SlideShare ist ein Scribd-Unternehmen logo
1 von 15
A SEMINAR ON
GENERATION OF ELECTRICITY
USING ROAD TRANSPORT PRESSURE
BY
KADTARE GOURI SATEJ
SHARAD INSTITUTE OF TECHNOLOGY COLLEGE OF
ENGINEERING , YADRAV.
Contents
1. Introduction
2. Load Considerations
3. Components of System
4. Specifications of Speed Breaker
5. Working Process
6. Calculation of Input Energy and Output Energy
7. Advantages
8. Disadvantages
9. Conclusion
10.Reference
8/11/2019 2
INTRODUCTION
 Need of renewable energy-
Conventional energy resources are limited i.e. fossil fuels,
Nuclear energy etc.
 Wastage of kinetic energy of vehicles passing over a speed
breaker-
Energy of vehicle is wasted as heat in it.
8/11/2019 3
Continue
 Using wasted kinetic energy in producing electricity –
Extraction of such kinetic energy can be used to produce and
store electricity.
 Speed breaker generator for extraction of energy
Principle of working- Simply energy conversion from
mechanical to electrical.
8/11/2019 4
Load Considerations
 The Roads are different at different locations, when we design
something related to roads, it is must to consider all type of loads. [1]
1) Bus= 10200 kg at back axle
2) Multi-Axle Volvo= 14500 kg at back axle
3) 3 axles rigid lorry= 26000 kg
4) 5 axle vehicle with draw bar trailer = 36000 kg
5) 6 axle draw bar heavy duty lorry = 41000 kg
6) 6 axles artic heavy duty vehicle = 44000 kg
8/11/2019 5
Components
The system consists of following Electro- Mechanical elements:
1. Plate
2. Fixture and constrains
3. Sprocket and chain
4. Unidirectional ball bearing
5. Flywheel
6. Generator
7. Storage battery
8/11/2019 6
Fig. No.1 components of speed breaker generator
(Reference- IJEST Volume 2, Issue 3, May 2013.)8/11/2019 7
 The material used for construction of speed breakers is steel.
 Height of Speed Breakers is 10 to 12cm.
 Fixture used - L shaped clamp or an inverted T clamp.
Specifications of Speed Breakers
8/11/2019 8
Working Process
Ref. (Power Ramp, Hughes Research)8/11/2019 9
Considering 7 kg load (m) on the pressure lever, the lever travels a distance of 0.152 meter (S) and
the total time taken to travel this distance is 0.717 seconds(t). RPM for one Stroke is 1014. [1]
‱ Input power-
Work done = W= F*S
= mg*S
= 7*9.81*0.152
= 10.43 Joule
Input Power = Total Work done / Total time
taken to do the work
= 10.43/0.717
= 14.55 Watt
‱ Output Power = Voltage * Current
= 4 * 0.5
= 2 Watt
Efficiency = (Output Power /
Input Power)*100 %
= (2/14.55)*100 %
= 13.75%
Calculations of Input Power
and Output Power
8/11/2019 10
Advantages
 It can eliminate the transmission system (electric towers) in rural areas.
 Simple construction.
 Offers renewable energy having very less environmental impact.
8/11/2019 11
Disadvantages
 It may not work with light weight vehicle.
 Require more suitable and compact mechanisms to enhance efficiency.
 Checking of mechanism from time to time in short span of period.
 Because of Rain water it may get damaged.
8/11/2019 12
Conclusion
‱ In coming days, it will prove a great boon to the world, since it will save a
lot of electricity of power plants that gets wasted in illuminating the street
lights.
‱ Vehicular traffic can be utilized for proper generation by means of a new
technique called “power hump”. It has advantages that it does not utilize
any external source.
8/11/2019 13
Reference
1. Saiful Islam, Syed Khalid Rahman, ‘Generation of Electricity using Load Transport
Pressure’, International Journal of Engineering Science and Innovative Technology
(IJESIT) Volume 2, Issue 3, May 2013.
2. Shakun Srivastava, Ankit Asthana, “Produce Electricity by the use of Speed Breakers,”
Journal of Engineering Research and Studies, Vol.2, No.1 April-Jun 2011.
3. ‘Anusandhana’ Journal of Science Engineering and Management, Vol- 3, Issue-1, June
2014, published by- NITTE Meenakshi Institute Of Technology, Karnataka, India.
8/11/2019 14
THANK YOU !
8/11/2019 15

Weitere Àhnliche Inhalte

Was ist angesagt?

