SlideShare ist ein Scribd-Unternehmen logo
1 von 59
Kingdom of Morocco


   Natural Disaster Risk
  Management in Morocco
          For an integrated approach




Mohamed Tabyaoui Technical Adviser
to The Chief of Government           Davos 28 -08- 2012
Morocco
Decision making needs figures
 Earthquakes cost Morocco an average of
  85 M$ per year
 The North region are the most exposed
 The probability for an earthquake to cause
  a loss of 1.5 b $ is 25% on the coming 30
  years
Decision making needs figures
 Annual losses caused by floods are 5 times
  more important than those caused by
  earthquakes.
 Annual losses caused by flood are around
  0.44 b $ per year
 A tsunami similar to the one occurred in
  the 1755 will produce a wave high as 8 m
  and will sink the whole Casablanca port
Source
   All these figures are calculated and
    scenarios generated by Moroccan national
    hazard Probabilistic Risk Assessment
    (MnhPRA) a GIS software elaborated
    recently within the process of settling our
    new approach to tackle natural hazards
    risk management in Morocco
The story behind
Risk management analysis find-out
 Post crisis oriented
 Ex post financing
 Coordination needed among sectoral
  strategies
 Program overlapping
 Many actors but at different speed
 law text need updating
 ….etc
New strategy:Triggers
 Recent events 2004 earthquake in the
  North of Morocco
 Recurrent floods and drought
 Recurrent price volatility
 International organisations (sensitizing;
  technical support (WB, GFDR/UNISDR)
 awareness increasing among top
  management
The needs
   Develop Global and integrated strategy

   Coordinate all sectoral risk policies

   Cause change in paradigm: prevention
    and resilience first
The 3 pillars of our strategy
 1-price volatility
 2-Natural hazards
 3-Risks in Agriculture
Natural Hazards strategy
 Assessment and risk modeling in Morocco
 What if scenarios
 Sectorial Strategies elaboration
 National strategy
Assessment: perimeter
   5 major risks
       Floods
       Earthquakes
       Tsunamis
       Land slides
       Drought
Risk Modeling
                5. Estimate
                Losses




                4. Compute Damage




                3. Define and
                Overlay Inventory



                2. Characterize
                Hazard



                1. Identify Study
                Region


                                    #13
Assessment: Method
 Probabilistic model
 Economic model after a choc situation
 Assessment of risk perception into
  communities
Deployment/make it durable

    Official Institution for coordination
    Information system
    Financial instruments
Task force
 World Bank: coordination +International
  Experts hiring +project TOR + project
  supervising
 Swiss cooperation +GFDRR : Funds
 Consulting firm : Modeling and risk
  assessment
 MAGG: focal point, Coordination and follow
  up
 Departments: data, capacity building,
  deployment of sectoral strategies
Assessment: Project phases
 Hazard Modeling
 Vulnerability/ potential impacts
 What if scenarios
 cost/benefit analysis
Assessment objectives
   calculate with enough precision the level
    of exposure of infrastructure, population
       Calculate cost (average annual loss , Loss
        Exceedance Curve (LEC))
       casualities
       Cost benefit ananlysis of mitigation mesures
Data types
3 data types :

- Scientific data
 Sesmic data,
 Meteorology
   Hydrology
 MOU


-   infrastructure data

   Industrial zones, ports, airports, rail roads, bridges and road network,
    drinkable water canalisation, electrical network, housing, schools, mosks,
    sport facilities …etc.

-   Data about population
   Age,
   sexe,
   Social situation
Major partners
   Urbanism
   Education
   Agriculture
   Finance
   Equipment
       Rail roads
       Airports
       Dams
       Roads
       ports
   Health
   Weather Forcast
   water,
   Remote sensing,
   Scientific community and university
   lnsurance …
Data collection: The success factors

 Participative approach
 scientific quality of the work
 Respond to specific needs
 Involvement of politics
Assessment outputs
 Risk maps
 Risk modeling and simulations
 Impacts/potential losses
 Economic modeling assuming a chock
 What if scenarios
 Cost benefit analysis
What’s next

 Sectoral strategies:
 National strategy: aggregation of Sectoral
  Strategies
 National institutions for coordination
       National Bureau
       National Platform for Risk Management
 Information system
 Law texts
 Finance:
Financial instrument
 Annual Budgets
 National Fund for Natural Catastrophes
 Insurances
       Insurance to cover Natural catastrophes
       Insurance to cover extrem events in
        Agriculture
value added
 Readness and resilience for Morocco
  (infrastructure and population)
 Better cooperation at regional and
  international level
 Competitive advantage to attract
  investments in Morocco
In reel !
Risk Modling
Earthquake Catalogue              Compiled Catalogue

 Only large historical events prior
  to 1901 are considered from Peláez
  et al (2007).
 Events from 1901 to 1984 have
  been compiled from the book
  “Fichier des seismes du Maroc et
  des regions limitrophes 1901-1984
  by T.E. Cherkaoui 1988.
 Events from 1984 to 1990 have
  been compiled from updated
  additional records from Cherkaoui
  T.E. (personal communication)
 From 1990 to March 2010, event
  data has been received from
  CNRST
 March 2010 to March 2011 data has
  been received from ANSS




                                                            #28
Stochastic Events

Earthquake event never a
point source


Considered a line source
Area sources are
subdivided into Area-line
sources




Num of Seismic Sources -     22
Num of Stochastic Faults -
1,735
Num of Stochastic Events -
14,670




