DEVELOPMENT PLANNING IV
ANALYSIS OF PLAN IMPLEMENTATION AND
MANAGEMENT EXPERIENCES OF ASANTE AKIM
NORTH DISTRICT
Presented by group six (6)
1
Introduction
• Development can be achieved by drawing plans, programs and policies and implementing them.
• The implementation of a plan is one of the important stages
• Plan implementation refers to the process of determining how an initiative will be implemented
and setting this out in sufficient detail to enable the policy makers to make an informed judgment
about whether to proceed in the light of the risks and requirements involved (Commonwealth of
Australia; 2014).
• The purpose of this assignment is to critically assess the performance of Asante Akim North
District in plan implementation.
2
Objectives
• To aid in the assessment of the strengths and weaknesses of the medium term
district development plan prepared by the Asante Akim North District Assembly.
• Municipal
• To analyse the fiscal health of the assembly and its implications for plan
implementation.
• To identify and analyse factors that affect plan implementation in the district.
• To assess the current capacity of institutions under the assembly to manage the
implementation of the District Medium Term Development Plan (DMTDP).
3
Assessment of Plan Preparation by Asante
Akim North District.
STAGES
CRITERIA
Sequence
Checks
TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Vision, Mission and
Functions
N/A Vision, mission and function was not provided in the DMTDP of
AANDP. Due to this, the district may not be able to assess the extent of
achievement of their work since visions and missions helps to know
the tasks ahead.
Performance review
of DMTDP
 A Matrix to assess the performance of
the MMDA from 2010 - 2013
The output was captured in the district plan. This will help to know
how far the implementation of the plan has reached and also to assess
deviations since the level of achievement is assessed.
4
Assessment of Plan Preparation by Asante
Akim North District Cont’d
STAGES
CRITERIA
Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Compilation of the
District Profile
-Design of questionnaire.
-Design of interview guides to
guide the data collection for
institutions
-Literature review of
-Key informant survey
-Observations
The plan contains the updated district
profile, Updated district spatial maps, An
analyzed state of social, economic,
political and spatial inequalities which
helps to know the section of the
population who are being affected
by a particular situation
The plan contains the updated district
profile, Updated district spatial maps,
An analyzed state of social, economic,
political and spatial inequalities.
5
Assessment of Plan Preparation by Asante
Akim North District Cont’d
STAGES
CRITERIA
Sequence
Checks
TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Local/Community
Development Plans
N/
A
The district Assembly did not facilitate the preparation of the Local
Development plans which is valuable data for planning and decision
making.
Harmonisation of
community needs and
aspirations with
identified key
development gaps
N/A -A matrix showing Key Development
Problems/ Issues Harmonized under
the appropriate Thematic Areas of
the GSGDA 2010-2013
-Harmonization of District Needs
with GSGDA
The stage was consistent with the guidelines for plan preparation in
terms of output since a matrix showing key development
problems/issues harmonized under the appropriate thematic areas of
the GSGDA 2014-2017.
6
Assessment of Plan Preparation by Asante
Akim North District Cont’d
STAGES
CRITERIA
Sequence
Checks
TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Local/Community
Development Plans
N/
A
The district Assembly did not facilitate the preparation of the Local
Development plans which is valuable data for planning and decision
making.
Harmonisation of
community needs and
aspirations with
identified key
development gaps
N/A -A matrix showing Key Development
Problems/ Issues Harmonized under
the appropriate Thematic Areas of
the GSGDA 2010-2013
-Harmonization of District Needs
with GSGDA
The stage was consistent with the guidelines for plan preparation in
terms of output since a matrix showing key development
problems/issues harmonized under the appropriate thematic areas of
the GSGDA 2014-2017.
7
Assessment of Plan Preparation by Asante
Akim North District Cont’d
STAGES
CRITERIA
Sequence
Checks
TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Linking harmonized
Key Development
issues to NMTDPF
S - A Matrix showing adopted issues/
problems under NMTDPF 2014-
2017
The stage was not omitted in the preparation of the district’s
development plan.
Prioritization S -Identification of District Needs and
Aspirations
-Identification of development gaps.
-Analysis of the POCC
The stage was consistent with the guidelines for plan preparation in
terms of output since a list of the prioritized issues including cross-
cutting issues and spatial dimensions was stated.
District Development
Goal
 -Goals formulated to reflect the
themes of GSGDA
-Application of POCC analysis
The stage was consistent with the guidelines for plan preparation in
terms of output since relevant Thematic Goals of the DA was adopted
8
Assessment of Plan Preparation by Asante
Akim North District Cont’d
STAGES
CRITERIA
Sequence
Checks
TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Adoption of District
Objectives and Strategies
 -A matrix outlining the issues, adopted
Policy Objectives and Strategies of the DAs.
The provision of a matrix outlining the issues, adopted
Policy Objectives and Strategies of the DAs is proof of
consistency in this stage.
Formulation of
Development Programmes
 -Programme Matrix -A programme Matrix outlined in the DMTDP.
Formulation of Composite
PoA
 -Detailed use and description of
implementation matrices
- District Composite PoA prepared.
Preparation of District
Composite Annual Action
Plans
 -Detailed use and description of
implementation matrices
-District Annual Action Plans reflecting spatial
planning interventions like SP, LPs and CAPs.
9
Assessment of Plan Preparation by Asante
Akim North District Cont’d
STAGES
CRITERIA
Sequence
Checks
TOOLS & TECHNIQUE USED CONSISTENCY
(in terms of output)
Adoption of DMTDP  -Adopted DMTDP
Implementation of
Annual Action Plans
 -Implementation Schedule There was consistency due to the presence of implementation
schedule and its linkage with the budget
Monitoring and
Evaluation (M&E)
 - Quarterly and annual reports to the
NDPC and other relevant stakeholders.
There was consistency based on the NDPC M&E guidelines
since an M &E plan was prepared
Development of
District communication
Strategy/Plan
-Meeting with Political leadership,
NGO’s, CSO’S and Donors, Heads of
Department
This stage was consistent with the NDPC guidelines for the
preparation of the DMTDP in terms the preparation
Communication strategies/plans 10
Strengths and Weaknesses of Plan
implementation process
Criteria Strengths Weaknesses
Consistency - The plan was responsive to the needs of the
people in relation to needs prioritization,
formulation of goals and objectives,
communication strategy, etc.
-
- Vision, mission and function serves as source
of direction. Due to this, the district may not
be able to assess the extent of achievement of
their work since it was omitted.
Vivid description was made on most of the
stages in the guideline.
- Spatial development option which aids in the
effective allocation of resources and also it
helps stakeholders and other development
bodies to know the exact location of projects
was not adopted in the plan.
11
Assessment of Stakeholder Participation
Process Stakeholders Involved Means of Participation (Role Inclusive) Extent of Participation
Performance Review Member of the DPCU, Sub
district structures, community
members, decentralised
departments and traditional
Authorities
 Public hearing
 Coordination of activities
Participation by consultation
Data Collection, Analysis
and Harmonization
Community members, sub
district structures, DPCU
 Focus group discussion Participation by interaction
District Development
Priorities and POCC
DPCU, sub district structure,
decentralised departments
 The communities and the sub district
structures were not involved at this stage
-
Development Focus Decentralised Departments
and DPCU
Development Goal,
Projections
Decentralised Departments
and DPCU
Objectives and Strategies Decentralised Departments
and DPCU
Formulation of
Development Programmes
DPCU  The communities and the sub district
structures were not involved at this stage
-
8.Design of Composite and
Annual Plans and Budget
DPCU  The communities and the sub district
structures were not involved at this stage
