Earned Value Management
Overview
Earned Value Management (EVM) is a project management technique that
objectively tracks physical accomplishment of work.
More elaborately:
 EVM is used to track the progress and status of a project and forecasts the likely future
performance of the project.
 EVM integrates the scope, schedule, and cost of a project.
 EVM answers a lot of questions to the stakeholders in a project related to its performance.
 EVM can be used to show the past and the current performance of a project and predict
the future performance of the project by the use of statistical techniques.
 Good planning coupled with effective use of EVM will reduce a lot of issues arising out of
schedule and cost overruns.
EVM has emerged as a financial analysis specialty in United States Government
programs in the 1960s, but it has since become a significant branch of project
management.
In the late 1980s and early 1990s, EVM emerged as a project management
methodology to be understood and used by managers and executives, not just EVM
specialists. Today, EVM has become an essential part of every project tracking.
EVM - Basic Elements
EVM consists of the following three basic elements:
www.educatererindia.com , 07830294949 Gautam Singh
 Planned Value
 Actual Cost
 Earned Value
All the three elements are captured on a regular basis as of a reporting date.
Planned Value
Planned value (PV) is also referred to as Budgeted Cost of Work Scheduled (BCWS).
PV or BCWS is the total cost of the work scheduled/planned as of a reporting date.
It is calculated as:
PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled
NOTE: Hourly Rate is the rate at which effort will be valued.
Actual Cost
Actual cost (AC) is also referred to as Actual Cost of Work Performed (ACWP). AC or
ACWP is the total cost taken to complete the work as of a reporting date.
It is calculated as:
AC or ACWP = Hourly Rate × Total Hours Spent
Earned Value
Earned value (EV) is also referred to as Budgeted Cost of Work Performed (BCWP).
EV or BCWP is the total cost of the work completed/performed as of a reporting date.
It is calculated as:
EV or BCWP = Baselined Cost × % Complete Actual
All these three elements can be derived from Work Breakdown Structure by
associating the costs to each of the tasks. For a big project, it will be a tedious task
to calculate these elements manually. Scheduling software tools like Microsoft Project
is used to calculate these three elements.
NOTE: % Completed Planned and % Completed Actual are defined below.
% Completed Planned
The percentage of work which was planned to be completed by the Reporting Date.
It is calculated using the following formula:
% Completed Planned = PV / BAC
www.educatererindia.com , 07830294949 Gautam Singh
% Completed Actual
The percentage of work which was actually completed by the Reporting Date. It is
calculated using the following formula:
% Completed Actual = AC / EAC
EVM - Cost Variance
Cost Variance (CV) is a very important factor to measure project performance. CV
indicates how much over - or under-budget the project is.
CV can be calculated using the following formula:
Cost Variance (CV) = Earned Value (EV) − Actual Cost (AC)
OR
Cost Variance (CV) = BCWP − ACWP
 The formula mentioned above gives the variance in terms of cost.
 Positive CV indicates the project is under-budget.
 Negative CV indicates the project is over-budget.
Cost Variance %
Cost Variance % indicates how much over - or under-budget the project is in terms
of percentage.
Cost Variance % can be calculated using the following formula:
CV % = Cost Variance (CV) ⁄ Earned Value (EV)
OR
CV % = CV ⁄ BCWP
 The formula mentioned above gives the variance in terms of percentage.
 Positive Variance % indicates % under budget
 Negative Variance % indicates % over budget.
Cost Performance Indicator
Cost Performance Indicator (CPI) is an index showing the efficiency of the utilization
of the resources on the project. CPI can be calculated using the following formula:
CPI = Earned Value (EV) ⁄ Actual Cost (AC)
OR
www.educatererindia.com , 07830294949 Gautam Singh
CPI = BCWP ⁄ ACWP
 The formula mentioned above gives the efficiency of the utilization of the resources
allocated to the project.
 A CPI value above 1 indicates the efficiency of utilizing the resources allocated to the
project is good.
 A CPI value below 1 indicates the efficiency of utilizing the resources allocated to the
project is not good.
To Complete Cost Performance Indicator
To Complete Cost Performance Indicator (TCPI) is an index showing the efficiency at
which the resources on the project should be utilized for the remainder of the
project. It can be calculated using the following formula:
TCPI = ( Total Budget − EV ) ⁄ ( Total Budget − AC )
OR
TCPI = ( Total Budget − BCWP ) ⁄ ( Total Budget − ACWP )
 The formula mentioned above gives the efficiency at which the project team should be
utilized for the remainder of the project.
 A TCPI value above 1 indicates the utilization of the project team for the remainder of the
project can be stringent.
 A TCPI value below 1 indicates the utilization of the project team for the remainder of the
project should be lenient.
EVM - Schedule Variance
Schedule Variance (SV) indicates how much ahead or behind the schedule a project
is running.
It can be calculated using the following formula:
Schedule Variance (SV) = Earned Value (EV) − Planned Value (PV)
OR
Schedule Variance (SV) = BCWP − BCWS
 The formula mentioned above gives the variance in terms of cost which indicates how
much cost of the work is yet to be completed as per schedule or how much cost of work
has been completed over and above the scheduled cost.
 A positive SV indicates we are ahead of schedule.