                                  #29
Sebou Basin: Hydraulic Model




                               #30
Stochastically simulated flows




                                 #31
Data used in Numerical Model
General Bathymetry Chart of Oceans (GEBCO): resolution (1 min)
          GRID A                             GRID B




          GRID C
                                             GRID D




                                                  High resolution bathymetry from
                                                  remote sensing departm ent and
                                                  topography from SRT M

                                                                                    #32
1st November 1755 Lisbon Tsunami – Contd.,
Extreme water surface elevations after 3
hrs of simulation
 Gorringe
 Bank
                                               MPTF/GB
                                               source
 source                                        (Baptista et
 (Johnson ,                                    al., 2003)
 1996)




 Cardiz                                        N160 source
 subduction                                    (Baptista et
 source                                        al., 1998)
 (Gutscher
 et al.,
 2002;
 Gutscher ,
 2004)




                                                   #33
LEC/AAC
1
    Definitions: LEC and AAL
                                      Kingdom of Morocco
                                 GDP MAD 1,300 billion (2011 est.)
       Probability of Loss      Budget: Expenditure: MAD 250 billion
       being Exceeded
          (per year)


              Loss Exceedance Curve
              (LEC)




0
                                                        Loss (MAD)
            Average Annual Loss (AAL)
                   (~ center of gravity)

                                                                #35
Average Annual Loss (AAL)
  Loss (MAD)                    AAL = ‘pure premium’

                               Insurance premium =
                           pure prem. + overhead + profit
        Average Annual Loss (AAL)




                                          time

        “ stochastic ” ~ random occurrence
                                                 #36
MnhPRA: Moroccan National Hazards Probabilistic Risk
Assessment

 Models were incorporated in SIG software
 Extensible
 adaptable
 free of charges (open source)
MnhPRA – Hazard data aggregation – Contd   .,




                                                # 38
MnhPRA – Hazard data aggregation




                                   # 39
Earthquake losses
                              Country Level Losses Million
                              MAD        Return Period
Occupancy             Average Annual Loss      20      50      100      500    1,000

Residential           506.5                  2,849   5,516    8,926   17,680   22,677

Commercial                           144.4    626    1,248    3,467   8,021    10,061
Industrial                            34.9    193      409    1,066   2,289     2,871
E.Facilities                          96.9    549    1,862    1,128   1,855     2,524
Infrastructures                       64.2    385      623      810   4,939     6,350


Total All Exposures                  846.8   4,602   9,658   15,397   34,784   44,482




                                                                        #40
Flood losses
Flood losses
                    Country Level Losses Million MAD
                                              Return Period
                  Average Annual
  Occupancy            Loss      20   50       100     500      1,000

  Residential         1,895     9,399 11,232 12,092    13,065   14,718

 Commercial           434       1,965 2,342    2,530   2,708    3,006

  Industrial          471       2,072 2,242    2,231   2,477    2,569

  Essential F         369       1,913 2,214    2,351   2,497    2,751

Infrastructures       1,210     3,152 3,323    3,218   3,427    3,648



 All Exposures        4,380     18,501 21,354 22,423   24,174   26,692
                                                                   #42
Tsunami losses




Country Level Losses Million MAD




                                   #43
Tsunami losses
                                           Return Period
                  Average Annual
Occupancy              Loss      20   50       100   388      1,000

Residential            23             1        57    1,969    17,639

Commercial             18             2        183   2,385    9,053
                                           -
Industrial             18                      143   3,408    8,898

Essential              2              0        4     158      1,421

Infrastructures       133             1        146   23,439   60,233


All Exposures         195             4        533   31,359   97,243
Inondations: pertes potentielles par
categories d’infrastructure
                                                                                 Loss Cost
 Exposure type     Estimated     Estimated     Exposure   Flood AAL    AAL
                                                                                (per mille)
                 value (million value in Per     parts     (Million Contributio
                     MAD)         capita                    MAD)        n