-
12
Plan Implementation
Process
Expected Actual Gap Recommendation
Rational PoA should be based on the DMTDP
under the GSGDA I, 2010-2013
–Should support the achievement of
DMTDPs
- Ensuring effectively implemented,
monitored and evaluated plan
-Plan implementation
was based on the
DMTDP under the
GSGDA I, 2010-
2013
-The overall
performance of the
Assembly during the
Plan period was not
encouraging
Elaboration on measure to
assess monitoring and
evaluation
Formation of project team DCE (Chair) District Departments,
SPC, Sub-District Councils, Finance
and Administration Sub-Committee,
NGOs must be identified and engaged
in the plan preparation team in
addition to the government set up.
-supports the
achievement of
DMTDPs
-The District SPCs will
actively participate in
the selection of a
preferred development
option and evaluate
proposed provisions for
Structure Plans
- The District SPCs will
actively participate in the
evaluate proposed
provisions for Structure
Plans
13
Gap Analysis
14
Plan Implementation Process Expected Actual Gap Recommendation
Budgeting
-Budget is to prepared using MTEF
-Mobilizing required resources for
implementation categorised into three (3):
taxes, non-taxes and transfers
-Budget was prepared
using MTEF
-Estimation of revenue
for the plan period 2014-
2017 is GHc18, 693,458
and estimated cost is
GH¢26,115,530
-Insufficient funds
mobilized
- funding gap of GH¢
7,422,072
- Assembly to improve its
internal generation by lobbying
for more support from
international donors, citizens
living abroad ,Floating district
Bonds ,Introducing user fees or
community contributions
Monitoring and Evaluation - Detail out annual action plans reflecting
spatial elements like Spatial Plan, Local
Plan, linked to the MTEF budget as well as
the M&E, workshop to finalize the AAP,
budget and M&E plan.
-Engagement of other stakeholders in M&E
like District Departments, SPC, Assembly
members, Sub-District Councils,
Parliamentarians, Development Partners,
NGOs, Private sector, CSO.
- Periodic site inspection
(monthly and bi-
annually on 2nd week of
every month and June
and November of
2015,2016 & 2017
-Quarterly Review
meetings with partners
on February, April,
September and
November of years 2015
& 2016 respectively
-
PESTELI Analysis
15
SECTOR ISSUES IMPACT ON PLAN
IMPLEMENTATIONPOSITIVE FACTORS NEGATIVE FACTORS
Political -The election of UC ensures grassroots
participation (11.87%)
-Good relationship between MP and the
district and hence lobbies projects for
communities (39.23%.)
-Change in government which leads to
discontinuation of projects (42.38%)
-Political favouritism in the
distribution of projects to
communities (19.36%).
-Inadequate commitment towards
projects based on political affiliations
(16.37%).
Positive:
-ensures grassroot participation in project
implementation (11.87%)
Negative:
-leads to delay in the implementation of
projects and at times projects are
abandoned.
Economic -Derivation of revenue through tolls from
farmers transporting produce, lumbermen
and also property rate to support projects.
(48.40%)
-Generation of funds through the payment
of development levy (51.60%)
-Unemployment and low income
levels hinder financial contributions
towards projects by the community
members. (35.82%)
-Mismanagement of funds by
community leaders. (24.18%)
Positive:
-a large revenue base is derived to support
plan implementation
Negative:
-hinders financial contributions towards
projects by the community members.
Socio-Cultural -Cooperation and support from the
traditional council. The TC headed by the
chiefs provide land for the implementation
of projects. (55.46%)
Taboo days prevent farmers from
going to the farms and it slows down
production. (54.42%)
Positive: The Traditional Council headed by the
chiefs provide land for the implementation of
projects
-
16
SECTOR ISSUES IMPACT ON PLAN
IMPLEMENTATIONPOSITIVE FACTORS NEGATIVE FACTORS
Technological -The existence of Asempa Fm, and information
centres helps in easy dissemination of
information about projects in the district.
(100%)
-It creates unemployment since it is more
capital intensive than labour-intensive
(51.91%)
-Poor network with the
telecommunication services makes it
difficult in getting in touch with the office
of the District Assembly. (48.09%)
Positive:
-Awareness creation of projects helped in easy
dissemination of information about projects in the district
Negative:
This situation in the district is very crucial since 78.09%
respondent attested to this fact and in a way makes it
difficult in getting in touch with the office of the District
Assembly.
Environmental -Availability of land for projects. (58.28%)
-River bodies serve as source of water for the
construction of projects. (41.72%)
-The nature of the land prevents the siting
of some projects (57.02%).
-Rainfall obstructs the implementation of
projects (42.98%)
Positive: Availability of land helps in the siting of
projects.
Negative: The nature of land is undulating and this will
lead to an increase in cost of project implementation.
Legal -The police service helps to curb the menace
posed by Fulani herdsmen who allow their
cattle to destroy farmlands. (73.64%)
The existence of Bye-laws and the judiciary
help to provide an enabling environment on the
implementation of projects. (26.36%)
Litigation affects the smooth
implementation of plans (100%)
Positive:This helped in providing an enabling
environment on the implementation of projects.
Negative:In this case, there is difficulty in the acquisition
of lands for projects which slows down the
implementation of projects.
17
POSITIVE FACTORS NEGATIVE FACTORS IMPACT ON PLAN IMPLEMENTATION
Institutional -the traditional arrangement uses its influence
to organise communal labour (54.92%)
There is a problem of whom to report
issues that affect project implementation
to whether unit committee or chief or the
assembly. (62.24%)
Positive:
-The influence traditional authority have on the
community helps in maintaining a project
-The monitoring and evaluation activity undertaken by
the institutions help detect deviations and these
deviations are rectified and corrected as soon as possible.
-It promotes transparency in the assembly.
Negative:
-Bureaucracy
18
SWOT Analysis of the Various Departments/Units
Health Directorate
Strengths Weaknesses Opportunities Threats
-Highly trained staff
Very dedicated and committed staff
Adequate staff to carry out their duties.
Capacity building programmes
-Some staff are not
abreast with some
requisite skills(
analytical, human
relations)
-Human resource development
workshops can be organized by
the NGOs in the district for the
staff of the various departments.
-Financial and logistics support
from NGO’s.
District Water and Sanitation Team
The ability of the staff to work together
as a team.
They collaborate with the Watsan in the
community very often and organize
workshops to train them on how to
maintain the facility they have been
provided with.
The staff needs more
training on management
and on I.T
The means of transport to
carry out the duties were
not readily available and
was also in poor
condition
-Availability of agencies such as
KFC, World Vision and CWSA to
help in the training, monitoring and
evaluation of the institution.
The regular transfers of personnel
and the reason being that it
affects their flow of work.
Political interference.
19
Social Welfare and Community Development
Strengths Weaknesses Opportunities Threats
-Well qualified and trained staff.
Adequate logistics to help them carry out
their activities.
-Adequate staff to carry out activities
Traditional authorities as well as
assembly men in the area are
cooperative.
-Inadequate funds to
finance some of their
activities
Existence of World Vision to help
fund their activities.
Efforts of institutions such as
NCCE and Police to improve level
of participation among stake
holders.
 Political interference in the
location of activities
 Delay in the release of the
DACF
District Agricultural Development Unit ( DADU)
-Well trained staff
-Availability of capacity building
programmes for the staff.
Presence of a market to help in
marketing their goods
Adequate staff to carry out their
activities. dissemination of projects
through their chiefs
-Inadequate logistics for
the institution to carry out
their activities which
slows productivity.
-Availability of the DACF for the
district.
Dissemination of information on
Agricultural projects through the
radio stations.
-Delays in the release of the
common fund
Long dry seasons pushes farming
season further away
20
Key Problems faced by the institutions
Challenges Suggestions
Town and Country Planning
Financial Difficulty On time release of funds by the District assembly
