Greville and King Streets – Community Consultation Analysis Report 1
GREVILLE AND KING STREETS
IMPROVEMENT PLAN
COMMUNITY CONSULTATION ANALYSIS REPORT – AUGUST 2015
Contents
GREVILLE AND KING STREETS IMPROVEMENT PLAN................................................................1
INTRODUCTION..................................................................................................................................3
SURVEY FEEDBACK OVERVIEW.....................................................................................................8
SURVEY RESULTS............................................................................................................................18
POP–UP RESULTS............................................................................................................................29
ADDITIONAL CORRESPONDENCE................................................................................................33
Greville and King Streets – Community Consultation Analysis Report 2
Introduction
Council is preparing draft concept plans to improve the pedestrian amenity along Greville
and King Streets, Prahran. Those who live, work and visit the area participated either by
survey or attendance at an information session. We have developed a couple of draft
concept plans to give you an idea about how we’re planning to improve Greville and King
Streets.
Purpose of this report
Information from this report will be used to inform the final design package which we will
present to community members, including residents, traders, service providers and visitors
to the area for further comment.
Background
The Greville and King Street improvement plan is based on themes and ideas from the
Chapel Street Masterplan, Re-discover Chapel Street. The plan aims to improve the quality
of streets and public spaces to meet the needs of the increasing population that live, work
and visit the area. Since the Masterplan’s implementation, several footpath extensions for
additional key public spaces have been built, including Windsor Plaza at the Windsor Train
Station and several ‘pause points’ for increased dining, trade and public seating.
Improvements to Greville and King Streets are proposed for the next stage in delivering this
Masterplan.
Scope of the improvement works
The key areas for improvements have been separated into sections to make it easier to
provide feedback. These draft concept plans are based on feedback received from residents
and traders, and are combined with an analysis of technical data including traffic, social and
commercial impact assessments. An accompanying map of Greville and King Streets shows
the areas we are seeking to improve. The next few pages will provide more information on
the proposed changes.
The key design ideas are:
• Changing the traffic flow to one-way west bound between Chapel Street and the
Prahran Train Station.
• Changing Porter Street to one-way north bound between Greville Street and
Commercial Road with two way access from High Street to Leggett’s Lane to maintain
residential access.
• Changing Grattan Street to one-way South bound with car parking maintained.
• Creating a shared pedestrian and vehicle zone in front of the entrance to the Prahran
train station.
• Grattan Gardens: Creating a local plaza space, with no kerbs and a paved surface
across the street in front of Grattan Gardens.
• Changing the pedestrian crossings at Izett Street to create less conflict between cars
and pedestrians.
• Removing two of the four plane trees in front of the Prahran Town Hall to allow for new
urban plaza space on Chapel Street.
• The removal of three car parks (for more trees, seating and dining).
Greville and King Streets – Community Consultation Analysis Report 3
• Fully pedestranised King Street between the roundabout and Chapel Street with
residential car parking access maintained to the east by removing seven car parks
• Shared car and pedestrian space between Grattan Street and Izett Street.
• Closed to traffic between Grattan Street and the access laneway with a shard street
between the laneway and Izett Street.
Greville and King Streets Concept Plan by area
Methodology
The consultation included:
• The development of a communication and engagement activation plan
• Distribution of communication and consultation material
• Consultation processes and engagement activities
• Analysis of consultation data
• Preparation of key findings and recommendations report
During the preparation of the consultation and engagement plan, consideration was given to the
approach, response rate and attendance levels of the Chapel Street Masterplan, Re-discover Chapel Street
consultation.
Greville and King Streets – Community Consultation Analysis Report 4
Data was collated in Excel. Where possible, data was analysed quantitatively and put into a graph.
When analysing the qualitative data from open-ended questions, attention was given to the variety of
responses, as well as giving a ranking of popularity of
responses (through counting responses of a similar theme).
Communication activity
Communication activities were used to promote the
consultation, including:
• Dedicated webpage
www.stonnington.vic.gov.au/grevilleking
• Advertisements in the Stonnington Leader
o 14 July 2015
o 21 July 2015
o 28 July 2015
• Article placed in InStonnington (delivered all residents)
o June/July edition
o August/September edition
• Direct mail of 8pp brochure and 4pp survey, mailed to 7,000 residents and traders
• Social media posts (Facebook and Twitter) using #grevilleking
• Posters distributed to traders and Service Centres
• Media release
Engagement activity
Online or hard copy survey
This survey sought feedback on a range of issues including what respondents like/dislike about
Greville and King Streets, traffic, amenity, travel and why respondents travel to the centre. Hard
copy surveys were sent to all owners and occupiers within the Greville and King Streets area
including free post envelopes. The same survey was provided online. 288 surveys were received.
Information sessions
Three information sessions were held to provide key stakeholders with vital information
about the proposed plans. Staff from the City Works, Communications and Community
Planning departments and consultants were available to discuss the improvement plan with
residents, answer questions and provide feedback. The sessions were:
• Tuesday28July,FunctionsonChapel–Traderssession
• Wednesday29July,FunctionsonChapel–Communitysession
• Saturday1August,FunctionsonChapel–Communitysession
At each session there were:
• Staff to ensure customer service and expert advice
Greville and King Streets – Community Consultation Analysis Report 5
288
surveys received
and included
1406
individual
comments
• Large maps of the proposed improvement plan
• iPads to provide feedback via online a survey
• Hard copy surveys to complete and submit at the session or to return via mail with a
reply-paid envelope.
Greville and King Streets – Community Consultation Analysis Report 6
Three
Community/Trader
workshops
with
44
attendees approximately
Pop-up events on Greville Street
There were a number of pop-up activities where City of Stonnington staff were available to discuss
the improvement plan with residents.
These sessions took place on the following dates:
• Saturday 18 July outside Prahran Library, 10 – 11am
• Saturday 25 July in Grattan Gardens, 10 – 11am
• Thursday 30 July on the corner of Greville Street and Macquarie Street, 8 – 11a
Complementing the engagement sessions were a range of signage, communication materials and on-
street prototyping to draw attention to the proposed changes and engage the community to gather
feedback. These included:
• On-street decals advertising the consultation process and indicating the location of pop-
up consultation sessions.
• On-street stencils indicating the types and
locations of proposed changes.
• Bin signs providing a summary of the ways to
have a say in an eye-catching manner.
Greville and King Streets – Community Consultation Analysis Report 7
3 pop-ups
300 attendees
171
comments and votes
175
surveys handed out
Survey Feedback Overview
Greville and King Streets – Community Consultation Analysis Report 8
This page has been intentionally left blank.
Greville and King Streets – Community Consultation Analysis Report 9
Greville and King Streets – Community Consultation Analysis Report 10
Analysis
Overview
The following commentary is an overview of the feedback from
the survey, information session, popups and letters/email and
covers each of the questions in the survey. Further information
can be obtained through the range of data images following this
including graphs and tables.
Survey
Overall 288 completed the survey. Of these, the majority were local residents (76%/169
respondents) followed by landholder (25%/55 respondents) and business owner/
trader (15%/34 respondents).
The majority of respondents who visit Greville Street come to dine or drink (70%/154
respondents) followed by retail shopping (60%/134 respondents) and just passing through
(40%/90 respondents). Respondents who visit King Street mostly just pass through (26%/57
respondents) followed by dining or drinking (11%/26 respondents) and retail shopping
(7%/16 respondents).
The majority of respondents who travel to Greville Street walk (78%/174 respondents)
followed by car (57%/127 respondents) and train (24%/53 respondents). King Street had
similar results walk was the most popular mode (32%/71 respondents) followed by car
(26%/57 respondents) and train (4%/9 respondents).
Information sessions
Approximately 44 residents and traders attended the three sessions at Functions on Chapel.
Pop-up
Approximately 300 people were engaged through the pop-up consultation sessions by
providing comments or having conversations and taking away surveys to complete. 171
comments and votes were provided and between 150-200 hardcopy surveys and postcards
handed out at the consultation sessions.
Letter/email
Three emails were received from traders on Greville Street.
Greville and King Streets – Community Consultation Analysis Report 11
What people like most and what could be improved
Survey
Respondents were asked what they currently like most about Greville and King Streets.
Most comments indicated that the retail shops (30%/86 comments) are the best thing about
Greville and King Streets followed by village feel/atmosphere (25%/71 comments) and
cafes/restaurants (24%/67 comments).
Respondents were then asked what they would improve in Greville and King Streets. Two
hundred respondents answered this question. The majority would like the traffic flow to
improve (30%/76 comments), of these comments most said a one-way street would improve
traffic flow. Widened footpath/improve pedestrian amenity (29%/74 comment) was also
mentioned as an improvement followed by increase trees and green space (17%/44
comments) and more outdoor dining (5%/14 comments).
Widened footpaths are also reflected in question 4 were 73%/202 respondents agree with
extending the width of the footpath to improve, seating and dining in Greville Street. Of the
respondents who support this idea the majority where residents (77%/130 respondents) and
landholders (69%/38 respondents).
Pop ups
Attendees provided a range of responses on ways to
improve the street. These for the most part aligned with
the changes proposed, with the exception of a desire to
see the shop owners work together to improve the look
of the streets (e.g. uniform / colourful facades) as well as
suggestions related to disability access, cycling and
history.
Comments have been categorised into the following 11
core themes, in order of popularity:
• Pedestrian focused (9 comments): including wayfinding,
better connections, wider footpaths.
• Street experience (9 comments): temporary events, markets and alfresco drinking and dining.