 Residential      1,126,875         34,148      47.2%                              1.68
                                                              1,895   43.3%
 Commercial        370,877          11,239      15.6%                              1.17
                                                               434     9.9%
   Education       139,428           4,225      5.8%                               1.74
                                                               242     5.5%
   (Schools)
                                                                                   3.81
                                                               471    10.8%
  Industrial       123,804           3,752      5.2%
                                                                                   0.26
                                                                30     0.7%
   Electrical      116,538           3,531      4.9%
                                                                                   3.69
     Road          105,501           3,197      4.4%           389     8.9%
                                                                                   3.88
   Railway          73,009           2,212      3.1%           283     6.5%
                                                                                    -
 Fishing craft      63,964           1,938      2.7%      -            0.0%
                    53,956           1,635      2.3%                                -
     Ports                                                -            0.0%
    Health          48,339           1,465      2.0%                               0.96
                                                                46     1.1%
   Mosque           40,985           1,242      1.7%                               1.92
                                                                79     1.8%
 Motor Vehicle      31464              953      1.3%                              12.30
                                                               387     8.8%
 Airport Value      22867              693      1.0%                                -         #45
Tremblement de terre: pertes
potentielles par categories
d’infrastructure
 Exposure       Estimated Estimated Exposure
                    EQ AAL AAL                                  Loss Cost
   type           value   value in Per parts (Million Contribut   (per
                 (million   capita            MAD)       ion      mille)
                  MAD)
Residential     1,126,875     34,148   47.2%       506 59.7%      0.45
Commercial       370,877      11,239   15.6%       144 17.0%
                                                                  0.39
  Education      139,428       4,225    5.8%            6.6%
  (Schools)                                                       0.40
                                             56
 Industrial     123,804       3,752   5.2%                        0.28
  Electrical    116,538               4.9%
                                                         4.1%
                              3,531                               0.11
    Road        105,501       3,197   4.4%   35
   Railway      73,009        2,212   3.1%               1.6%      -
Fishing craft   63,964        1,938   2.7%   13                   0.00
    Ports       53,956        1,635   2.3%         -     0.0%     0.38
   Health       48,339        1,465   2.0%        0.19   0.0%     0.40
   Mosque       40,985        1,242   1.7%
    Motor        31464                1.3%
                                                  24.3   2.9%     0.41
                                953
   Vehicle                                        21.5   2.5%
                                                                  0.50
    Airport      22867         693    1.0%        19.8   2.3%
    Value                                                         0.01
                                                  20.6   2.4%               #46
                                                                  0.18
Tsunami: pertes potentielles par
categories d’infrastructure                                AAL
    Exposure      Estimated Estimated Exposure
      type          value   value in Per parts   Tsunam Contrib
                   (million   capita               i AAL ution   Loss Cost
                    MAD)                         (Million       (per mille)
  Residential     1,126,875     34,148 47.2%       MAD)
  Commercial       370,877      11,239 15.6%              12.2%    0.02
    Education      139,428       4,225   5.8%    23                0.05
    (Schools)                                              9.7%
                                                 18                0.01
   Industrial     123,804       3,752   5.2%
    Electrical    116,538       3,531   4.9%               0.6%    0.15
      Road        105,501       3,197   4.4%     1                 0.03
     Railway      73,009        2,212   3.1%               9.6%
                                                 18                0.00
  Fishing craft   63,964        1,938   2.7%
      Ports       53,956        1,635   2.3%               1.7%    0.01
     Health       48,339        1,465   2.0%     3
                                                                   0.41
     Mosque       40,985        1,242   1.7%               0.1%
                                                 0                 1.21
      Motor        31464          953   1.3%
     Vehicle                                               0.3%    0.01
     Airport       22867         693    1.0%     1
                                                                   0.01
      Value                                               13.7%
                                                 26                0.02
  Agriculture*     20340         616    0.9%                                  #47
                                                          34.5%
Mitigation Planning Strategies
   Options that reduce hazard                                                                                                         Ê
      Reduce flood peak by providing storage
      Confine the hazard in predetermined area
      Divert flood water to another area
   Options that reduce vulnerability
      Seismic retrofitting of buildings                                                                                      Legend
                                                                                                                               Roads



      Earthquake proof foundations
                                                                                                                              Proposed Levee
                                                                                                                              Flood Extent
                                                                                                     0      0.25   0.5
                                                                                                                              Settlements
                                                                                                         Kilometers


      Increasing Ground Floor Elevation
      Water level planning for reservoirs
      Hazard Zoning
                                                                                                                                       Ê
                        Loss Exceedance Probablity curve for households
              0.6
                                                                       With Mitigation
                                                                       Without mitigation
              0.5



              0.4



              0.3
          P
          E




              0.2                                                                                                              Legend
                                                                                                                                   Roads
                                                                                                                                   Settlements

                                                                                                                          0          1           2
              0.1                                                                                                               Kilometers




               0
                                                                                                                         #48
               15,000    25,000         35,000                45,000   55,000               65,000

                                                 Loss (USD)                        Thousands
Cost
Decision-making               (MAD)

            CT = Total Cost
            = CD + CI                         CI = Investment
                                              Cost

CD
= Cost of
Damage




                                          Design level (PGA)
                 Min CT
                 = Optimum Design level
losses




         #50
#51
Tsunami Warning and Evacuation




                                 #52
What-if ’s : 47 cases examined (so far)




                                     #53
What-if ’s
 what   where   protected   rebuild   optimum    Cost     2013   2014 ~   201?
                                                mns MAD            18




                                                                          #54
MnhPRA – Morocco natural hazard Probabilistic Risk Assessment Software
   FOSS (Free Open Source Software)
 Delivered to Morocco
 Loss Estimation System
       Hazard data aggregation
       Exposure
       Vulnerability
       Risk Assessment
        – LEC, AAL




                                                                          # 55
MnhPRA – Morocco natural hazard Probabilistic Risk Assessment Software
   Built using Open Source platforms
        Quantum GIS
        PostgreSQL




                                                              Secure /
                                                              password
                                                              protected
       Hazard Identification
     Vulnerability Assessment
         Risk Assessment               Built Environment
                                           (Buildings
          Economic Impact                Infrastructure
                                        Agriculture) and
          Reporting Engine               Demographics




                                                                          # 56
editing capabilities
 Available Damage functions
       Structure – 29 type
       Site specific – 15 type
       Occupancy – 7 type and
       Causality

   S. No            Occupancy Type
   1     Villa
   2     Apartment in a building
   3     a. Traditional Moroccan house
         b. Modern Moroccan house
   4     Informal housing (habitat sommaire)
   5     Rural Type
   6     Others
                          S.No. Site Specific Exposure
                               1 Airport
                               2 Road
                               3 Railway
                               4 Motor Vehicle
                               5 Seaport
                               6 Electrical System
                               7 Communication System
                               8 Portable Water
                               9 Waste Water
                             10 Oil & Gas
                             11 Police Station
                             12 Fire Station
                             13 Mosque
                             14 Coranic school
                                                         # 57
National Disaster Risk Management and Financing Strategy

Mitigation Alternatives – “what if” scenarios

•“what if” I put in a flood warning system?
    • What are the benefits (avoided deaths, losses)?
    • What does it cost?
    • Is the cost more, or less, than the benefits?