Acquiring the base map is a challenge since they have to pay
the survey department to get it
Base map acquisition should be free
Finance and Revenue
Untrained revenue collectors Training programs
Leakages Improving record keeping and accountability.
Asante Akim Disaster Prevention and Management Unit
Inadequate logistics (from transportation to office equipment) Availability of adequate logistics
Inadequate funds to run activities Adequate means of transport (a car and motor bikes)
Lack of support from the District Assembly Adequate funds to run regular projects on disaster
management 21
ASSESSMENT OF FISCAL
HEALTH
22
Trend of Internal Revenue (2013 – 2015)
64,557.40
325,362.68
286,287.95
207,039.21
294,446
161,863
0.00
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
350,000.00
2013 2014 2015
Trend of Internal Revenue (2013 – 2015)
Budgeted Actual
• actual revenue received in 2013 exceeded the amount that
was budgeted in 2013 by 68.81%.
• In 2014 there was a 10.5% decrease in the actual revenue
generated.
• The shortfall was due to low collections from revenue
heads such as Rates, Fees and Fines, Licences and Rents.
• Budget Committee has proposed measures to curtail the
shortfall. These include:
 Intensification of the already existing Task Force,
 Periodic checks at the revenue barriers at Agogo and
Juansa to check under invoicing,
 reshuffle of the revenue collectors,
 Maintenance of the Revenue Mobilization Vehicle
which has been granted some time now and period
Audit of Revenue collectors by the Internal Auditor.
23
Internally Generated Fund (IGF) - 2014
40.30%
1.30%
23.70%
16%
15.90%
2.90%
Sources of funds for IGF
Fees and fines Rent Land Licenses Rates Others
• The fees and fines as inflows to the assembly were seen to
increase with the passing year.
• This can be related to the fact that the district has several
agrarian communities in which they have markets
established.
• Market fees are collected from some markets like the
Agogo market, Juansa market and Hwidiem market.
• most of the produce gained from the farming activities
undertaken are charged on when exporting.
• Licenses as a source of revenue to the district assembly
decreased from 47094 in 2014 to 35256 in 2015.
• This is due to the inability of the revenue collectors to
properly locate the informal traders
24
Challenges in revenue generation
• Tax evasion on the part of payers
Most tax payers evade their responsibilities of paying taxes because
they feel the taxes they pay are not effectively and efficiently utilized.
• Inadequate qualified and competent revenue staff or collectors.
• Poor data base on all economic activities in the district (Improper
record keeping)
25
Assessment of Source of funds for Asante
Akim North District
• The district has received low funding from
the DDF (GHC 244,805 & GHC150,218) as a
result of their poor performances in the
FOAT assessment.
• Decrease in DDF- might be as a result of
the district being unable to implement
some projects which would have qualified
them for accessing more district
development fund.
• Looking at 2013, it was realized that the
total amount of funds dedicated to
development expenditure was 5.2%
26
100%
63.6%
20.6%
15.8%
87.2%
9.5%
3.3%
100.0%
0%
20%
40%
60%
80%
100%
120%
DACF DDF Feeding Grant
2012 2013 2014 2015
Expenditure (Recurrent)
RECURRENT
EXPENDITURE
2013 2014 2015
Budgete
d
Percent
ages
Actuals Percent
ages
Budgete
d
Percent
ages
Actual Percent
ages
Budgete
d
Percent
ages
Actual Percent
ages
Personnel
Emolument (IGF)
22,200.
00
9.6 28,316.
11
13.7 36601.6
1
9.6 30674.4
8
6.5 60345.8
5
9.6 22152.8
5
6.5
Travelling and
Transport
38,420.
00
16.6 32,965.
00
15.9 63343.8
7
16.55 47016.9
99
10.0 104436.
39
16.55 29665.4
5
10.0
General
Expenditure
149630 64.5 127607.
39
61.6 246698.
17
64.45 293737.
43
62.1 406736.
52
64.45 212134.
63
62.1
Maintenance/Repa
ir and Renewal
5,200.0
0
2.2 7,194.0
0
3.5 8573.33 2.2 81245.8
9
17.2 14135.0
3
2.2 58675.0
8
17.2
Development
Expenditure (IGF)
16,680.
00
7.1 10,956.
50
5.3 27500.6
7
7.2 19298.8
0
9.1 45340.9
4
7.2 13937.2
1
9.1
Total 232,130
.00
100 207,039
.21
100 382717.
67
100 471973.
60
100 630994.
73
100 336565.
22
100
27
Trend of Recurrent Expenditure(2013 -2014)
13.7%
15.9%
61.6%
3.5%
5.3%
6.5%
10.0%
62.1%
17.2%
9.1%
6.5%
10.0%
62.1%
17.2%
9.1%
Personnel
emolument
Transport General Exp. Maintenance Development Exp.
Expenditure by Type of Recurrent Expenditure
2013 2014 2015
• The inflation on petrol prices lead to
the rise in transport.
• Personnel emolument increased
from 2012- 2015 because the
district was created in 2012 and;
• As such people were employed
over the years.
• Due to this reason, the wages and
salaries also increased over the
years from 2012 to 2015.
28
Assessment of Performance in M&E
Institutions Specific Roles Expected
to be Played
Monitoring and
Evaluation Arrangements
Actual Efforts Challenges faced by
Monitoring and
Evaluation
Measures to address
Monitoring and Evaluation
Challenges
Disaster prevention
and management unit
Undertakes quarterly
monitoring and evaluation.
-Formation of an M&E
team.
-data keeping and track
keeping of disaster zones
-The formation of
M&E team does
quarterly monitoring of
implemented projects.
-Collaborate with
NGO‟s
-Inadequate logistics.
-Inadequate funds to
run activities.
-Lack of support from
the District Assembly
-Adequate logistics.
-Adequate funds to run regular
projects on disaster
management.
Department of social
welfare and
community
development
-Collaborating with
agencies to carry out the
M&E.
-monitor projects by taking
visits to project sites twice
quarterly to assess their
development level.
-Evaluation is carried out
through peer review on
how projects are done.
-Collaborate with chief
and opinion leaders as
well as assembly men.
-Collaborate with
NGO‟s eg. World
vision to fund their
projects.
-cultural practices
always hinder project
implementation
-Inadequate funds to
carry out M&E.
- Adequate funds to carry out
M&E.
29
Institutions Specific Roles Expected
to be Played
Monitoring and
Evaluation Arrangements
Actual Efforts Challenges faced by
Monitoring and
Evaluation
Measures to address
Monitoring and Evaluation
Challenges
District agricultural
development unit
(DADU)
-Undertakes weekly
monitoring
Formation of an M&E
team.
- submit their
antennary on quarterly
bases to the DA in
monitoring.
-Financial problems
-Lack of vehicles
-Availability of Funds from
government
-Collaboration with other NGOs
so that they can fund some of
the monitoring activities
-availability of vehicles
District health
directorate
-Undertake evaluation
Projects just after
implementation.
-Evaluation is carried out
by using data chats and
field visits.
Formation of M&E team to
undertake monitoring and
evaluation.
Submission of reports on
implemented projects to
track their progress.
-collaborates with
District assembly in
monitoring and
evaluation of projects.
-inadequate Funds -Collaboration with other clinics
and NGOs so that they can fund
some of the monitoring
activities
- timely release of funds from
GOG
30
Findings
• Political Interference: Political interference tends to pose a challenge in smooth
implementations of the development plans in Asante Akim North district. Most of the
activities of the technocrats are being controlled by the politicians especially the DCE
who is at the helm of affairs.
• Resource Mobilization :Limited resources are major problems that confront most
planning agencies as these resources are needed for physical manifestations of plans.
All the institutions within the district are constrained by financial resources and
therefore not being able to effectively implement, monitor and evaluate plans as
required.
• Stakeholder Participation:The involvement of institutions in implementation and
plan preparation are key to the success of development plans.
31
Recommendations
• Acquisition of the needed logistics needed for smooth
implementation.
• The training and re-training of staff. This should be organized for all
the key institutions and other departments involved in plan
implementation and management.
• Stakeholders should be actively involved in project implementation so
as to have a say in how the projects should be implemented.
• There should be effective utilization of the IGF. Measures should be
adopted to reduce revenue leakages by giving them a percentage on
the bonus received.
32
Conclusion
• Plan Preparation, Implementation and Management is very vital in
promoting development.
• This calls for the need to improve the capacity of the various
institution involved and to encourage participation of various sub-
structures in the Asante Akim North District Assembly.
33