• Green space (8): including new street trees and a more varied selection in species.
• Business diversity (6): including emphasis on boutiques that contribute to Greville Street’s
‘edgy’ character.
• Safety (4): including the provision of better lighting in Grattan Gardens and near Prahran
Train Station / Leggetts Lane.
• Streetscape aesthetics (4): including better upkeep of shop fronts and uniform awnings. This
could be inspired by project such as the painted ladies in San Francisco with bright painted
buildings.
Greville and King Streets – Community Consultation Analysis Report 12
“Variety of retail
shops”
“Improve traffic
flow”
(Indicative comments)
• New public infrastructure (3): such as a public toilet block in Grattan Gardens and inclusive
public spaces.
• Bicycle focused (3): including dedicated bike lanes and a bike share scheme.
• Disability access (1): including flushed kerbing, a wheelchair accessible public toilet and
signage at wheelchair eye level, charging point for scooters
• History (1): street elements to reflect and tell the story of the unique role of Greville St in
Melbourne’s history
• Public art (1).
General Traffic changes
Survey
The majority of survey respondents supported all three
proposed changes. Changing the traffic flow to one-
way west bound on Greville Street between Chapel
Street and the Prahran Train Station was the most
supported option (63%/169 respondents), followed by
changing Grattan Street to one-way south bound with
car spaces maintained (58%/157 respondents).
Responses to changing Porter Street to one-way north
bound between Greville Street and Commercial Road,
with two-way access from High Street to Percy Street
to maintain residential access was collated (52%/143
respondents).
Of the survey respondents who supported changing the traffic flow to one-way west bound
on Greville Street between Chapel Street and the Prahran Train Station, the majority were
local residents (61%/101 respondents) and landholders (61%/34 respondents). Of the
traders/business owners there was an even split between both supporting (47%/16
respondents) and not supporting (47%/16 respondents) this option.
Amenity changes
Survey
Survey respondents were asked if they supported a number of amenity changes outlined in
the proposal. The majority of respondents (83%/227 respondents) supported changing the
pedestrian crossings at Izett Street to create less conflict between cars and pedestrians
followed by extend the width of the footpath to improve planting, seating and dining in
Greville Street (73.7%/202 respondents) followed by creating a local plaza space, with no
kerbs and a paved surface across the street in front of Grattan Gardens (73%/195
respondents). A number of respondents (36%/101) don’t support removing two of the four
plane trees in front of the Prahran Town Hall to allow for new urban plaza on Chapel Street.
Greville and King Streets – Community Consultation Analysis Report 13
“More
attractive
seating”
(Indicative comments)
Then respondents were then asked what they would like to see in front of Prahran Town
Hall. Most comments indicated that more seating (35%/80 comments) should be considered
followed by public art (31%/72 comments), better lighting (29%/66 comments) and more
tress and gardens (10%/22 comments).
While only 22 respondents commented on having trees and gardens, there was a significant
amount of respondents (36%/101 respondents) against the removal for trees in front of
Prahran Town Hall in question four.
Pop-ups
Respondents were asked if the supported the changes to Izett Street, (10) indicated support
for the proposed changes. The overwhelming majority of people we spoke to express a
belief that the existing pedestrian crossing should be changed to improve pedestrian safety
and amenity, and reduce confusion for drivers. People also indicated support for making
Greville Street one-way if it would make this intersection
safer.
Respondents were asked if the supported the changes to
create a Town Hall Plaza, In total 80% (4) of votes and
many comments indicated support for the proposed
changes in this section, while one person indicated they
had some concerns. There was a general sense that the
look and feel of Town Hall Plaza could be improved
through new softer landscaping treatments and the
provision of public artwork. Some people made the
comment that trees need to be selected carefully to suit
the street and not cause allergies. Some concerns were
raised about the removal of existing street trees on
Chapel Street to improve the connection with King Street.
These concerns seem to be alleviated when it was
demonstrated that these losses would be offset by additional trees elsewhere and that the
landscape architects had recommended removal to increase canopy cover and overall tree
health.
Letter/email
Two emails received by traders were in favour of the idea of widening and improving
footpaths down Greville Street. One trader extended on this saying if car spaces were
removed to make footpaths wider he would only support it if it creates more footpath dining.
One trader was happy with Porter Street continuing to be one-way.
One way traffic or shard zone
Survey
Survey respondents were asked if they prefer either shared street use (allows for one way
through traffic) or shared street use and permanent street closure at Grattan Gardens. A
Greville and King Streets – Community Consultation Analysis Report 14
“Like the opportunity
to close off for
events”
“Restricting trade!”
(Trader comment)
small majority of respondents prefer shared street use (33%/86 respondents) followed by
shared street use and permanent street closure at Grattan Gardens (28%/73 respondents),
neither option (24%/64 respondents) and both options
(16%/43 respondents).
A small majority of local residents support shared street
use (33%/55 respondents) followed by shared street use
and permanent street closure at Grattan Gardens
(28%/48 respondents). Of the traders/business owners
the majority were against both options (41%/14
respondents). The majority of respondents aged between
25-44 years old (38%/30 respondents) support shared
street use. Respondents aged 45-54 (27%/13
respondents) were an even split between both options
whereas most respondents aged 55-64 years (30%/15
respondents) were against both options.
Information sessions
Respondents were asked two options of temporary or permanent closure of Greville Street
outside Grattan Gardens. The community who cast the votes was generally in favor (4
respondents) of temporary closures of Greville Street whereas most community members
were against (2 respondents) permanent closures.
A small majority of traders were in favor (5 respondents) of temporary closure. There was a
general sense that this would be a great opportunity to close the road for events. Four
traders were opposed to this closure believing it would be too much of an impact on traffic
flow and parking.
A small majority of traders (4 respondents) were opposed to permanent closures believing it
would restrict trading. Three traders were in favour of the idea.
Two residents were against the idea of redirecting traffic on Porter Street to northbound from
the intersection with Greville Street believing it would limit property access.
Pop ups
Respondents were asked two options of temporary or permanent closure of Greville Street
outside Grattan Gardens. In total 70% of votes (21) were cast in favour of temporary
closures only, while 30% (10) preferred removing cars permanently. Many people responded
positively to the idea of allowing temporary events to attract more visitors to the area and
reinvigorate the Greville Street precinct. Many also noted that a temporarily closed space
could test the waters for a permanent closure.
Concerns raised related to impacts of redirecting traffic on Porter Street to northbound from
the intersection with Greville Street. These concerns were generally voiced by local
residents who felt they would be inconvenienced in terms of access to their properties,
Greville and King Streets – Community Consultation Analysis Report 15
“Remove car
parks on one
side no matter
what is
decided”
(Resident comment)
especially those located on Leggett’s Lane. Residents were particularly concerned when
they thought Greville Street could be closed off.
Letter/email
Two emails received by traders were opposed to permanent closure of Greville Street
outside Grattan Gardens, stating that this will effect traffic flow and be hard for customers to
access shopping. One trader is in favour of option temporary closure believed this is the
better option of the two.
Shared street use changes
Survey
The majority of survey respondents supported all three changes. Temporary closure for
designated events was the most supported option (69%/182 respondents) followed by
providing more trees, seating and dining (67%/176) and shared car and pedestrian space
between Grattan Street and Izett Street (49%/126 respondents. Almost 30% for
respondents did not support shared car and pedestrian space between Grattan Street and
Izett Street.
Information sessions
Three residents were in favor of the idea of a shared car and pedestrian space between
Grattan Street and Izett Street. Furthermore two residents liked the idea of removing car
parks on one side of the road. Two residents were against this idea believing it would limit
property access.
Shared Street Use and Permanent Street Closure
Survey
Of the two options, majority of respondents supported providing more trees, seating and
dining (requires removal of 10 car spaces) (58%/156 respondents) whereas a small majority
of respondents did not support closed to traffic between Grattan Street and the access
laneway with a shared street between the laneway and Izett Street (42%/110 respondents).
Greville and King Streets – Community Consultation Analysis Report 16
This page has been intentionally left blank.
Greville and King Streets – Community Consultation Analysis Report 17
Greville and King Streets – Community Consultation Analysis Report 18
Survey Results
Q1. What respondents like most about Greville and King Streets
Currently what do you like most about Greville and King Streets?
Number of respondents: 281 of 281 total survey respondents.
Four themes were identified and demonstrated in the indicative comments below.
Theme 1
Retail/shopping
86/30% respondents said:
Greville and King Streets – Community Consultation Analysis Report 19
“Variety of retail shops”
“The alternative retail shops”
“Quirky shops”
Theme 3
Cafes/restaurants
67/24% respondents said:
“The cafes and shops. It's a great area
to live in”
“Small shops and cafes”
“Cafes and bars”
Theme 2
Atmosphere/ Village feel
71/25% respondents said:
“Feels like a little modern village”
“The 'small village' atmosphere”
“The culture, diversity and atmosphere.
Great vibe.”
Theme 4
Good Access
29/10% respondents said:
“Provides easy access for cars and
pedestrians”
“Easy access to Prahran station”
“King St is an important means of
access to Chapel St”
Q2. What respondents would improve about Greville and King Streets
What would you improve in Greville and King Streets?
Number of respondents: 281 of 281 total survey respondents.
Four themes were identified and demonstrated in the indicative comments below.
Theme 1
Improve traffic flow/one way
street 76/30% respondents said:
Theme 3
Increase trees and green space
44/17% respondents said:
“Improve traffic flow”
“Reduce cars and make the whole
road paved for pedestrians, change to
local traffic only, one-way”
“Make it all one way traffic from Chapel
Street”
Theme 2
Improve pedestrian amenity/widened
footpaths 74/29% respondents said:
“Wider footpath for walking”
“Pedestrian access
(footpaths need to be wider)”
“Improve pedestrian amenity”
“More trees and greenery please”
“More trees, the palms are the best”.
“Green and open spaces”
Theme 4
Increase outdoor dining 14/5%
respondents said:
“More outdoor dining, improve
vibrancy”