            Benefits = AAL /i            i = interest rate per year

    “what if” I…
    • Strengthen high risk schools for earthquake? B? C?
    • Build flood levees in high flood risk areas? B? C?
    • Put in a tsunami warning system?
       • With evacuation routes clearly marked with signs?
    • Strengthen all houses for earthquake?
    • Insure all houses for disasters?
    • ….



                                                                      #58
Thank you

Weitere ähnliche Inhalte

Was ist angesagt?

Participatory approach to DRR
Participatory approach to DRRParticipatory approach to DRR
Participatory approach to DRR
Pv Krishnan
 
Management of Biological Disasters: NDMA GUIDLINES
Management of Biological Disasters: NDMA GUIDLINESManagement of Biological Disasters: NDMA GUIDLINES
Management of Biological Disasters: NDMA GUIDLINES
SUNIL KUMAR KOHLI, IDAS ndc
 
Natural disaster management indian scenario by vvr ias
Natural disaster management   indian scenario by vvr iasNatural disaster management   indian scenario by vvr ias
Natural disaster management indian scenario by vvr ias
VVR IAS Exam Preparation
 

Was ist angesagt? (20)

Village disaster management plan
Village disaster management planVillage disaster management plan
Village disaster management plan
 
Participatory approach to DRR
Participatory approach to DRRParticipatory approach to DRR
Participatory approach to DRR
 
Disaster and People With Disabilities
Disaster and People With DisabilitiesDisaster and People With Disabilities
Disaster and People With Disabilities
 
Sphere standards health response
Sphere standards   health responseSphere standards   health response
Sphere standards health response
 
Basic Concept and Terminologies in Disaster
Basic Concept and Terminologies in DisasterBasic Concept and Terminologies in Disaster
Basic Concept and Terminologies in Disaster
 
Ipcc initiative in climate change mitigation
Ipcc initiative in climate change mitigationIpcc initiative in climate change mitigation
Ipcc initiative in climate change mitigation
 
Management of Biological Disasters: NDMA GUIDLINES
Management of Biological Disasters: NDMA GUIDLINESManagement of Biological Disasters: NDMA GUIDLINES
Management of Biological Disasters: NDMA GUIDLINES
 
ICT for Disaster Risk Management-Managing Disaster Information-Global Risk Id...
ICT for Disaster Risk Management-Managing Disaster Information-Global Risk Id...ICT for Disaster Risk Management-Managing Disaster Information-Global Risk Id...
ICT for Disaster Risk Management-Managing Disaster Information-Global Risk Id...
 
Natural disaster management indian scenario by vvr ias
Natural disaster management   indian scenario by vvr iasNatural disaster management   indian scenario by vvr ias
Natural disaster management indian scenario by vvr ias
 
Concept of disaster risk management
Concept of disaster risk managementConcept of disaster risk management
Concept of disaster risk management
 
Natural Disaster in Bangladesh
Natural Disaster in BangladeshNatural Disaster in Bangladesh
Natural Disaster in Bangladesh
 
The institutions for disaster management in bangladesh
The institutions for disaster management in bangladeshThe institutions for disaster management in bangladesh
The institutions for disaster management in bangladesh
 
Inclusive Disaster and Development
Inclusive Disaster and DevelopmentInclusive Disaster and Development
Inclusive Disaster and Development
 
Rehabilitation, reconstruction and recovery
Rehabilitation, reconstruction and recoveryRehabilitation, reconstruction and recovery
Rehabilitation, reconstruction and recovery
 
Reconstruction and development
Reconstruction and developmentReconstruction and development
Reconstruction and development
 
Disaster Risk Reduction and Response Report
Disaster Risk Reduction and Response ReportDisaster Risk Reduction and Response Report
Disaster Risk Reduction and Response Report
 
Public health in disaster
Public health in disasterPublic health in disaster
Public health in disaster
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Cascading Disasters
Cascading DisastersCascading Disasters
Cascading Disasters
 
Unit1e differential impact
Unit1e differential impactUnit1e differential impact
Unit1e differential impact
 

Andere mochten auch (7)

War and terrorism
War and terrorismWar and terrorism
War and terrorism
 
Project report on Risk management in insurance sector
Project report on Risk management in insurance sectorProject report on Risk management in insurance sector
Project report on Risk management in insurance sector
 
Risk management in insurance sector
Risk management in insurance sectorRisk management in insurance sector
Risk management in insurance sector
 
Risk Management in Insurance Sector
Risk Management in Insurance SectorRisk Management in Insurance Sector
Risk Management in Insurance Sector
 
Disaster preparedness
Disaster preparednessDisaster preparedness
Disaster preparedness
 
Disaster Risk Reduction and Management
Disaster Risk Reduction and ManagementDisaster Risk Reduction and Management
Disaster Risk Reduction and Management
 