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Budget
BudgetBudget
Budget
 
Ppbs 2011
Ppbs 2011Ppbs 2011
Ppbs 2011
 
Budget (Nursing Management)
Budget (Nursing Management)Budget (Nursing Management)
Budget (Nursing Management)
 
Budgeting process in nepal
Budgeting process in nepalBudgeting process in nepal
Budgeting process in nepal
 
Vikas2
Vikas2Vikas2
Vikas2
 
Budgeting in nursing
 Budgeting in nursing  Budgeting in nursing
Budgeting in nursing
 
Budget Development
Budget DevelopmentBudget Development
Budget Development
 
Performance Budgeting - Key Performance Indicators -- Wojciech ZIELINSKI, OECD
Performance Budgeting - Key Performance Indicators -- Wojciech ZIELINSKI, OECDPerformance Budgeting - Key Performance Indicators -- Wojciech ZIELINSKI, OECD
Performance Budgeting - Key Performance Indicators -- Wojciech ZIELINSKI, OECD
 
Budgeting
BudgetingBudgeting
Budgeting
 
FY 2021 Advertised Budget Presentation
FY 2021 Advertised Budget PresentationFY 2021 Advertised Budget Presentation
FY 2021 Advertised Budget Presentation
 
Zero based and performance based budgeting
Zero based and performance based budgetingZero based and performance based budgeting
Zero based and performance based budgeting
 
Budget Analysis
Budget Analysis Budget Analysis
Budget Analysis
 
Principle Budget Factor | Accounting
Principle Budget Factor | AccountingPrinciple Budget Factor | Accounting
Principle Budget Factor | Accounting
 
Business budgeting
Business budgetingBusiness budgeting
Business budgeting
 
Zero Base Budgeting
Zero Base BudgetingZero Base Budgeting
Zero Base Budgeting
 
Budget control and budget making techniques in a hospital
Budget control and budget making techniques in a hospitalBudget control and budget making techniques in a hospital
Budget control and budget making techniques in a hospital
 
Budgeting
BudgetingBudgeting
Budgeting
 
Planning and Budgeting
Planning and BudgetingPlanning and Budgeting
Planning and Budgeting
 
Committed to the path of sustainability Excellence with EFQM
Committed to the path of sustainability Excellence with EFQMCommitted to the path of sustainability Excellence with EFQM
Committed to the path of sustainability Excellence with EFQM
 
Budgeting
BudgetingBudgeting
Budgeting
 

Ähnlich wie ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NORTH DISTRICT

Strategic thrust form
Strategic thrust formStrategic thrust form
Strategic thrust form
Jo Magdaraog
 
Updated Israel Laizer CV
Updated Israel Laizer CVUpdated Israel Laizer CV
Updated Israel Laizer CV
Israel Laizer
 
guidelines-on-crafting-the-lydp-cbydp.pptx
guidelines-on-crafting-the-lydp-cbydp.pptxguidelines-on-crafting-the-lydp-cbydp.pptx
guidelines-on-crafting-the-lydp-cbydp.pptx
dejesuscarlo402
 
SDF01 ToR for Directors Operations
SDF01 ToR for Directors OperationsSDF01 ToR for Directors Operations
SDF01 ToR for Directors Operations
MahinA Arefin
 