Power generation from speed breakers
Power generation from speed breakersPower generation from speed breakers
Power generation from speed breakers
Biswajit Pratihari
 
POWER GENERATION FROM SPEED BREAKERS
POWER GENERATION FROM SPEED BREAKERSPOWER GENERATION FROM SPEED BREAKERS
POWER GENERATION FROM SPEED BREAKERS
Shyam Kumar
 
power generation using speed breakers synopsis
power generation using speed breakers synopsispower generation using speed breakers synopsis
power generation using speed breakers synopsis
rdeepali92
 
Electromagnetic braking
Electromagnetic brakingElectromagnetic braking
Electromagnetic braking
Surya Prakash
 

Was ist angesagt? (20)

Energy Generation from road speed breaker
Energy Generation from road speed breakerEnergy Generation from road speed breaker
Energy Generation from road speed breaker
 
Power generation through speed breaker
Power generation through speed breakerPower generation through speed breaker
Power generation through speed breaker
 
Power generation from speed breakers
Power generation from speed breakersPower generation from speed breakers
Power generation from speed breakers
 
electricity generating by using speed breaker
electricity generating by using speed breakerelectricity generating by using speed breaker
electricity generating by using speed breaker
 
Power generation using speed breakers
Power generation using speed breakersPower generation using speed breakers
Power generation using speed breakers
 
FOOT STEP POWER GENERATION
FOOT STEP POWER GENERATIONFOOT STEP POWER GENERATION
FOOT STEP POWER GENERATION
 
Power generation using speed breakers
Power generation using speed breakersPower generation using speed breakers
Power generation using speed breakers
 
Control of wind turbines
Control of wind turbinesControl of wind turbines
Control of wind turbines
 
Ultrasonic motor
Ultrasonic motorUltrasonic motor
Ultrasonic motor
 
Extraction of electricity from speed breakers
Extraction of electricity from speed breakersExtraction of electricity from speed breakers
Extraction of electricity from speed breakers
 
Foot step power generation.ppt
Foot step power generation.pptFoot step power generation.ppt
Foot step power generation.ppt
 
Walk n charge
Walk n chargeWalk n charge
Walk n charge
 
POWER GENERATION FROM SPEED BREAKERS
POWER GENERATION FROM SPEED BREAKERSPOWER GENERATION FROM SPEED BREAKERS
POWER GENERATION FROM SPEED BREAKERS
 
power generation using speed breakers synopsis
power generation using speed breakers synopsispower generation using speed breakers synopsis
power generation using speed breakers synopsis
 
Electro magnetic brake
Electro  magnetic brakeElectro  magnetic brake
Electro magnetic brake
 
Electromagnetic braking
Electromagnetic brakingElectromagnetic braking
Electromagnetic braking
 
Seminar report on foot step power generation
Seminar report on foot step power generationSeminar report on foot step power generation
Seminar report on foot step power generation
 
power generation through foot step
power generation through foot steppower generation through foot step
power generation through foot step
 
Comparison and analysis of electrical motor used in Electric Vehicles..
Comparison and analysis of electrical motor used in Electric Vehicles..Comparison and analysis of electrical motor used in Electric Vehicles..
Comparison and analysis of electrical motor used in Electric Vehicles..
 
Solar power satellite
Solar power satellite Solar power satellite
Solar power satellite
 

Ähnlich wie Generation of electricity using road trasport pressure

AStudyofElectricBike-FutureNeeds.pdf
AStudyofElectricBike-FutureNeeds.pdfAStudyofElectricBike-FutureNeeds.pdf
AStudyofElectricBike-FutureNeeds.pdf
tonnguyn16516
 
Modeling and experimental analysis of variable speed three phase squirrel 2
Modeling and experimental  analysis of variable speed three phase squirrel 2Modeling and experimental  analysis of variable speed three phase squirrel 2
Modeling and experimental analysis of variable speed three phase squirrel 2
IAEME Publication
 

Ähnlich wie Generation of electricity using road trasport pressure (20)

Design and Development of Solar Two Wheeler
Design and Development of Solar Two WheelerDesign and Development of Solar Two Wheeler
Design and Development of Solar Two Wheeler
 
IRJET- Solar Powered Electric Bicycle
IRJET-  	  Solar Powered Electric BicycleIRJET-  	  Solar Powered Electric Bicycle
IRJET- Solar Powered Electric Bicycle
 