Risk Management and Insurance
Risk Management and InsuranceRisk Management and Insurance
Risk Management and Insurance
 

Ähnlich wie Risk Management of Natural Disasters in Morocco: a project of Global and Integrated Strategy

Honorary Minister Mohamed Najib Boulif - Moroccan risk management policy
Honorary Minister Mohamed Najib Boulif -  Moroccan risk management policyHonorary Minister Mohamed Najib Boulif -  Moroccan risk management policy
Honorary Minister Mohamed Najib Boulif - Moroccan risk management policy
Global Risk Forum GRFDavos
 
ICT and sustainable Cities
ICT and sustainable CitiesICT and sustainable Cities
ICT and sustainable Cities
ACIDD
 
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Robert Muir
 
Climate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss Re
Climate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss ReClimate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss Re
Climate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss Re
Sustainable Seattle
 
GCF - Présentation Industry - 1022.pdf
GCF - Présentation Industry - 1022.pdfGCF - Présentation Industry - 1022.pdf
GCF - Présentation Industry - 1022.pdf
Lucas518833
 

Ähnlich wie Risk Management of Natural Disasters in Morocco: a project of Global and Integrated Strategy (20)

Honorary Minister Mohamed Najib Boulif - Moroccan risk management policy
Honorary Minister Mohamed Najib Boulif -  Moroccan risk management policyHonorary Minister Mohamed Najib Boulif -  Moroccan risk management policy
Honorary Minister Mohamed Najib Boulif - Moroccan risk management policy
 
National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...
National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...
National Guideline Development for Benefit-Cost Analysis of Storm Drainage In...
 
Concept and methodology of nam as development- selection creteria, mrv and te...
Concept and methodology of nam as development- selection creteria, mrv and te...Concept and methodology of nam as development- selection creteria, mrv and te...
Concept and methodology of nam as development- selection creteria, mrv and te...
 
Economic Evaluation for Flood Control Investment in Japan
Economic Evaluation for Flood Control Investment in JapanEconomic Evaluation for Flood Control Investment in Japan
Economic Evaluation for Flood Control Investment in Japan
 
Understanding Natural Hazards And Market Exposure - Natural Catastrophes: Hav...
Understanding Natural Hazards And Market Exposure - Natural Catastrophes: Hav...Understanding Natural Hazards And Market Exposure - Natural Catastrophes: Hav...
Understanding Natural Hazards And Market Exposure - Natural Catastrophes: Hav...
 
Parte II - Key issues in planning adaptation to climate change
Parte II - Key issues in planning adaptation to climate change Parte II - Key issues in planning adaptation to climate change
Parte II - Key issues in planning adaptation to climate change
 
ICT and sustainable Cities
ICT and sustainable CitiesICT and sustainable Cities
ICT and sustainable Cities
 
Bristol Ict Workshop2
Bristol Ict Workshop2Bristol Ict Workshop2
Bristol Ict Workshop2
 
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
Grey and Green Infrastructure Benefit Cost, Return on Investment Analysis for...
 
Earthquake challenges
Earthquake challengesEarthquake challenges
Earthquake challenges
 
Investments in Italy to improve the resilience of infrastructural systems for...
Investments in Italy to improve the resilience of infrastructural systems for...Investments in Italy to improve the resilience of infrastructural systems for...
Investments in Italy to improve the resilience of infrastructural systems for...
 
Wildfire-Workshop-Presentation-Matthew-Eagle
Wildfire-Workshop-Presentation-Matthew-EagleWildfire-Workshop-Presentation-Matthew-Eagle
Wildfire-Workshop-Presentation-Matthew-Eagle
 
Climate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss Re
Climate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss ReClimate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss Re
Climate Change & the Bottom Line conference- Keynote, Alex Kaplan, Swiss Re
 
Afghanistan Multi-Hazard Risk Assessment, cost benefit analysis and resilient...
Afghanistan Multi-Hazard Risk Assessment, cost benefit analysis and resilient...Afghanistan Multi-Hazard Risk Assessment, cost benefit analysis and resilient...
Afghanistan Multi-Hazard Risk Assessment, cost benefit analysis and resilient...
 
My Ocean Breve
My Ocean BreveMy Ocean Breve
My Ocean Breve
 
Economics of climate change adaptation ethiopia
Economics of climate change adaptation ethiopia   Economics of climate change adaptation ethiopia
Economics of climate change adaptation ethiopia
 
学会ポスター(中田)
学会ポスター(中田)学会ポスター(中田)
学会ポスター(中田)
 
GCF - Présentation Industry - 1022.pdf
GCF - Présentation Industry - 1022.pdfGCF - Présentation Industry - 1022.pdf
GCF - Présentation Industry - 1022.pdf
 
Economywide Impacts of Climate Change and Adaptation in Ethiopia: Preliminary...
Economywide Impacts of Climate Change and Adaptation in Ethiopia: Preliminary...Economywide Impacts of Climate Change and Adaptation in Ethiopia: Preliminary...
Economywide Impacts of Climate Change and Adaptation in Ethiopia: Preliminary...
 
IRJET - A Case Study On Flood Risk Management
IRJET - A Case Study On Flood Risk ManagementIRJET - A Case Study On Flood Risk Management
IRJET - A Case Study On Flood Risk Management
 

Mehr von Global Risk Forum GRFDavos

Mehr von Global Risk Forum GRFDavos (20)

Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyDisaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian Doherty
 
Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...
 