Presentation for Final Evaluation Design.pptx
Presentation for Final Evaluation Design.pptxPresentation for Final Evaluation Design.pptx
Presentation for Final Evaluation Design.pptx
ojhasp
 

Ähnlich wie ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NORTH DISTRICT (20)

Strategic thrust form
Strategic thrust formStrategic thrust form
Strategic thrust form
 
LSDG- UTTAR PRADESH Capacity building of nodal departments.ppt
LSDG- UTTAR PRADESH Capacity building of nodal departments.pptLSDG- UTTAR PRADESH Capacity building of nodal departments.ppt
LSDG- UTTAR PRADESH Capacity building of nodal departments.ppt
 
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.KarimAPR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
 
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
 
Educational Planning (QAAD Session)
Educational Planning (QAAD Session)Educational Planning (QAAD Session)
Educational Planning (QAAD Session)
 
Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and Evaluation
 
Updated Israel Laizer CV
Updated Israel Laizer CVUpdated Israel Laizer CV
Updated Israel Laizer CV
 
Country Examples and Civil Society Perspective
Country Examples and Civil Society Perspective Country Examples and Civil Society Perspective
Country Examples and Civil Society Perspective
 
Kyiv School of Economics
Kyiv School of EconomicsKyiv School of Economics
Kyiv School of Economics
 
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan PerezAPR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
 
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan PerezAPR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
 
Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...
 
Localizing SDGs in Pakistan
Localizing SDGs in PakistanLocalizing SDGs in Pakistan
Localizing SDGs in Pakistan
 
guidelines-on-crafting-the-lydp-cbydp.pptx
guidelines-on-crafting-the-lydp-cbydp.pptxguidelines-on-crafting-the-lydp-cbydp.pptx
guidelines-on-crafting-the-lydp-cbydp.pptx
 
Benin nairobi
Benin nairobiBenin nairobi
Benin nairobi
 
National Climate Change Adaptation Plan for Sri Lanka
National Climate Change Adaptation Plan for Sri Lanka�National Climate Change Adaptation Plan for Sri Lanka�
National Climate Change Adaptation Plan for Sri Lanka
 
SDF01 ToR for Directors Operations
SDF01 ToR for Directors OperationsSDF01 ToR for Directors Operations
SDF01 ToR for Directors Operations
 
Presentation for Final Evaluation of FOSTER-II.pptx
Presentation for Final Evaluation of FOSTER-II.pptxPresentation for Final Evaluation of FOSTER-II.pptx
Presentation for Final Evaluation of FOSTER-II.pptx
 
Presentation for Final Evaluation Design.pptx
Presentation for Final Evaluation Design.pptxPresentation for Final Evaluation Design.pptx
Presentation for Final Evaluation Design.pptx
 
8.3.4 Subnational adaptation
8.3.4 Subnational adaptation8.3.4 Subnational adaptation
8.3.4 Subnational adaptation
 

Kürzlich hochgeladen

Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
HyderabadDolls
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
gajnagarg
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
HyderabadDolls
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Bertram Ludäscher
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
ranjankumarbehera14
 

Kürzlich hochgeladen (20)

Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf
 
Fun all Day Call Girls in Jaipur 9332606886 High Profile Call Girls You Ca...
Fun all Day Call Girls in Jaipur   9332606886  High Profile Call Girls You Ca...Fun all Day Call Girls in Jaipur   9332606886  High Profile Call Girls You Ca...
Fun all Day Call Girls in Jaipur 9332606886 High Profile Call Girls You Ca...
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
 
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
 
Statistics notes ,it includes mean to index numbers
Statistics notes ,it includes mean to index numbersStatistics notes ,it includes mean to index numbers
Statistics notes ,it includes mean to index numbers
 
Aspirational Block Program Block Syaldey District - Almora
Aspirational Block Program Block Syaldey District - AlmoraAspirational Block Program Block Syaldey District - Almora
Aspirational Block Program Block Syaldey District - Almora
 