“Space for sidewalk dining”
“Increase outdoor dining /cafes”
62.6%
52.4%
58.1%
7.4%
14.7%
13.3%
28.5% 30.0%
25.9%
1.5% 2.9% 2.6%
Between Area 1 and Area 4 - Changing the
traffic flow to one-way west bound on
GrevilleStreet between Chapel Street and
the Prahran Train Station.
Area 1 - Changing Porter Street to one-
way north bound between Greville
Streetand Commercial Road, with two-
way access from High Street to Percy
Street to maintain residential access.
Area 2 - Changing Grattan Street to one-
way south bound with car spaces
maintained.
Support Neutral Don’t support Can’t say
Source: Corporate and Community Planning 2015
Figure 1: Question 3
Number of respondents: 273 of 288
69.1% 73.0%
83.2%
36.7%
73.7%
51.6%
12.8%
9.4%
8.4%
23.6%
7.3%
18.3%
15.8% 17.2%
7.0%
36.4%
18.2%
23.1%
2.3% 0.4% 1.5% 3.3% 0.7%
7.0%
Area 1 - Creating a
shared pedestrian
and vehicle zone in
front of the
entranceto the
Prahran train
station.
Area 2 - Grattan
Gardens: Creating a
local plaza space,
with no kerbs and a
paved surface
across the street in
front of Grattan
Gardens.
Area 3 - Changing
the pedestrian
crossings at Izett
Street to create
less conflict
between cars and
pedestrians.
Area 4 - Removing
two of thefour
plane trees infront
of the Prahran
Town Hall to allow
for new urban
plaza on Chapel
Street.
Area 4 - In Greville
Street, extend the
width of the
footpath to
improve planting,
seating and dining.
Area 5 - Fully
pedestrianised King
Street between the
round about and
Chapel Street, with
residential car
spaces access
maintained to the
east
Support Neutral Don’t support Can’t say
Source: Corporate and Community Planning 2015
Figure 2: Question 4
Number of respondents: 275 of 288
Q3. Traffic changes
Do you support the following traffic changes outlined in the proposal?
Number of respondents: 273 of 281 total survey respondents.
Q4. Proposed changes
Do you support the following changes outlined in the proposal?
Number of respondents: 275 of 281 total survey respondents.
Q5. Prahran Town Hall
What would you like to see in front of the Prahran Town Hall (e.g. public art, lighting, more
seating)
Number of respondents: 230 of 288 total survey respondents.
Five themes were identified and demonstrated in the indicative comments below.
Theme 1
Increase seating 80/35%
respondents said:
Theme 3
Better lighting 66/29%
respondents said:
Theme 5
Less homeless/unfortunate
people 14/6% respondents said:
“More seating to eat lunch”
“More attractive seating”
Theme 2
Install art 72/31% respondents
said:
“Public art including graffiti art”
“More lighting and public art”
“Better lighting which celebrates the
historic buildings”
“Lighting on the building”
Theme 4
More trees and gardens 22/10%
respondents said:
“Less homeless/drunk people.
Less people asking for money”
“Less 'unfortunate' people.
It's distracting and undesirable to
walk past”
“Increase the trees - beautify with plant
boxes”
“Garden beds with flowers and small
scrubs”
Q6. Shared Street Use (Allows for one way through traffic) or Shared Street Use and
Permanent Street Closure at Grattan Gardens
Do you generally support the following?
Number of respondents: 264 of 288 total survey respondents.
32.6%
27.7%
15.9%
23.9%
Option 1 – Shared Street Use (Allows for one way through traffic)
Option 2 – Shared Street Use and Permanent Street Closureat Grattan Gardens
Both options
Neither option
Source: Corporate and Community Planning 2015
Figure 3: Question 6
Number of respondents: 264 of 288
48.8%
66.9% 69.5%
19.8%
10.6%
17.2%
27.1%
21.7%
12.6%
4.3% 0.8% 0.8%
Area 2 - Shared car and pedestrian
space between Grattan Streetand
Izett Street.
Area 2 - Providing more trees,
seating and dining (requires
removal of six car spaces).
Area 2 - Temporary closurefor
designated events.
Support Neutral Don’t support Can’t say
Source: Corporate and Community Planning 2015
Figure 4: Question 7
Number of respondents: 263 of 288
40.2%
58.4%
13.0%
6.7%
42.1%
33.7%
4.6% 1.1%
Area 2 - Closed to traffic between Grattan Street and the
access laneway with a shared street between the
laneway and Izett Street.
Area 2 - Providing moretrees, seating and dining
(requires removal of 10 car spaces).
Support Neutral Don’t support Can’t say
Source: Corporate and Community Planning 2015
Figure 5: Question 8
Number of respondents: 267 of 288
Q7. Shared street use
Do you support the following changes outlined in Option 1 – Shared Street Use
Number of respondents: 263 of 288 total survey respondents.
Q8. Shared Street Use and Permanent Street Closure
Do you support the following changes outlined in Option 2 – Shared Street Use and
Permanent Street Closure?
Number of respondents: 267 of 288 total survey respondents.
0.5%
57.2%
8.1%
23.9%
6.8% 7.2%
78.4%
1.4%0.0%
25.7%
3.6% 4.1%
1.4% 2.7%
32.0%
0.9%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
Bus Car Cycle Train Tram Taxi Walk Other
GrevilleStreet King Street
Source: Corporate and Community Planning 2015
Figure 7: Question 10a
Number of respondents: 260 of 288
Q9. Why respondents normally visit Greville or King Streets?
Why do you normally visit Greville or King Streets?
Number of respondents: 267 of 288 total survey respondents.
60.4%
69.4%
18.0% 20.7%
14.0%
33.3%
40.5%
55.4%
16.2%
12.6%
7.2%
10.8%
4.1% 4.1%
5.4%
2.3%
25.7%
3.2%
9.5%
4.5%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
Greville Street King Street
Source: Corporate and Community Planning 2015
Figure 6: Question 9a
Number of respondents: 267 of 288
Q10. How respondents normally travel to Greville or King Streets
Why do you normally visit Greville or King Streets?
Number of respondents: 260 of 288 total survey respondents.
52.7%
26.6%
7.2%
4.1% 3.6% 4.1%
17.6%
9.0% 10.4%
5.4% 6.3%
18.0%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
Daily 2-3 times/week Once/ week 2-3 times/ month Once/ month Less than once/
month
Greville Street King Street
Source: Corporate and Community Planning 2015
Figure 8: Question 10a
Number ofrespondents: 260 of288
Q11. How often respondents visit Greville or King Streets
How often do you visit Greville or King Streets?
Number of respondents: 260 of 288 total survey respondents.
This page has been intentionally left blank.
29
Pop–up Results
Engagement Overview
The City of Stonnington has developed a Masterplan proposing widespread improvements to
Greville and King Streets. To test these improvements with the community and users of these
streets, CoDesign Studio was engaged to deliver three on-street consultation sessions as well
as complementary communications and street prototyping activities. Together, these activities
have enabled local residents, workers, traders and visitors alike to provide input into the future
design outcomes for the Greville and King Street precinct.
Consultation sessions
These sessions took place on the following dates:
• Saturday 18 July outside Prahran Library, 10 – 11am
• Saturday 25 July in Grattan Gardens, 10 – 11am
• Thursday 30 July on the corner of Greville St and Macquarie St, 8 – 11am
The sessions aimed to:
• Inform people about the ongoing project to improve Greville Street.
• Communicate, in a simple easy to understand way, the improvements being considered.
• Gain feedback on key design elements.
Complementary prototyping and communications activities
Complementing the engagement sessions were a range of signage, communication materials
and on-street prototyping to draw attention to the proposed changes and engage the
community to gather feedback. These included:
• On-street decals promoting the consultation process and indicating the location of pop-up
consultation sessions.
• On-street stencils indicating the types and locations of proposed changes.
• Bin signage provided a summary of the ways to have a say in an eye-catching manner.
The results of the consultation sessions have been compiled into the following report,
concluding with a set of recommendations for the next phase of the project.
30
Summary of findings
Overall, people were supportive of improvements proposed for Greville and King Streets and
many aspects of the plan were not seen as controversial.
Most positive: People responded very positively to having more (carefully selected) street
trees and fixing the intersection at Izett Street. Overall, they were also supportive of making
Greville Street one-way if this helped to improved safety, including at Izett Street, and created
more space for pedestrians, outdoor activities and trees.
Concerns: Most of the concerns raised came from residents in the area impacted by the
changes to traffic flows, surrounding Porter and Grattan Streets. People registered concerns
about the impacts on their ability to get into and out of the area by car.
Locals: Most locals were in favour of creating a better pedestrian environment, especially
those that do not heavily rely on a motor vehicle for transport. Some of the locals we spoke to
have been living in the same area for over 10 years and have seen the area change; they
often recited concerns about the decline in Greville Street over the years and their desire to
see targeted improvements made to help revitalise the area.
Traders: Traders and shop staff could see potential in the proposed changes where they were
directly linked to introducing more and new uses of the street. They often acknowledged the
difficult trade-off between improving the street environment to make Greville Street a
destination and restricting car space and the need for car parking.
Bang for the investment buck: Some residents and traders wanted to be sure that the
improvements would provide a return for the street and were seeking information linking
changes to outcomes, new uses and benefits.
Implementation impacts: A number of people – both residents and traders – asked questions
and raised concerns about the staging and timing of the implementation, which related to
minimising impacts on businesses.
King Street: There was less feedback provided about King Street, with many indicating
confusion about where this street was located.
31
Recommendations
Based on the observations of the street, conversations and analysis of community feedback,
CoDesign Studio provides the following recommendations for the future implementation of the
project:
• Most community concerns focus on the impacts of individual or cumulative traffic flow
changes. Trials of these proposed changes could assist in seeing if these concerns will be
realised.
• Many community members and traders felt the shop owners as well as their tenants could
play a powerful role in making Greville Street a unique destination. This could be
encouraged.
• Consider prototyping the proposed closure of King Street to draw attention to this area and
signpost the proposed changes. This could also be used to further involve traders and the
community with the project.
• Consider careful staging of the project. Lead with elements, which will have the greatest
impact and time implementation to minimise impacts to businesses.
• Link changes with initiatives that ensure new spaces are well used. For example,
community programming to activate new shared space.
32
Additional
correspondence
33
Letter 1
This letter was from a trader who was opposed to permanent closure of Greville Street outside
Grattan Gardens stating that this will effect traffic flow and be hard for customers to access
shopping. But was in favor of temporary closure believing this is the better option of the two.
The letter was also in favour of the number of amenity changes outline in the proposal e.g.
Increased greenery and landscaping, Improved pavement surfaces and widening of footpaths
Letter 2
This letter was opposed to permanent closure of Greville Street but was happy with Porter
Street continuing to be one way.
Letter 3
This trader was in favour of the idea of widening and improving footpaths down Greville Street.
In addition he supported car spaces being removed to make footpaths wider but only if it
creates more footpath dinning.
34
35