www.educatererindia.com , 07830294949 Gautam Singh
 A negative SV indicates we are behind schedule.
Schedule Variance %
Schedule Variance % indicates how much ahead or behind the schedule a project is
running in terms of percentage.
Schedule Variance % can be calculated using the following formula:
SV % = Schedule Variance (SV) ⁄ Planned Value (PV)
OR
SV % = SV ⁄ BCWS
 The formula mentioned above gives the variance in terms of percentage which indicates
how much percentage of work is yet to be completed as per schedule or how much
percentage of work has been completed over and above the scheduled cost.
 Positive Variance % indicates % ahead of schedule.
 Negative Variance % indicates % behind of schedule.
Schedule Performance Indicator
Schedule Performance Indicator (SPI) is an index showing the efficiency of the time
utilized on the project. SPI can be calculated using the following formula:
SPI = Earned Value (EV) ⁄ Planned Value (PV)
OR
SPI = BCWP ⁄ BCWS
 The formula mentioned above gives the efficiency of the project team in utilizing the time
allocated for the project.
 An SPI value above 1 indicates the project team is very efficient in utilizing the time
allocated to the project.
 An SPI value below 1 indicates the project team is less efficient in utilizing the time
allocated to the project.
To Complete Schedule Performance Indicator
To Complete Schedule Performance Indicator (TSPI) is an index showing the
efficiency at which the remaining time on the project should be utilized. It can be
calculated using the following formula:
TSPI = ( Total Budget − EV ) ⁄ ( Total Budget − PV )
www.educatererindia.com , 07830294949 Gautam Singh
OR
TSPI = ( Total Budget − BCWP ) ⁄ ( Total Budget − BCWS )
 The formula mentioned above gives the efficiency at which the project team should utilize
the remaining time allocated for the project.
 A TSPI value below 1 indicates the project team can be lenient in utilizing the remaining
time allocated to the project.
 A TSPI value above 1 indicates the project team needs to work harder in utilizing the
remaining time allocated to the project.
EVM - Miscellaneous Formula
Budget at Completion
 Budget at Completion (BAC) is the total budget allocated to the project.
 BAC is generally plotted over time. For example, periods of reporting (Monthly, Weekly,
etc.)
 BAC is used to compute the Estimate at Completion (EAC), explained in the next section.
 BAC is also used to compute the TCPI and TSPI.
BAC is calculated using the following formula:
BAC = Baselined Effort − hours × Hourly Rate
Estimate to Complete
 Estimate to Complete (ETC) is the estimated cost required to complete the remainder of
the project.
 ETC is calculated and applied when the past estimating assumptions become invalid and a
need for fresh estimates arises.
 ETC is used to compute the Estimation at Completion (EAC).
Estimate at Completion
Estimate at Completion (EAC) is the estimated cost of the project at the end of the
project.
There are three methods to calculate EAC:
www.educatererindia.com , 07830294949 Gautam Singh
 Variances are typical - This method is used when the variances at the current stage are
typical and are not expected to occur in the future.
 Past estimating assumptions are not valid - This method is used when the past
estimating assumptions are not valid and fresh estimates are applied to the project.
 Variances will be present in the future - This method is used when the assumption is
that the current variances will continue to be present in the future.
The formulas for calculation of the three methods are as given below:
 AC + (BAC − EV)
 AC + ETC (Estimate To Complete)
 AC + (BAC − EV) ⁄ CPI
Variance at Completion
Variance at completion (VAC) is the variance on the total budget at the end of the
project.
This is the difference between what the project was originally expected (baselined) to
cost versus what it is now expected to cost.
VAC is calculated using the following formula:
VAC = BAC − EAC
% Completed Planned
The percentage of work which was planned to be completed by the Reporting Date.
It is calculated using the following formula:
% Completed Planned = PV ⁄ BAC
% Completed Actual
The percentage of work which was actually completed by the Reporting Date. It is
calculated using the following formula:
% Completed Actual = AC ⁄ EAC
EVM - Examples
To illustrate the concept of EVM and all the formulas, assume a project that has
exactly one task. The task was baselined at 8 hours, but 11 hours have been spent
and the estimate to complete is 1 additional hour. The task would have been
completed already.
www.educatererindia.com , 07830294949 Gautam Singh
Assume an Hourly Rate of $100 per hour.
Using this information:
PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled
PV = $100 * 8 hours = $800
AC or ACWP = Hourly Rate × Total Hours Spent
AC = $100 * 11 hours = $1100
EV or BCWP = Baselined Cost × % Complete Actual
EV = baseline of $800 * 91.7% complete = $734
(NOTE % Complete Actual (below) to get the 91.7%)
BAC = Baselined Effort − hours × Hourly Rate
BAC = 8 hours * $100 = $800
EAC = AC + ETC
EAC = 1100 + 100 = $1200
VAC = BAC − EAC
VAC = $800 − $1200 = −$400
% Completed Planned = PV ⁄ BAC
% Complete Planned = $800 PV ⁄ $800 BAC = 100%
% Completed Actual = AC ⁄ EAC
% Complete Actual = $1100 AC ⁄ $1200 EAC = 91.7%
SV = Earned Value (EV) − Planned Value (PV)
SV = $734 EV − $800 PV = −$66
SPI = Earned Value (EV) ⁄ Planned Value (PV)
SPI = $734 EV ⁄ $800 PV = 0.91
CV = Earned Value (EV) − Actual Cost (AC)
www.educatererindia.com , 07830294949 Gautam Singh
CV = ($734 EV − $1100 AC) = −$366*
* indicates a cost overrun
CPI = Earned Value (EV) ⁄ Actual Cost (AC)
CPI = $734 EV ⁄ $1100 AC = 0.66*
* indicates over-budget