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
 
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
 
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 

ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NORTH DISTRICT

  • 1. DEVELOPMENT PLANNING IV ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NORTH DISTRICT Presented by group six (6) 1
  • 2. Introduction • Development can be achieved by drawing plans, programs and policies and implementing them. • The implementation of a plan is one of the important stages • Plan implementation refers to the process of determining how an initiative will be implemented and setting this out in sufficient detail to enable the policy makers to make an informed judgment about whether to proceed in the light of the risks and requirements involved (Commonwealth of Australia; 2014). • The purpose of this assignment is to critically assess the performance of Asante Akim North District in plan implementation. 2
  • 3. Objectives • To aid in the assessment of the strengths and weaknesses of the medium term district development plan prepared by the Asante Akim North District Assembly. • Municipal • To analyse the fiscal health of the assembly and its implications for plan implementation. • To identify and analyse factors that affect plan implementation in the district. • To assess the current capacity of institutions under the assembly to manage the implementation of the District Medium Term Development Plan (DMTDP). 3
  • 4. Assessment of Plan Preparation by Asante Akim North District. STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Vision, Mission and Functions N/A Vision, mission and function was not provided in the DMTDP of AANDP. Due to this, the district may not be able to assess the extent of achievement of their work since visions and missions helps to know the tasks ahead. Performance review of DMTDP  A Matrix to assess the performance of the MMDA from 2010 - 2013 The output was captured in the district plan. This will help to know how far the implementation of the plan has reached and also to assess deviations since the level of achievement is assessed. 4
  • 5. Assessment of Plan Preparation by Asante Akim North District Cont’d STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Compilation of the District Profile -Design of questionnaire. -Design of interview guides to guide the data collection for institutions -Literature review of -Key informant survey -Observations The plan contains the updated district profile, Updated district spatial maps, An analyzed state of social, economic, political and spatial inequalities which helps to know the section of the population who are being affected by a particular situation The plan contains the updated district profile, Updated district spatial maps, An analyzed state of social, economic, political and spatial inequalities. 5
  • 6. Assessment of Plan Preparation by Asante Akim North District Cont’d STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Local/Community Development Plans N/ A The district Assembly did not facilitate the preparation of the Local Development plans which is valuable data for planning and decision making. Harmonisation of community needs and aspirations with identified key development gaps N/A -A matrix showing Key Development Problems/ Issues Harmonized under the appropriate Thematic Areas of the GSGDA 2010-2013 -Harmonization of District Needs with GSGDA The stage was consistent with the guidelines for plan preparation in terms of output since a matrix showing key development problems/issues harmonized under the appropriate thematic areas of the GSGDA 2014-2017. 6
  • 7. Assessment of Plan Preparation by Asante Akim North District Cont’d STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Local/Community Development Plans N/ A The district Assembly did not facilitate the preparation of the Local Development plans which is valuable data for planning and decision making. Harmonisation of community needs and aspirations with identified key development gaps N/A -A matrix showing Key Development Problems/ Issues Harmonized under the appropriate Thematic Areas of the GSGDA 2010-2013 -Harmonization of District Needs with GSGDA The stage was consistent with the guidelines for plan preparation in terms of output since a matrix showing key development problems/issues harmonized under the appropriate thematic areas of the GSGDA 2014-2017. 7
  • 8. Assessment of Plan Preparation by Asante Akim North District Cont’d STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Linking harmonized Key Development issues to NMTDPF S - A Matrix showing adopted issues/ problems under NMTDPF 2014- 2017 The stage was not omitted in the preparation of the district’s development plan. Prioritization S -Identification of District Needs and Aspirations -Identification of development gaps. -Analysis of the POCC The stage was consistent with the guidelines for plan preparation in terms of output since a list of the prioritized issues including cross- cutting issues and spatial dimensions was stated. District Development Goal  -Goals formulated to reflect the themes of GSGDA -Application of POCC analysis The stage was consistent with the guidelines for plan preparation in terms of output since relevant Thematic Goals of the DA was adopted 8
  • 9. Assessment of Plan Preparation by Asante Akim North District Cont’d STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Adoption of District Objectives and Strategies  -A matrix outlining the issues, adopted Policy Objectives and Strategies of the DAs. The provision of a matrix outlining the issues, adopted Policy Objectives and Strategies of the DAs is proof of consistency in this stage. Formulation of Development Programmes  -Programme Matrix -A programme Matrix outlined in the DMTDP. Formulation of Composite PoA  -Detailed use and description of implementation matrices - District Composite PoA prepared. Preparation of District Composite Annual Action Plans  -Detailed use and description of implementation matrices -District Annual Action Plans reflecting spatial planning interventions like SP, LPs and CAPs. 9
  • 10. Assessment of Plan Preparation by Asante Akim North District Cont’d STAGES CRITERIA Sequence Checks TOOLS & TECHNIQUE USED CONSISTENCY (in terms of output) Adoption of DMTDP  -Adopted DMTDP Implementation of Annual Action Plans  -Implementation Schedule There was consistency due to the presence of implementation schedule and its linkage with the budget Monitoring and Evaluation (M&E)  - Quarterly and annual reports to the NDPC and other relevant stakeholders. There was consistency based on the NDPC M&E guidelines since an M &E plan was prepared Development of District communication Strategy/Plan -Meeting with Political leadership, NGO’s, CSO’S and Donors, Heads of Department This stage was consistent with the NDPC guidelines for the preparation of the DMTDP in terms the preparation Communication strategies/plans 10
  • 11. Strengths and Weaknesses of Plan implementation process Criteria Strengths Weaknesses Consistency - The plan was responsive to the needs of the people in relation to needs prioritization, formulation of goals and objectives, communication strategy, etc. - - Vision, mission and function serves as source of direction. Due to this, the district may not be able to assess the extent of achievement of their work since it was omitted. Vivid description was made on most of the stages in the guideline. - Spatial development option which aids in the effective allocation of resources and also it helps stakeholders and other development bodies to know the exact location of projects was not adopted in the plan. 11
  • 12. Assessment of Stakeholder Participation Process Stakeholders Involved Means of Participation (Role Inclusive) Extent of Participation Performance Review Member of the DPCU, Sub district structures, community members, decentralised departments and traditional Authorities  Public hearing  Coordination of activities Participation by consultation Data Collection, Analysis and Harmonization Community members, sub district structures, DPCU  Focus group discussion Participation by interaction District Development Priorities and POCC DPCU, sub district structure, decentralised departments  The communities and the sub district structures were not involved at this stage - Development Focus Decentralised Departments and DPCU Development Goal, Projections Decentralised Departments and DPCU Objectives and Strategies Decentralised Departments and DPCU Formulation of Development Programmes DPCU  The communities and the sub district structures were not involved at this stage - 8.Design of Composite and Annual Plans and Budget DPCU  The communities and the sub district structures were not involved at this stage - 12