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...
 
Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...
 
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
 
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
 
C&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAC&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLA
 
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
 
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
 
Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...
 
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
 
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
 
Capacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDACapacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDA
 
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
 
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
 
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
 
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
 
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
 
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
 
A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...
 

Kürzlich hochgeladen

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Kürzlich hochgeladen (20)

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Risk Management of Natural Disasters in Morocco: a project of Global and Integrated Strategy

  • 1. Kingdom of Morocco Natural Disaster Risk Management in Morocco For an integrated approach Mohamed Tabyaoui Technical Adviser to The Chief of Government Davos 28 -08- 2012
  • 3. Decision making needs figures  Earthquakes cost Morocco an average of 85 M$ per year  The North region are the most exposed  The probability for an earthquake to cause a loss of 1.5 b $ is 25% on the coming 30 years
  • 4. Decision making needs figures  Annual losses caused by floods are 5 times more important than those caused by earthquakes.  Annual losses caused by flood are around 0.44 b $ per year  A tsunami similar to the one occurred in the 1755 will produce a wave high as 8 m and will sink the whole Casablanca port
  • 5. Source  All these figures are calculated and scenarios generated by Moroccan national hazard Probabilistic Risk Assessment (MnhPRA) a GIS software elaborated recently within the process of settling our new approach to tackle natural hazards risk management in Morocco
  • 7. Risk management analysis find-out  Post crisis oriented  Ex post financing  Coordination needed among sectoral strategies  Program overlapping  Many actors but at different speed  law text need updating  ….etc
  • 8. New strategy:Triggers  Recent events 2004 earthquake in the North of Morocco  Recurrent floods and drought  Recurrent price volatility  International organisations (sensitizing; technical support (WB, GFDR/UNISDR)  awareness increasing among top management
  • 9. The needs  Develop Global and integrated strategy  Coordinate all sectoral risk policies  Cause change in paradigm: prevention and resilience first
  • 10. The 3 pillars of our strategy  1-price volatility  2-Natural hazards  3-Risks in Agriculture
  • 11. Natural Hazards strategy  Assessment and risk modeling in Morocco  What if scenarios  Sectorial Strategies elaboration  National strategy
  • 12. Assessment: perimeter  5 major risks  Floods  Earthquakes  Tsunamis  Land slides  Drought
  • 13. Risk Modeling 5. Estimate Losses 4. Compute Damage 3. Define and Overlay Inventory 2. Characterize Hazard 1. Identify Study Region #13
  • 14. Assessment: Method  Probabilistic model  Economic model after a choc situation  Assessment of risk perception into communities
  • 15. Deployment/make it durable  Official Institution for coordination  Information system  Financial instruments
  • 16. Task force  World Bank: coordination +International Experts hiring +project TOR + project supervising  Swiss cooperation +GFDRR : Funds  Consulting firm : Modeling and risk assessment  MAGG: focal point, Coordination and follow up  Departments: data, capacity building, deployment of sectoral strategies
  • 17. Assessment: Project phases  Hazard Modeling  Vulnerability/ potential impacts  What if scenarios  cost/benefit analysis
  • 18. Assessment objectives  calculate with enough precision the level of exposure of infrastructure, population  Calculate cost (average annual loss , Loss Exceedance Curve (LEC))  casualities  Cost benefit ananlysis of mitigation mesures
  • 19. Data types 3 data types : - Scientific data  Sesmic data,  Meteorology  Hydrology  MOU - infrastructure data  Industrial zones, ports, airports, rail roads, bridges and road network, drinkable water canalisation, electrical network, housing, schools, mosks, sport facilities …etc. - Data about population  Age,  sexe,  Social situation
  • 20. Major partners  Urbanism  Education  Agriculture  Finance  Equipment  Rail roads  Airports  Dams  Roads  ports  Health  Weather Forcast  water,  Remote sensing,  Scientific community and university  lnsurance …
  • 21. Data collection: The success factors  Participative approach  scientific quality of the work  Respond to specific needs  Involvement of politics