Weitere ähnliche Inhalte

Was ist angesagt?

A simple approach to understanding Earned Value Management
A simple approach to understanding Earned Value ManagementA simple approach to understanding Earned Value Management
A simple approach to understanding Earned Value ManagementProPM Academy
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)Harshit Mahajan
 
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...Tipsographic . com
 
Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentationProPM Academy
 
Evaluating Earned Value Management
Evaluating Earned Value ManagementEvaluating Earned Value Management
Evaluating Earned Value ManagementKristine Hejna
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management EssentialsGlen Alleman
 
Earned value in five easy pieces
Earned value in five easy piecesEarned value in five easy pieces
Earned value in five easy piecesGlen Alleman
 
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationEarned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationRicardo Viana Vargas
 
Earning Value from Earned Value Management
Earning Value from Earned Value ManagementEarning Value from Earned Value Management
Earning Value from Earned Value ManagementGlen Alleman
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction projectIAEME Publication
 
Project Management Earned Value
Project Management Earned ValueProject Management Earned Value
Project Management Earned Valueconstructioninside
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updatedShraddha PMP
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value AnalysisSaqib Raza
 

Was ist angesagt? (20)

The Benefits of using Earned Value Management
The Benefits of using Earned Value ManagementThe Benefits of using Earned Value Management
The Benefits of using Earned Value Management
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
A simple approach to understanding Earned Value Management
A simple approach to understanding Earned Value ManagementA simple approach to understanding Earned Value Management
A simple approach to understanding Earned Value Management
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
 
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
 
Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentation
 
Evaluating Earned Value Management
Evaluating Earned Value ManagementEvaluating Earned Value Management
Evaluating Earned Value Management
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management Essentials
 