Weitere ähnliche Inhalte

Was ist angesagt?

DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016
DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016
DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016Stonnington
 
Hoboken - Application for Pedestrian Safety Program
Hoboken - Application for Pedestrian Safety ProgramHoboken - Application for Pedestrian Safety Program
Hoboken - Application for Pedestrian Safety ProgramHoboken Resistance
 
Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebfregoneseassociates
 
Honolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu Civil Beat
 
Beaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling ResultsBeaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling Resultsfregoneseassociates
 
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock Rail~Volution
 
Ribbon Development With Case Study Of Aydin
Ribbon Development With Case Study Of Aydin Ribbon Development With Case Study Of Aydin
Ribbon Development With Case Study Of Aydin Pathik
 
North East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanNorth East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanPaul Vernon
 

Was ist angesagt? (13)

14 04-09 complete streets overview
14 04-09 complete streets overview14 04-09 complete streets overview
14 04-09 complete streets overview
 
DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016
DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016
DRAFT Inner Melbourne Action Plan Consultation document - Jan 2016
 
Hoboken - Application for Pedestrian Safety Program
Hoboken - Application for Pedestrian Safety ProgramHoboken - Application for Pedestrian Safety Program
Hoboken - Application for Pedestrian Safety Program
 
Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forweb
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Placemaking through complete streets
Placemaking through complete streetsPlacemaking through complete streets
Placemaking through complete streets
 
Honolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu land use ordinance amendment
Honolulu land use ordinance amendment
 
Lbdc 081013
Lbdc 081013Lbdc 081013
Lbdc 081013
 
Beaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling ResultsBeaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling Results
 
Have transit seeking development
Have transit seeking developmentHave transit seeking development
Have transit seeking development
 
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
 
Ribbon Development With Case Study Of Aydin
Ribbon Development With Case Study Of Aydin Ribbon Development With Case Study Of Aydin
Ribbon Development With Case Study Of Aydin
 
North East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanNorth East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development Plan
 

Andere mochten auch

Greville and King St Concept Plans
Greville and King St Concept PlansGreville and King St Concept Plans
Greville and King St Concept PlansStonnington Connect
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingStonnington Connect
 
Windsor siding masterplan - endorsed plan
Windsor siding masterplan - endorsed planWindsor siding masterplan - endorsed plan
Windsor siding masterplan - endorsed planStonnington
 
Greville king draft concept plans
Greville king draft concept plansGreville king draft concept plans
Greville king draft concept plansStonnington
 
Greville King Streets Concept Plans
Greville King Streets Concept PlansGreville King Streets Concept Plans
Greville King Streets Concept PlansStonnington
 

Andere mochten auch (6)

Greville and King St Concept Plans
Greville and King St Concept PlansGreville and King St Concept Plans
Greville and King St Concept Plans
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor Siding
 
Windsor siding masterplan - endorsed plan
Windsor siding masterplan - endorsed planWindsor siding masterplan - endorsed plan
Windsor siding masterplan - endorsed plan
 
Windsor Siding Master Plan
Windsor Siding Master PlanWindsor Siding Master Plan
Windsor Siding Master Plan
 
Greville king draft concept plans
Greville king draft concept plansGreville king draft concept plans
Greville king draft concept plans
 
Greville King Streets Concept Plans
Greville King Streets Concept PlansGreville King Streets Concept Plans
Greville King Streets Concept Plans
 

Ähnlich wie Greville and King Engagement Analysis Report August 2015

Hawksburn Village Structure Plan - Survey Analysis Report
Hawksburn Village Structure Plan - Survey Analysis ReportHawksburn Village Structure Plan - Survey Analysis Report
Hawksburn Village Structure Plan - Survey Analysis ReportStonnington
 
OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North Alexandra Dobson
 
Adopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure PlanAdopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure PlanStonnington
 
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...Alexandra Dobson
 
Comprehensive Parking Improvement Study for the Borough of East Greenville
Comprehensive Parking Improvement Study for the Borough of East GreenvilleComprehensive Parking Improvement Study for the Borough of East Greenville
Comprehensive Parking Improvement Study for the Borough of East GreenvilleMarley Bice, AICP
 
OPDC second revised draft Local Plan consultation - Park Royal and Employment
OPDC second revised draft Local Plan consultation - Park Royal and EmploymentOPDC second revised draft Local Plan consultation - Park Royal and Employment
OPDC second revised draft Local Plan consultation - Park Royal and EmploymentAlexandra Dobson
 
LA Open Data Incentive Scheme – launch presentation, July 2014
LA Open Data Incentive Scheme – launch presentation, July 2014LA Open Data Incentive Scheme – launch presentation, July 2014
LA Open Data Incentive Scheme – launch presentation, July 2014LG Inform Plus
 
April 9th 2008 Future Pointe Coupee Meeting
April 9th 2008 Future Pointe Coupee MeetingApril 9th 2008 Future Pointe Coupee Meeting
April 9th 2008 Future Pointe Coupee Meetingfregoneseassociates
 
Community Engagement for Complete Communities
Community Engagement for Complete CommunitiesCommunity Engagement for Complete Communities
Community Engagement for Complete CommunitiesRPO America
 
Histon & Impington Neighbourhood Plan
Histon & Impington Neighbourhood PlanHiston & Impington Neighbourhood Plan
Histon & Impington Neighbourhood Planhisimp
 
ODUG LA incentive scheme - Final bristol deck 03/07/2014
ODUG LA incentive scheme - Final bristol deck 03/07/2014ODUG LA incentive scheme - Final bristol deck 03/07/2014
ODUG LA incentive scheme - Final bristol deck 03/07/2014Jacqui Taylor
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Crosstown TO
 
Municipal Perspectives on Compete Streets
Municipal Perspectives on Compete StreetsMunicipal Perspectives on Compete Streets
Municipal Perspectives on Compete StreetsAngela Vincent, AICP
 
OPDC second revised draft Local Plan consultation - Design & Environment
OPDC second revised draft Local Plan consultation - Design & EnvironmentOPDC second revised draft Local Plan consultation - Design & Environment
OPDC second revised draft Local Plan consultation - Design & EnvironmentAlexandra Dobson
 

Ähnlich wie Greville and King Engagement Analysis Report August 2015 (20)

Hawksburn Village Structure Plan - Survey Analysis Report
Hawksburn Village Structure Plan - Survey Analysis ReportHawksburn Village Structure Plan - Survey Analysis Report
Hawksburn Village Structure Plan - Survey Analysis Report
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
 
OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North
 
2013 Orange-Chatham Development Briefing
2013 Orange-Chatham Development Briefing2013 Orange-Chatham Development Briefing
2013 Orange-Chatham Development Briefing
 
Adopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure PlanAdopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure Plan
 
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
OPDC second revised draft Local Plan consultation - Town Centre Uses & Social...
 
