive pulses. For screening applications, several (Usually 4 to 6) of these
vibrators are attached to a specially designed shaker table which is allowed to vibrate in multiple
axes simultaneously. This complex motion (6 degrees of freedom vibration–3 linear axes and 3
rotational axes) is very effective in finding all types of flaws.
It is not difficult to visualize that the complex interactions possible under random vibration can
induce a wider variety of relative motions in an assembly. As indicated by Table 1, vibration is
the area of stressing that normally precipitates latent assembly flaws caused by the undesired
relative motion of parts, wires, structural elements, etc., as well as mechanical flaws that lead to
propagating cracks.
As indicated in Table 1, some types of flaws may be precipitated to failures by either thermal
cycling or random vibration. However, it is important to note that thermal cycling and random
vibration are synergistic. For example, thermal cycling following random vibration sometimes
leads to detection of vibration induced failures that were not apparent immediately. There have
been reported cases where a very small flaw did not propagate to the point of detectability during
random vibration, but advanced to the point of detectability during subsequent thermal cycling.
Hilaire Ananda Perera
http://www.linkedin.com/in/hilaireperera
Ref: ESS Guidelines July 1993; A Tri-Service (Army, Navy, Air Force) Technical Brief

1
The combined efforts (synergism) between vibration and thermal cycling suggests that
concurrent application of the two stress types may be desirable. This combined environment is
in fact sometimes used in ESS, but more often is avoided because it requires more elaborate
facilities. Also, concurrent application of random vibration and thermal cycling can make it
difficult to determine what caused a defect so that corrective action can be taken.
If random vibration and thermal cycling are to be conducted sequentially, random vibration
would usually be done first. A more effective sequence would be five minutes of random
vibration prior to thermal cycling, and another five minutes of random vibration following.

Table 1: Screening Environments Versus Typical Failure Mechanics

SCREENING ENVIRONMENT
Thermal Cycling
•

Particle Contamination

•

Chaffed, Pinched Wires

•

Defective Crystals

Component
Incorrectly Installed

•

Mixed Assemblies

•

Wrong Component

•

•

Adjacent Boards
Rubbing

Hermetic Seal
Failure

•

Chemical
Contamination

•
•
•

TYPE OF FAILURES

Vibration

•

Component
Parameter Drift
PWA Open / Shorts

Thermal or Vibration
•

Defective Solder
Joints

•

Loose Hardware

•

Defective Components

•

Fasteners

•

Broken Component

Two Components
Shorting

•

Surface Mount
Technology Flaws

•

Loose Wire

•

Improperly Etched
PWAs

•

Defective Harness
Termination

•

Poorly Bonded
Component

•

Improper Crimp

•

•

Inadequately Secured
Parts

Poor Bonding

•

•

Mechanical Flaws

Hairline Cracks in
Parts

•

Improperly Seated
Connectors

•

Out-Of-Tolerance
Parts

Hilaire Ananda Perera
http://www.linkedin.com/in/hilaireperera
Ref: ESS Guidelines July 1993; A Tri-Service (Army, Navy, Air Force) Technical Brief

2

Weitere ähnliche Inhalte

Was ist angesagt?

Power systems analysis and design pdf
Power systems analysis and design pdfPower systems analysis and design pdf
Power systems analysis and design pdf
krishna290
 
Smart Power Grid Monitoring System
Smart Power Grid Monitoring SystemSmart Power Grid Monitoring System
Smart Power Grid Monitoring System
Imane Haf
 
Introduction of wide area mesurement syatem
Introduction of wide area mesurement syatemIntroduction of wide area mesurement syatem
Introduction of wide area mesurement syatem
PanditNitesh
 

Was ist angesagt? (20)

Power systems analysis and design pdf
Power systems analysis and design pdfPower systems analysis and design pdf
Power systems analysis and design pdf
 
IEEE 1547
IEEE 1547IEEE 1547
IEEE 1547
 
Electrical energy meter
Electrical energy meterElectrical energy meter
Electrical energy meter
 
Integration of Renewable Distributed Generators in Distribution System
Integration of Renewable Distributed Generators in Distribution System Integration of Renewable Distributed Generators in Distribution System
Integration of Renewable Distributed Generators in Distribution System
 
Smart Power Grid Monitoring System
Smart Power Grid Monitoring SystemSmart Power Grid Monitoring System
Smart Power Grid Monitoring System
 
Chapter1 - Signal and System
Chapter1 - Signal and SystemChapter1 - Signal and System
Chapter1 - Signal and System
 