  • 13. Plan Implementation Process Expected Actual Gap Recommendation Rational PoA should be based on the DMTDP under the GSGDA I, 2010-2013 –Should support the achievement of DMTDPs - Ensuring effectively implemented, monitored and evaluated plan -Plan implementation was based on the DMTDP under the GSGDA I, 2010- 2013 -The overall performance of the Assembly during the Plan period was not encouraging Elaboration on measure to assess monitoring and evaluation Formation of project team DCE (Chair) District Departments, SPC, Sub-District Councils, Finance and Administration Sub-Committee, NGOs must be identified and engaged in the plan preparation team in addition to the government set up. -supports the achievement of DMTDPs -The District SPCs will actively participate in the selection of a preferred development option and evaluate proposed provisions for Structure Plans - The District SPCs will actively participate in the evaluate proposed provisions for Structure Plans 13 Gap Analysis
  • 14. 14 Plan Implementation Process Expected Actual Gap Recommendation Budgeting -Budget is to prepared using MTEF -Mobilizing required resources for implementation categorised into three (3): taxes, non-taxes and transfers -Budget was prepared using MTEF -Estimation of revenue for the plan period 2014- 2017 is GHc18, 693,458 and estimated cost is GH¢26,115,530 -Insufficient funds mobilized - funding gap of GH¢ 7,422,072 - Assembly to improve its internal generation by lobbying for more support from international donors, citizens living abroad ,Floating district Bonds ,Introducing user fees or community contributions Monitoring and Evaluation - Detail out annual action plans reflecting spatial elements like Spatial Plan, Local Plan, linked to the MTEF budget as well as the M&E, workshop to finalize the AAP, budget and M&E plan. -Engagement of other stakeholders in M&E like District Departments, SPC, Assembly members, Sub-District Councils, Parliamentarians, Development Partners, NGOs, Private sector, CSO. - Periodic site inspection (monthly and bi- annually on 2nd week of every month and June and November of 2015,2016 & 2017 -Quarterly Review meetings with partners on February, April, September and November of years 2015 & 2016 respectively -
  • 16. SECTOR ISSUES IMPACT ON PLAN IMPLEMENTATIONPOSITIVE FACTORS NEGATIVE FACTORS Political -The election of UC ensures grassroots participation (11.87%) -Good relationship between MP and the district and hence lobbies projects for communities (39.23%.) -Change in government which leads to discontinuation of projects (42.38%) -Political favouritism in the distribution of projects to communities (19.36%). -Inadequate commitment towards projects based on political affiliations (16.37%). Positive: -ensures grassroot participation in project implementation (11.87%) Negative: -leads to delay in the implementation of projects and at times projects are abandoned. Economic -Derivation of revenue through tolls from farmers transporting produce, lumbermen and also property rate to support projects. (48.40%) -Generation of funds through the payment of development levy (51.60%) -Unemployment and low income levels hinder financial contributions towards projects by the community members. (35.82%) -Mismanagement of funds by community leaders. (24.18%) Positive: -a large revenue base is derived to support plan implementation Negative: -hinders financial contributions towards projects by the community members. Socio-Cultural -Cooperation and support from the traditional council. The TC headed by the chiefs provide land for the implementation of projects. (55.46%) Taboo days prevent farmers from going to the farms and it slows down production. (54.42%) Positive: The Traditional Council headed by the chiefs provide land for the implementation of projects - 16
  • 17. SECTOR ISSUES IMPACT ON PLAN IMPLEMENTATIONPOSITIVE FACTORS NEGATIVE FACTORS Technological -The existence of Asempa Fm, and information centres helps in easy dissemination of information about projects in the district. (100%) -It creates unemployment since it is more capital intensive than labour-intensive (51.91%) -Poor network with the telecommunication services makes it difficult in getting in touch with the office of the District Assembly. (48.09%) Positive: -Awareness creation of projects helped in easy dissemination of information about projects in the district Negative: This situation in the district is very crucial since 78.09% respondent attested to this fact and in a way makes it difficult in getting in touch with the office of the District Assembly. Environmental -Availability of land for projects. (58.28%) -River bodies serve as source of water for the construction of projects. (41.72%) -The nature of the land prevents the siting of some projects (57.02%). -Rainfall obstructs the implementation of projects (42.98%) Positive: Availability of land helps in the siting of projects. Negative: The nature of land is undulating and this will lead to an increase in cost of project implementation. Legal -The police service helps to curb the menace posed by Fulani herdsmen who allow their cattle to destroy farmlands. (73.64%) The existence of Bye-laws and the judiciary help to provide an enabling environment on the implementation of projects. (26.36%) Litigation affects the smooth implementation of plans (100%) Positive:This helped in providing an enabling environment on the implementation of projects. Negative:In this case, there is difficulty in the acquisition of lands for projects which slows down the implementation of projects. 17
  • 18. POSITIVE FACTORS NEGATIVE FACTORS IMPACT ON PLAN IMPLEMENTATION Institutional -the traditional arrangement uses its influence to organise communal labour (54.92%) There is a problem of whom to report issues that affect project implementation to whether unit committee or chief or the assembly. (62.24%) Positive: -The influence traditional authority have on the community helps in maintaining a project -The monitoring and evaluation activity undertaken by the institutions help detect deviations and these deviations are rectified and corrected as soon as possible. -It promotes transparency in the assembly. Negative: -Bureaucracy 18
  • 19. SWOT Analysis of the Various Departments/Units Health Directorate Strengths Weaknesses Opportunities Threats -Highly trained staff Very dedicated and committed staff Adequate staff to carry out their duties. Capacity building programmes -Some staff are not abreast with some requisite skills( analytical, human relations) -Human resource development workshops can be organized by the NGOs in the district for the staff of the various departments. -Financial and logistics support from NGO’s. District Water and Sanitation Team The ability of the staff to work together as a team. They collaborate with the Watsan in the community very often and organize workshops to train them on how to maintain the facility they have been provided with. The staff needs more training on management and on I.T The means of transport to carry out the duties were not readily available and was also in poor condition -Availability of agencies such as KFC, World Vision and CWSA to help in the training, monitoring and evaluation of the institution. The regular transfers of personnel and the reason being that it affects their flow of work. Political interference. 19
  • 20. Social Welfare and Community Development Strengths Weaknesses Opportunities Threats -Well qualified and trained staff. Adequate logistics to help them carry out their activities. -Adequate staff to carry out activities Traditional authorities as well as assembly men in the area are cooperative. -Inadequate funds to finance some of their activities Existence of World Vision to help fund their activities. Efforts of institutions such as NCCE and Police to improve level of participation among stake holders.  Political interference in the location of activities  Delay in the release of the DACF District Agricultural Development Unit ( DADU) -Well trained staff -Availability of capacity building programmes for the staff. Presence of a market to help in marketing their goods Adequate staff to carry out their activities. dissemination of projects through their chiefs -Inadequate logistics for the institution to carry out their activities which slows productivity. -Availability of the DACF for the district. Dissemination of information on Agricultural projects through the radio stations. -Delays in the release of the common fund Long dry seasons pushes farming season further away 20
  • 21. Key Problems faced by the institutions Challenges Suggestions Town and Country Planning Financial Difficulty On time release of funds by the District assembly Acquiring the base map is a challenge since they have to pay the survey department to get it Base map acquisition should be free Finance and Revenue Untrained revenue collectors Training programs Leakages Improving record keeping and accountability. Asante Akim Disaster Prevention and Management Unit Inadequate logistics (from transportation to office equipment) Availability of adequate logistics Inadequate funds to run activities Adequate means of transport (a car and motor bikes) Lack of support from the District Assembly Adequate funds to run regular projects on disaster management 21