Comprehensive Parking Improvement Study for the Borough of East Greenville
Comprehensive Parking Improvement Study for the Borough of East GreenvilleComprehensive Parking Improvement Study for the Borough of East Greenville
Comprehensive Parking Improvement Study for the Borough of East Greenville
 
OPDC second revised draft Local Plan consultation - Park Royal and Employment
OPDC second revised draft Local Plan consultation - Park Royal and EmploymentOPDC second revised draft Local Plan consultation - Park Royal and Employment
OPDC second revised draft Local Plan consultation - Park Royal and Employment
 
Great British High Streets – creating a buzz and reviving interest | Jasmin T...
Great British High Streets – creating a buzz and reviving interest | Jasmin T...Great British High Streets – creating a buzz and reviving interest | Jasmin T...
Great British High Streets – creating a buzz and reviving interest | Jasmin T...
 
LA Open Data Incentive Scheme – launch presentation, July 2014
LA Open Data Incentive Scheme – launch presentation, July 2014LA Open Data Incentive Scheme – launch presentation, July 2014
LA Open Data Incentive Scheme – launch presentation, July 2014
 
April 9th 2008 Future Pointe Coupee Meeting
April 9th 2008 Future Pointe Coupee MeetingApril 9th 2008 Future Pointe Coupee Meeting
April 9th 2008 Future Pointe Coupee Meeting
 
Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
Community Engagement for Complete Communities
Community Engagement for Complete CommunitiesCommunity Engagement for Complete Communities
Community Engagement for Complete Communities
 
Histon & Impington Neighbourhood Plan
Histon & Impington Neighbourhood PlanHiston & Impington Neighbourhood Plan
Histon & Impington Neighbourhood Plan
 
ODUG LA incentive scheme - Final bristol deck 03/07/2014
ODUG LA incentive scheme - Final bristol deck 03/07/2014ODUG LA incentive scheme - Final bristol deck 03/07/2014
ODUG LA incentive scheme - Final bristol deck 03/07/2014
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
 
Municipal Perspectives on Compete Streets
Municipal Perspectives on Compete StreetsMunicipal Perspectives on Compete Streets
Municipal Perspectives on Compete Streets
 
OPDC second revised draft Local Plan consultation - Design & Environment
OPDC second revised draft Local Plan consultation - Design & EnvironmentOPDC second revised draft Local Plan consultation - Design & Environment
OPDC second revised draft Local Plan consultation - Design & Environment
 

Mehr von Stonnington Connect

Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Stonnington Connect
 
Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Stonnington Connect
 
Greville and King St Traffic Notifications
Greville and King St Traffic NotificationsGreville and King St Traffic Notifications
Greville and King St Traffic NotificationsStonnington Connect
 
Local Law Permit in Greville/King Streets
Local Law Permit in Greville/King StreetsLocal Law Permit in Greville/King Streets
Local Law Permit in Greville/King StreetsStonnington Connect
 
Princes Gardens Masterplan of Existing Conditions
 Princes Gardens Masterplan of Existing Conditions  Princes Gardens Masterplan of Existing Conditions
Princes Gardens Masterplan of Existing Conditions Stonnington Connect
 
Aged Services Client Satisfaction
Aged Services Client SatisfactionAged Services Client Satisfaction
Aged Services Client SatisfactionStonnington Connect
 
July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)Stonnington Connect
 
July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)Stonnington Connect
 
March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)Stonnington Connect
 
March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)Stonnington Connect
 
FAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept PlanFAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept PlanStonnington Connect
 
Possible Synthetic Surface Infill Option
Possible Synthetic Surface Infill OptionPossible Synthetic Surface Infill Option
Possible Synthetic Surface Infill OptionStonnington Connect
 
Brochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept PlanBrochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept PlanStonnington Connect
 

Mehr von Stonnington Connect (17)

Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016
 
Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016
 
Greville and King St Traffic Notifications
Greville and King St Traffic NotificationsGreville and King St Traffic Notifications
Greville and King St Traffic Notifications
 
Local Law Permit in Greville/King Streets
Local Law Permit in Greville/King StreetsLocal Law Permit in Greville/King Streets
Local Law Permit in Greville/King Streets
 
November 2015: CCTV
November 2015: CCTVNovember 2015: CCTV
November 2015: CCTV
 
Location of Princes Gardens
Location of Princes GardensLocation of Princes Gardens
Location of Princes Gardens
 
Princes Gardens Masterplan of Existing Conditions
 Princes Gardens Masterplan of Existing Conditions  Princes Gardens Masterplan of Existing Conditions
Princes Gardens Masterplan of Existing Conditions
 
Aged Services Client Satisfaction
Aged Services Client SatisfactionAged Services Client Satisfaction
Aged Services Client Satisfaction
 
Open Space Strategy
Open Space StrategyOpen Space Strategy
Open Space Strategy
 
July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)
 
July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)
 
March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)
 
March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)
 
FAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept PlanFAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept Plan
 
Recreation Strategy 2014 2024
Recreation Strategy 2014 2024Recreation Strategy 2014 2024
Recreation Strategy 2014 2024
 
Possible Synthetic Surface Infill Option
Possible Synthetic Surface Infill OptionPossible Synthetic Surface Infill Option
Possible Synthetic Surface Infill Option
 
Brochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept PlanBrochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept Plan
 

Kürzlich hochgeladen

Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 

Kürzlich hochgeladen (20)

Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

Greville and King Engagement Analysis Report August 2015

  • 1. Greville and King Streets – Community Consultation Analysis Report 1 GREVILLE AND KING STREETS IMPROVEMENT PLAN COMMUNITY CONSULTATION ANALYSIS REPORT – AUGUST 2015
  • 2. Contents GREVILLE AND KING STREETS IMPROVEMENT PLAN................................................................1 INTRODUCTION..................................................................................................................................3 SURVEY FEEDBACK OVERVIEW.....................................................................................................8 SURVEY RESULTS............................................................................................................................18 POP–UP RESULTS............................................................................................................................29 ADDITIONAL CORRESPONDENCE................................................................................................33 Greville and King Streets – Community Consultation Analysis Report 2
  • 3. Introduction Council is preparing draft concept plans to improve the pedestrian amenity along Greville and King Streets, Prahran. Those who live, work and visit the area participated either by survey or attendance at an information session. We have developed a couple of draft concept plans to give you an idea about how we’re planning to improve Greville and King Streets. Purpose of this report Information from this report will be used to inform the final design package which we will present to community members, including residents, traders, service providers and visitors to the area for further comment. Background The Greville and King Street improvement plan is based on themes and ideas from the Chapel Street Masterplan, Re-discover Chapel Street. The plan aims to improve the quality of streets and public spaces to meet the needs of the increasing population that live, work and visit the area. Since the Masterplan’s implementation, several footpath extensions for additional key public spaces have been built, including Windsor Plaza at the Windsor Train Station and several ‘pause points’ for increased dining, trade and public seating. Improvements to Greville and King Streets are proposed for the next stage in delivering this Masterplan. Scope of the improvement works The key areas for improvements have been separated into sections to make it easier to provide feedback. These draft concept plans are based on feedback received from residents and traders, and are combined with an analysis of technical data including traffic, social and commercial impact assessments. An accompanying map of Greville and King Streets shows the areas we are seeking to improve. The next few pages will provide more information on the proposed changes. The key design ideas are: • Changing the traffic flow to one-way west bound between Chapel Street and the Prahran Train Station. • Changing Porter Street to one-way north bound between Greville Street and Commercial Road with two way access from High Street to Leggett’s Lane to maintain residential access. • Changing Grattan Street to one-way South bound with car parking maintained. • Creating a shared pedestrian and vehicle zone in front of the entrance to the Prahran train station. • Grattan Gardens: Creating a local plaza space, with no kerbs and a paved surface across the street in front of Grattan Gardens. • Changing the pedestrian crossings at Izett Street to create less conflict between cars and pedestrians. • Removing two of the four plane trees in front of the Prahran Town Hall to allow for new urban plaza space on Chapel Street. • The removal of three car parks (for more trees, seating and dining). Greville and King Streets – Community Consultation Analysis Report 3
  • 4. • Fully pedestranised King Street between the roundabout and Chapel Street with residential car parking access maintained to the east by removing seven car parks • Shared car and pedestrian space between Grattan Street and Izett Street. • Closed to traffic between Grattan Street and the access laneway with a shard street between the laneway and Izett Street. Greville and King Streets Concept Plan by area Methodology The consultation included: • The development of a communication and engagement activation plan • Distribution of communication and consultation material • Consultation processes and engagement activities • Analysis of consultation data • Preparation of key findings and recommendations report During the preparation of the consultation and engagement plan, consideration was given to the approach, response rate and attendance levels of the Chapel Street Masterplan, Re-discover Chapel Street consultation. Greville and King Streets – Community Consultation Analysis Report 4
  • 5. Data was collated in Excel. Where possible, data was analysed quantitatively and put into a graph. When analysing the qualitative data from open-ended questions, attention was given to the variety of responses, as well as giving a ranking of popularity of responses (through counting responses of a similar theme). Communication activity Communication activities were used to promote the consultation, including: • Dedicated webpage www.stonnington.vic.gov.au/grevilleking • Advertisements in the Stonnington Leader o 14 July 2015 o 21 July 2015 o 28 July 2015 • Article placed in InStonnington (delivered all residents) o June/July edition o August/September edition • Direct mail of 8pp brochure and 4pp survey, mailed to 7,000 residents and traders • Social media posts (Facebook and Twitter) using #grevilleking • Posters distributed to traders and Service Centres • Media release Engagement activity Online or hard copy survey This survey sought feedback on a range of issues including what respondents like/dislike about Greville and King Streets, traffic, amenity, travel and why respondents travel to the centre. Hard copy surveys were sent to all owners and occupiers within the Greville and King Streets area including free post envelopes. The same survey was provided online. 288 surveys were received. Information sessions Three information sessions were held to provide key stakeholders with vital information about the proposed plans. Staff from the City Works, Communications and Community Planning departments and consultants were available to discuss the improvement plan with residents, answer questions and provide feedback. The sessions were: • Tuesday28July,FunctionsonChapel–Traderssession • Wednesday29July,FunctionsonChapel–Communitysession • Saturday1August,FunctionsonChapel–Communitysession At each session there were: • Staff to ensure customer service and expert advice Greville and King Streets – Community Consultation Analysis Report 5 288 surveys received and included 1406 individual comments
  • 6. • Large maps of the proposed improvement plan • iPads to provide feedback via online a survey • Hard copy surveys to complete and submit at the session or to return via mail with a reply-paid envelope. Greville and King Streets – Community Consultation Analysis Report 6 Three Community/Trader workshops with 44 attendees approximately
  • 7. Pop-up events on Greville Street There were a number of pop-up activities where City of Stonnington staff were available to discuss the improvement plan with residents. These sessions took place on the following dates: • Saturday 18 July outside Prahran Library, 10 – 11am • Saturday 25 July in Grattan Gardens, 10 – 11am • Thursday 30 July on the corner of Greville Street and Macquarie Street, 8 – 11a Complementing the engagement sessions were a range of signage, communication materials and on- street prototyping to draw attention to the proposed changes and engage the community to gather feedback. These included: • On-street decals advertising the consultation process and indicating the location of pop- up consultation sessions. • On-street stencils indicating the types and locations of proposed changes. • Bin signs providing a summary of the ways to have a say in an eye-catching manner. Greville and King Streets – Community Consultation Analysis Report 7 3 pop-ups 300 attendees 171 comments and votes 175 surveys handed out
  • 8. Survey Feedback Overview Greville and King Streets – Community Consultation Analysis Report 8
  • 9. This page has been intentionally left blank. Greville and King Streets – Community Consultation Analysis Report 9
  • 10. Greville and King Streets – Community Consultation Analysis Report 10 Analysis Overview
  • 11. The following commentary is an overview of the feedback from the survey, information session, popups and letters/email and covers each of the questions in the survey. Further information can be obtained through the range of data images following this including graphs and tables. Survey Overall 288 completed the survey. Of these, the majority were local residents (76%/169 respondents) followed by landholder (25%/55 respondents) and business owner/ trader (15%/34 respondents). The majority of respondents who visit Greville Street come to dine or drink (70%/154 respondents) followed by retail shopping (60%/134 respondents) and just passing through (40%/90 respondents). Respondents who visit King Street mostly just pass through (26%/57 respondents) followed by dining or drinking (11%/26 respondents) and retail shopping (7%/16 respondents). The majority of respondents who travel to Greville Street walk (78%/174 respondents) followed by car (57%/127 respondents) and train (24%/53 respondents). King Street had similar results walk was the most popular mode (32%/71 respondents) followed by car (26%/57 respondents) and train (4%/9 respondents). Information sessions Approximately 44 residents and traders attended the three sessions at Functions on Chapel. Pop-up Approximately 300 people were engaged through the pop-up consultation sessions by providing comments or having conversations and taking away surveys to complete. 171 comments and votes were provided and between 150-200 hardcopy surveys and postcards handed out at the consultation sessions. Letter/email Three emails were received from traders on Greville Street. Greville and King Streets – Community Consultation Analysis Report 11
  • 12. What people like most and what could be improved Survey Respondents were asked what they currently like most about Greville and King Streets. Most comments indicated that the retail shops (30%/86 comments) are the best thing about Greville and King Streets followed by village feel/atmosphere (25%/71 comments) and cafes/restaurants (24%/67 comments). Respondents were then asked what they would improve in Greville and King Streets. Two hundred respondents answered this question. The majority would like the traffic flow to improve (30%/76 comments), of these comments most said a one-way street would improve traffic flow. Widened footpath/improve pedestrian amenity (29%/74 comment) was also mentioned as an improvement followed by increase trees and green space (17%/44 comments) and more outdoor dining (5%/14 comments). Widened footpaths are also reflected in question 4 were 73%/202 respondents agree with extending the width of the footpath to improve, seating and dining in Greville Street. Of the respondents who support this idea the majority where residents (77%/130 respondents) and landholders (69%/38 respondents). Pop ups Attendees provided a range of responses on ways to improve the street. These for the most part aligned with the changes proposed, with the exception of a desire to see the shop owners work together to improve the look of the streets (e.g. uniform / colourful facades) as well as suggestions related to disability access, cycling and history. Comments have been categorised into the following 11 core themes, in order of popularity: • Pedestrian focused (9 comments): including wayfinding, better connections, wider footpaths. • Street experience (9 comments): temporary events, markets and alfresco drinking and dining. • Green space (8): including new street trees and a more varied selection in species. • Business diversity (6): including emphasis on boutiques that contribute to Greville Street’s ‘edgy’ character. • Safety (4): including the provision of better lighting in Grattan Gardens and near Prahran Train Station / Leggetts Lane. • Streetscape aesthetics (4): including better upkeep of shop fronts and uniform awnings. This could be inspired by project such as the painted ladies in San Francisco with bright painted buildings. Greville and King Streets – Community Consultation Analysis Report 12 “Variety of retail shops” “Improve traffic flow” (Indicative comments)