Earned value in five easy pieces
Earned value in five easy piecesEarned value in five easy pieces
Earned value in five easy pieces
 
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationEarned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Earning Value from Earned Value Management
Earning Value from Earned Value ManagementEarning Value from Earned Value Management
Earning Value from Earned Value Management
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction project
 
Project Management Earned Value
Project Management Earned ValueProject Management Earned Value
Project Management Earned Value
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updated
 
PMP COST FORMULAE
PMP COST FORMULAEPMP COST FORMULAE
PMP COST FORMULAE
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
PMP Exam Formulas To Know
PMP Exam Formulas To KnowPMP Exam Formulas To Know
PMP Exam Formulas To Know
 

Ähnlich wie Earned value management

Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisBECM, RUET, Bangladesh
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.pptProfDrAnbalaganChinn
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneWaleed Hamdy Albana
 
projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)Nita Cristian
 
Project cost & control
Project cost & controlProject cost & control
Project cost & controlAMARAYYA
 
cost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.pptcost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.pptRedhaElhuni
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)Ejaz Bhatti
 
Track Project Performance - Earned Value Management
Track Project Performance - Earned Value ManagementTrack Project Performance - Earned Value Management
Track Project Performance - Earned Value ManagementBaroness PM
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1reddvise
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-controleidalin95
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 

Ähnlich wie Earned value management (20)

Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part One
 
projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)
 
Project cost & control
Project cost & controlProject cost & control
Project cost & control
 
cost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.pptcost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.ppt
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
Project Management EVM & SCBA
Project Management EVM & SCBAProject Management EVM & SCBA
Project Management EVM & SCBA
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)
 
Track Project Performance - Earned Value Management
Track Project Performance - Earned Value ManagementTrack Project Performance - Earned Value Management
Track Project Performance - Earned Value Management
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 

Mehr von Gautam Kumar

Customer relationship management
Customer relationship managementCustomer relationship management
Customer relationship managementGautam Kumar
 
Consumer behavior
Consumer behavior Consumer behavior
Consumer behavior Gautam Kumar
 
Collaborative management
Collaborative management Collaborative management
Collaborative management Gautam Kumar
 
Coaching and mentoring
Coaching and mentoring Coaching and mentoring
Coaching and mentoring Gautam Kumar
 
Classroom management
Classroom management Classroom management
Classroom management Gautam Kumar
 
Business sales training
Business sales training Business sales training
Business sales training Gautam Kumar
 
Business analysis
Business analysis Business analysis
Business analysis Gautam Kumar
 
Aviation management
Aviation managementAviation management
Aviation managementGautam Kumar
 
Appreciative inquiry
Appreciative inquiryAppreciative inquiry
Appreciative inquiryGautam Kumar
 
Upsc population and associated issues
Upsc   population and associated issuesUpsc   population and associated issues
Upsc population and associated issuesGautam Kumar
 
Upsc political philosophies like communism, capitalism, socialism etc. - th...
Upsc   political philosophies like communism, capitalism, socialism etc. - th...Upsc   political philosophies like communism, capitalism, socialism etc. - th...
Upsc political philosophies like communism, capitalism, socialism etc. - th...Gautam Kumar
 
Upsc important geophysical phenomena such as earthquakes, tsunami, volcanic...
Upsc   important geophysical phenomena such as earthquakes, tsunami, volcanic...Upsc   important geophysical phenomena such as earthquakes, tsunami, volcanic...
Upsc important geophysical phenomena such as earthquakes, tsunami, volcanic...Gautam Kumar
 
Upsc distribution of key natural resources across the world (including sout...
Upsc   distribution of key natural resources across the world (including sout...Upsc   distribution of key natural resources across the world (including sout...
Upsc distribution of key natural resources across the world (including sout...Gautam Kumar
 
Upsc salient features of world's physical geography
Upsc   salient features of world's physical geographyUpsc   salient features of world's physical geography
Upsc salient features of world's physical geographyGautam Kumar
 

Mehr von Gautam Kumar (20)

Customer relationship management
Customer relationship managementCustomer relationship management
Customer relationship management
 
Consumer behavior
Consumer behavior Consumer behavior
Consumer behavior
 
Collaborative management
Collaborative management Collaborative management
Collaborative management
 
Coaching and mentoring
Coaching and mentoring Coaching and mentoring
Coaching and mentoring
 
Classroom management
Classroom management Classroom management
Classroom management
 
Business sales training
Business sales training Business sales training
Business sales training
 
Business law
Business law Business law
Business law
 
Business analysis
Business analysis Business analysis
Business analysis
 
Brand management.
Brand management.Brand management.
Brand management.
 