Modern power system planning new
Modern power system planning newModern power system planning new
Modern power system planning new
 
Energy management system
Energy management systemEnergy management system
Energy management system
 
Introduction of wide area mesurement syatem
Introduction of wide area mesurement syatemIntroduction of wide area mesurement syatem
Introduction of wide area mesurement syatem
 
WIDE AREA PROTECTION IN POWER SYSTEMS
WIDE AREA PROTECTION IN POWER SYSTEMSWIDE AREA PROTECTION IN POWER SYSTEMS
WIDE AREA PROTECTION IN POWER SYSTEMS
 
Power quality disturbances
Power quality disturbancesPower quality disturbances
Power quality disturbances
 
Smart energy meter ppt
Smart energy meter   pptSmart energy meter   ppt
Smart energy meter ppt
 
Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation Control
 
Lecture-1 : Introduction to Power Electronics
Lecture-1 : Introduction to Power ElectronicsLecture-1 : Introduction to Power Electronics
Lecture-1 : Introduction to Power Electronics
 
Smart grid
Smart  gridSmart  grid
Smart grid
 
Introduction to Microgrid
Introduction to Microgrid Introduction to Microgrid
Introduction to Microgrid
 
Energy management-system-ppt
Energy management-system-pptEnergy management-system-ppt
Energy management-system-ppt
 
Smart energy meter (Updated)
Smart energy meter (Updated)Smart energy meter (Updated)
Smart energy meter (Updated)
 
Smart Grid
Smart GridSmart Grid
Smart Grid
 
Energy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptxEnergy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptx
 

Ähnlich wie Vibration before thermal cycling in ESS

ICOMS2002-ABSORBER
ICOMS2002-ABSORBERICOMS2002-ABSORBER
ICOMS2002-ABSORBER
Ray Beebe
 

Ähnlich wie Vibration before thermal cycling in ESS (20)

Chapter 1
Chapter 1Chapter 1
Chapter 1
 
G010523539
G010523539G010523539
G010523539
 
Relays book.pdf
Relays book.pdfRelays book.pdf
Relays book.pdf
 
ICOMS2002-ABSORBER
ICOMS2002-ABSORBERICOMS2002-ABSORBER
ICOMS2002-ABSORBER
 
Vibration analysis and modelling of cantilever beam
Vibration analysis and modelling of cantilever beam Vibration analysis and modelling of cantilever beam
Vibration analysis and modelling of cantilever beam
 
Ijariie1165
Ijariie1165Ijariie1165
Ijariie1165
 
Theory of vibration
Theory of vibrationTheory of vibration
Theory of vibration
 
Chakresh Tiwari Philips report
Chakresh Tiwari Philips reportChakresh Tiwari Philips report
Chakresh Tiwari Philips report
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Identification of coulomb, viscous and particle damping parameters from the r...
Identification of coulomb, viscous and particle damping parameters from the r...Identification of coulomb, viscous and particle damping parameters from the r...
Identification of coulomb, viscous and particle damping parameters from the r...
 
6004312 0000 eng_a_w
6004312 0000 eng_a_w6004312 0000 eng_a_w
6004312 0000 eng_a_w
 
ED7104 VAC_notes
ED7104 VAC_notesED7104 VAC_notes
ED7104 VAC_notes
 
industrial vibration control method
industrial vibration control methodindustrial vibration control method
industrial vibration control method
 
Mechanical Vibration
Mechanical VibrationMechanical Vibration
Mechanical Vibration
 
Free Vibrational Analysis of Cracked and Un-cracked Cantilever Beam
Free Vibrational Analysis of Cracked and Un-cracked Cantilever BeamFree Vibrational Analysis of Cracked and Un-cracked Cantilever Beam
Free Vibrational Analysis of Cracked and Un-cracked Cantilever Beam
 
IRJET- Transient Analysis of Twin Spool Aero-Gas Turbine Engine
IRJET- Transient Analysis of Twin Spool Aero-Gas Turbine EngineIRJET- Transient Analysis of Twin Spool Aero-Gas Turbine Engine
IRJET- Transient Analysis of Twin Spool Aero-Gas Turbine Engine
 
Case Studies from 25 Years of Troubleshooting Vibration Problems.pdf
Case Studies from 25 Years of Troubleshooting Vibration Problems.pdfCase Studies from 25 Years of Troubleshooting Vibration Problems.pdf
Case Studies from 25 Years of Troubleshooting Vibration Problems.pdf
 