  • 22. Assessment outputs  Risk maps  Risk modeling and simulations  Impacts/potential losses  Economic modeling assuming a chock  What if scenarios  Cost benefit analysis
  • 23. What’s next  Sectoral strategies:  National strategy: aggregation of Sectoral Strategies  National institutions for coordination  National Bureau  National Platform for Risk Management  Information system  Law texts  Finance:
  • 24. Financial instrument  Annual Budgets  National Fund for Natural Catastrophes  Insurances  Insurance to cover Natural catastrophes  Insurance to cover extrem events in Agriculture
  • 25. value added  Readness and resilience for Morocco (infrastructure and population)  Better cooperation at regional and international level  Competitive advantage to attract investments in Morocco
  • 28. Earthquake Catalogue Compiled Catalogue  Only large historical events prior to 1901 are considered from Peláez et al (2007).  Events from 1901 to 1984 have been compiled from the book “Fichier des seismes du Maroc et des regions limitrophes 1901-1984 by T.E. Cherkaoui 1988.  Events from 1984 to 1990 have been compiled from updated additional records from Cherkaoui T.E. (personal communication)  From 1990 to March 2010, event data has been received from CNRST  March 2010 to March 2011 data has been received from ANSS #28
  • 29. Stochastic Events Earthquake event never a point source Considered a line source Area sources are subdivided into Area-line sources Num of Seismic Sources - 22 Num of Stochastic Faults - 1,735 Num of Stochastic Events - 14,670 #29
  • 32. Data used in Numerical Model General Bathymetry Chart of Oceans (GEBCO): resolution (1 min) GRID A GRID B GRID C GRID D High resolution bathymetry from remote sensing departm ent and topography from SRT M #32
  • 33. 1st November 1755 Lisbon Tsunami – Contd., Extreme water surface elevations after 3 hrs of simulation Gorringe Bank MPTF/GB source source (Baptista et (Johnson , al., 2003) 1996) Cardiz N160 source subduction (Baptista et source al., 1998) (Gutscher et al., 2002; Gutscher , 2004) #33
  • 35. 1 Definitions: LEC and AAL Kingdom of Morocco GDP MAD 1,300 billion (2011 est.) Probability of Loss Budget: Expenditure: MAD 250 billion being Exceeded (per year) Loss Exceedance Curve (LEC) 0 Loss (MAD) Average Annual Loss (AAL) (~ center of gravity) #35
  • 36. Average Annual Loss (AAL) Loss (MAD) AAL = ‘pure premium’ Insurance premium = pure prem. + overhead + profit Average Annual Loss (AAL) time “ stochastic ” ~ random occurrence #36
  • 37. MnhPRA: Moroccan National Hazards Probabilistic Risk Assessment  Models were incorporated in SIG software  Extensible  adaptable  free of charges (open source)
  • 38. MnhPRA – Hazard data aggregation – Contd ., # 38
  • 39. MnhPRA – Hazard data aggregation # 39
  • 40. Earthquake losses Country Level Losses Million MAD Return Period Occupancy Average Annual Loss 20 50 100 500 1,000 Residential 506.5 2,849 5,516 8,926 17,680 22,677 Commercial 144.4 626 1,248 3,467 8,021 10,061 Industrial 34.9 193 409 1,066 2,289 2,871 E.Facilities 96.9 549 1,862 1,128 1,855 2,524 Infrastructures 64.2 385 623 810 4,939 6,350 Total All Exposures 846.8 4,602 9,658 15,397 34,784 44,482 #40
  • 42. Flood losses Country Level Losses Million MAD Return Period Average Annual Occupancy Loss 20 50 100 500 1,000 Residential 1,895 9,399 11,232 12,092 13,065 14,718 Commercial 434 1,965 2,342 2,530 2,708 3,006 Industrial 471 2,072 2,242 2,231 2,477 2,569 Essential F 369 1,913 2,214 2,351 2,497 2,751 Infrastructures 1,210 3,152 3,323 3,218 3,427 3,648 All Exposures 4,380 18,501 21,354 22,423 24,174 26,692 #42
  • 43. Tsunami losses Country Level Losses Million MAD #43
  • 44. Tsunami losses Return Period Average Annual Occupancy Loss 20 50 100 388 1,000 Residential 23 1 57 1,969 17,639 Commercial 18 2 183 2,385 9,053 - Industrial 18 143 3,408 8,898 Essential 2 0 4 158 1,421 Infrastructures 133 1 146 23,439 60,233 All Exposures 195 4 533 31,359 97,243
  • 45. Inondations: pertes potentielles par categories d’infrastructure Loss Cost Exposure type Estimated Estimated Exposure Flood AAL AAL (per mille) value (million value in Per parts (Million Contributio MAD) capita MAD) n Residential 1,126,875 34,148 47.2% 1.68 1,895 43.3% Commercial 370,877 11,239 15.6% 1.17 434 9.9% Education 139,428 4,225 5.8% 1.74 242 5.5% (Schools) 3.81 471 10.8% Industrial 123,804 3,752 5.2% 0.26 30 0.7% Electrical 116,538 3,531 4.9% 3.69 Road 105,501 3,197 4.4% 389 8.9% 3.88 Railway 73,009 2,212 3.1% 283 6.5% - Fishing craft 63,964 1,938 2.7% - 0.0% 53,956 1,635 2.3% - Ports - 0.0% Health 48,339 1,465 2.0% 0.96 46 1.1% Mosque 40,985 1,242 1.7% 1.92 79 1.8% Motor Vehicle 31464 953 1.3% 12.30 387 8.8% Airport Value 22867 693 1.0% - #45
  • 46. Tremblement de terre: pertes potentielles par categories d’infrastructure Exposure Estimated Estimated Exposure EQ AAL AAL Loss Cost type value value in Per parts (Million Contribut (per (million capita MAD) ion mille) MAD) Residential 1,126,875 34,148 47.2% 506 59.7% 0.45 Commercial 370,877 11,239 15.6% 144 17.0% 0.39 Education 139,428 4,225 5.8% 6.6% (Schools) 0.40 56 Industrial 123,804 3,752 5.2% 0.28 Electrical 116,538 4.9% 4.1% 3,531 0.11 Road 105,501 3,197 4.4% 35 Railway 73,009 2,212 3.1% 1.6% - Fishing craft 63,964 1,938 2.7% 13 0.00 Ports 53,956 1,635 2.3% - 0.0% 0.38 Health 48,339 1,465 2.0% 0.19 0.0% 0.40 Mosque 40,985 1,242 1.7% Motor 31464 1.3% 24.3 2.9% 0.41 953 Vehicle 21.5 2.5% 0.50 Airport 22867 693 1.0% 19.8 2.3% Value 0.01 20.6 2.4% #46 0.18