Bank management
Bank management Bank management
Bank management
 
Aviation management
Aviation managementAviation management
Aviation management
 
Appreciative inquiry
Appreciative inquiryAppreciative inquiry
Appreciative inquiry
 
Advertisement
AdvertisementAdvertisement
Advertisement
 
Upsc population and associated issues
Upsc   population and associated issuesUpsc   population and associated issues
Upsc population and associated issues
 
Upsc political philosophies like communism, capitalism, socialism etc. - th...
Upsc   political philosophies like communism, capitalism, socialism etc. - th...Upsc   political philosophies like communism, capitalism, socialism etc. - th...
Upsc political philosophies like communism, capitalism, socialism etc. - th...
 
Upsc important geophysical phenomena such as earthquakes, tsunami, volcanic...
Upsc   important geophysical phenomena such as earthquakes, tsunami, volcanic...Upsc   important geophysical phenomena such as earthquakes, tsunami, volcanic...
Upsc important geophysical phenomena such as earthquakes, tsunami, volcanic...
 
Upsc distribution of key natural resources across the world (including sout...
Upsc   distribution of key natural resources across the world (including sout...Upsc   distribution of key natural resources across the world (including sout...
Upsc distribution of key natural resources across the world (including sout...
 
Upsc salient features of world's physical geography
Upsc   salient features of world's physical geographyUpsc   salient features of world's physical geography
Upsc salient features of world's physical geography
 
Hr terminology 3
Hr terminology 3Hr terminology 3
Hr terminology 3
 
Hr terminology 2
Hr terminology 2Hr terminology 2
Hr terminology 2
 

Kürzlich hochgeladen

Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhiguptaswati8536
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 

Kürzlich hochgeladen (15)

Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 

Earned value management

  • 1. www.educatererindia.com , 07830294949 Gautam Singh Earned Value Management Overview Earned Value Management (EVM) is a project management technique that objectively tracks physical accomplishment of work. More elaborately:  EVM is used to track the progress and status of a project and forecasts the likely future performance of the project.  EVM integrates the scope, schedule, and cost of a project.  EVM answers a lot of questions to the stakeholders in a project related to its performance.  EVM can be used to show the past and the current performance of a project and predict the future performance of the project by the use of statistical techniques.  Good planning coupled with effective use of EVM will reduce a lot of issues arising out of schedule and cost overruns. EVM has emerged as a financial analysis specialty in United States Government programs in the 1960s, but it has since become a significant branch of project management. In the late 1980s and early 1990s, EVM emerged as a project management methodology to be understood and used by managers and executives, not just EVM specialists. Today, EVM has become an essential part of every project tracking. EVM - Basic Elements EVM consists of the following three basic elements:
  • 2. www.educatererindia.com , 07830294949 Gautam Singh  Planned Value  Actual Cost  Earned Value All the three elements are captured on a regular basis as of a reporting date. Planned Value Planned value (PV) is also referred to as Budgeted Cost of Work Scheduled (BCWS). PV or BCWS is the total cost of the work scheduled/planned as of a reporting date. It is calculated as: PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled NOTE: Hourly Rate is the rate at which effort will be valued. Actual Cost Actual cost (AC) is also referred to as Actual Cost of Work Performed (ACWP). AC or ACWP is the total cost taken to complete the work as of a reporting date. It is calculated as: AC or ACWP = Hourly Rate × Total Hours Spent Earned Value Earned value (EV) is also referred to as Budgeted Cost of Work Performed (BCWP). EV or BCWP is the total cost of the work completed/performed as of a reporting date. It is calculated as: EV or BCWP = Baselined Cost × % Complete Actual All these three elements can be derived from Work Breakdown Structure by associating the costs to each of the tasks. For a big project, it will be a tedious task to calculate these elements manually. Scheduling software tools like Microsoft Project is used to calculate these three elements. NOTE: % Completed Planned and % Completed Actual are defined below. % Completed Planned The percentage of work which was planned to be completed by the Reporting Date. It is calculated using the following formula: % Completed Planned = PV / BAC
  • 3. www.educatererindia.com , 07830294949 Gautam Singh % Completed Actual The percentage of work which was actually completed by the Reporting Date. It is calculated using the following formula: % Completed Actual = AC / EAC EVM - Cost Variance Cost Variance (CV) is a very important factor to measure project performance. CV indicates how much over - or under-budget the project is. CV can be calculated using the following formula: Cost Variance (CV) = Earned Value (EV) − Actual Cost (AC) OR Cost Variance (CV) = BCWP − ACWP  The formula mentioned above gives the variance in terms of cost.  Positive CV indicates the project is under-budget.  Negative CV indicates the project is over-budget. Cost Variance % Cost Variance % indicates how much over - or under-budget the project is in terms of percentage. Cost Variance % can be calculated using the following formula: CV % = Cost Variance (CV) ⁄ Earned Value (EV) OR CV % = CV ⁄ BCWP  The formula mentioned above gives the variance in terms of percentage.  Positive Variance % indicates % under budget  Negative Variance % indicates % over budget. Cost Performance Indicator Cost Performance Indicator (CPI) is an index showing the efficiency of the utilization of the resources on the project. CPI can be calculated using the following formula: CPI = Earned Value (EV) ⁄ Actual Cost (AC) OR
  • 4. www.educatererindia.com , 07830294949 Gautam Singh CPI = BCWP ⁄ ACWP  The formula mentioned above gives the efficiency of the utilization of the resources allocated to the project.  A CPI value above 1 indicates the efficiency of utilizing the resources allocated to the project is good.  A CPI value below 1 indicates the efficiency of utilizing the resources allocated to the project is not good. To Complete Cost Performance Indicator To Complete Cost Performance Indicator (TCPI) is an index showing the efficiency at which the resources on the project should be utilized for the remainder of the project. It can be calculated using the following formula: TCPI = ( Total Budget − EV ) ⁄ ( Total Budget − AC ) OR TCPI = ( Total Budget − BCWP ) ⁄ ( Total Budget − ACWP )  The formula mentioned above gives the efficiency at which the project team should be utilized for the remainder of the project.  A TCPI value above 1 indicates the utilization of the project team for the remainder of the project can be stringent.  A TCPI value below 1 indicates the utilization of the project team for the remainder of the project should be lenient. EVM - Schedule Variance Schedule Variance (SV) indicates how much ahead or behind the schedule a project is running. It can be calculated using the following formula: Schedule Variance (SV) = Earned Value (EV) − Planned Value (PV) OR Schedule Variance (SV) = BCWP − BCWS  The formula mentioned above gives the variance in terms of cost which indicates how much cost of the work is yet to be completed as per schedule or how much cost of work has been completed over and above the scheduled cost.  A positive SV indicates we are ahead of schedule.