Partial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
Partial Discharge Techniques For Measuring Condition Of MV & HV SwitchgearPartial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
Partial Discharge Techniques For Measuring Condition Of MV & HV Switchgear
 
VIBRATION LEVEL OPTIMIZATION OF LATHE MACHINE BY CONSIDERING NONLINEARITIES I...
VIBRATION LEVEL OPTIMIZATION OF LATHE MACHINE BY CONSIDERING NONLINEARITIES I...VIBRATION LEVEL OPTIMIZATION OF LATHE MACHINE BY CONSIDERING NONLINEARITIES I...
VIBRATION LEVEL OPTIMIZATION OF LATHE MACHINE BY CONSIDERING NONLINEARITIES I...
 
Ms chapter 6
Ms chapter 6Ms chapter 6
Ms chapter 6
 

Mehr von Hilaire (Ananda) Perera P.Eng.

Basic Design Considerations for Surface Mount Technology
Basic Design Considerations for Surface Mount TechnologyBasic Design Considerations for Surface Mount Technology
Basic Design Considerations for Surface Mount Technology
Hilaire (Ananda) Perera P.Eng.
 

Mehr von Hilaire (Ananda) Perera P.Eng. (20)

ESS and HASS: Concerns with the Practices and Standards
ESS and HASS:  Concerns with the Practices and StandardsESS and HASS:  Concerns with the Practices and Standards
ESS and HASS: Concerns with the Practices and Standards
 
CALCE Test Services and Failure Analysis (TSFA) Laboratory
CALCE Test Services and Failure Analysis (TSFA) LaboratoryCALCE Test Services and Failure Analysis (TSFA) Laboratory
CALCE Test Services and Failure Analysis (TSFA) Laboratory
 
IEEE 1633 Recommended Practice on Software Reliability
IEEE 1633 Recommended Practice on Software ReliabilityIEEE 1633 Recommended Practice on Software Reliability
IEEE 1633 Recommended Practice on Software Reliability
 
BIOMASS Based Power ( Electrical & Thermal )
BIOMASS Based Power ( Electrical & Thermal )BIOMASS Based Power ( Electrical & Thermal )
BIOMASS Based Power ( Electrical & Thermal )
 
Reliability Growth Testing (RGT) Plan
Reliability Growth Testing (RGT) Plan Reliability Growth Testing (RGT) Plan
Reliability Growth Testing (RGT) Plan
 
Statistical Confidence Level
Statistical Confidence LevelStatistical Confidence Level
Statistical Confidence Level
 
Reliability if "m" of "n" Must be Working
Reliability if "m" of "n" Must be WorkingReliability if "m" of "n" Must be Working
Reliability if "m" of "n" Must be Working
 
Outgoing Reliability Assurance of 'End-Units'
Outgoing Reliability Assurance of 'End-Units'Outgoing Reliability Assurance of 'End-Units'
Outgoing Reliability Assurance of 'End-Units'
 
Transient Suppressors
Transient SuppressorsTransient Suppressors
Transient Suppressors
 
Reliability Prediction Procedure for Mechanical Components
Reliability Prediction Procedure for Mechanical ComponentsReliability Prediction Procedure for Mechanical Components
Reliability Prediction Procedure for Mechanical Components
 
Software Reliability
Software ReliabilitySoftware Reliability
Software Reliability
 
Virtual Qualification
Virtual QualificationVirtual Qualification
Virtual Qualification
 
Availability
AvailabilityAvailability
Availability
 
Testability
TestabilityTestability
Testability
 
Accelerated Stress Testing
Accelerated Stress TestingAccelerated Stress Testing
Accelerated Stress Testing
 
Early Life Failure Rate Calculation Procedure for Semiconductor Components
Early Life Failure Rate Calculation Procedure for Semiconductor ComponentsEarly Life Failure Rate Calculation Procedure for Semiconductor Components
Early Life Failure Rate Calculation Procedure for Semiconductor Components
 
Use of Failure Mechanisms enhance FMEA and FMECA
Use of Failure Mechanisms enhance FMEA and FMECAUse of Failure Mechanisms enhance FMEA and FMECA
Use of Failure Mechanisms enhance FMEA and FMECA
 
Basic Design Considerations for Surface Mount Technology
Basic Design Considerations for Surface Mount TechnologyBasic Design Considerations for Surface Mount Technology
Basic Design Considerations for Surface Mount Technology
 