IRJET- A Review on Design and Fabrication of a Solar Roadways
IRJET- A Review on Design and Fabrication of a Solar RoadwaysIRJET- A Review on Design and Fabrication of a Solar Roadways
IRJET- A Review on Design and Fabrication of a Solar Roadways
 
HYBRID ROAD RAIL POWER GENERATOR
HYBRID ROAD RAIL POWER GENERATORHYBRID ROAD RAIL POWER GENERATOR
HYBRID ROAD RAIL POWER GENERATOR
 
IRJET- Review on Power Charging Unit using Rotary Leverage System
IRJET-  	  Review on Power Charging Unit using Rotary Leverage SystemIRJET-  	  Review on Power Charging Unit using Rotary Leverage System
IRJET- Review on Power Charging Unit using Rotary Leverage System
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
 
PNEUMATIC & ELECTROMAGNATIC HYBRID ENGINE
PNEUMATIC & ELECTROMAGNATIC HYBRID ENGINEPNEUMATIC & ELECTROMAGNATIC HYBRID ENGINE
PNEUMATIC & ELECTROMAGNATIC HYBRID ENGINE
 
IRJET- A Study on Campus-Friendly Solar Powered Electric Vehicle
IRJET-  	  A Study on Campus-Friendly Solar Powered Electric VehicleIRJET-  	  A Study on Campus-Friendly Solar Powered Electric Vehicle
IRJET- A Study on Campus-Friendly Solar Powered Electric Vehicle
 
IRJET- Design and Analysis of Vertical Axis Wind Turbine
IRJET- Design and Analysis of Vertical Axis Wind TurbineIRJET- Design and Analysis of Vertical Axis Wind Turbine
IRJET- Design and Analysis of Vertical Axis Wind Turbine
 
AStudyofElectricBike-FutureNeeds.pdf
AStudyofElectricBike-FutureNeeds.pdfAStudyofElectricBike-FutureNeeds.pdf
AStudyofElectricBike-FutureNeeds.pdf
 
Design And Development of Vertical Axis Turbine for Charging Moving Electrica...
Design And Development of Vertical Axis Turbine for Charging Moving Electrica...Design And Development of Vertical Axis Turbine for Charging Moving Electrica...
Design And Development of Vertical Axis Turbine for Charging Moving Electrica...
 
Power Generation Using Rumblers
Power Generation Using RumblersPower Generation Using Rumblers
Power Generation Using Rumblers
 
pptonprojecttopicebs-df
pptonprojecttopicebs-dfpptonprojecttopicebs-df
pptonprojecttopicebs-df
 
Ppt on project_ELECTOMAGNETIC_BRAKING_SYSTEM
Ppt on project_ELECTOMAGNETIC_BRAKING_SYSTEMPpt on project_ELECTOMAGNETIC_BRAKING_SYSTEM
Ppt on project_ELECTOMAGNETIC_BRAKING_SYSTEM
 
Ppt on project_ELECTOMAGNETIC_BRAKING_SYSTEM
Ppt on project_ELECTOMAGNETIC_BRAKING_SYSTEMPpt on project_ELECTOMAGNETIC_BRAKING_SYSTEM
Ppt on project_ELECTOMAGNETIC_BRAKING_SYSTEM
 
Automatic Solar Grass Cutter Machine
Automatic Solar Grass Cutter MachineAutomatic Solar Grass Cutter Machine
Automatic Solar Grass Cutter Machine
 
Modeling and experimental analysis of variable speed three phase squirrel 2
Modeling and experimental  analysis of variable speed three phase squirrel 2Modeling and experimental  analysis of variable speed three phase squirrel 2
Modeling and experimental analysis of variable speed three phase squirrel 2
 
case study on energy conservation and utilization.
case study on energy conservation and utilization.case study on energy conservation and utilization.
case study on energy conservation and utilization.
 