  • 23. Trend of Internal Revenue (2013 – 2015) 64,557.40 325,362.68 286,287.95 207,039.21 294,446 161,863 0.00 50,000.00 100,000.00 150,000.00 200,000.00 250,000.00 300,000.00 350,000.00 2013 2014 2015 Trend of Internal Revenue (2013 – 2015) Budgeted Actual • actual revenue received in 2013 exceeded the amount that was budgeted in 2013 by 68.81%. • In 2014 there was a 10.5% decrease in the actual revenue generated. • The shortfall was due to low collections from revenue heads such as Rates, Fees and Fines, Licences and Rents. • Budget Committee has proposed measures to curtail the shortfall. These include:  Intensification of the already existing Task Force,  Periodic checks at the revenue barriers at Agogo and Juansa to check under invoicing,  reshuffle of the revenue collectors,  Maintenance of the Revenue Mobilization Vehicle which has been granted some time now and period Audit of Revenue collectors by the Internal Auditor. 23
  • 24. Internally Generated Fund (IGF) - 2014 40.30% 1.30% 23.70% 16% 15.90% 2.90% Sources of funds for IGF Fees and fines Rent Land Licenses Rates Others • The fees and fines as inflows to the assembly were seen to increase with the passing year. • This can be related to the fact that the district has several agrarian communities in which they have markets established. • Market fees are collected from some markets like the Agogo market, Juansa market and Hwidiem market. • most of the produce gained from the farming activities undertaken are charged on when exporting. • Licenses as a source of revenue to the district assembly decreased from 47094 in 2014 to 35256 in 2015. • This is due to the inability of the revenue collectors to properly locate the informal traders 24
  • 25. Challenges in revenue generation • Tax evasion on the part of payers Most tax payers evade their responsibilities of paying taxes because they feel the taxes they pay are not effectively and efficiently utilized. • Inadequate qualified and competent revenue staff or collectors. • Poor data base on all economic activities in the district (Improper record keeping) 25
  • 26. Assessment of Source of funds for Asante Akim North District • The district has received low funding from the DDF (GHC 244,805 & GHC150,218) as a result of their poor performances in the FOAT assessment. • Decrease in DDF- might be as a result of the district being unable to implement some projects which would have qualified them for accessing more district development fund. • Looking at 2013, it was realized that the total amount of funds dedicated to development expenditure was 5.2% 26 100% 63.6% 20.6% 15.8% 87.2% 9.5% 3.3% 100.0% 0% 20% 40% 60% 80% 100% 120% DACF DDF Feeding Grant 2012 2013 2014 2015
  • 27. Expenditure (Recurrent) RECURRENT EXPENDITURE 2013 2014 2015 Budgete d Percent ages Actuals Percent ages Budgete d Percent ages Actual Percent ages Budgete d Percent ages Actual Percent ages Personnel Emolument (IGF) 22,200. 00 9.6 28,316. 11 13.7 36601.6 1 9.6 30674.4 8 6.5 60345.8 5 9.6 22152.8 5 6.5 Travelling and Transport 38,420. 00 16.6 32,965. 00 15.9 63343.8 7 16.55 47016.9 99 10.0 104436. 39 16.55 29665.4 5 10.0 General Expenditure 149630 64.5 127607. 39 61.6 246698. 17 64.45 293737. 43 62.1 406736. 52 64.45 212134. 63 62.1 Maintenance/Repa ir and Renewal 5,200.0 0 2.2 7,194.0 0 3.5 8573.33 2.2 81245.8 9 17.2 14135.0 3 2.2 58675.0 8 17.2 Development Expenditure (IGF) 16,680. 00 7.1 10,956. 50 5.3 27500.6 7 7.2 19298.8 0 9.1 45340.9 4 7.2 13937.2 1 9.1 Total 232,130 .00 100 207,039 .21 100 382717. 67 100 471973. 60 100 630994. 73 100 336565. 22 100 27
  • 28. Trend of Recurrent Expenditure(2013 -2014) 13.7% 15.9% 61.6% 3.5% 5.3% 6.5% 10.0% 62.1% 17.2% 9.1% 6.5% 10.0% 62.1% 17.2% 9.1% Personnel emolument Transport General Exp. Maintenance Development Exp. Expenditure by Type of Recurrent Expenditure 2013 2014 2015 • The inflation on petrol prices lead to the rise in transport. • Personnel emolument increased from 2012- 2015 because the district was created in 2012 and; • As such people were employed over the years. • Due to this reason, the wages and salaries also increased over the years from 2012 to 2015. 28
  • 29. Assessment of Performance in M&E Institutions Specific Roles Expected to be Played Monitoring and Evaluation Arrangements Actual Efforts Challenges faced by Monitoring and Evaluation Measures to address Monitoring and Evaluation Challenges Disaster prevention and management unit Undertakes quarterly monitoring and evaluation. -Formation of an M&E team. -data keeping and track keeping of disaster zones -The formation of M&E team does quarterly monitoring of implemented projects. -Collaborate with NGO‟s -Inadequate logistics. -Inadequate funds to run activities. -Lack of support from the District Assembly -Adequate logistics. -Adequate funds to run regular projects on disaster management. Department of social welfare and community development -Collaborating with agencies to carry out the M&E. -monitor projects by taking visits to project sites twice quarterly to assess their development level. -Evaluation is carried out through peer review on how projects are done. -Collaborate with chief and opinion leaders as well as assembly men. -Collaborate with NGO‟s eg. World vision to fund their projects. -cultural practices always hinder project implementation -Inadequate funds to carry out M&E. - Adequate funds to carry out M&E. 29
  • 30. Institutions Specific Roles Expected to be Played Monitoring and Evaluation Arrangements Actual Efforts Challenges faced by Monitoring and Evaluation Measures to address Monitoring and Evaluation Challenges District agricultural development unit (DADU) -Undertakes weekly monitoring Formation of an M&E team. - submit their antennary on quarterly bases to the DA in monitoring. -Financial problems -Lack of vehicles -Availability of Funds from government -Collaboration with other NGOs so that they can fund some of the monitoring activities -availability of vehicles District health directorate -Undertake evaluation Projects just after implementation. -Evaluation is carried out by using data chats and field visits. Formation of M&E team to undertake monitoring and evaluation. Submission of reports on implemented projects to track their progress. -collaborates with District assembly in monitoring and evaluation of projects. -inadequate Funds -Collaboration with other clinics and NGOs so that they can fund some of the monitoring activities - timely release of funds from GOG 30
  • 31. Findings • Political Interference: Political interference tends to pose a challenge in smooth implementations of the development plans in Asante Akim North district. Most of the activities of the technocrats are being controlled by the politicians especially the DCE who is at the helm of affairs. • Resource Mobilization :Limited resources are major problems that confront most planning agencies as these resources are needed for physical manifestations of plans. All the institutions within the district are constrained by financial resources and therefore not being able to effectively implement, monitor and evaluate plans as required. • Stakeholder Participation:The involvement of institutions in implementation and plan preparation are key to the success of development plans. 31
  • 32. Recommendations • Acquisition of the needed logistics needed for smooth implementation. • The training and re-training of staff. This should be organized for all the key institutions and other departments involved in plan implementation and management. • Stakeholders should be actively involved in project implementation so as to have a say in how the projects should be implemented. • There should be effective utilization of the IGF. Measures should be adopted to reduce revenue leakages by giving them a percentage on the bonus received. 32
  • 33. Conclusion • Plan Preparation, Implementation and Management is very vital in promoting development. • This calls for the need to improve the capacity of the various institution involved and to encourage participation of various sub- structures in the Asante Akim North District Assembly. 33

Hinweis der Redaktion

  1. A gap analysis is a method of assessing the difference in performance of any entity to determine whether the requirements are being met successfully. Gap refers to the difference between ‘where we are’ (the present state) and ‘where we want to be ’(the target state). Can also be referred to as need-gap analysis
  2. To minimize the challenges the Assembly encountered during the implementation of the DMTDP (2009-2013) and to ensure majority of not all the programmes/projects are implemented during the current plan, the Assembly would adopt the following strategies: Activities and projects to be reduced and lower priority programmes/activities to be dropped Identifying more cost effective ways of achieving the same objectives (i.e. encourage private sector involvement in project implementation Introducing user fees/ Community contributions Lobbying for both foreign and local support in implementing the plan
  3. Stakeholders should be actively involved in project implementation so as to have a say in how the projects should be implemented. This means community leaders should be given a role to play in the implementation of projects in their communities. This will help to identify and correct deviations when the need arises since they are actually closer to the projects; There should be effective utilization of the IGF. Measures should be adopted to reduce revenue leakages by giving them a percentage on the bonus received. Furthermore, revaluation of properties and developing a database should be embarked on to improve internally generated fund mobilization.