  • 47. Tsunami: pertes potentielles par categories d’infrastructure AAL Exposure Estimated Estimated Exposure type value value in Per parts Tsunam Contrib (million capita i AAL ution Loss Cost MAD) (Million (per mille) Residential 1,126,875 34,148 47.2% MAD) Commercial 370,877 11,239 15.6% 12.2% 0.02 Education 139,428 4,225 5.8% 23 0.05 (Schools) 9.7% 18 0.01 Industrial 123,804 3,752 5.2% Electrical 116,538 3,531 4.9% 0.6% 0.15 Road 105,501 3,197 4.4% 1 0.03 Railway 73,009 2,212 3.1% 9.6% 18 0.00 Fishing craft 63,964 1,938 2.7% Ports 53,956 1,635 2.3% 1.7% 0.01 Health 48,339 1,465 2.0% 3 0.41 Mosque 40,985 1,242 1.7% 0.1% 0 1.21 Motor 31464 953 1.3% Vehicle 0.3% 0.01 Airport 22867 693 1.0% 1 0.01 Value 13.7% 26 0.02 Agriculture* 20340 616 0.9% #47 34.5%
  • 48. Mitigation Planning Strategies  Options that reduce hazard Ê  Reduce flood peak by providing storage  Confine the hazard in predetermined area  Divert flood water to another area  Options that reduce vulnerability  Seismic retrofitting of buildings Legend Roads  Earthquake proof foundations Proposed Levee Flood Extent 0 0.25 0.5 Settlements Kilometers  Increasing Ground Floor Elevation  Water level planning for reservoirs  Hazard Zoning Ê Loss Exceedance Probablity curve for households 0.6 With Mitigation Without mitigation 0.5 0.4 0.3 P E 0.2 Legend Roads Settlements 0 1 2 0.1 Kilometers 0 #48 15,000 25,000 35,000 45,000 55,000 65,000 Loss (USD) Thousands
  • 49. Cost Decision-making (MAD) CT = Total Cost = CD + CI CI = Investment Cost CD = Cost of Damage Design level (PGA) Min CT = Optimum Design level
  • 50. losses #50
  • 51. #51
  • 52. Tsunami Warning and Evacuation #52
  • 53. What-if ’s : 47 cases examined (so far) #53
  • 54. What-if ’s what where protected rebuild optimum Cost 2013 2014 ~ 201? mns MAD 18 #54
  • 55. MnhPRA – Morocco natural hazard Probabilistic Risk Assessment Software  FOSS (Free Open Source Software)  Delivered to Morocco  Loss Estimation System  Hazard data aggregation  Exposure  Vulnerability  Risk Assessment – LEC, AAL # 55
  • 56. MnhPRA – Morocco natural hazard Probabilistic Risk Assessment Software  Built using Open Source platforms  Quantum GIS  PostgreSQL Secure / password protected Hazard Identification Vulnerability Assessment Risk Assessment Built Environment (Buildings Economic Impact Infrastructure Agriculture) and Reporting Engine Demographics # 56
  • 57. editing capabilities Available Damage functions Structure – 29 type Site specific – 15 type Occupancy – 7 type and Causality S. No Occupancy Type 1 Villa 2 Apartment in a building 3 a. Traditional Moroccan house b. Modern Moroccan house 4 Informal housing (habitat sommaire) 5 Rural Type 6 Others S.No. Site Specific Exposure 1 Airport 2 Road 3 Railway 4 Motor Vehicle 5 Seaport 6 Electrical System 7 Communication System 8 Portable Water 9 Waste Water 10 Oil & Gas 11 Police Station 12 Fire Station 13 Mosque 14 Coranic school # 57
  • 58. National Disaster Risk Management and Financing Strategy Mitigation Alternatives – “what if” scenarios •“what if” I put in a flood warning system? • What are the benefits (avoided deaths, losses)? • What does it cost? • Is the cost more, or less, than the benefits? Benefits = AAL /i i = interest rate per year “what if” I… • Strengthen high risk schools for earthquake? B? C? • Build flood levees in high flood risk areas? B? C? • Put in a tsunami warning system? • With evacuation routes clearly marked with signs? • Strengthen all houses for earthquake? • Insure all houses for disasters? • …. #58

Hinweis der Redaktion

  1. - La dimension « confidentialité et sensibilité des données stratégiques » les dispositions suivantes ont été prises : ne seront communiquées que des données affichées publiques. Les départements décideront des données qu’ils pourront communiquer La Banque Mondiale s’est engagée officiellement pour que les données collectées et communiquées au bureau d’études ne soient utilisées que dans le cadre de ce projet. - La dimension « confidentialité et sensibilité des données stratégiques » les dispositions suivantes ont été prises : ne seront communiquées que des données affichées publiques. Les départements décideront des données qu’ils pourront communiquer La Banque Mondiale s’est engagée officiellement pour que les données collectées et communiquées au bureau d’études ne soient utilisées que dans le cadre de ce projet. - La dimension « confidentialité et sensibilité des données stratégiques » les dispositions suivantes ont été prises : ne seront communiquées que des données affichées publiques. Les départements décideront des données qu’ils pourront communiquer La Banque Mondiale s’est engagée officiellement pour que les données collectées et communiquées au bureau d’études ne soient utilisées que dans le cadre de ce projet.