Ijmet 06 07_010
Ijmet 06 07_010Ijmet 06 07_010
Ijmet 06 07_010
 
Ijmet 06 07_010
Ijmet 06 07_010Ijmet 06 07_010
Ijmet 06 07_010
 

KĂŒrzlich hochgeladen

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

KĂŒrzlich hochgeladen (20)

BhubaneswarđŸŒčCall Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
BhubaneswarđŸŒčCall Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...BhubaneswarđŸŒčCall Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
BhubaneswarđŸŒčCall Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Generation of electricity using road trasport pressure

  • 1. A SEMINAR ON GENERATION OF ELECTRICITY USING ROAD TRANSPORT PRESSURE BY KADTARE GOURI SATEJ SHARAD INSTITUTE OF TECHNOLOGY COLLEGE OF ENGINEERING , YADRAV.
  • 2. Contents 1. Introduction 2. Load Considerations 3. Components of System 4. Specifications of Speed Breaker 5. Working Process 6. Calculation of Input Energy and Output Energy 7. Advantages 8. Disadvantages 9. Conclusion 10.Reference 8/11/2019 2
  • 3. INTRODUCTION  Need of renewable energy- Conventional energy resources are limited i.e. fossil fuels, Nuclear energy etc.  Wastage of kinetic energy of vehicles passing over a speed breaker- Energy of vehicle is wasted as heat in it. 8/11/2019 3
  • 4. Continue  Using wasted kinetic energy in producing electricity – Extraction of such kinetic energy can be used to produce and store electricity.  Speed breaker generator for extraction of energy Principle of working- Simply energy conversion from mechanical to electrical. 8/11/2019 4
  • 5. Load Considerations  The Roads are different at different locations, when we design something related to roads, it is must to consider all type of loads. [1] 1) Bus= 10200 kg at back axle 2) Multi-Axle Volvo= 14500 kg at back axle 3) 3 axles rigid lorry= 26000 kg 4) 5 axle vehicle with draw bar trailer = 36000 kg 5) 6 axle draw bar heavy duty lorry = 41000 kg 6) 6 axles artic heavy duty vehicle = 44000 kg 8/11/2019 5
  • 6. Components The system consists of following Electro- Mechanical elements: 1. Plate 2. Fixture and constrains 3. Sprocket and chain 4. Unidirectional ball bearing 5. Flywheel 6. Generator 7. Storage battery 8/11/2019 6
  • 7. Fig. No.1 components of speed breaker generator (Reference- IJEST Volume 2, Issue 3, May 2013.)8/11/2019 7
  • 8.  The material used for construction of speed breakers is steel.  Height of Speed Breakers is 10 to 12cm.  Fixture used - L shaped clamp or an inverted T clamp. Specifications of Speed Breakers 8/11/2019 8
  • 9. Working Process Ref. (Power Ramp, Hughes Research)8/11/2019 9
  • 10. Considering 7 kg load (m) on the pressure lever, the lever travels a distance of 0.152 meter (S) and the total time taken to travel this distance is 0.717 seconds(t). RPM for one Stroke is 1014. [1] ‱ Input power- Work done = W= F*S = mg*S = 7*9.81*0.152 = 10.43 Joule Input Power = Total Work done / Total time taken to do the work = 10.43/0.717 = 14.55 Watt ‱ Output Power = Voltage * Current = 4 * 0.5 = 2 Watt Efficiency = (Output Power / Input Power)*100 % = (2/14.55)*100 % = 13.75% Calculations of Input Power and Output Power 8/11/2019 10
  • 11. Advantages  It can eliminate the transmission system (electric towers) in rural areas.  Simple construction.  Offers renewable energy having very less environmental impact. 8/11/2019 11
  • 12. Disadvantages  It may not work with light weight vehicle.  Require more suitable and compact mechanisms to enhance efficiency.  Checking of mechanism from time to time in short span of period.  Because of Rain water it may get damaged. 8/11/2019 12
  • 13. Conclusion ‱ In coming days, it will prove a great boon to the world, since it will save a lot of electricity of power plants that gets wasted in illuminating the street lights. ‱ Vehicular traffic can be utilized for proper generation by means of a new technique called “power hump”. It has advantages that it does not utilize any external source. 8/11/2019 13
  • 14. Reference 1. Saiful Islam, Syed Khalid Rahman, ‘Generation of Electricity using Load Transport Pressure’, International Journal of Engineering Science and Innovative Technology (IJESIT) Volume 2, Issue 3, May 2013. 2. Shakun Srivastava, Ankit Asthana, “Produce Electricity by the use of Speed Breakers,” Journal of Engineering Research and Studies, Vol.2, No.1 April-Jun 2011. 3. ‘Anusandhana’ Journal of Science Engineering and Management, Vol- 3, Issue-1, June 2014, published by- NITTE Meenakshi Institute Of Technology, Karnataka, India. 8/11/2019 14