  • 5. www.educatererindia.com , 07830294949 Gautam Singh  A negative SV indicates we are behind schedule. Schedule Variance % Schedule Variance % indicates how much ahead or behind the schedule a project is running in terms of percentage. Schedule Variance % can be calculated using the following formula: SV % = Schedule Variance (SV) ⁄ Planned Value (PV) OR SV % = SV ⁄ BCWS  The formula mentioned above gives the variance in terms of percentage which indicates how much percentage of work is yet to be completed as per schedule or how much percentage of work has been completed over and above the scheduled cost.  Positive Variance % indicates % ahead of schedule.  Negative Variance % indicates % behind of schedule. Schedule Performance Indicator Schedule Performance Indicator (SPI) is an index showing the efficiency of the time utilized on the project. SPI can be calculated using the following formula: SPI = Earned Value (EV) ⁄ Planned Value (PV) OR SPI = BCWP ⁄ BCWS  The formula mentioned above gives the efficiency of the project team in utilizing the time allocated for the project.  An SPI value above 1 indicates the project team is very efficient in utilizing the time allocated to the project.  An SPI value below 1 indicates the project team is less efficient in utilizing the time allocated to the project. To Complete Schedule Performance Indicator To Complete Schedule Performance Indicator (TSPI) is an index showing the efficiency at which the remaining time on the project should be utilized. It can be calculated using the following formula: TSPI = ( Total Budget − EV ) ⁄ ( Total Budget − PV )
  • 6. www.educatererindia.com , 07830294949 Gautam Singh OR TSPI = ( Total Budget − BCWP ) ⁄ ( Total Budget − BCWS )  The formula mentioned above gives the efficiency at which the project team should utilize the remaining time allocated for the project.  A TSPI value below 1 indicates the project team can be lenient in utilizing the remaining time allocated to the project.  A TSPI value above 1 indicates the project team needs to work harder in utilizing the remaining time allocated to the project. EVM - Miscellaneous Formula Budget at Completion  Budget at Completion (BAC) is the total budget allocated to the project.  BAC is generally plotted over time. For example, periods of reporting (Monthly, Weekly, etc.)  BAC is used to compute the Estimate at Completion (EAC), explained in the next section.  BAC is also used to compute the TCPI and TSPI. BAC is calculated using the following formula: BAC = Baselined Effort − hours × Hourly Rate Estimate to Complete  Estimate to Complete (ETC) is the estimated cost required to complete the remainder of the project.  ETC is calculated and applied when the past estimating assumptions become invalid and a need for fresh estimates arises.  ETC is used to compute the Estimation at Completion (EAC). Estimate at Completion Estimate at Completion (EAC) is the estimated cost of the project at the end of the project. There are three methods to calculate EAC:
  • 7. www.educatererindia.com , 07830294949 Gautam Singh  Variances are typical - This method is used when the variances at the current stage are typical and are not expected to occur in the future.  Past estimating assumptions are not valid - This method is used when the past estimating assumptions are not valid and fresh estimates are applied to the project.  Variances will be present in the future - This method is used when the assumption is that the current variances will continue to be present in the future. The formulas for calculation of the three methods are as given below:  AC + (BAC − EV)  AC + ETC (Estimate To Complete)  AC + (BAC − EV) ⁄ CPI Variance at Completion Variance at completion (VAC) is the variance on the total budget at the end of the project. This is the difference between what the project was originally expected (baselined) to cost versus what it is now expected to cost. VAC is calculated using the following formula: VAC = BAC − EAC % Completed Planned The percentage of work which was planned to be completed by the Reporting Date. It is calculated using the following formula: % Completed Planned = PV ⁄ BAC % Completed Actual The percentage of work which was actually completed by the Reporting Date. It is calculated using the following formula: % Completed Actual = AC ⁄ EAC EVM - Examples To illustrate the concept of EVM and all the formulas, assume a project that has exactly one task. The task was baselined at 8 hours, but 11 hours have been spent and the estimate to complete is 1 additional hour. The task would have been completed already.
  • 8. www.educatererindia.com , 07830294949 Gautam Singh Assume an Hourly Rate of $100 per hour. Using this information: PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled PV = $100 * 8 hours = $800 AC or ACWP = Hourly Rate × Total Hours Spent AC = $100 * 11 hours = $1100 EV or BCWP = Baselined Cost × % Complete Actual EV = baseline of $800 * 91.7% complete = $734 (NOTE % Complete Actual (below) to get the 91.7%) BAC = Baselined Effort − hours × Hourly Rate BAC = 8 hours * $100 = $800 EAC = AC + ETC EAC = 1100 + 100 = $1200 VAC = BAC − EAC VAC = $800 − $1200 = −$400 % Completed Planned = PV ⁄ BAC % Complete Planned = $800 PV ⁄ $800 BAC = 100% % Completed Actual = AC ⁄ EAC % Complete Actual = $1100 AC ⁄ $1200 EAC = 91.7% SV = Earned Value (EV) − Planned Value (PV) SV = $734 EV − $800 PV = −$66 SPI = Earned Value (EV) ⁄ Planned Value (PV) SPI = $734 EV ⁄ $800 PV = 0.91 CV = Earned Value (EV) − Actual Cost (AC)
  • 9. www.educatererindia.com , 07830294949 Gautam Singh CV = ($734 EV − $1100 AC) = −$366* * indicates a cost overrun CPI = Earned Value (EV) ⁄ Actual Cost (AC) CPI = $734 EV ⁄ $1100 AC = 0.66* * indicates over-budget