  • 13. • New public infrastructure (3): such as a public toilet block in Grattan Gardens and inclusive public spaces. • Bicycle focused (3): including dedicated bike lanes and a bike share scheme. • Disability access (1): including flushed kerbing, a wheelchair accessible public toilet and signage at wheelchair eye level, charging point for scooters • History (1): street elements to reflect and tell the story of the unique role of Greville St in Melbourne’s history • Public art (1). General Traffic changes Survey The majority of survey respondents supported all three proposed changes. Changing the traffic flow to one- way west bound on Greville Street between Chapel Street and the Prahran Train Station was the most supported option (63%/169 respondents), followed by changing Grattan Street to one-way south bound with car spaces maintained (58%/157 respondents). Responses to changing Porter Street to one-way north bound between Greville Street and Commercial Road, with two-way access from High Street to Percy Street to maintain residential access was collated (52%/143 respondents). Of the survey respondents who supported changing the traffic flow to one-way west bound on Greville Street between Chapel Street and the Prahran Train Station, the majority were local residents (61%/101 respondents) and landholders (61%/34 respondents). Of the traders/business owners there was an even split between both supporting (47%/16 respondents) and not supporting (47%/16 respondents) this option. Amenity changes Survey Survey respondents were asked if they supported a number of amenity changes outlined in the proposal. The majority of respondents (83%/227 respondents) supported changing the pedestrian crossings at Izett Street to create less conflict between cars and pedestrians followed by extend the width of the footpath to improve planting, seating and dining in Greville Street (73.7%/202 respondents) followed by creating a local plaza space, with no kerbs and a paved surface across the street in front of Grattan Gardens (73%/195 respondents). A number of respondents (36%/101) don’t support removing two of the four plane trees in front of the Prahran Town Hall to allow for new urban plaza on Chapel Street. Greville and King Streets – Community Consultation Analysis Report 13 “More attractive seating” (Indicative comments)
  • 14. Then respondents were then asked what they would like to see in front of Prahran Town Hall. Most comments indicated that more seating (35%/80 comments) should be considered followed by public art (31%/72 comments), better lighting (29%/66 comments) and more tress and gardens (10%/22 comments). While only 22 respondents commented on having trees and gardens, there was a significant amount of respondents (36%/101 respondents) against the removal for trees in front of Prahran Town Hall in question four. Pop-ups Respondents were asked if the supported the changes to Izett Street, (10) indicated support for the proposed changes. The overwhelming majority of people we spoke to express a belief that the existing pedestrian crossing should be changed to improve pedestrian safety and amenity, and reduce confusion for drivers. People also indicated support for making Greville Street one-way if it would make this intersection safer. Respondents were asked if the supported the changes to create a Town Hall Plaza, In total 80% (4) of votes and many comments indicated support for the proposed changes in this section, while one person indicated they had some concerns. There was a general sense that the look and feel of Town Hall Plaza could be improved through new softer landscaping treatments and the provision of public artwork. Some people made the comment that trees need to be selected carefully to suit the street and not cause allergies. Some concerns were raised about the removal of existing street trees on Chapel Street to improve the connection with King Street. These concerns seem to be alleviated when it was demonstrated that these losses would be offset by additional trees elsewhere and that the landscape architects had recommended removal to increase canopy cover and overall tree health. Letter/email Two emails received by traders were in favour of the idea of widening and improving footpaths down Greville Street. One trader extended on this saying if car spaces were removed to make footpaths wider he would only support it if it creates more footpath dining. One trader was happy with Porter Street continuing to be one-way. One way traffic or shard zone Survey Survey respondents were asked if they prefer either shared street use (allows for one way through traffic) or shared street use and permanent street closure at Grattan Gardens. A Greville and King Streets – Community Consultation Analysis Report 14 “Like the opportunity to close off for events” “Restricting trade!” (Trader comment)
  • 15. small majority of respondents prefer shared street use (33%/86 respondents) followed by shared street use and permanent street closure at Grattan Gardens (28%/73 respondents), neither option (24%/64 respondents) and both options (16%/43 respondents). A small majority of local residents support shared street use (33%/55 respondents) followed by shared street use and permanent street closure at Grattan Gardens (28%/48 respondents). Of the traders/business owners the majority were against both options (41%/14 respondents). The majority of respondents aged between 25-44 years old (38%/30 respondents) support shared street use. Respondents aged 45-54 (27%/13 respondents) were an even split between both options whereas most respondents aged 55-64 years (30%/15 respondents) were against both options. Information sessions Respondents were asked two options of temporary or permanent closure of Greville Street outside Grattan Gardens. The community who cast the votes was generally in favor (4 respondents) of temporary closures of Greville Street whereas most community members were against (2 respondents) permanent closures. A small majority of traders were in favor (5 respondents) of temporary closure. There was a general sense that this would be a great opportunity to close the road for events. Four traders were opposed to this closure believing it would be too much of an impact on traffic flow and parking. A small majority of traders (4 respondents) were opposed to permanent closures believing it would restrict trading. Three traders were in favour of the idea. Two residents were against the idea of redirecting traffic on Porter Street to northbound from the intersection with Greville Street believing it would limit property access. Pop ups Respondents were asked two options of temporary or permanent closure of Greville Street outside Grattan Gardens. In total 70% of votes (21) were cast in favour of temporary closures only, while 30% (10) preferred removing cars permanently. Many people responded positively to the idea of allowing temporary events to attract more visitors to the area and reinvigorate the Greville Street precinct. Many also noted that a temporarily closed space could test the waters for a permanent closure. Concerns raised related to impacts of redirecting traffic on Porter Street to northbound from the intersection with Greville Street. These concerns were generally voiced by local residents who felt they would be inconvenienced in terms of access to their properties, Greville and King Streets – Community Consultation Analysis Report 15 “Remove car parks on one side no matter what is decided” (Resident comment)
  • 16. especially those located on Leggett’s Lane. Residents were particularly concerned when they thought Greville Street could be closed off. Letter/email Two emails received by traders were opposed to permanent closure of Greville Street outside Grattan Gardens, stating that this will effect traffic flow and be hard for customers to access shopping. One trader is in favour of option temporary closure believed this is the better option of the two. Shared street use changes Survey The majority of survey respondents supported all three changes. Temporary closure for designated events was the most supported option (69%/182 respondents) followed by providing more trees, seating and dining (67%/176) and shared car and pedestrian space between Grattan Street and Izett Street (49%/126 respondents. Almost 30% for respondents did not support shared car and pedestrian space between Grattan Street and Izett Street. Information sessions Three residents were in favor of the idea of a shared car and pedestrian space between Grattan Street and Izett Street. Furthermore two residents liked the idea of removing car parks on one side of the road. Two residents were against this idea believing it would limit property access. Shared Street Use and Permanent Street Closure Survey Of the two options, majority of respondents supported providing more trees, seating and dining (requires removal of 10 car spaces) (58%/156 respondents) whereas a small majority of respondents did not support closed to traffic between Grattan Street and the access laneway with a shared street between the laneway and Izett Street (42%/110 respondents). Greville and King Streets – Community Consultation Analysis Report 16
  • 17. This page has been intentionally left blank. Greville and King Streets – Community Consultation Analysis Report 17
  • 18. Greville and King Streets – Community Consultation Analysis Report 18 Survey Results
  • 19. Q1. What respondents like most about Greville and King Streets Currently what do you like most about Greville and King Streets? Number of respondents: 281 of 281 total survey respondents. Four themes were identified and demonstrated in the indicative comments below. Theme 1 Retail/shopping 86/30% respondents said: Greville and King Streets – Community Consultation Analysis Report 19 “Variety of retail shops” “The alternative retail shops” “Quirky shops” Theme 3 Cafes/restaurants 67/24% respondents said: “The cafes and shops. It's a great area to live in” “Small shops and cafes” “Cafes and bars” Theme 2 Atmosphere/ Village feel 71/25% respondents said: “Feels like a little modern village” “The 'small village' atmosphere” “The culture, diversity and atmosphere. Great vibe.” Theme 4 Good Access 29/10% respondents said: “Provides easy access for cars and pedestrians” “Easy access to Prahran station” “King St is an important means of access to Chapel St”
  • 20. Q2. What respondents would improve about Greville and King Streets What would you improve in Greville and King Streets? Number of respondents: 281 of 281 total survey respondents. Four themes were identified and demonstrated in the indicative comments below. Theme 1 Improve traffic flow/one way street 76/30% respondents said: Theme 3 Increase trees and green space 44/17% respondents said: “Improve traffic flow” “Reduce cars and make the whole road paved for pedestrians, change to local traffic only, one-way” “Make it all one way traffic from Chapel Street” Theme 2 Improve pedestrian amenity/widened footpaths 74/29% respondents said: “Wider footpath for walking” “Pedestrian access (footpaths need to be wider)” “Improve pedestrian amenity” “More trees and greenery please” “More trees, the palms are the best”. “Green and open spaces” Theme 4 Increase outdoor dining 14/5% respondents said: “More outdoor dining, improve vibrancy” “Space for sidewalk dining” “Increase outdoor dining /cafes”