Thermal cycling screen development
Thermal cycling screen developmentThermal cycling screen development
Thermal cycling screen development
 
Design For Reliability
Design For ReliabilityDesign For Reliability
Design For Reliability
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 

Vibration before thermal cycling in ESS

  • 1. In Environmental Stress Screening (ESS), When To Do Vibration Environmental stress screening of a product is a process which involves the application of one or more specific types of environmental stresses for the purpose of precipitating to hard failure, latent, intermittent, or incipient defects or flaws which would cause product failure in the use environment. The stress may be applied in combination or in sequence on an accelerated basis but within product design capabilities. Our requirements to improve the operational performance of End-Units while reducing their operating and support costs can be met only by improving their quality and reliability. ESS has been shown to be a significant aid towards meeting these objectives. ESS is a cost-effective means of improving quality and reliability of electrical, electronic, electro-optical, electromechanical assemblies and systems at a time when defect removal is relatively inexpensive. Random Vibration and Temperature Cycling have proven to be the most successful forms of ESS in terms of flaw precipitation. ESS is a process rather than a test in the normal accept/reject sense. Those participating in the effort, including the contractor, should never be led to believe that a “failure” is bad and would be held against them. ESS is intended to stimulate defects, not to simulate the operating environment, and therefore, factory “failures” are encouraged. The root causes of ESS failures need to be found and corrected before there is a complete process. Today, true random and quasi-random vibration are used almost exclusively for ESS. True random vibration, which is well known in the ESS community, applies all frequencies in a certain bandwidth (usually 20 to 2000 HZ) and is neither cyclic nor repetitive. Quasi-random vibration, on the other hand, is a relatively new technology using pneumatically driven vibrators which generate repetitive pulses. For screening applications, several (Usually 4 to 6) of these vibrators are attached to a specially designed shaker table which is allowed to vibrate in multiple axes simultaneously. This complex motion (6 degrees of freedom vibration–3 linear axes and 3 rotational axes) is very effective in finding all types of flaws. It is not difficult to visualize that the complex interactions possible under random vibration can induce a wider variety of relative motions in an assembly. As indicated by Table 1, vibration is the area of stressing that normally precipitates latent assembly flaws caused by the undesired relative motion of parts, wires, structural elements, etc., as well as mechanical flaws that lead to propagating cracks. As indicated in Table 1, some types of flaws may be precipitated to failures by either thermal cycling or random vibration. However, it is important to note that thermal cycling and random vibration are synergistic. For example, thermal cycling following random vibration sometimes leads to detection of vibration induced failures that were not apparent immediately. There have been reported cases where a very small flaw did not propagate to the point of detectability during random vibration, but advanced to the point of detectability during subsequent thermal cycling. Hilaire Ananda Perera http://www.linkedin.com/in/hilaireperera Ref: ESS Guidelines July 1993; A Tri-Service (Army, Navy, Air Force) Technical Brief 1
  • 2. The combined efforts (synergism) between vibration and thermal cycling suggests that concurrent application of the two stress types may be desirable. This combined environment is in fact sometimes used in ESS, but more often is avoided because it requires more elaborate facilities. Also, concurrent application of random vibration and thermal cycling can make it difficult to determine what caused a defect so that corrective action can be taken. If random vibration and thermal cycling are to be conducted sequentially, random vibration would usually be done first. A more effective sequence would be five minutes of random vibration prior to thermal cycling, and another five minutes of random vibration following. Table 1: Screening Environments Versus Typical Failure Mechanics SCREENING ENVIRONMENT Thermal Cycling • Particle Contamination • Chaffed, Pinched Wires • Defective Crystals Component Incorrectly Installed • Mixed Assemblies • Wrong Component • • Adjacent Boards Rubbing Hermetic Seal Failure • Chemical Contamination • • • TYPE OF FAILURES Vibration • Component Parameter Drift PWA Open / Shorts Thermal or Vibration • Defective Solder Joints • Loose Hardware • Defective Components • Fasteners • Broken Component Two Components Shorting • Surface Mount Technology Flaws • Loose Wire • Improperly Etched PWAs • Defective Harness Termination • Poorly Bonded Component • Improper Crimp • • Inadequately Secured Parts Poor Bonding • • Mechanical Flaws Hairline Cracks in Parts • Improperly Seated Connectors • Out-Of-Tolerance Parts Hilaire Ananda Perera http://www.linkedin.com/in/hilaireperera Ref: ESS Guidelines July 1993; A Tri-Service (Army, Navy, Air Force) Technical Brief 2