  • 21. 62.6% 52.4% 58.1% 7.4% 14.7% 13.3% 28.5% 30.0% 25.9% 1.5% 2.9% 2.6% Between Area 1 and Area 4 - Changing the traffic flow to one-way west bound on GrevilleStreet between Chapel Street and the Prahran Train Station. Area 1 - Changing Porter Street to one- way north bound between Greville Streetand Commercial Road, with two- way access from High Street to Percy Street to maintain residential access. Area 2 - Changing Grattan Street to one- way south bound with car spaces maintained. Support Neutral Don’t support Can’t say Source: Corporate and Community Planning 2015 Figure 1: Question 3 Number of respondents: 273 of 288 69.1% 73.0% 83.2% 36.7% 73.7% 51.6% 12.8% 9.4% 8.4% 23.6% 7.3% 18.3% 15.8% 17.2% 7.0% 36.4% 18.2% 23.1% 2.3% 0.4% 1.5% 3.3% 0.7% 7.0% Area 1 - Creating a shared pedestrian and vehicle zone in front of the entranceto the Prahran train station. Area 2 - Grattan Gardens: Creating a local plaza space, with no kerbs and a paved surface across the street in front of Grattan Gardens. Area 3 - Changing the pedestrian crossings at Izett Street to create less conflict between cars and pedestrians. Area 4 - Removing two of thefour plane trees infront of the Prahran Town Hall to allow for new urban plaza on Chapel Street. Area 4 - In Greville Street, extend the width of the footpath to improve planting, seating and dining. Area 5 - Fully pedestrianised King Street between the round about and Chapel Street, with residential car spaces access maintained to the east Support Neutral Don’t support Can’t say Source: Corporate and Community Planning 2015 Figure 2: Question 4 Number of respondents: 275 of 288 Q3. Traffic changes Do you support the following traffic changes outlined in the proposal? Number of respondents: 273 of 281 total survey respondents. Q4. Proposed changes Do you support the following changes outlined in the proposal? Number of respondents: 275 of 281 total survey respondents.
  • 22. Q5. Prahran Town Hall What would you like to see in front of the Prahran Town Hall (e.g. public art, lighting, more seating) Number of respondents: 230 of 288 total survey respondents. Five themes were identified and demonstrated in the indicative comments below. Theme 1 Increase seating 80/35% respondents said: Theme 3 Better lighting 66/29% respondents said: Theme 5 Less homeless/unfortunate people 14/6% respondents said: “More seating to eat lunch” “More attractive seating” Theme 2 Install art 72/31% respondents said: “Public art including graffiti art” “More lighting and public art” “Better lighting which celebrates the historic buildings” “Lighting on the building” Theme 4 More trees and gardens 22/10% respondents said: “Less homeless/drunk people. Less people asking for money” “Less 'unfortunate' people. It's distracting and undesirable to walk past” “Increase the trees - beautify with plant boxes”
  • 23. “Garden beds with flowers and small scrubs”
  • 24. Q6. Shared Street Use (Allows for one way through traffic) or Shared Street Use and Permanent Street Closure at Grattan Gardens Do you generally support the following? Number of respondents: 264 of 288 total survey respondents. 32.6% 27.7% 15.9% 23.9% Option 1 – Shared Street Use (Allows for one way through traffic) Option 2 – Shared Street Use and Permanent Street Closureat Grattan Gardens Both options Neither option Source: Corporate and Community Planning 2015 Figure 3: Question 6 Number of respondents: 264 of 288
  • 25. 48.8% 66.9% 69.5% 19.8% 10.6% 17.2% 27.1% 21.7% 12.6% 4.3% 0.8% 0.8% Area 2 - Shared car and pedestrian space between Grattan Streetand Izett Street. Area 2 - Providing more trees, seating and dining (requires removal of six car spaces). Area 2 - Temporary closurefor designated events. Support Neutral Don’t support Can’t say Source: Corporate and Community Planning 2015 Figure 4: Question 7 Number of respondents: 263 of 288 40.2% 58.4% 13.0% 6.7% 42.1% 33.7% 4.6% 1.1% Area 2 - Closed to traffic between Grattan Street and the access laneway with a shared street between the laneway and Izett Street. Area 2 - Providing moretrees, seating and dining (requires removal of 10 car spaces). Support Neutral Don’t support Can’t say Source: Corporate and Community Planning 2015 Figure 5: Question 8 Number of respondents: 267 of 288 Q7. Shared street use Do you support the following changes outlined in Option 1 – Shared Street Use Number of respondents: 263 of 288 total survey respondents. Q8. Shared Street Use and Permanent Street Closure Do you support the following changes outlined in Option 2 – Shared Street Use and Permanent Street Closure? Number of respondents: 267 of 288 total survey respondents.
  • 26. 0.5% 57.2% 8.1% 23.9% 6.8% 7.2% 78.4% 1.4%0.0% 25.7% 3.6% 4.1% 1.4% 2.7% 32.0% 0.9% 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Bus Car Cycle Train Tram Taxi Walk Other GrevilleStreet King Street Source: Corporate and Community Planning 2015 Figure 7: Question 10a Number of respondents: 260 of 288 Q9. Why respondents normally visit Greville or King Streets? Why do you normally visit Greville or King Streets? Number of respondents: 267 of 288 total survey respondents. 60.4% 69.4% 18.0% 20.7% 14.0% 33.3% 40.5% 55.4% 16.2% 12.6% 7.2% 10.8% 4.1% 4.1% 5.4% 2.3% 25.7% 3.2% 9.5% 4.5% 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Greville Street King Street Source: Corporate and Community Planning 2015 Figure 6: Question 9a Number of respondents: 267 of 288 Q10. How respondents normally travel to Greville or King Streets Why do you normally visit Greville or King Streets? Number of respondents: 260 of 288 total survey respondents.
  • 27. 52.7% 26.6% 7.2% 4.1% 3.6% 4.1% 17.6% 9.0% 10.4% 5.4% 6.3% 18.0% 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Daily 2-3 times/week Once/ week 2-3 times/ month Once/ month Less than once/ month Greville Street King Street Source: Corporate and Community Planning 2015 Figure 8: Question 10a Number ofrespondents: 260 of288 Q11. How often respondents visit Greville or King Streets How often do you visit Greville or King Streets? Number of respondents: 260 of 288 total survey respondents.
  • 28. This page has been intentionally left blank.
  • 30. Engagement Overview The City of Stonnington has developed a Masterplan proposing widespread improvements to Greville and King Streets. To test these improvements with the community and users of these streets, CoDesign Studio was engaged to deliver three on-street consultation sessions as well as complementary communications and street prototyping activities. Together, these activities have enabled local residents, workers, traders and visitors alike to provide input into the future design outcomes for the Greville and King Street precinct. Consultation sessions These sessions took place on the following dates: • Saturday 18 July outside Prahran Library, 10 – 11am • Saturday 25 July in Grattan Gardens, 10 – 11am • Thursday 30 July on the corner of Greville St and Macquarie St, 8 – 11am The sessions aimed to: • Inform people about the ongoing project to improve Greville Street. • Communicate, in a simple easy to understand way, the improvements being considered. • Gain feedback on key design elements. Complementary prototyping and communications activities Complementing the engagement sessions were a range of signage, communication materials and on-street prototyping to draw attention to the proposed changes and engage the community to gather feedback. These included: • On-street decals promoting the consultation process and indicating the location of pop-up consultation sessions. • On-street stencils indicating the types and locations of proposed changes. • Bin signage provided a summary of the ways to have a say in an eye-catching manner. The results of the consultation sessions have been compiled into the following report, concluding with a set of recommendations for the next phase of the project. 30
  • 31. Summary of findings Overall, people were supportive of improvements proposed for Greville and King Streets and many aspects of the plan were not seen as controversial. Most positive: People responded very positively to having more (carefully selected) street trees and fixing the intersection at Izett Street. Overall, they were also supportive of making Greville Street one-way if this helped to improved safety, including at Izett Street, and created more space for pedestrians, outdoor activities and trees. Concerns: Most of the concerns raised came from residents in the area impacted by the changes to traffic flows, surrounding Porter and Grattan Streets. People registered concerns about the impacts on their ability to get into and out of the area by car. Locals: Most locals were in favour of creating a better pedestrian environment, especially those that do not heavily rely on a motor vehicle for transport. Some of the locals we spoke to have been living in the same area for over 10 years and have seen the area change; they often recited concerns about the decline in Greville Street over the years and their desire to see targeted improvements made to help revitalise the area. Traders: Traders and shop staff could see potential in the proposed changes where they were directly linked to introducing more and new uses of the street. They often acknowledged the difficult trade-off between improving the street environment to make Greville Street a destination and restricting car space and the need for car parking. Bang for the investment buck: Some residents and traders wanted to be sure that the improvements would provide a return for the street and were seeking information linking changes to outcomes, new uses and benefits. Implementation impacts: A number of people – both residents and traders – asked questions and raised concerns about the staging and timing of the implementation, which related to minimising impacts on businesses. King Street: There was less feedback provided about King Street, with many indicating confusion about where this street was located. 31
  • 32. Recommendations Based on the observations of the street, conversations and analysis of community feedback, CoDesign Studio provides the following recommendations for the future implementation of the project: • Most community concerns focus on the impacts of individual or cumulative traffic flow changes. Trials of these proposed changes could assist in seeing if these concerns will be realised. • Many community members and traders felt the shop owners as well as their tenants could play a powerful role in making Greville Street a unique destination. This could be encouraged. • Consider prototyping the proposed closure of King Street to draw attention to this area and signpost the proposed changes. This could also be used to further involve traders and the community with the project. • Consider careful staging of the project. Lead with elements, which will have the greatest impact and time implementation to minimise impacts to businesses. • Link changes with initiatives that ensure new spaces are well used. For example, community programming to activate new shared space. 32
  • 34. Letter 1 This letter was from a trader who was opposed to permanent closure of Greville Street outside Grattan Gardens stating that this will effect traffic flow and be hard for customers to access shopping. But was in favor of temporary closure believing this is the better option of the two. The letter was also in favour of the number of amenity changes outline in the proposal e.g. Increased greenery and landscaping, Improved pavement surfaces and widening of footpaths Letter 2 This letter was opposed to permanent closure of Greville Street but was happy with Porter Street continuing to be one way. Letter 3 This trader was in favour of the idea of widening and improving footpaths down Greville Street. In addition he supported car spaces being removed to make footpaths wider but only if it creates more footpath dinning. 34
  • 35. 35